Professional Documents
Culture Documents
Project
Project
Project
1. Conduct system audit of FDD Lab in Centre for Building Science (CBS). You
may need to do interview or questionnaire for technical details.
2. It is proposed to retrofit the existing FDD lab to conduct experiments related
to radiant cubicle and personal environment control. You have to analyse and
design the control system for Hot/Cold wells to conduct these experiments.
System architecture in hardware and software must be designed. Develop a
mathematical description of the system and may use the Matlab in designing
and tuning the control system.
3. Write a report to summarize your work.
Important:
1. Make sure that the project work that you submit is your own work. Do not
copy any part from any source including your friends, seniors or the internet.
Any breach of this could result in serious action including an F grade in the
course.
2. Your grade will depend on the correctness of design. In addition, due
consideration will be given to the clarity and details of your report.
3. Clearly demarcate individual contributions.
Groups:
Groups (5)
Group members
Group A
Group B
Group C
Group D
Group E
User
count
3
2
2
2
2