Professional Documents
Culture Documents
Magnetic Test: Client: Gas Filling Company (GFC) Contractor
Magnetic Test: Client: Gas Filling Company (GFC) Contractor
Pages
Report
Date
Report
No.
Magnetic test
Report
CLIENT
Project Name
Joint
: 22/12/2016
: M047-KAMT-09
:Heavy
Engineering
Equipment (HEESCO)
Contractor
Material /
: A537 C-1 / 44.0 46.0
Thick(mm)
mm & A36 / 8 mm
DRAWING NO.
: N.A
ATTACHMENTS
: N.A
Examined part
: See remarks
Equipment and Product
Procedure
Acc. Criteria
: SM I(1.1) W100
WPS NO.
Method Description
Magnetization
Permanent
Method
Method of
Wet METHOD
Examination
Type of Current N/A
Lighting
Natural
Artificial
Light Meter
N/A
Lighting
NATURAL
intensity
Magnetic Field LONGITUDINAL
Sr.
: 01
Location
Welder
Stamp
Equipment Type
A/C Yoke
Manufacturer
INDIA
Particle Type
Manufacturer
Color
Wet PARTICLE
INDIA
Black
Magnetizing Time
10 SEC
Defects
Evaluation
ACC.
REJ.
Remarks
---------
---------
602 ,601
---------
Plate No. 1
---------
---------
602 ,601
---------
Plate No. 2
---------
---------
602 ,601
---------
Plate No. 3
---------
---------
602 ,601
---------
Plate No. 4
---------
---------
602 ,601
---------
Plate No. 5
---------
---------
602 ,601
---------
Plate No. 6
HEESCO QC
Name
GFC
MTI
TPI
AHMED OMER
Signature
Date
Page|1