1. PLANNING
1.1. Proposing Title (choosing of
project)
1.2. Preparation of Sample
Chapter 1
2. SYSTEM ANALYSIS
2.1. Making DFD & ERD
2.2. Initial Interview
2.3. Outline of Interview
3.
SYSTEM
DESIGN
&
DEVELOPMENT
3.1. Chapter 1
3.1.1. Introduction
3.1.2. Objectives of the Study
3.1.3. Scope and Limitations
3.1.4. Significance of the Study
3.1.5. Definition of Terms
3.2. Chapter 2
3.2.1. Related Literature
3.2.2. Related Studies
3.3. Chapter 3
3.3.1. Planning and Selection
3.3.2. Analysis
3.3.3. Design
3.3.4.
Implementation
and
Operation
3.4 Program
3.4.1. Screen Design
3.4.2. Coding
3.4.3. initial testing
3.4.4. Debugging
3.4.5. Final testing
3.5. final paper
JANUARY
1 2 3 4
Gantt Chart
FEBRUARY
1 2 3 4
MARCH
1 2 3
Assigned
4