VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.74
9.29
16.72
17.53
18.24
11.40
16.86
15.84
18.23
7.28

18.452
9.008
16.439
17.241
17.951
11.115
16.580
15.563
17.929
6.969

0
3,183
559
248
0
2,729
504
808
9
357

0
20,019
3,518
1,557
0
17,167
3,172
5,080
59
2,248

Nil
18.130
Nil
Nil
Nil
17.687
NIL
NIL
18.507
12.058

8,397

52,819
940

SL.S

OIL VOL

Volume

V.C.F.

G.O.V.

TEMP

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

CU.M.

VOL.(BBLS)

BBLS

17.845

17.443

0
110

17.403

186.071

18.204
11.749

0.6
204.58

1,170
0
0
4
1,287

0
19,909
3,518
1,557
0
15,997
3,172
5,080
55
961

31.0
32.5
31.2
31.0
30.6
32.7
30.9
30.7
29.8
30.8

87.8
90.5
88.2
87.8
87.1
90.9
87.6
87.3
85.6
87.4

2,571
71

50,248
869

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98458
0.98625
0.98638
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
19,606
3,468
1,535
0
15,750
3,128
5,010
54
948

0.000
39.212
5.202
3.071
0.000
31.50
6.256
7.516
0.135
2.370

0
19,567
3,463
1,532
0
15,719
3,122
5,003
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

409

49,500
855

49,405
853

PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

52,819
2,571
50,248
49,500
6,210
6,309
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

49,500

DRAFT FWD

7.30 m

Capt. Juanda Pardede

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
17-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
2,459.356
435.032
192.592
0.000
1,975.736
392.616
628.512
6.783
118.907

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

6,210

8.60 m

0.000
2498.764
442.003
195.678
0.000
2007.394
398.903
638.583
6.892
120.813
6,309

TRIM
LIST

Capt. Ihwan Asrul

1.30 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

17-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Juanda Pard

Lifting

24 Hours Total (bbls)

940

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

50,248

Storage Net / G.S.V (Nbbls)

49,500

Storage Net / N.S.V (Nbbls)

49,405

Days to Tank Tops

299

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

49,500

Water

Offtake

Water Received 24hrs (bbls)

71

Total Water in Cargo (bbls)

2,571

Total P/W Received (bbls)

84,545

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

32.7

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)

FSO-MDO

Service Vessel
MDO

231,612

### 53,533

Received / Bunkered (m3)

Consumption (m3)

30,000
###
1,524
82,009

Closing (m3)

231,612

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment

1. Review previous day activity


2. Maintenance LSA & FFA
3. Repainting gyro repeater , standard compass, etc at top
4. Maintenance main deck etc COT 6C and Slop S
5. Collecting garbage in to garbage container
6. Corrective action for SPKK & work place inspection
7. Maintenance air conditioner area
8. Maintenance RO no.1 & 2
9. Maintenance cylinder head auxiliary engine for spare
10. Maintenance auxiliary boiler

1. Review deck, engine and galley dept. activity


2. Marking label on deck
3. Corrective action for SPKK & work place inspection
4. Internal cargo transfer

Incidents
Type
NIL

Reference

Comments

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 21
The details see SPKK sheet *)
###

Time

Comment

Capt. Juanda Pardede

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

15615 / 49475

e Vessel

Comment

compass, etc at top deck area


C and Slop S
ntainer
lace inspection

engine for spare

t. activity

lace inspection

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
16.00 : AHT. Tegap jaya starboard side alongside
18.20 : AHT. Tegap jaya cast off

Bunkering/Debunkering :
16.40 : Commenced transferred MDO from AHT. Tegap jaya
17.20 : Completed transferred MDO 30T from AHT. Tegap jaya

Personnel & Material Transfer :


05.30 : 21 Persons PKP, 1 person mafhindo & 1 person santos rep by KST.51 ( Out )
14.00 : 2 Persons Santos & 1 person Oryx by KST. 51 ( in )
17.06 : 21 Persons PKP &1 person mafhindo by KST.51 ( in )
18.15 : 2 Persons santos & 1 person oryx by AHT. Tegap jaya ( out )
19.10 : 1 Person santos rep by KST. 51 ( in )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos, Oryx, Mafhindo & PKP Personnel's
2. Continued checked/maintenance fire extinguisher & fire hose
3. Chipping and brushing main deck etc COT 6C
4. Collected garbage in to garbage container at lay down
5. Final coating main deck, etc at Slop S
6. Corrective action for the workplace inspection
7. Checked , tested and repaired SDV system on deck and CCR

ENGINE :
1. Cleaned & painted condenser cover air conditioner
2. Collected engine room garbage in to garbage container at lay down
3. Repaired electric angle grinder
4. Maintenance cylinder head auxiliary engine for spare
5. Renewed gland packing condensate pump
6. Maintenance chipping & painted scrapper plate condensate pump
7. Replacement fine filter 10 mikro RO no.1 & 2
8. Checked automizing regulator valve boiler
9. House keeping air conditioner room
10. Firing up auxiliary boiler until 5kg/cm2 ( warming )
11. Received bunker HSD 30T from AHT. Tegap jaya
12. Running up A/E 1 & 3 :
13.00 - 15.00 - Warming up auxiliary boiler for internal cargo transfer scheduled

2.

PERMIT TO WORK

PW

MW

HW

CSE

IP

VAL

441

2.1
J HA
3. BUNKERS(M3)

441

1693
1693

4. FRESH WATER (MT)


BLR
DOM

374

169

374

169

930

M.F.O
M.D.O

CONS
0
1,524

RCVD
0
30,000

CONS

RCV

TRNSF

PROD

0
10

0
0

0
0

0
18

OSD
200

REC
0
IN

CONS
0
OUT

26

26

5. DISPERSANT, FOAM, CHEMICALS (LTRS)


REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

214152
252
214404

Days W/O LTI

1146

Since

214404
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

930

28-Nov-13

17-Jan-17

TOTAL

@2400 HRS

3614
3612

TRANS
0
0
ROB

ROB
231,612
82,009
`

45
135
ROB
200
POB

43
28-Nov-13

Previous

Today

Total

0
0
0
0
1625
1922
3
0
58

0
0
0
0
2
21
0
0
0

0
0
0
0
1627
1943
3
0
58

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06

0
0

0
0

1,324
1,394

0
0

2.0
17.0

0.0
0.0

24.0
14.0

66,808

Transferred Materials

07

68,132
66,808

65,414

Transferred Materials

08

65,414

1,324

24.0

0.0

2.0

64,090

Transferred Materials

09

64,090

1,296

24.0

0.0

0.0

62,794

10

62,794

1,310

13.0

0.0

12.0

61,484

Transferred Materials

11

61,484

1,310

1.0

0.0

24.0

60,174

Transferred Materials

12

60,174

1,310

1.0

0.0

24.0

58,864

Transferred Materials

13

0
0

0
0

1,324
1,352

0
0

14.0
15.0

0.0
4.0

12.0
9.0

57,540

Transferred Materials

14

58,864
57,540

56,188

Transferred Materials

15

56,188

1,303

0.5

0.0

24.0

54,885

Transferred Materials

16

54,885

1,352

4.0

0.0

24.0

53,533

Transferred Materials

17

53,533

30,000

1,524

2.0

0.0

24.0

82,009

Warming up boiler

18
19
20
21
22
23
24
25
26
27
28
29
30
31

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

231,612

231,612

07

231,612

231,612

08

231,612

231,612

09

231,612

231,612

10

231,612

231,612

11

231,612

231,612

12

231,612

231,612

13

231,612

231,612

14

231,612

231,612

15

231,612

231,612

16

231,612

231,612

17

231,612

231,612

18
19
20
21
22
23
24
25
26
27
28
29
30
31

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

214

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

130

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
4,966
4,958
4,963
4,974
4,988

TOTAL 84,489
Averag
e/Day

JUL AUG SEP OCT NOV DEC

2,725

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90

1,575

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017

22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21

0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1

0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21

22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43

TOTAL

367

183

556

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
17/Jan/17
Action/Commen
t

Positive /
Negative

Total

Advice to all crew about certificate revalidation

Done

Positive

Cancelled maintenance on deck due to rain

Done

Positive

Repainted etc at compass deck

Done

Positive

Continued Check and maintenance fire


extinguisher hose in engine room

Done

Positive

Checked atomizing regulator valve boiler

Done

Positive

Maintenance RO no.1 & 2

Done

Positive

Engine Room

Maintenance cylinder head auxiliary engine for


spare

Done

Positive

4/E

Engine Room

Chipping & painted scrapper plate condensate


pump

Done

Positive

E/E

AC Room

House keeping in AC room

Done

Positive

Bosun

Main Deck

Maintenance chipping brushing COT 6C

Done

Positive

11 ACHMAD NURUL HUDA

AB

Main Deck

Assisted boatswain maintenance etc COT 6C

Done

Positive

12 UDIYANTO

AB

Bridge

Assisted 2/O repainted at compass deck etc

Done

Positive

13 BAYU SEGARA

AB

Main Deck

Final coating maen deck etc slop STBD

Done

Positive

14 DEDI

OS

Main Deck

Assisted boatswain maintenance etc COT 6C

Done

Positive

15 ELIK BUDIANTO

FTR

Work Shop

Repaired electric angle grinder

Done

Positive

16 SUAIB

MTM

Lay down

Collected engine room garbage in to garbage


container at lay down

Done

Positive

17 CHULWAN NURFALLAH WIPER

AC Room

Assisted Electrician house keeping in AC room

Done

Positive

18 MASRUDI

C/Cook

Provision
store

Checked provision quantity and condition

Good

Positive

19 ROCHIM

COOK

Galley

Prepared coffe time all crew

Good

Positive

20 BOBY MANGONTO

STWD

Galley

Daily house keeping all tableware

Well Done

Positive

Induction
room

House keeping in induction room

Clean & tidy

Positive

Reported by

Rank

Location

Master

Crew Mess
Room

2 DENNY DAVID PAULUS

C/O

Main Deck

3 CENG UMAR

2/O

Bridge

4 INDRA

3/O

Engine Room

5 JULY MANGIRI

C/E

Boiler

6 AGUNG RISTIANTO

2/E

RO Room

7 IRVAN TAHIR

3/E

8 HENDRA PRATAMA
9 SURYADINATA

1 IHWAN ASRUL

10 AANG

21 HARIANTO SULE TANAN STWD

Description

TOTAL 21