Professional Documents
Culture Documents
Vessel'S Midnight Ullage Report
Vessel'S Midnight Ullage Report
VESSEL:
PRODUCT:
TANK
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.74
9.29
16.72
17.53
18.24
11.40
16.86
15.84
18.23
7.28
18.452
9.008
16.439
17.241
17.951
11.115
16.580
15.563
17.929
6.969
0
3,183
559
248
0
2,729
504
808
9
357
0
20,019
3,518
1,557
0
17,167
3,172
5,080
59
2,248
Nil
18.130
Nil
Nil
Nil
17.687
NIL
NIL
18.507
12.058
8,397
52,819
940
SL.S
OIL VOL
Volume
V.C.F.
G.O.V.
TEMP
OIL VOLUME
W.C.F
@ 60F
TABLE 11
CU.M.
VOL.(BBLS)
BBLS
17.845
17.443
0
110
17.403
186.071
18.204
11.749
0.6
204.58
1,170
0
0
4
1,287
0
19,909
3,518
1,557
0
15,997
3,172
5,080
55
961
31.0
32.5
31.2
31.0
30.6
32.7
30.9
30.7
29.8
30.8
87.8
90.5
88.2
87.8
87.1
90.9
87.6
87.3
85.6
87.4
2,571
71
50,248
869
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98615
0.98478
0.98593
0.98613
0.98648
0.98458
0.98625
0.98638
0.98723
0.98633
G.S.V.
G.S.V.
N.S.V.
0
19,606
3,468
1,535
0
15,750
3,128
5,010
54
948
0.000
39.212
5.202
3.071
0.000
31.50
6.256
7.516
0.135
2.370
0
19,567
3,463
1,532
0
15,719
3,122
5,003
54
946
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
409
49,500
855
49,405
853
52,819
2,571
50,248
49,500
6,210
6,309
44.6
49,500
DRAFT FWD
7.30 m
AFT
0.20
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
17-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
0.000
2,459.356
435.032
192.592
0.000
1,975.736
392.616
628.512
6.783
118.907
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
6,210
8.60 m
0.000
2498.764
442.003
195.678
0.000
2007.394
398.903
638.583
6.892
120.813
6,309
TRIM
LIST
1.30 m
NIL
MASTER
Staff
Surya Putra Jaya Master
Crude Storage
Santos Rep.
Lifting
940
Last Lifting
BS and W %
0.20
50,248
49,500
49,405
299
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
49,500
Water
Offtake
71
2,571
84,545
Loading/Incoming Temp
42.0
Specific Gravity
32.7
PFW PH
0
Note:
10
Vol (m3)
Kg
Soft Waste
0.00
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Biological Waste
Note :
Comments
FSO-MFO
Opening (m3)
FSO-MDO
Service Vessel
MDO
231,612
### 53,533
Consumption (m3)
30,000
###
1,524
82,009
Closing (m3)
231,612
Meetings
Type
Time
Supervisory Meeting
06.30
16.30
Comment
Incidents
Type
NIL
Reference
Comments
Drills
Type
Time
Comment
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
15615 / 49475
e Vessel
Comment
t. activity
lace inspection
Comment
Mooring/Unmooring :
16.00 : AHT. Tegap jaya starboard side alongside
18.20 : AHT. Tegap jaya cast off
Bunkering/Debunkering :
16.40 : Commenced transferred MDO from AHT. Tegap jaya
17.20 : Completed transferred MDO 30T from AHT. Tegap jaya
ENGINE :
1. Cleaned & painted condenser cover air conditioner
2. Collected engine room garbage in to garbage container at lay down
3. Repaired electric angle grinder
4. Maintenance cylinder head auxiliary engine for spare
5. Renewed gland packing condensate pump
6. Maintenance chipping & painted scrapper plate condensate pump
7. Replacement fine filter 10 mikro RO no.1 & 2
8. Checked automizing regulator valve boiler
9. House keeping air conditioner room
10. Firing up auxiliary boiler until 5kg/cm2 ( warming )
11. Received bunker HSD 30T from AHT. Tegap jaya
12. Running up A/E 1 & 3 :
13.00 - 15.00 - Warming up auxiliary boiler for internal cargo transfer scheduled
2.
PERMIT TO WORK
PW
MW
HW
CSE
IP
VAL
441
2.1
J HA
3. BUNKERS(M3)
441
1693
1693
374
169
374
169
930
M.F.O
M.D.O
CONS
0
1,524
RCVD
0
30,000
CONS
RCV
TRNSF
PROD
0
10
0
0
0
0
0
18
OSD
200
REC
0
IN
CONS
0
OUT
26
26
214152
252
214404
1146
Since
214404
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
930
28-Nov-13
17-Jan-17
TOTAL
@2400 HRS
3614
3612
TRANS
0
0
ROB
ROB
231,612
82,009
`
45
135
ROB
200
POB
43
28-Nov-13
Previous
Today
Total
0
0
0
0
1625
1922
3
0
58
0
0
0
0
2
21
0
0
0
0
0
0
0
1627
1943
3
0
58
NIL
NIL
NIL
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
Remarks
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
73,030
1,752
4.0
0.0
24.0
71,278
04
71,278
1,808
8.0
0.0
24.0
69,470
05
69,470
1,338
3.0
0.0
24.0
68,132
Transferred Materials
06
0
0
0
0
1,324
1,394
0
0
2.0
17.0
0.0
0.0
24.0
14.0
66,808
Transferred Materials
07
68,132
66,808
65,414
Transferred Materials
08
65,414
1,324
24.0
0.0
2.0
64,090
Transferred Materials
09
64,090
1,296
24.0
0.0
0.0
62,794
10
62,794
1,310
13.0
0.0
12.0
61,484
Transferred Materials
11
61,484
1,310
1.0
0.0
24.0
60,174
Transferred Materials
12
60,174
1,310
1.0
0.0
24.0
58,864
Transferred Materials
13
0
0
0
0
1,324
1,352
0
0
14.0
15.0
0.0
4.0
12.0
9.0
57,540
Transferred Materials
14
58,864
57,540
56,188
Transferred Materials
15
56,188
1,303
0.5
0.0
24.0
54,885
Transferred Materials
16
54,885
1,352
4.0
0.0
24.0
53,533
Transferred Materials
17
53,533
30,000
1,524
2.0
0.0
24.0
82,009
Warming up boiler
18
19
20
21
22
23
24
25
26
27
28
29
30
31
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
Remarks
01
235,612
235,612
02
235,612
235,612
03
235,612
1,000
234,612
04
05
06
234,612
231,612
0
0
0
0
3,000
0
0
0
231,612
231,612
231,612
231,612
07
231,612
231,612
08
231,612
231,612
09
231,612
231,612
10
231,612
231,612
11
231,612
231,612
12
231,612
231,612
13
231,612
231,612
14
231,612
231,612
15
231,612
231,612
16
231,612
231,612
17
231,612
231,612
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
214
Jul
13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
130
Jul
7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
TOTAL 84,489
Averag
e/Day
2,725
80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
1,575
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
TOTAL
367
183
556
REMARKS
Positive /
Negative
Total
Done
Positive
Done
Positive
Done
Positive
Done
Positive
Done
Positive
Done
Positive
Engine Room
Done
Positive
4/E
Engine Room
Done
Positive
E/E
AC Room
Done
Positive
Bosun
Main Deck
Done
Positive
AB
Main Deck
Done
Positive
12 UDIYANTO
AB
Bridge
Done
Positive
13 BAYU SEGARA
AB
Main Deck
Done
Positive
14 DEDI
OS
Main Deck
Done
Positive
15 ELIK BUDIANTO
FTR
Work Shop
Done
Positive
16 SUAIB
MTM
Lay down
Done
Positive
AC Room
Done
Positive
18 MASRUDI
C/Cook
Provision
store
Good
Positive
19 ROCHIM
COOK
Galley
Good
Positive
20 BOBY MANGONTO
STWD
Galley
Well Done
Positive
Induction
room
Positive
Reported by
Rank
Location
Master
Crew Mess
Room
C/O
Main Deck
3 CENG UMAR
2/O
Bridge
4 INDRA
3/O
Engine Room
5 JULY MANGIRI
C/E
Boiler
6 AGUNG RISTIANTO
2/E
RO Room
7 IRVAN TAHIR
3/E
8 HENDRA PRATAMA
9 SURYADINATA
1 IHWAN ASRUL
10 AANG
Description
TOTAL 21