DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA

No.

URAIAN

KO
DE

HP

KAP.

HARGA
ALAT

KET.

SEWA
ALAT/JAM
(di luar PPN)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

ASPHALT MIXING PLANT


ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3.5 TON
DUMP TRUCK 10 TON
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
PEDESTRIAN ROLLER
TAMPER
JACK HAMMER
FULVI MIXER
CONCRETE PUMP
TRAILER 20 TON
PILE DRIVER + HAMMER
CRANE ON TRACK 35 TON
WELDING SET
BORE PILE MACHINE
ASPHALT LIQUID MIXER
TRONTON
COLD MILLING
ROCK DRILL BREAKER
COLD RECYCLER
HOT RECYCLER
AGGREGAT (CHIP) SPREADER
ASPHALT DISTRIBUTOR
SLIP FORM PAVER
CONCRETE PAN MIXER
CONCRETE BREAKER
ASPAHLT TANKER
CEMENT TANKER
CONDRETE MIXER (350)
VIBRATING RAMMER
TRUK MIXER (AGITATOR)
BORE PILE MACHINE
CRANE ON TRACK 75-100 TON
BLENDING EQUIPMENT

E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51
E52

294.0
72.4
4.0
155.0 60.0
20.0
138.0
100.0
190.0
133.0
190.0
180.0
135.0
70.0
96.0
55.0
82.0
100.5
82.0
5.5
220.0
6.0 100.0
8.8
4.7
0.0
345.0
100.0
175.0
25.0
125.0
40.0
150.0
5.0
150.0
248.0
3.0 900.0
400.0
115.0
115.0
105.0
134.0
290.0
190.0
190.0
20.0
4.2
220.0
125.0
200.0
50.0

60.0 T/Jam
10.0 Ton
850.0 Liter
5,000.0 CPM/(L/m)
500.0 Liter
15.0 Ton
3.5 Ton
10.0 Ton
0.9 M3
10.0 ton
135.0 KVA
10,800.0 0.8 M3
1.5 M3
8.0 Ton
8.1 Ton
9.0 Ton
7.1 Ton
25.0 60.0 T/Jam
4,000.0 Liter
835.00 Ton
121.00 Ton
1,330.00 2,005.00 8.00 M3
20.00 Ton
2.50 Ton
35.0 Ton
250.0 Amp
2,000.0 Meter
1,000.0 Liter
15.0 Ton
1,000.0 m
2,200.0 M
3.0 M
3.5 M
4,000.0 Liter
2.5 M
600.0 Liter
20.0 m3/jam
4,000.0 liter
4,000.0 liter
350.0 liter
80.0 KG
5.0 M3
60.0 CM
75.0 Ton
30.0 Ton

53

ASPHALT LIQUID MIXER

E34a

40.0

54
55

BAR BENDER
BAR CUTTER

E53
E54

3.0
3.0

56

BREAKER

E55

80.0

57

GROUTING PUMP

E56

100.0

15.0 Ton

58

JACK HIDROLIC

E57

3.0

59

MESIN LAS

E58

60
61
62

PILE DRIVER LEADER, 75 kw


PILE HAMMER
PILE HAMMER, 2,5 Ton

63
64

STRESSING JACK
WELDING MACHINE, 300 A

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-

20,000.0 Liter

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

0.0 0
0.0 0

3.0 m3/jam

150.0 Ton

3.0

0.2 Ton

E59
E60
E61

70.0
10.0
1.0

75.0 kw
0.0 0
2.5 Ton

E62
E63

89.0
5.0

15.0 Ton
0.0 0

URAIAN ANALISA ALAT


No.

URAIAN

A.
1.
2.
3.
4.

5
B.
1.

KOEF.

SATUAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

Pw
Cp
A
W
B

Kapastas tangki aspal

Ca

850

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

H
H3

0.00
0.00

Rupiah
Rupiah

0.00

Rupiah

Rupiah

0.00

Rupiah

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

0.002 x B
W

Biaya Pasti per Jam


C.

KODE

(E+F)

ASPHALT SPRAYER
4.0
HP
850.0
Liter
5.0
Tahun
2,000.0
Jam
0
Rupiah

Liter

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms


Bahan Bakar Pemanas Aspal
= 1/1000 *Ca*Ms

2.

Pelumas

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E03

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

COMPRESSOR 4000-6500 L\M


Pw
60.0
HP
Cp
5,000.0 CPM/(L/m)
A
5.0
Tahun
W
2,000.0
Jam
B
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E05

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

CONCRETE MIXER 0.3-0.6 M3


Pw
20.0
HP
Cp
500.0
Liter
A
2.0
Tahun
W
1,500.0
Jam
B
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.57619

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E06

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

DUMP TRUCK 3.5 TON


100.0
HP
3.5
Ton
5.0
Tahun
2,000.0
Jam
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir / Mekanik
Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E08

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

FLAT BED TRUCK 3-4 M3


190.0
HP
10.0
M3
5.0
Tahun
2,000.0
Jam
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E11

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

MOTOR GRADER >100 HP


135.0
HP
10,800.0
5.0
Tahun
2,000.0
Jam
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E13

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

WHEEL LOADER 1.0-1.6 M3


96.0
HP
1.5
M3
5.0
Tahun
2,000.0
Jam
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E15

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

THREE WHEEL ROLLER 6-8 T


Pw
55.0
HP
Cp
8.0
Ton
A
5.0
Tahun
W
2,000.0
Jam
B
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E16

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

TANDEM ROLLER 6-8 T.


82.0
HP
8.1
Ton
5.0
Tahun
2,000.0
Jam
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E17

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

VIBRATORY ROLLER 5-8 T.


82.0
HP
7.050
Ton
5.0
Tahun
2,000.0
Jam
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.

E19

URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

WATER TANKER 3000-4500 L.


Pw
100.0
HP
Cp
4,000.0
Liter
A
5.0
Tahun
W
2,000.0
Jam
B
0
Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.26380

(B-C)xD
W

0.00

Rupiah

0.00

Rupiah

0.00

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

0.00

Rupiah

2.

Pelumas

0.00

Rupiah

Rupiah

0.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

0.00
0.00

Rupiah
Rupiah

Biaya Operasi per Jam

0.00

Rupiah

0.00

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10.00 % / Tahun
0.00 Rp./Jam
0.00 Rp./Jam
0.00
Liter
0.00
Liter
0.00
Liter

KET.