PQ Fire Stopper Surabaya
PQ Fire Stopper Surabaya
Surabaya
No.
A
A.1
D
D.1
D.2
D.3
Description
Brand / Part No. Qty
Lama Pengerjaan Selama 45 Hari
Labour Cost
- Supervisi
1
- Helper
7
Tools
1
- Obeng kembang
- Cutter
- Meteran
- Lampu Sorot
- Tangga
- Scafolding / Stagger @4set
- Mesin Bor Beton
- Kabel Roll
Consumable
1
- Kape
- Majun
- Kuas Panjang Bengkok 2"
- Plastik Sampah
- Ember
- Plastik Beton
- Kuas Pendek 1"
- Mata Bor Beton 10"
- Fisher 10"
- Sekrup Gipsum 10" @10000 ea
- Kawat nyamuk (alumunium)
Other
Biaya Operasional
HSE Cost
- Masker
- Sarung Tangan Kain
- Sarung Tangan Karet
- Safety Glasses
- Ear Plug
- Safety Shoes
- Helm Biru
Mobilisasi dan Demobilisasi
GRAND TOTAL
1
1
Unit Price(IDR)
Rp
Org
Org
Lot
Rp
7,981,098
Rp
7,981,098
Lot
Rp
16,548,108
Rp
16,548,108
Lot
Lot
Rp
Rp
7,408,933
2,340,000
Rp
Rp
Rp
29,312,505
7,408,933
2,340,000
Lot
Rp
19,563,572
Rp
19,563,572
Jamsostek
PPN 10%
Rp
Rp
Rp
102,492,000
244,735
10,249,200
Rp
112,985,935
Misal Kontrak 7 M
0 - 100 Jt
100 - 500 Jt
500 jt 1 M
15M
Sisanya 2 M
720,019,500
0 - 100 Jt
100 - 500 Jt
500 jt 1 M
405,454,495
0 - 100 Jt
100 - 500 Jt
240,000
760,000
750,000
4,800,000
2,000,000
8,550,000
240,000
760,000
330,029
1,330,029
240,000
580,364
820,364
102,492,000.00
0 - 100 jt
0.24% x 100.000.000
2,492,000.00
4,734.80
240,000
4,734.80
Rp 244,734.80