VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.75
9.30
16.73
17.53
18.24
15.14
16.87
15.85
18.24
7.28

18.452
9.008
16.439
17.241
17.951
14.847
16.580
15.563
17.929
6.969

0
3,183
559
248
0
1,212
504
808
9
357

0
20,019
3,518
1,557
0
7,621
3,172
5,080
59
2,248

Nil
18.135
Nil
Nil
Nil
18.006
NIL
NIL
18.510
12.060

6,880

43,272
980

SL.S

OIL VOL

Volume

V.C.F.

G.O.V.

TEMP

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

CU.M.

VOL.(BBLS)

BBLS

17.845

17.443

0
110

17.717

69.582

18.204
11.749

0.6
204.58

438
0
0
4
1,287

0
19,909
3,518
1,557
0
7,183
3,172
5,080
55
961

31.0
32.5
31.2
31.0
30.6
33.3
30.9
30.7
29.8
30.8

87.8
90.5
88.2
87.8
87.1
91.9
87.6
87.3
85.6
87.4

1,838
74

41,434
906

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98408
0.98625
0.98638
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
19,606
3,468
1,535
0
7,069
3,128
5,010
54
948

0.000
39.212
5.202
3.071
0.000
14.14
6.256
7.516
0.135
2.370

0
19,567
3,463
1,532
0
7,055
3,122
5,003
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

292

40,819
893

40,741
891

PRODUCTION LOADING IN TO 6C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

43,272
1,838
41,434
40,819
5,121
5,203
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

40,819

DRAFT FWD

7.30 m

Capt. Saiful Bahri

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
7-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
2,459.356
435.032
192.592
0.000
886.724
392.616
628.512
6.783
118.907

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

5,121

8.30 m

0.000
2498.764
442.003
195.678
0.000
900.932
398.903
638.583
6.892
120.813
5,203

TRIM
LIST

Capt. Ihwan Asrul

1.00 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

7-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Saiful Bah

Lifting

24 Hours Total (bbls)

980

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

41,434

Storage Net / G.S.V (Nbbls)

40,819

Storage Net / N.S.V (Nbbls)

40,741

Days to Tank Tops

296

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

40,819

Water

Offtake

Water Received 24hrs (bbls)

74

Total Water in Cargo (bbls)

1,838

Total P/W Received (bbls)

83,812

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

33.3

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

231,612

### 66,808

###

1,394

231,612

65,414

Service Vessel
MDO
0
0

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

Incidents

06.30

16.30

Comment
1. Review previous day activity
2. Weekly Test LSA, FFA, Nav/GMDSS equipment
3. Weekly Test safety device and emergency machinery
4. Transfer materials
5. Collecting garbage into garbage container at laydown
6. Workplace inspection In Engine Room Area
7. Closing finding work place inspection
8. Continue General Overhaul Auxiliary Engine No.2
9. RepairMain Hole Handle COT 1C
10. Repair Control Panel screw air Compressor

1. Review deck, engine and galley dept. activity


2. EHS and Security re induction to all crew
3. Review the workplace inspection / SPKK
4. Ship drill and safety learn

Type
NIL

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 22
The details see SPKK sheet *)
###

Reference

Time

Comments

Comment

Capt. Saiful Bahri

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

6953 / 40705

e Vessel

Comment

S equipment
gency machinery

tainer at laydown
om Area
n
y Engine No.2

mpressor

t. activity
crew
PKK

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
17.00 : KST. 51 Port Side Alongside

Bunkering/Debunkering :
17.10 : Commenced Transferred Fresh Water To KST. 51
19.30 : Completed Transferred Fresh Water 20T To KST. 51

Personnel & Material Transfer :


06.30 : 6 Persons PKP By KST. 51 ( Out )
07.30 : 1 Person Santos, 1 Person BVI & 5 Persons PKP By KST. 51 ( In )
08.20 : 2 Cradle & 1 Coil Wood By KST. 51 ( Out )
08.30 : 1 Person Santos Rep By KST. 51 ( Out )
10.38 : 1 Cradle Yellow By KST. 51 ( In )
15.00 : 3 Modules Pipe, 7 Pipe, 1 Cradle Yellow
5 Persons PKP, 1 Person Santos, 1 person BVI By KST.51 ( Out )
17.00 : 6 Persons PKP By KST.51 ( in )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos Rep, BVI & PKP Personnel's
2. Weekly Tested LSA, FFA, Nav/GMDSS equipment
3. Weekly Tested safety device and emergency machinery
4. Collected garbage into garbage container at laydown
5. Shifted & Transferred Materials
6. Workplace inspection In Engine Room Area
7. Closing finding workplace inspection
8. Preparation equipment for testing machine butterworth & portable butterworth
9. House Keeping

ENGINE :
1. Continued General Overhaul Auxiliary Engine No.2
2. Repaired Main Hole Handle COT 1C
3. Repaired Control Panel screw air Compressor
4. Workplace Inspection In Engine Room Area
5. Running up A/E 1 & 3:
08.00 - 15.00 - Shifted & Transferred Materials

2.

PERMIT TO WORK

PW

MW

HW

CSE

IP

VAL

436

1668

374

168

907

2.1
J HA
3. BUNKERS(M3)

436

1668

4. FRESH WATER (MT)


BLR
DOM

374

168

907

M.F.O
M.D.O

CONS
0
1,394

RCVD
0
0

CONS

RCV

TRNSF

PROD

0
10

0
0

0
20

0
26

OSD
200

REC
0
IN

CONS
0
OUT

20

14

5. DISPERSANT, FOAM, CHEMICALS (LTRS)


REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

211584
264
211848

Days W/O LTI

1136

Since

211848
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

28-Nov-13

07-Jan-17

TOTAL
3560

@2400 HRS

3558

TRANS
0
0
ROB

ROB
231,612
65,414
`

45
138
ROB
200
POB

28
28-Nov-13

Previous

Today

Total

0
0
0
0
1605
1708
3
0
41

0
0
0
0
2
22
0
0
0

0
0
0
0
1607
1730
3
0
41

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06

68,132
66,808

0
0

0
0

1,324
1,394

0
0

2.0
17.0

0.0
0.0

24.0
14.0

66,808

Transferred Materials

65,414

Transferred Materials

07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

231,612

231,612

07

231,612

231,612

08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

87

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12
14
13

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

53

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8
7
8

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972

TOTAL 34,761
Averag
e/Day

JUL AUG SEP OCT NOV DEC

1,121

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120
125
130

740

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017

22
22
22
22
22
22
22

0
0
0
0
0
1
0

0
0
0
0
0
6
6

22
22
22
22
22
29
28

TOTAL

154

12

167

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
7/Jan/17
Reported by

1 IHWAN ASRUL

Rank

Location

Description

Action/Commen
t

Positive /
Negative

Total

Positive

Well Done

Positive

Turn Off

Negative

Done

Positive

General Overhaul

Positive

Done

Positive

Master Meeting Room Advised to Lifting Personnels For Working safely Transferred Materials
Assisted Boatswain Lifted Materials As Signal
Man

2 IYYANG

C/O

3 CENG UMAR

2/O

4 INDRA

3/O

Main Deck

5 JULY MANGIRI

C/E

Engine Room

6 AGUNG RISTIANTO

2/E

STBD Quarter Repaired Control Panel Screw Compressor

7 IRVAN TAHIR

3/E

Engine Room

Assisted C/E General Overhaul Auxiliary Engine


No.2

General Overhaul

Positive

8 HENDRA PRATAMA

4/E

Engine Room

Assisted C/E General Overhaul Auxiliary Engine


No.2

General Overhaul

Positive

9 SURYADINATA

E/E

STBD Quarter

Assisted 2/E Repaired Control Panel Screw


Compressor

Done

Positive

Bosun

Main Deck

Transferred Materials As Crane Operator

Done

Positive

11 ACHMAD NURUL HUDA

AB

Lay Down

Assisted C/O Lifted Materials In Lay Down

Well Done

Positive

12 UDIYANTO

AB

Main Deck

Collected Garbage To Laydown

Done

Positive

13 BAYU SEGARA

AB

Lay Down

Opened Garbage Container At Lay Down

Well Done

Positive

14 DEDI

OS

Lay Down

Checked Weight Of Garbage Before In To


Container

Done

Positive

15 SAIFUL IMAM

FTR

Engine Room

General Overhaul

Positive

16 ELIK BUDIANTO

FTR

Workshop

Done

Positive

17 SUAIB

MTM

Engine Room

Assisted C/E General Overhaul Auxiliary Engine


No.2

General Overhaul

Positive

18 NUR ALI

MTM

Engine Room

Assisted C/E General Overhaul Auxiliary Engine


No.2

General Overhaul

Positive

Well Done

Positive

Done

Positive

Collecting Garbage
scheduled

Positive

Collecting Garbage
scheduled

Positive

10 AANG

19 MASRUDI

C/Cook

20 ROCHIM

COOK

21 RANGGUN JAWI

STWD

22 BOBI MANGOTO

STWD

Main Deck

Officer Mess
Television In Officer Mess Room On Continuously
room
Weekly Test Safety Device
Continued General Overhaul Auxiliary Engine
No.2

Assisted C/E General Overhaul Auxiliary Engine


No.2
Welding Mainhole Handle COT 1C

Officer Mess
Officer Mess Room Clean
room
Galley

House Keeping Cooking Equipment In galley

Accommodati
Collected Garbage In Accomondation Passage
on
Galley

Collected garbage In Galley Area

TOTAL 22

You might also like