Professional Documents
Culture Documents
Vessel'S Midnight Ullage Report
Vessel'S Midnight Ullage Report
VESSEL:
PRODUCT:
TANK
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.75
9.30
16.73
17.53
18.24
15.14
16.87
15.85
18.24
7.28
18.452
9.008
16.439
17.241
17.951
14.847
16.580
15.563
17.929
6.969
0
3,183
559
248
0
1,212
504
808
9
357
0
20,019
3,518
1,557
0
7,621
3,172
5,080
59
2,248
Nil
18.135
Nil
Nil
Nil
18.006
NIL
NIL
18.510
12.060
6,880
43,272
980
SL.S
OIL VOL
Volume
V.C.F.
G.O.V.
TEMP
OIL VOLUME
W.C.F
@ 60F
TABLE 11
CU.M.
VOL.(BBLS)
BBLS
17.845
17.443
0
110
17.717
69.582
18.204
11.749
0.6
204.58
438
0
0
4
1,287
0
19,909
3,518
1,557
0
7,183
3,172
5,080
55
961
31.0
32.5
31.2
31.0
30.6
33.3
30.9
30.7
29.8
30.8
87.8
90.5
88.2
87.8
87.1
91.9
87.6
87.3
85.6
87.4
1,838
74
41,434
906
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98615
0.98478
0.98593
0.98613
0.98648
0.98408
0.98625
0.98638
0.98723
0.98633
G.S.V.
G.S.V.
N.S.V.
0
19,606
3,468
1,535
0
7,069
3,128
5,010
54
948
0.000
39.212
5.202
3.071
0.000
14.14
6.256
7.516
0.135
2.370
0
19,567
3,463
1,532
0
7,055
3,122
5,003
54
946
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
292
40,819
893
40,741
891
PRODUCTION LOADING IN TO 6C
43,272
1,838
41,434
40,819
5,121
5,203
44.6
40,819
DRAFT FWD
7.30 m
AFT
0.20
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
7-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
0.000
2,459.356
435.032
192.592
0.000
886.724
392.616
628.512
6.783
118.907
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
5,121
8.30 m
0.000
2498.764
442.003
195.678
0.000
900.932
398.903
638.583
6.892
120.813
5,203
TRIM
LIST
1.00 m
NIL
MASTER
Staff
Surya Putra Jaya Master
Crude Storage
Santos Rep.
Lifting
980
Last Lifting
BS and W %
0.20
41,434
40,819
40,741
296
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
40,819
Water
Offtake
74
1,838
83,812
Loading/Incoming Temp
42.0
Specific Gravity
33.3
PFW PH
0
Note:
10
Vol (m3)
Kg
Soft Waste
0.00
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Biological Waste
Note :
Comments
FSO-MFO
Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)
FSO-MDO
231,612
### 66,808
###
1,394
231,612
65,414
Service Vessel
MDO
0
0
Meetings
Type
Time
Supervisory Meeting
Incidents
06.30
16.30
Comment
1. Review previous day activity
2. Weekly Test LSA, FFA, Nav/GMDSS equipment
3. Weekly Test safety device and emergency machinery
4. Transfer materials
5. Collecting garbage into garbage container at laydown
6. Workplace inspection In Engine Room Area
7. Closing finding work place inspection
8. Continue General Overhaul Auxiliary Engine No.2
9. RepairMain Hole Handle COT 1C
10. Repair Control Panel screw air Compressor
Type
NIL
Drills
Type
Reference
Time
Comments
Comment
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
6953 / 40705
e Vessel
Comment
S equipment
gency machinery
tainer at laydown
om Area
n
y Engine No.2
mpressor
t. activity
crew
PKK
Comment
Mooring/Unmooring :
17.00 : KST. 51 Port Side Alongside
Bunkering/Debunkering :
17.10 : Commenced Transferred Fresh Water To KST. 51
19.30 : Completed Transferred Fresh Water 20T To KST. 51
ENGINE :
1. Continued General Overhaul Auxiliary Engine No.2
2. Repaired Main Hole Handle COT 1C
3. Repaired Control Panel screw air Compressor
4. Workplace Inspection In Engine Room Area
5. Running up A/E 1 & 3:
08.00 - 15.00 - Shifted & Transferred Materials
2.
PERMIT TO WORK
PW
MW
HW
CSE
IP
VAL
436
1668
374
168
907
2.1
J HA
3. BUNKERS(M3)
436
1668
374
168
907
M.F.O
M.D.O
CONS
0
1,394
RCVD
0
0
CONS
RCV
TRNSF
PROD
0
10
0
0
0
20
0
26
OSD
200
REC
0
IN
CONS
0
OUT
20
14
211584
264
211848
1136
Since
211848
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
28-Nov-13
07-Jan-17
TOTAL
3560
@2400 HRS
3558
TRANS
0
0
ROB
ROB
231,612
65,414
`
45
138
ROB
200
POB
28
28-Nov-13
Previous
Today
Total
0
0
0
0
1605
1708
3
0
41
0
0
0
0
2
22
0
0
0
0
0
0
0
1607
1730
3
0
41
NIL
NIL
NIL
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
Remarks
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
73,030
1,752
4.0
0.0
24.0
71,278
04
71,278
1,808
8.0
0.0
24.0
69,470
05
69,470
1,338
3.0
0.0
24.0
68,132
Transferred Materials
06
68,132
66,808
0
0
0
0
1,324
1,394
0
0
2.0
17.0
0.0
0.0
24.0
14.0
66,808
Transferred Materials
65,414
Transferred Materials
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
Remarks
01
235,612
235,612
02
235,612
235,612
03
235,612
1,000
234,612
04
05
06
234,612
231,612
0
0
0
0
3,000
0
0
0
231,612
231,612
231,612
231,612
07
231,612
231,612
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
87
Jul
13
11
12
12
14
13
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
53
Jul
7
7
8
8
7
8
TOTAL 34,761
Averag
e/Day
1,121
80
70
135
80
120
125
130
740
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
22
22
22
22
22
22
22
0
0
0
0
0
1
0
0
0
0
0
0
6
6
22
22
22
22
22
29
28
TOTAL
154
12
167
REMARKS
1 IHWAN ASRUL
Rank
Location
Description
Action/Commen
t
Positive /
Negative
Total
Positive
Well Done
Positive
Turn Off
Negative
Done
Positive
General Overhaul
Positive
Done
Positive
Master Meeting Room Advised to Lifting Personnels For Working safely Transferred Materials
Assisted Boatswain Lifted Materials As Signal
Man
2 IYYANG
C/O
3 CENG UMAR
2/O
4 INDRA
3/O
Main Deck
5 JULY MANGIRI
C/E
Engine Room
6 AGUNG RISTIANTO
2/E
7 IRVAN TAHIR
3/E
Engine Room
General Overhaul
Positive
8 HENDRA PRATAMA
4/E
Engine Room
General Overhaul
Positive
9 SURYADINATA
E/E
STBD Quarter
Done
Positive
Bosun
Main Deck
Done
Positive
AB
Lay Down
Well Done
Positive
12 UDIYANTO
AB
Main Deck
Done
Positive
13 BAYU SEGARA
AB
Lay Down
Well Done
Positive
14 DEDI
OS
Lay Down
Done
Positive
15 SAIFUL IMAM
FTR
Engine Room
General Overhaul
Positive
16 ELIK BUDIANTO
FTR
Workshop
Done
Positive
17 SUAIB
MTM
Engine Room
General Overhaul
Positive
18 NUR ALI
MTM
Engine Room
General Overhaul
Positive
Well Done
Positive
Done
Positive
Collecting Garbage
scheduled
Positive
Collecting Garbage
scheduled
Positive
10 AANG
19 MASRUDI
C/Cook
20 ROCHIM
COOK
21 RANGGUN JAWI
STWD
22 BOBI MANGOTO
STWD
Main Deck
Officer Mess
Television In Officer Mess Room On Continuously
room
Weekly Test Safety Device
Continued General Overhaul Auxiliary Engine
No.2
Officer Mess
Officer Mess Room Clean
room
Galley
Accommodati
Collected Garbage In Accomondation Passage
on
Galley
TOTAL 22