Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

1

LAPORAN PEMERIKSAAN UKURAN HEAD


HEAD DIMENSIONAL INSPECTION REPORT

No. Dok.
Doc. No.

Pemesan

No. Komponen/Rakitan

Customer
Proyek

Part / Assy No.


Nama Produk

Project
No. Pekerjaan

Name of Equipment
No. Gambar

Job. No.

Drawing No.

Forming Metod :

Type

1. Cold Process

NDE. :

Using Messurement :

Material

2. Hot Process

1 . Roll Meter.

R (Radius)
PWHT : Yes

or

0o

circum

r (Radius Knuckle)

No
Points

3 . Micro Meter.
Data Actual

Purchase Order

TL

Tangen L

Height

CL

Circum L

2 . Wall Thickness.

Barata

Dif.

Witness

Dif.

Tolerances

D1
270o

90o

D2 Inside Dia.
D3 (Roudness)
D4

180

Points

by Template
T.A

G.A

Points

T.B

G.E

T.E

Gap. C

Gap. D

Gap. E

Actual

T.D

Nom. Thk.
Thk. A

mm.
Thk. B

Thk. C

Min. Thk. :
Thk. D

Thk. E

Reduced

0o

T.C
G.D

Gap. B

90o
180o
270o

T
TL

H G.B
G.C

Gap. A

0o
3

ID

Radius of Head

90o
180o
270o

Average
We here by certify that this head plate is satisfied with ASME Section VIII Div. 1
TOLERANCE of HEAD :
- Radius Max.
Min.

: 1.25 %

x ID =

: 0,625 % x ID =

- Thickness PL

: < 10 % x T =

- Roudness

: <

Result

ACC.

1 % x ID =
Reject

[ Unit. : mm. ]

PT. Meisha Internusa Teknik


Dikaji Ulang oleh
Reviewed by

Disetujui dan Disaksikan oleh


Approved and Witnessed by

Disetujui oleh

Disiapkan oleh

Approved by

Prepared

(Tgl.) Peninjau
(Date) Surveyor

(Tgl.) Peninjau
(Date) Surveyor

(Tgl.) Supervisor Insp. Kualitas

(Tgl.) Pemeriksa

(Date) Quality Insp. Supervisor

(Date) Inspector

by

You might also like