Shop Shut 48 Hrs
Shop Shut 48 Hrs
SL
NO.
BAY
LOCATIO
N
Defect
Rail joint
failed, bulb
broken &
level
difference.
CHG
Between
LD 1& 2
DSL side
CHG
NDSL side
above LD
1, 2 & 3
3*
SLAG
NDSL
above pit2
Rail bulb
expanded
DF
DSL coln.
125-127
desperation
JOB
TIME
REQUIR
ED
START
OF
JOB
DSL
POWER
S/D
REQUIR
ED
Responsib
ility
REMARKS
36 mts. Rail
changing
36 hrs
DAY1&2
Whole
bay
Inspection of
rail & rail
dressing if
required
8 hrs
DAY-2
NR
12 mts. Rail
changing
12 hrs
DAY-2
or
05/01/
17
NR
Rail dressing
4 hrs
DAY-2
Whole
bay
DF
DSL coln.
94-98
Longitudina
l rail crack
12 mts. Rail
changing
12 hrs
DAY-2
FH
Between
m/c 3 & 4
Rail joint
broken and
gap
Small piece
rail and fish
plate fixing
8 hrs
DAY-1
LM
DSL/NDSL
Bolts
12 hrs
DAY-2
Rail clamp
Coln. 80
to 113
KVR& JVN
Whole
side
8
MQ
DSL/NDSL
side
QR
DSL/NDSL
side
loose
/missing
Bolts
loose
/missing
Bolts
loose
/missing
bolts
tightening
Rail clamp
bolts
tightening
Rail clamp
bolts
tightening
bay
12 hrs
DAY-1
Whole
bay
12 hrs
DAY-1
Whole
bay
Note- point no. 3 can be planned on 5/01/17 with single BF & LD-1 down
N K MARKANDE
AGM (M)/CRANES (M)