Ot Complex: Corridor (3000 Wide)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PANTRY

ALUCO BOND

OT COMPLEX

TOI.

NURSE
CHANGE

GLAZING
AS/ELEVATION
100X100
R.C.C. POST

LOBBY
SHAFT

100X100
R.C.C. POST

DIRTY SERVICE PASSAGE (1200 WIDE)

100X100
R.C.C. POST

HATCH
WINDOW

GRC SCREEN
JALI(UNISTONE OR
EQUIVALENT)

ETO

100X100
R.C.C. POST

OT-1
6

10

11

12

DIRTY
INST.
STORE

DIRTY

OT-2

OT-3

OT-4

OT-5

13

SCRUB

CLEAN
UTILITY

SCRUB

INST.
STORE
CORRIDOR (3600 WIDE)

AIR
CURTAIN

INST.
STORE

HATCH
WINDOW

DIRTY

DIRTY

100X100
R.C.C. POST

CONTROL
PANEL
(REF.DETAIL)

HATCH
WINDOW

CONTROL
PANEL
(REF.DETAIL)

INST.
STORE

DIRTY
INST.
STORE

LOCKER'S(13NO'S)

CONTROL
PANEL
(REF.DETAIL)

INST.
STORE

CONTROL
PANEL
(REF.DETAIL)

CORRIDOR

ORAS
CHANGE

DIRTY

TOI.

500WIDE
R.C.C.PROJ. AT L.L.
FOR U.P.S.

TOI.

CAB. FOR GAS &


OTH. SER.

150

150

ANAET
HESIST

CORRIDOR

ANAET
HESIST

SHAFT

PRE-OPERATIVE
ROOM

ANAET
HESIST

CORRIDOR (3000 WIDE)

BLOOD
STORAGE

AUTO
CLAVE

NURSING
ASST.

MINOR OT
OT-6
SCRUB

AHU-8

GAS
BANK

TOI.

OTMATRONS
ROOM

100X100
R.C.C. POST

CONTROL PANEL
(REF.DETAIL)

ELECT
RONICS

DN

GLAZING AS
/ELEVATION

CORRIDOR

D3

NURSE
CHANGE

SHOE
RECEPTION CHANGE

SHAFT FOR
ELEC. CABLE

LEAD
JAC.

250

LOCKER'S(REF. DETAIL)

250

ELEC.
-3

CAB. FOR GAS &


OTH. SER.

UPS

ELECT
RICAL

CORRIDOR

SCRUB

500 WD.
R.C.C.PROJ. AT L.L.
FOR U.P.S.

ELEC.-1
UP

STAIR -2
REF. DETAIL

ORA'S &
CHANGE

AIR
CURTAIN

WARD
STORE
WAITING
LOUNGE
FOR OT

3 TIER SLAB

DN

+4950

HEAT
STROKE

INST.
STORE

HATCH
WINDOW

WASH

500 WD.
R.C.C.PROJ. AT L.L.
FOR U.P.S.

SEPTIC
OT-9
GLAZING
AS/ELEVATION
CONTROL PANEL
(REF.DETAIL)

BENCH

EQPT
STORE

CLEAN
DUMP
WEIGHTER

RECOVERY
ROOM

CORRIDOR (2850 WIDE)

m
SERVICE DUCT
FROM MEDICAL
GAS &
AC PLANT ROOM

AIR
CURTAIN

TROLLEY
BAY
AIR
LOCK

PANTRY

INSTRUMENTS
& DISPOSABLE
STORE
3 TIER SLAB

SHOE
CHANGE

WAITING
ROOM FOR
CTVS-1&2
TOILET

CLEAN UTILITY

TOI.

DN

UP

APPLIANCES
&
MEDICAL STORE

500
2200

LIFT
(20P)

LIFT
(20P)

LOCKER'S(REF. DETAIL)

LIFT
(20P)

500

LIFT
LOBBY

DOCTORS'
LOUNGE

SHAFT

SHAFT

DIRTY

DOCTORS'
CHANGE
ROOM

PANTRY

REC.LOBBY

SCRUB

TOI.

TOI.

CORRIDOR (2960 WIDE)

S.M.
ROOM

CORRIDOR (3200 WIDE)

S.S RAILING
AS PER DET.
WITH GLASS
PANEL

CORRIDOR (3000 WIDE)

AIR
CURTAIN

SERVICE DUCT
FROM ELECT.
SUB STATION

HATCH
WINDOW

ANAETHESIA
INDUCTION

HYBRID
CATHETER
ENDOVASCULAR OT
& EQUIP.
CONSOLE (OPERATING CATH LAB) STORE
ROOM
OT-7 & 8
ROOM

RADIUM PROOF
GLASS(REF.DETAIL)

DIRTY

TOI.

AHU-7

STAIR -7

PANTRY
CUM
SERVERY
TOI.

S/B
DUTY MO

You might also like