Design Of Buttress: fy ρ fy f ' c d
Design Of Buttress: fy ρ fy f ' c d
2
Mu=fcb d (1-0.59)
min =
1.4
fy
fy
= f 'c
1.4
414
= 0.0034
0.0034( 414)
27.6
= 0.0507
2
d2
(1000)
1643.6
= 0.90(27.6)(1500) )( 0.0507)1-0.59(0.0507))
d
+75
2
b=
1030
+75
2
= 550 mm
CHECK SHEAR:
V=P
V = 228.28 KN
V=
V
bd
228.28
0.85(550)(950)
Steel Area:
2
As = bd = 0.0034(1500)( 500) = 2536.2 mm
Spacing, S =
2
2
( 28 ) = 615.75 mm
615.75 (1000)
2536.2
DESIGN OF BASE
Height = 7.8 m.
Thickness of buttress = 1.5 m
B= 3.5 m
C= 1.03 m
Loadings:
W1 = (Unit weight of concrete)(b)(t) (h)
W1 = (23.544)(0.55)(1.5)(7.8) = 151.51 KN
W2 = (23.544)(0.95-0.55)(1.5)(7.8) = 110.19 KN
W3 = (15.3)(3.5-0.95)(0.60)(2.5) = 58.523 KN
W4 = (23.544)(3.5)(1.03)(2.5) = 212.19 KN
RIGHTING MOMENT: RM
b
B
RM = W1(
2
db
) + W2( Bd 1
3
0.55
RM = 488.61(3.5- 2
)+
) ) + W3(
Bd
2
0.950.55
1
110.19(3.5-0.95
) + W4(
)) + 58.523 (
3.50.95
)
2
+ 212.19(
3.5
2
RM = 1176 KN.m
OVERTURNING MOMEMT: OM
OM = P(7.8/3)
OM = 228.28(7.8+1.03/2) = 671.9 KN.m
Factor of Safety:
RM
OM
F.S. =
1176
671.9
Temperature bars:
Stem:
Horizontal steel = 0.0025 (vertical x ave. section of stem)
Ast = 0.0025 (7800)(
550+ 950
2
) = 14,625
mm2
B
2 )
For 12 mm bars, Ab =
Spacing =
2
2
( 12 ) = 113.1 mm
113.1 (7800)
9750
314.16 (7800)
4875
550+ 950
2
) = 1687.50
mm2
For 20 mm bars
Spacing =
314.16 (1500)
1687.50
314.16 (3500)
5407.5
) = 5407.5
mm2
= 203.24 mm say200 mm