N O Diagram Explanation Equipment 1 Provided Hammers To Do Dismantle. Hammer
N O Diagram Explanation Equipment 1 Provided Hammers To Do Dismantle. Hammer
N
O
DIAGRAM
EXPLANATION
EQUIPMENT
*Provided
hammers to do
dismantle.
*Hammer
*By using
hammers hits
directly the piece
of scrap wood.
*This ensures that
boards arent
damaged by the
metal surface of
of the hammer.
*Hammer
*Remove the
boards properly.
*formwork has
been remove.
CURING PROCESS
Hydration in concrete begins to take place immediately after the water and cement are mixed. It
is rapid at first, then tapers off as time goes on. Theoretically, if no water ever evaporates,
hydration goes on continuously. Practically, however, all water is lost through evaporation, and
after 28 days, hydration nearly ceases, although some continues for about a year.(John E.
Ball,2004)