SITE ID:
2105
V1-en
NSN Networks
1 (19)
1.
1.1
Site Configuration
BTS TYPE
BTS
INSTALLATION
Type
BTS
INSTALLATION
Room
Stack type
CONFIGURATION
AND
RF OUTPUT
POWER
3
Wall Mounted
Shelter /
container
+ 3 + 2
20 W
Pole Mounted
40 W
Outdoor
1.2
Site Type:
TYPE
REMARKS
SDH HUB
PDH HUB
PDH LOOP
SPUR
V1-en
NSN Networks
2 (19)
1.3
Transmission
1.3.1
Transmission Media
TYPE
STM 1
E1:
120 ohm
75 ohm
FLEXBUS TYPE
REMARKS
SDH
PDH
Flexihopper
1.4
SYSTEM DATA
Tap to Existing
Rectifier
Rectifier
Rectifier
Rectifier
Rectifier
1:
2:
3:
4:
5:
Install New
Rectifier
Rectifier
Rectifier
Rectifier
Rectifier
6:
7:
8:
9:
10:
Available Breaker:
V1-en
NSN Networks
3 (19)
BATTERIES
ITEM
DETAILS
Make/ Type
NA
Battery bank AH
NA
No of battery Banks
NA
NA
NA
NA
Battery Bank 1
Cell
Cell
Cell
Cell
Cell
Cell
Cell
Cell
1=
2=
3=
4=
5=
6=
7=
8=2
Cell
Cell
Cell
Cell
Cell
Cell
Cell
Cell
9=
10=
11=
12=
13=
14=
15=
16=
Cell
Cell
Cell
Cell
Cell
Cell
Cell
Cell
17=
18=
19=
20=
21=
22=
23=
24=
V1-en
Cell 9=
Cell 10=
Cell 11=
Cell 12=
Cell 13=
Cell 14=
Cell 15=
Cell 16=
Cell 17=
Cell 18=
Cell 19=
Cell 20=
Cell 21=
Cell 22=
Cell 23=
Cell 24=
NSN Networks
4 (19)
2.
2.1
2.1.1
Antenna Configuration
SECTOR 1
Antenna Type
Main: 932DG
Serial Number
Main:
08ASZP4323444
SECTOR 2
SECTOR 3
932DG
932DG
08ASZP4497878
08ASZP399053
0
Direction
120
240
Mechanical Tilt
Electrical Tilt
Mounting Height
SRC in use
30m
30m
SECTOR 1/2
30m
SECTOR 2/2
SECTOR 3/2
Antenna Type
Main:
Serial Number
Main:
Direction
Mechanical Tilt
Electrical Tilt
Mounting Height
2.1.2
Rx1Div
Line Marked
Feeder Cable Type
CO AXIAL 7 / 8 "
7/8
"
2pCS
2pcs
Yes/No
Yes/No
NSN Networks
3m
3m
40m
m
5 (19)
MHA Antenna
SECTOR 1
Tx2/Rx2
Rx2Div
Line Marked
Feeder Cable Type
"
"
pcs
pcs
Yes/No
Yes/No
V1-en
MHA Antenna
NSN Networks
6 (19)
SECTOR 2
Tx1/Rx1
Rx1Div
Line Marked
Feeder Cable Type
COAXIAL 7/8
"
COAXIAL 7/8
"
2pcs
2pcs
Yes/No
Yes/No
3m
3m
MHA Antenna
SECTOR 2
Tx2/Rx2
Rx2Div
Line Marked
Feeder Cable Type
COAXIAL 7/8
"
COAXIAL 7/8
/
"
2pcs
2pcs
Yes/No
Yes/No
V1-en
2m
2m
MHA Antenna
NSN Networks
7 (19)
SECTOR 3
Tx1/Rx1
Rx1Div
Line Marked
Feeder Cable Type
"
pcs
pcs
Yes/No
Yes/No
"
MHA Antenna
SECTOR 3
Tx2/Rx2
Rx2Div
Line Marked
Feeder Cable Type
"
"
pcs
pcs
Yes/No
Yes/No
V1-en
MHA Antenna
NSN Networks
8 (19)
2.1.2.1.1.1
1
2
3
4
5
6
7
8
OK
OK
NOT
YES
YES
YES
YES
YES
YES
Remarks:-
____ , ____V
___________dBm
___________dBm
V1-en
____ , ____V
___________dBm
___________dBm
RX
NSN Networks
9 (19)
____ , ____V
___________dBm
___________dBm
___________dBm
___________dBm
RX
3.
EQUIPMENT IMPLEMENTATION
3.1
Site Information
3.1.1
TRS Information
ITEM
V1-en
____ , ____V
VALUE
NSN Networks
10 (19)
3.1.2
BTS Information
ITEM
3.1.3
VALUE
SECTOR 1
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
Tx1/Rx1
RxDiv1
Tx2/Rx2
RxDiv2
V1-en
NSN Networks
11 (19)
3.2
3.2.1
TRX2
TRX3
TRX4
TRX5
TRX6
TRX7
TRX8
TRX9
TRX10
TRX11
TRX12
SECTOR 1
SECTOR 2
SECTOR 3
3.2.2
Master Clock Value (Automatic adjust for FLEXI BTS. Manual adjustment is not
applicable)
Particulars
Value
DAC
3.2.3
Commissioning Files
All next files have to be saved in SiteID_Implementation.zip file if applicable.
COMMISSIONING FILES
V1-en
FILE DATA
File Name
SiteID_BarCode_yyyymmdd.csv
SiteID_TRSconfig_yyyymmdd.txt
SiteID_TRSparam_yyyymmdd.xml
SiteID_TRS_SW_yyyymmdd.xml
SiteID_BTSparam_yyyymmdd.xml
SiteID_BTScomreport_yyyymmdd.txt
SiteID_BTS_HW_yyyymmdd.txt
SiteID_BTS_SW_yyyymmdd.txt
NSN Networks
12 (19)
3.2.4
3.2.5
TEST
INITIALS / DATE
COMMENTS
Iub Test
External Alarm Tests*
(Details Shown Below)
BTS Restart
3.2.6
Alarm
No.
OK/NO
K
RECTIFIER MODULE
FAILURE
SMOKE DETECTED IN
SHELTER
LOW FUEL
10
DG ON LOAD
11
DG ON NO LOAD
V1-en
NSN Networks
Remarks
13 (19)
12
DG FAILS TO START
3.2.7
MANUFACTURER
MODEL
3.3
BTS Integration
3.3.1
Scrambling Codes
ITEM
Scrambling Code for Cell
1
Scrambling Code for Cell
2
Scrambling Code for Cell
3
3.3.2
SERIAL NUMBER
DATE OF LAST
CALIBRATION
VALUE
MODEL
3.3.3
CELL 1
SERIAL
NUMBER
PHONE NUMBER
SIM NUMBER
NA
INITIALS / DATE
COMMENTS
CELL 1
CELL 2
CELL 3
3.3.4
CELL 1
NA
INITIALS / DATE
COMMENTS
CELL 1
V1-en
NSN Networks
14 (19)
CELL 2
CELL 3
3.3.5
CELL
OK
NA
INITIALS / DATE
COMMENTS
Cell 1 Cell 2
Cell 1 Cell 3
Cell 2 Cell 1
Cell 2 Cell 3
Cell 3 Cell 1
Cell 3 Cell 2
4.
4.1
4.1.1
FILE NAME
V1-en
NSN Networks
15 (19)
DOCUMENT NAME
EDGE FLEXI BTS Site Folder
EDGE FLEXI BTS Implementation Check List
EDGE FLEXI BTS Packing Lists
Power System Installation and Commissioning (if new is installed)
Factory test report (included in the HW delivery)
SiteID Implementation.zip file in CD-ROM
V1-en
NSN Networks
16 (19)
CERTIFICATE OF ACCOMPLISHMENT
PARTNER NSN
Site acceptance certificate for telecom implementation works
PO NUMBER:
SITE ADDRESS:
SITE ID:
SITE NAME:
STAGE
COMPLETE (Initials/Signature)
PARTNER REPRESENTATIVE:
____ / ________
V1-en
NSN Networks
17 (19)
Data
Site ID
Site Name
Installed by / Date
Commissioned by / Date
Integrated by / Date
PUNCH LIST
Select the correct check number and point to check in Flexi BTS Implementation Check
List. Type the description of point to check and your comments for failure description.
When completed, type what was done.
Chec
k no.
Defect/Failure Description
Owner
Raised by
/date
Completed by /
date
V1-en
NSN Networks
18 (19)
CERTIFICATE OF ACCOMPLISHMENT
(COA)
AIRCEL NSN
Site acceptance certificate for telecom implementation works
SITE ADDRESS:
SITE ID:
SITE NAME:
STAGE
COMPLETE (Initials/Signature)
V1-en
NSN Networks
19 (19)