1.

SITE SPECIFIC INSTALLATION DATA

1.1

Site Configuration

BTS TYPE

BTS
INSTALLATION
Type

BTS
INSTALLATION
Room

EDGE Flexi BTS

Stack type

CONFIGURATION
AND
RF OUTPUT
POWER
3

Wall Mounted

Shelter /
container

+ 3 + 2

20 W

Pole Mounted

40 W

Outdoor

Note: * RF output power is one carriers output RF power

1.2

Site Type:
TYPE

REMARKS

SDH HUB

PDH HUB
PDH LOOP
SPUR

V1-en

NSN Networks

2 (19)

1.3

Transmission

1.3.1

Transmission Media

TYPE

REMARKS (Capacity, Number of E1s)

STM 1
E1:
120 ohm

75 ohm

FLEXBUS TYPE

REMARKS

SDH
PDH
Flexihopper
1.4

Power System Configuration

SYSTEM DATA

Power system Type


Power System Serial No.
PC Serial No.
Rectifier Module type
Rectifier Serial No.

Tap to Existing

Rectifier
Rectifier
Rectifier
Rectifier
Rectifier

1:
2:
3:
4:
5:

Install New

Rectifier
Rectifier
Rectifier
Rectifier
Rectifier

6:
7:
8:
9:
10:

Available Breaker:

V1-en

NSN Networks

3 (19)

BATTERIES

ITEM

DETAILS

Make/ Type

NA

Battery bank AH

NA

No of battery Banks

NA

Number of Battery Strings

NA

Initial Batt. Terminal Voltage

NA

Terminal Voltage after charging

NA

Terminal Voltage after dischargingcharging

3.5.2 Initial Battery Cell voltages,

Battery Bank 1
Cell
Cell
Cell
Cell
Cell
Cell
Cell
Cell

1=
2=
3=
4=
5=
6=
7=
8=2

Cell
Cell
Cell
Cell
Cell
Cell
Cell
Cell

9=
10=
11=
12=
13=
14=
15=
16=

Cell
Cell
Cell
Cell
Cell
Cell
Cell
Cell

17=
18=
19=
20=
21=
22=
23=
24=

Battery Bank 2 (if applicable)


Cell 1=
Cell 2=
Cell 3=
Cell 4=
Cell 5=
Cell 6=
Cell 7=
Cell 8=

V1-en

Cell 9=
Cell 10=
Cell 11=
Cell 12=
Cell 13=
Cell 14=
Cell 15=
Cell 16=

Cell 17=
Cell 18=
Cell 19=
Cell 20=
Cell 21=
Cell 22=
Cell 23=
Cell 24=

NSN Networks

4 (19)

2.

ANTENNA AND FEEDER SYSTEM INSTALLATION & COMMISSIONING

2.1

Antenna and Feeder System General Information

2.1.1

Antenna Configuration
SECTOR 1
Antenna Type
Main: 932DG
Serial Number
Main:

08ASZP4323444

SECTOR 2

SECTOR 3

932DG

932DG

08ASZP4497878

08ASZP399053
0

Direction

120

240

Mechanical Tilt

Electrical Tilt

Mounting Height
SRC in use

30m

30m

SECTOR 1/2

30m

SECTOR 2/2

SECTOR 3/2

Antenna Type
Main:
Serial Number
Main:
Direction

Mechanical Tilt

Electrical Tilt

Mounting Height
2.1.2

Feeder System Configuration


SECTOR 1
Tx1/Rx1

Rx1Div

Line Marked
Feeder Cable Type

CO AXIAL 7 / 8 "

Installed Feeder Length


Number of Grounding Kits
EMP Installed

7/8

"

2pCS

2pcs

Yes/No

Yes/No

Jumper Cable Length


BTS Feeder Cable
Feeder Cable Antenna or MHA
V1-en

NSN Networks

3m

3m

40m

m
5 (19)

MHA Antenna

SECTOR 1
Tx2/Rx2

Rx2Div

Line Marked
Feeder Cable Type

Installed Feeder Length


Number of Grounding Kits
EMP Installed

"

"

pcs

pcs

Yes/No

Yes/No

Jumper Cable Length

V1-en

BTS Feeder Cable

Feeder Cable Antenna or MHA

MHA Antenna

NSN Networks

6 (19)

SECTOR 2
Tx1/Rx1

Rx1Div

Line Marked
Feeder Cable Type

COAXIAL 7/8

Installed Feeder Length


Number of Grounding Kits
EMP Installed

"

COAXIAL 7/8

"

2pcs

2pcs

Yes/No

Yes/No

Jumper Cable Length


BTS Feeder Cable

3m

3m

Feeder Cable Antenna or MHA

MHA Antenna

SECTOR 2
Tx2/Rx2

Rx2Div

Line Marked
Feeder Cable Type

COAXIAL 7/8

Installed Feeder Length


Number of Grounding Kits
EMP Installed

"

COAXIAL 7/8

/
"

2pcs

2pcs

Yes/No

Yes/No

Jumper Cable Length


BTS Feeder Cable

V1-en

2m

2m

Feeder Cable Antenna or MHA

MHA Antenna

NSN Networks

7 (19)

SECTOR 3
Tx1/Rx1

Rx1Div

Line Marked
Feeder Cable Type

Installed Feeder Length

"

pcs

pcs

Yes/No

Yes/No

Number of Grounding Kits


EMP Installed

"

Jumper Cable Length


BTS Feeder Cable

Feeder Cable Antenna or MHA

MHA Antenna

SECTOR 3
Tx2/Rx2

Rx2Div

Line Marked
Feeder Cable Type

Installed Feeder Length


Number of Grounding Kits
EMP Installed

"

"

pcs

pcs

Yes/No

Yes/No

Jumper Cable Length

V1-en

BTS Feeder Cable

Feeder Cable Antenna or MHA

MHA Antenna

NSN Networks

8 (19)

2.1.2.1.1.1

Installation Acceptance Test for PDH


Particulars

1
2
3
4
5
6
7
8

OK
OK

Visual inspection to confirm installation done like shown in the


documentation (antenna height, direction, polarisation)
OU is grounded
Labels are mounted to the IU-OU cables (Cable numbers)
Connectors at IU and BTS are tightened properly
IU is installed correctly Hardware conformity as per BOM
All necessary 2 Mbit/s Cables are installed (not applicable for
FIFA)
Flexbus cable connected to IU is labelled with far end Site ID
Cables to DDF are labelled (not applicable for FIFA)

NOT

YES
YES

YES

YES

YES
YES

Remarks:-

Commissioning Acceptance at Location A

Single terminal / main Redundant unit


unit from redundant
pair
Measured AGC voltage
Expected RX level

____ , ____V
___________dBm

Measured RX level (deviation


of +/- 4 dBm)

___________dBm

Verify the frequency as per site TX


data
Verify equipped E1 capacity as
per site data
Verify Tx Power Settings as per
site data

V1-en

____ , ____V
___________dBm
___________dBm

RX

NSN Networks

9 (19)

Commissioning Acceptance at Location B


Single terminal / main Redundant unit
unit from redundant
pair
Measured AGC voltage
Expected RX level

____ , ____V
___________dBm

Measured RX level (deviation


of +/- 4 dBm)

___________dBm

Verify the frequency as per site TX


data
Verify equipped E1 capacity as
per site data
Verify equipped E1 capacity as
per site data

___________dBm
___________dBm
RX

3.

EQUIPMENT IMPLEMENTATION

3.1

Site Information

3.1.1

TRS Information

ITEM

V1-en

____ , ____V

VALUE

NSN Networks

10 (19)

3.1.2

BTS Information

ITEM

3.1.3

VALUE

Antenna and Feeder System Commissioning Information

SECTOR 1

Tx1/Rx1

RxDiv1

Tx2/Rx2

RxDiv2

Tx1/Rx1

RxDiv1

Tx2/Rx2

RxDiv2

Tx1/Rx1

RxDiv1

Tx2/Rx2

RxDiv2

Return Loss (max)


VSWR
Feeder Line Length
SECTOR 2
Return Loss (max)
VSWR
Feeder Line Length
SECTOR 3
Return Loss (max)
VSWR
Feeder Line Length

V1-en

NSN Networks

11 (19)

3.2

EDGE FLEXI BTS COMMISSIONING

3.2.1

TRX Power Outputs


TRX1

TRX2

TRX3

TRX4

TRX5

TRX6

TRX7

TRX8

TRX9

TRX10

TRX11

TRX12

SECTOR 1

SECTOR 2

SECTOR 3

3.2.2
Master Clock Value (Automatic adjust for FLEXI BTS. Manual adjustment is not
applicable)
Particulars

Value

DAC

3.2.3

Commissioning Files
All next files have to be saved in SiteID_Implementation.zip file if applicable.

COMMISSIONING FILES

V1-en

FILE DATA

File Name

Equipment Bar Code readings

SiteID_BarCode_yyyymmdd.csv

TRS Configuration (txt)

SiteID_TRSconfig_yyyymmdd.txt

TRS parameters (xml)

SiteID_TRSparam_yyyymmdd.xml

TRS SW version (xml)


FlexBus Commissioning Report
(txt)
FlexBus parameters (xml)

SiteID_TRS_SW_yyyymmdd.xml

BTS parameters (xml)

SiteID_BTSparam_yyyymmdd.xml

BTS Commissioning Report (txt)

SiteID_BTScomreport_yyyymmdd.txt

BTS HW Report (txt)

SiteID_BTS_HW_yyyymmdd.txt

BTS SW Report (txt)

SiteID_BTS_SW_yyyymmdd.txt

SiteID _FBcomreport _yymmdd.txt


SiteID_FBparam_yymmdd.xml

NSN Networks

12 (19)

3.2.4

HW Information and BTS tests


TRS units product codes and serial numbers are added in BTS HW Report file
BTS dummy units and cabinet parts product codes and serial numbers are
added in BTS HW Report file
BTS EDGE Loop Test results included in Commissioning Report.txt file
BTS EDGE Transmitter Output Power Level Test results included in Commissioning
Report.txt file

3.2.5

Remote Access Test

TEST

INITIALS / DATE

COMMENTS

Iub Test
External Alarm Tests*
(Details Shown Below)
BTS Restart
3.2.6
Alarm
No.

External Alarm Details


Alarm Details

OK/NO
K

RECTIFIER MAINS FAILURE

RECTIFIER MODULE
FAILURE

RECTIFIER MAJOR FAULT

RECTIFIER MINOR FAULT

HIGH ROOM TEMPERATURE

SHELTER DOOR OPEN

SMOKE DETECTED IN
SHELTER

AIR CONDITION FAILED

LOW FUEL

10

DG ON LOAD

11

DG ON NO LOAD

V1-en

NSN Networks

Remarks

13 (19)

12

DG FAILS TO START

3.2.7

Antenna Line (Site Master) and Output RF Power Measurement Equipments

MANUFACTURER

MODEL

3.3

BTS Integration

3.3.1

Scrambling Codes

ITEM
Scrambling Code for Cell
1
Scrambling Code for Cell
2
Scrambling Code for Cell
3
3.3.2

SERIAL NUMBER

DATE OF LAST
CALIBRATION

VALUE

Test Handset Details


NOTE: Fill the information of all GSM handsets used for test calls

MODEL

3.3.3
CELL 1

SERIAL
NUMBER

PHONE NUMBER

SIM NUMBER

Voice Call (MOC Call) Success


OK

NA

INITIALS / DATE

COMMENTS

CELL 1
CELL 2
CELL 3
3.3.4
CELL 1

Voice Call (MTC Call) Success


OK

NA

INITIALS / DATE

COMMENTS

CELL 1
V1-en

NSN Networks

14 (19)

CELL 2
CELL 3

3.3.5

Softer Handover Success

CELL

OK

NA

INITIALS / DATE

COMMENTS

Cell 1 Cell 2
Cell 1 Cell 3
Cell 2 Cell 1
Cell 2 Cell 3
Cell 3 Cell 1
Cell 3 Cell 2

4.

SITE ACCEPTANCE DOCUMENTS

4.1

Summary of Documents Enclosed

4.1.1

EDGE FLEXI BTS Site Documents inside SiteID_Implementation.zip file.


The Next files are saved in SiteID_Implementation.zip file. The file is saved in
CD-Rom.

SITE IMPLEMENTATION ZIP FILE


FILE DATA

FILE NAME

Signed NSN Site Acceptance


Certificate (Scanned)
Signed Partner NSN Site
Acceptance Certificate
(Scanned)
Signed page of EDGE Flexi BTS
Implementation Check List
(Scanned)
Complete EDGE BTS Site Folder
Commissioning files
Site Photos
DOC-EDGE BTS Punch List
Power System Data

V1-en

NSN Networks

15 (19)

Transmission System Data


As-build Drawings
4.1.2

EDGE FLEXI BTS Site Folder and Attached Documents

SITE FOLDER AND ATTACHED DOCUMENTS

DOCUMENT NAME
EDGE FLEXI BTS Site Folder
EDGE FLEXI BTS Implementation Check List
EDGE FLEXI BTS Packing Lists
Power System Installation and Commissioning (if new is installed)
Factory test report (included in the HW delivery)
SiteID Implementation.zip file in CD-ROM

V1-en

NSN Networks

16 (19)

CERTIFICATE OF ACCOMPLISHMENT
PARTNER NSN
Site acceptance certificate for telecom implementation works
PO NUMBER:

SITE ADDRESS:

SITE ID:
SITE NAME:

STAGE

COMPLETE (Initials/Signature)

EDGE FLEXI BTS Site Installation


EDGE FLEXI BTS Site Commissioning
EDGE FLEXI BTS Site Integration
EDGE FLEXI BTS Site Implementation Zip File
Site Folder and Attached Documents
Partner states that the whole of supplies detailed above have been inspected, implemented, tested
and unless otherwise stated conform to the specified requirements in the contract or order identified
above.

PARTNER REPRESENTATIVE:
____ / ________

______________________________________________ DATE: ____ /


(

NSN REPRESENTATIVE: _______________________________________________ DATE: ____ / ____ / _______


(
)

V1-en

NSN Networks

17 (19)

EDGE FLEXI BTS SITE PUNCH LIST


AIRCEL NSN
SITE DATA
Item

Data

Site ID
Site Name
Installed by / Date
Commissioned by / Date
Integrated by / Date

PUNCH LIST
Select the correct check number and point to check in Flexi BTS Implementation Check
List. Type the description of point to check and your comments for failure description.
When completed, type what was done.
Chec
k no.

Defect/Failure Description

Owner

Raised by
/date

Completed by /
date

PUNCH LIST APPROVED


AIRCEL REPRESENTATIVE
____ / ________

_______________________________________________ DATE: ____ /


(

NSN REPRESENTATIVE: _______________________________________________ DATE: ____ / ____ / ________

V1-en

NSN Networks

18 (19)

CERTIFICATE OF ACCOMPLISHMENT
(COA)
AIRCEL NSN
Site acceptance certificate for telecom implementation works
SITE ADDRESS:
SITE ID:
SITE NAME:

STAGE

COMPLETE (Initials/Signature)

EDGE FLEXI BTS Site Installation


EDGE FLEXI BTS Site Commissioning
EDGE FLEXI BTS Site Integration
EDGE FLEXI BTS Site Implementation Zip File
EDGE BTS Site Folder and Attached Documents
Partner-NSN Site Acceptance Certificate
Nokia Networks hereby states that the whole of supplies detailed above have been inspected,
implemented, tested and unless otherwise stated conform to the specified requirements in the
contract or order identified above.
AIRCEL REPRESENTATIVE:
____ / ________

______________________________________________ DATE: ____ /


(

NSN REPRESENTATIVE: _____________________________________________ DATE: ____ / ____ / ________


(
)

V1-en

NSN Networks

19 (19)

You might also like