IREF Project Report
IREF Project Report
Of
Ultra Mega Power Projects
Submitted By
Sanyam Aggarwal (10FN-100)
Srikanth Konduri (10FN-109)
Vaibhav Chaudhary (10FN-116)
Acknowledgement
We wish to express my sincere gratitude to Dr. G.C Tripathi, Professor at IMT Ghaziabad for
providing us an opportunity under his able guidance and for reposing confidence in us and
guiding us. Without his expert opinion, supervision and noble guidance this project would not
have been complete.
Introduction
Development of Ultra Mega Power Projects (UMPPs) has been identified as a thrust area.
These are very large sized projects, approximately 4000 MW each involving an estimated
investment of about Rs. 16,000 crore. These projects will meet the power needs of a number
of States/ distribution companies located in these States, and are being developed on a Build,
Own, and Operate (BOO) basis. Identification of project developer for such a projects are
done on the basis of tariff based competitive bidding. The Power Finance Corporation (PFC),
a PSU under the Ministry of Power, has been identified as the nodal agency for this initiative.
The table shows the location, state, capacity and project developer for a particular UMPP
From the above mentioned Sasan, Tilaiya, Mundhra and Krishnapatnam were awarded in the
first round of bidding. Mundhra recently became the first UMPP to commission power in
India
Partners in Development
The major partners and stakeholders in development of the project are as follows :
1.
2.
3.
4.
5.
6.
Ministry Of Power
Central Electricity Authority
Power Finance Corporation
States falling under Indian Union
Shell Companies or SPVs
Project Developers
All of the above have work together in order to make these projects successful
Inspite of best of intentions and active participation by the private sector UMPPs have run
into lots of problems. The problems that are generally encountered are
1.
2.
3.
4.
5.
6.
All the above challenges together or in isolation can hinder the progress of the project and
hence can come in the way of meeting the targets of such projects. Some of the currently
awarded UMPPs have come under scanner due to one of the above problems. We discuss the
details of the problems in this section
Now Reliance wants to increase the tariff at which power was supposed to be
supplied and pass on the hike to consumers
But while deciding on the Power Purchase Agreement (PPA), increase in fuel
prices was excluded from force majeure provisions. Also non-natural force
majeure events specified doesnt include actions by foreign government
According to government, it cant change power retrospectively as they were
fixed by competitive bidding
3.1.2 Condition of soil
Soil condition is another problem at Krishnapatnam. Even after going 75 metres down,
engineers found marine sand, which is not be a good sign for laying foundation. It has to be
filled with layers, due to which the cost would go up significantly
Conclusion
The above report gives a brief idea about the status of UMPPs in India. Some of the
advantages and disadvantages of UMPPs are discussed next
4.1
Advantages
Huge power generation capability for power starved nation
Reduces the burden on government due to private sector participation
Use of supercritical technology permit daily start up/shut down facilities along
with faster starting time and load changes leading to efficient power generation
Economical power generation for consumers and industry
4.2 Disadvantages
Land acquisition, environment and forest clearances, rehabilitation of displaced
discourage private partnerships
Heavy water use could cause severe water scarcity and water pollution and
adversely affect the local environment
Greenhouse gas emissions to increase substantially
UMPPs if implemented successfully can be pivotal in changing the face of India. Apart from
use of power generated by UMPPs for industrial purposes, power can also be used for
agricultural and domestic purposes. This will lead to a tremendous increase in productivity of
different sectors of India.
With the awarding of four projects, the UMPP program had a good start in India but some
recent developments have made this initiative a bit uncertain. With many more UMPPs down
the line challenges still exist in this field. Strong political will along with responsible private
sector participation is required to make this program a success
References
1. http://www.wikipedia.org
2. http://www.indianpowermarket.com/
3. http://www.indiainfoline.com/
4. Business Line
5. India Infrastructure