Subject: Material Take Off for Demolition of Steel Structure
Item
Description
Unit
sq.m.
265.65
sq.m.
lot
lot
lot
1128
no.
273.00
sq.m.
8.00
no.
0.56
ton
64
no.
3.00
ton
no.
2.20
ton
lot
8
32
nos.
nos.
General Works
Area preparation for mobile crane and disposal
Clearing of debris & waste within intake facility area (Internal size of steel
structure, L=21m & B=12.65m)
Scaffolding and temporary support installation, erection and dismantling
Disposal of demolished/removed unnecessary materials and debris
Removal of X-bracings including end plates at middle bay (4 nos. Angle bar
5"x5"x7mm thick; approx. length 9.50m)
Loosening of connections bolts between cleats and purlins (2nos. bolt per
connection; total of 32 connections)
Removal of purlins (Channel size 16cmx7cm; length=21m; 8nos.)
Qty
0.049
ton
0.290
ton
1
1
lot
lot
Remarks
Contractor to verify the coverage and
extent of area for mobile crane and
disposal.
Considering equivalent to
CH150x75x18 having weight of
17.87kg/m.