CORRECTIVE ACTION REPORT

Part
Problem
Source of problem

Graziano m/c H. Hsg 1.3


Dent of face .
in 2 nd set up chips gets
accumated above the
resting Pads

Failure mode Analysis


Root Cause
Method
MAN
MACHINE
MATERIAL
METHOD
MOTHER NATURE
MEASUREMENT

Date

In process/final inspection/customer site


Disposition : Endurance m/c shop

Defect due to root cause


Dents On face

CTION REPORT

tion/customer site
rance m/c shop

Corrective Action

1. Air Pressure used in 2nd set up for Chip-remov


2.Work instruction implemented for operatar for
3.Operator cross verify the 100 % production visu

Target Date
Sign

Effectiveness of corrective action


1. No NG component ever found

Corrective Action Impact


1.Operator awarness increased.

Status of Non Conformance


After dispatch of 857 nos Dent Problem on face don't Repeat.
Not Closed
Closed
Yes

Customer
Complain date
Qty

re used in 2nd set up for Chip-removal


uction implemented for operatar for 2nd Set up
cross verify the 100 % production visually.

Sign

Endurance
31/10/2012
26

CORRECTIVE ACTION REPORT


Part
Graziano m/c H. Hsg 1.3
Problem
Position out
Source of problem Due to hydroulic pressure

In process/final inspection/customer site


Disposition : Endurance m/c shop
Flucation clamping not Proper

Failure mode Analysis


Root Cause
Method
MAN
MACHINE
MATERIAL
METHOD
MOTHER NATURE
MEASUREMENT

Date

Defect due to root cause


Position out

TIVE ACTION REPORT

nal inspection/customer site


n : Endurance m/c shop

e to root cause
Corrective Action

1.C.M.M data recording started for


2. In a shift Dialing is done for Dowe
3.Hydroulic Pressur monitoring stat

Target Date
Sign

Effectiveness of corrective action


1. No NG component ever found

Corrective Action Impact


1.Operator awarness increased.

Status of Non Conformance


After dispatch of 1483 nos Position out Problem on face don't Repeat.
Not Closed
Closed
Yes

Customer
Endurance
Complain date 12/12/2012
Qty
18

a recording started for Positioning.


Dialing is done for Dowell hole Position 2 times.
Pressur monitoring stated.

e don't Repeat.

Sign