Professional Documents
Culture Documents
Vessel'S Midnight Ullage Report
Vessel'S Midnight Ullage Report
VESSEL:
PRODUCT:
TANK
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.75
9.30
16.73
17.53
18.24
14.77
16.87
15.85
18.24
7.28
18.452
9.008
16.439
17.241
17.951
14.482
16.580
15.563
17.929
6.969
0
3,183
559
248
0
1,360
504
808
9
357
0
20,019
3,518
1,557
0
8,555
3,172
5,080
59
2,248
Nil
18.135
Nil
Nil
Nil
17.973
NIL
NIL
18.510
12.060
7,028
44,206
934
SL.S
OIL VOL
Volume
V.C.F.
G.O.V.
TEMP
OIL VOLUME
W.C.F
@ 60F
TABLE 11
CU.M.
VOL.(BBLS)
BBLS
17.845
17.443
0
110
17.684
81.241
18.204
11.749
0.6
204.58
511
0
0
4
1,287
0
19,909
3,518
1,557
0
8,044
3,172
5,080
55
961
31.0
32.5
31.2
31.0
30.6
33.1
30.9
30.7
29.8
30.8
87.8
90.5
88.2
87.8
87.1
91.6
87.6
87.3
85.6
87.4
1,912
74
42,295
861
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98615
0.98478
0.98593
0.98613
0.98648
0.98423
0.98625
0.98638
0.98723
0.98633
G.S.V.
G.S.V.
N.S.V.
0
19,606
3,468
1,535
0
7,917
3,128
5,010
54
948
0.000
39.212
5.202
3.071
0.000
15.83
6.256
7.516
0.135
2.370
0
19,567
3,463
1,532
0
7,901
3,122
5,003
54
946
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
304
41,667
848
41,587
846
PRODUCTION LOADING IN TO 6C
44,206
1,912
42,295
41,667
5,227
5,311
44.6
41,667
DRAFT FWD
7.30 m
AFT
0.20
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
8-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
0.000
2,459.356
435.032
192.592
0.000
993.121
392.616
628.512
6.783
118.907
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
5,227
8.30 m
0.000
2498.764
442.003
195.678
0.000
1009.034
398.903
638.583
6.892
120.813
5,311
TRIM
LIST
1.00 m
NIL
MASTER
Staff
Surya Putra Jaya Master
Crude Storage
Santos Rep.
Lifting
934
Last Lifting
BS and W %
0.20
42,295
41,667
41,587
311
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
41,667
Water
Offtake
74
1,912
83,886
Loading/Incoming Temp
42.0
Specific Gravity
33.1
PFW PH
0
Note:
10
Vol (m3)
Kg
Soft Waste
0.00
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Biological Waste
Note :
Comments
FSO-MFO
Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)
FSO-MDO
231,612
### 65,414
###
1,324
231,612
64,090
Service Vessel
MDO
0
0
Meetings
Type
Time
Comment
1. Review previous day activity
2. EHS and Security re induction to all crew
3. Review the workplace inspection / SPKK
4. Emergency Fire Drill
5. Transfer Materials
Supervisory Meeting
06.30
16.30
Incidents
Type
NIL
Drills
Type
Emergency Fire Drill
Reference
Time
08.00 - 09.00
Comments
Comment
Followed all crew FSO SPJ
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
7779 / 41531
e Vessel
Comment
crew
PKK
t. activity
nspection
e
Comment
Mooring/Unmooring :
05.50 : KST. 51 Cast Off
Bunkering/Debunkering :
ENGINE :
1. Checked 440 Low Insulation & found No.1 Portable Air Compressor Transformator
2. Renewed Transformator Step Down 440 V To 220 V
3. Maintenance RO No.2
- Renewed Poly Erothine Tube To Drain Membrane
4. Checked & Repaired HP Pipe For RO No.1
5. Running up A/E 1 & 3:
13.00 - 15.00 - Transferred Materials
2.
PERMIT TO WORK
2.1
J HA
3. BUNKERS(M3)
PW
MW
HW
CSE
IP
VAL
436
1670
1670
374
168
909
374
168
909
M.F.O
M.D.O
CONS
0
1,324
RCVD
0
0
436
CONS
RCV
TRNSF
PROD
0
10
0
0
0
0
0
12
OSD
200
REC
0
IN
CONS
0
OUT
16
16
211848
264
212112
1137
Since
212112
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
28-Nov-13
08-Jan-17
@2400 HRS
TOTAL
3564
3562
TRANS
0
0
ROB
231,612
64,090
ROB
45
140
ROB
200
POB
28
28-Nov-13
Previous
Today
Total
0
0
0
0
1607
1730
3
0
41
0
0
0
0
2
22
0
0
0
0
0
0
0
1609
1752
3
0
41
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
Remarks
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
73,030
1,752
4.0
0.0
24.0
71,278
04
71,278
1,808
8.0
0.0
24.0
69,470
05
69,470
1,338
3.0
0.0
24.0
68,132
Transferred Materials
06
0
0
0
0
1,324
1,394
0
0
2.0
17.0
0.0
0.0
24.0
14.0
66,808
Transferred Materials
07
68,132
66,808
65,414
Transferred Materials
08
65,414
2.0
64,090
Transferred Materials
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1,324
24.0
0.0
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
Remarks
01
235,612
235,612
02
235,612
235,612
03
235,612
1,000
234,612
04
05
06
234,612
231,612
0
0
0
0
3,000
0
0
0
231,612
231,612
231,612
231,612
07
231,612
231,612
08
231,612
231,612
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
99
Jul
13
11
12
12
14
13
12
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
61
Jul
7
7
8
8
7
8
8
TOTAL 39,718
Averag
e/Day
1,281
80
70
135
80
120
125
130
60
800
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
22
22
22
22
22
22
22
22
0
0
0
0
0
1
0
0
0
0
0
0
0
6
6
6
22
22
22
22
22
29
28
28
TOTAL
176
18
195
REMARKS
1 IHWAN ASRUL
Rank
Location
Master
Bridge
Description
All In Charged Emergency Fire Drill
Action/Commen
t
Positive /
Negative
Total
Fire Drill
Positive
No Leakage
Positive
2 IYYANG
C/O
3 CENG UMAR
2/O
Lay Down
Good
Positive
4 INDRA
3/O
Main Deck
Done
Positive
5 JULY MANGIRI
C/E
STBD Quarter
Transformator Broken
Negative
6 AGUNG RISTIANTO
2/E
Main Deck
Well Done
Positive
7 IRVAN TAHIR
3/E
STBD Quarter
Done
Positive
8 HENDRA PRATAMA
4/E
STBD Quarter
Done
Positive
9 SURYADINATA
E/E
STBD Quarter
Done
Positive
Bosun
Foam Room
Fire Drill
Positive
AB
Main Deck
Well Done
Positive
12 UDIYANTO
AB
Lay Down
Done
Positive
13 BAYU SEGARA
AB
Main Deck
Well Done
Positive
14 DEDI
OS
Sea Good
Done
Positive
15 SAIFUL IMAM
FTR
Main Deck
Well Done
Positive
16 ELIK BUDIANTO
FTR
STBD Quarter
Done
Positive
17 SUAIB
MTM
Main Deck
Well Done
Positive
18 NUR ALI
MTM
Main Deck
Well Done
Positive
19 MASRUDI
C/Cook
Galley
Well Done
Positive
20 ROCHIM
COOK
Galley
Done
Positive
21 RANGGUN JAWI
STWD
Crew Mess
Room
Positive
22 BOBI MANGOTO
STWD
Sea Good
Done
Positive
10 AANG
TOTAL 22