Technical documents to be submitted for assessing whether the fit-for-service analyses of storage
tanks is/was performed in compliance with theory of EEMUA 159:
-
Visual inspection of 3 different storage tanks
NDT inspections of 3 different storage tanks covering: Floor scan inspection of bottom UT inspections, using grid line system on bottom plates and indicating where measurements were taken UT inspection of bottom annular plates in critical zone and in areas found susceptible by MFL/SLOFEC measurements UT inspections on tank shell, using grid line system, indicating where thickness measurements were taken UT inspection on tank roof plates, using grid line system and indicating where measurements were taken UT inspections on nozzles in tanks shell and tank roof, indicating where measurements were taken. Settlement measurements using grid line system valid for settlement measurements and method to assess limits for 1) Edge settlements 2) Radial bottom settlements 3) Circumferential differential settlements Calculations of rejection limits of main tank components of 3 different storage tanks, covering: Annular plates of the bottom Normal bottom plates Tank shell plates under three load combinations 1) Hydrostatic pressure + vapour pressure 2) Wind + vacuum 3) Axial distribution of loads from roof (including dead weight + super imposed load) + shell above course plates under consideration 4) Roof plates and roof supporting structure(s) 5) Other main tank components, if required Calculations of next inspection interval of three different tanks.