Professional Documents
Culture Documents
Uniclass2 Entities by Form Table Non Tabular Final v4
Uniclass2 Entities by Form Table Non Tabular Final v4
Uniclass2 Entities by Form Table Non Tabular Final v4
15 BUILDINGS
15_20 Floating buildings
15_50 Mobile and temporary buildings
15_50_20 Demountable buildings
15_50_50 Mobile buildings
15_50_80 Temporary buildings
20 CABLES
20_10 Buried
20_70 Suspended
25 CONTAINING STRUCTURES
25_30 Gasholders
25_30_65 Rigid gasholders
25_30_75 Telescopic gasholders
25_50 Ponds
25_55 Reservoirs
25_60 Silos
25_75 Tanks
25_75_20 Enclosed tanks
25_75_50 Open tanks
30 DIVIDING STRUCTURES
30_30 Dividing walls
30_35 Dividing fences
35 GROUND CONTOURING
60_45 Piers
60_40_30 Floating piers, anchored
60_40_35 Floating piers, moored to land
60_40_50 Open piled piers
60_40_55 Part solid part open piled piers
60_40_60 Piers floating one end
60_45_65 Solid piers
60_60 Platforms
60_60_20 Double sided platforms
60_60_65 Single sided platforms
60_50 Quays
60_50_50 Open piled quays
60_50_55 Sheet pile quays
60_50_65 Solid quays
50 OPEN CONDUITS
50_20 Canals
50_25 Channels
50_30 Ditches
50_70 Trenches
45 PAVEMENTS
40_10 Area pavements
40_50 Linear pavements
40_50_10 Single carriageway
40_50_40 Dual carriageway
40_50_70 Grade separated carriageway
55_60 Pipelines
55_60_70 Supported
55_60_90 Underground
75 RETAINING STRUCTURES
75_25 Dams
75_25_05 Arch dams
75_25_10 Buttress dams
75_25_20 Embankment dams
75_25_30 Gravity arch dams
75_25_35 Gravity dams
95 WELLS
95_10 Bored wells
95_20 Driven wells
95_25 Dug wells