Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Technical deviation for following jobs are pending:

Technical deviation for use of Tikikote in place of foster for vapour barrier material is
pending from EIL side.
Technical deviation in proper format along with financial implication is pending for roller
support. Present roller support is not as per drawing. This matter has been informed to M/s
Petron.
Technical deviation for use of Puff in working temperature below -120 deg C as per EIL
specification no 6-44-0003 clause 3.2 details specification is pending from EIL side.

You might also like