Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 33

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.73
17.71
16.70
18.03
18.22
11.00
11.14
13.28
18.22
6.72

18.452
17.454
16.439
17.764
17.951
10.746
10.880
13.032
17.929
6.420

0
143
559
53
0
2,880
2,809
1,719
9
375

0
899
3,518
334
0
18,113
17,670
10,813
59
2,358

Nil
Nil
Nil
Nil
Nil
17.640
NIL
NIL
18.492
11.499

8,548

53,765
946

SL.S

OIL VOL

Volume
CU.M.

VOL.(BBLS)

V.C.F.

G.O.V.

TEMP

BBLS

31.0
32.5
31.2
31.0
30.6
32.6
32.0
31.9
29.8
30.8

87.8
90.5
88.2
87.8
87.1
90.7
89.6
89.4
85.6
87.4

17.374

196.869

1,238

18.204
11.200

0.6
222.14

4
1,397

0
899
3,518
334
0
16,875
17,670
10,813
55
961

420

2,639
68

51,124
876

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98468
0.98525
0.98533
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
885
3,468
329
0
16,617
17,410
10,655
54
948

0.000
1.770
5.202
0.659
0.000
33.23
34.820
21.309
0.135
2.370

0
883
3,463
329
0
16,583
17,375
10,633
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

50,366
866

50,266
861

PRODUCTION LOADING INTO COT 6C


Internal cargo transfer

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

53,765
2,639
51,124
50,366
6,319
6,420
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

50,366

DRAFT FWD

6.40 m

Capt. Juanda Pardede

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
18-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
111.012
435.032
41.331
0.000
2,084.376
2,185.105
1,336.523
6.783
118.911

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

6,319

8.60 m

0.000
112.791
442.003
41.994
0.000
2117.775
2220.098
1357.939
6.892
120.816
6,420

TRIM
LIST

Capt. Ihwan Asrul

2.20 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

18-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Juanda Pard

Lifting

24 Hours Total (bbls)

946

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

51,124

Storage Net / G.S.V (Nbbls)

50,366

Storage Net / N.S.V (Nbbls)

50,266

Days to Tank Tops

296

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

50,366

Water

Offtake

Water Received 24hrs (bbls)

68

Total Water in Cargo (bbls)

2,639

Total P/W Received (bbls)

84,613

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

32.6

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

Service Vessel
MDO

231,612

### 82,009

0
###
11,801

70,208

2,750

228,862

Supply Remaining (days)


Remarks : Transferred MDO 10.000 Ltr to SMS Vision

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment

1. Review previous day activity


2. Marking label on deck
3. Repainting gyro repeater , standard compass, etc at top
4. Maintenance main deck etc COT 6C
5. Internal cargo transfer and deballasting
6. Maintenance RO
7. Maintenance spare cyl head Aux. Eng
8. Corrective action for the workplace inspection

1. Review deck, engine and galley dept. activity


2. Marking label on deck
3. Corrective action for SPKK & work place inspection
4. Progress maintenance main deck, etc at COT 6C

Incidents
Type
NIL

Reference

Comments

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 21
The details see SPKK sheet *)
###

Time

Comment

Capt. Juanda Pardede

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

16553 / 50413

e Vessel

Comment

compass, etc at top deck area


C
ing

ng
nspection

t. activity

lace inspection
tc at COT 6C

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Debottoming PW from COT 2C into Slop s


Internal cargo transferred from COT 2C and 4C into COT 7C and 8C
08.00 : Commenced internal cargo transfer
08.30 : Started deballasting WBT 7W and 8W
15.00 : Stopped deballasting WBT 7W and 8W
15.30 : Completed internal cargo transfer

Mooring/Unmooring :
05.50 : SMS Vision port side alongside
07.10 : SMS Vision cast off
14.42 : SMS Vision port side alongside
18.10 : SMS Vision cast off

Bunkering/Debunkering :
05.55 : Commenced transferred fresh water to SMS Vision
07.00 : Completed transferred fresh water 15T to SMS Vision
16.45 : Commenced transferred HSD to SMS Vision
17.46 : Completed transferred HSD 10T to SMS Vision

Personnel & Material Transfer :


05.30 : 21 Persons PKP, 1 person mafhindo & 1 person santos rep by KST.51 ( Out )
17.30 : 20 Persons PKP, 2 persons spectra & 1 person mafhindo by KST.51 ( in )
18.20 : 1 Person santos rep by KST. 51 ( in )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos rep, Mafhindo, Spectra & PKP Personnel's
2. Debottoming PW from COT 2C into Slop S
3. Internal cargo transferred from COT 2C & 4C into COT 7C & 8C
4. Deballasting WBT 7W and 8W
5. Assissted Eng. Dept for transfer HSD to SMS Vision

ENGINE :
1. Checked & repaired aldis lamp on the bridge
2. Painted garbage drums in engine room
3. Internal cargo transferred
4. Installed SDV close speaker alarm
5. Repaired the polyurethane tube sand filter pressure gauge RO no.1
6. Renewed system oil HP pump RO no.2
7. Transferred HSD 10T to SMS Vision
8. Continued maintenance cylinder head auxiliary engine for spare
9. Running up A/E 1 & 3 :
08.00 - 15.30 - Internal cargo transferred

2.

PERMIT TO WORK

PW

MW

HW

CSE

IP

VAL

442

1695

374

170

933

2.1
J HA
3. BUNKERS(M3)

442

1695

4. FRESH WATER (MT)


BLR
DOM

374

170

933

M.F.O
M.D.O

CONS
2,750
1,801

RCVD
0
0

CONS

RCV

TRNSF

PROD

0
10

0
0

0
15

0
19

OSD
200

REC
0
IN

CONS
0
OUT

24

23

5. DISPERSANT, FOAM, CHEMICALS (LTRS)


REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

214404
252
214656

Days W/O LTI

1147

Since

214656
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

28-Nov-13

18-Jan-17

TOTAL
3621

@2400 HRS

3619

TRANS
0
10,000
ROB

ROB
228,862
70,208
`

45
129
ROB
200
POB

44
28-Nov-13

Previous

Today

Total

0
0
0
0
1627
1943
3
0
58

0
0
0
0
2
21
0
0
0

0
0
0
0
1629
1964
3
0
58

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06

0
0

0
0

1,324
1,394

0
0

2.0
17.0

0.0
0.0

24.0
14.0

66,808

Transferred Materials

07

68,132
66,808

65,414

Transferred Materials

08

65,414

1,324

24.0

0.0

2.0

64,090

Transferred Materials

09

64,090

1,296

24.0

0.0

0.0

62,794

10

62,794

1,310

13.0

0.0

12.0

61,484

Transferred Materials

11

61,484

1,310

1.0

0.0

24.0

60,174

Transferred Materials

12

60,174

1,310

1.0

0.0

24.0

58,864

Transferred Materials

13

0
0

0
0

1,324
1,352

0
0

14.0
15.0

0.0
4.0

12.0
9.0

57,540

Transferred Materials

14

58,864
57,540

56,188

Transferred Materials

15

56,188

1,303

0.5

0.0

24.0

54,885

Transferred Materials

16

54,885

1,352

4.0

0.0

24.0

53,533

Transferred Materials

17

53,533

30,000

1,524

2.0

0.0

24.0

82,009

Warming up boiler

18

82,009

10,000

1,801

7.5

0.0

24.0

70,208

Internal Cargo Transferred

19
20
21
22
23
24
25
26
27
28
29
30
31

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

231,612

231,612

07

231,612

231,612

08

231,612

231,612

09

231,612

231,612

10

231,612

231,612

11

231,612

231,612

12

231,612

231,612

13

231,612

231,612

14

231,612

231,612

15

231,612

231,612

16

231,612

231,612

17

231,612

231,612

18

231,612

2,750

228,862

19
20
21
22
23
24
25
26
27
28
29
30
31

Internal Cargo Transferred

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

227

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
13

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

137

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
7

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
4,966
4,958
4,963
4,974
4,988
4,964

TOTAL 89,453
Averag
e/Day

JUL AUG SEP OCT NOV DEC

2,886

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
95

1,670

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
18-Jan-2017

22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
21

0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
1

0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22

22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
44

TOTAL

388

205

600

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
18/Jan/17
Action/Commen
t

Positive /
Negative

Total

Advice about internal cargo transferred

Done

Positive

All in charged internal cargo transferred

Internal cargo transfer


completed

Positive

EHS induction to new visitor onboard

Done

Positive

Assisted C/O internal cargo transferred

Done

Positive

Main Deck

All in charged transferred HSD to support vessel

Done

Positive

2/E

Main Deck

Assisted transferred HSD to support vessel

Done

Positive

7 IRVAN TAHIR

3/E

RO room

Repaired the polyurethane tube sand filter


pressure gauge RO no.1

Done

Positive

8 HENDRA PRATAMA

4/E

Boiler

Operated auxiliary boiler for internal cargo


transferred

Done

Positive

9 SURYADINATA

E/E

CCR

Installed SDV close speaker alarm

Done

Positive

Pump room Line up internal cargo transferred in pump room

Valve/pump operator

Positive

Reported by

Rank

Location

Master

Crew Mess
Room

2 DENNY DAVID PAULUS

C/O

CCR

3 CENG UMAR

2/O

Induction
room

4 INDRA

3/O

CCR

5 JULY MANGIRI

C/E

6 AGUNG RISTIANTO

1 IHWAN ASRUL

10 AANG

Bosun

Description

11 ACHMAD NURUL HUDA

AB

Main Deck

Checked all water ballast tank quantity

Monitoring COT

Positive

12 UDIYANTO

AB

Bridge

Assisted C/O internal cargo transferred

Done

Positive

13 BAYU SEGARA

AB

Main Deck

Assisted C/O checked ullage on deck

Monitoring WBT

Positive

14 DEDI

OS

Main Deck

Brushing & 1st coating etc 6C

Done

Positive

15 ELIK BUDIANTO

FTR

RO room

Assisted 2/E maintenance RO no.2

Done

Positive

16 SUAIB

MTM

Engine room

Assisted 3/E maintenance auxiliary engine for


spare

Done

Positive

Work shop

Painted garbage drums in engine room work


shop

Done

Positive

Prepared additional food list

Good

Positive

Good

Positive

Well Done

Positive

Done

Positive

17 CHULWAN NURFALLAH WIPER


18 MASRUDI

C/Cook

Provision
store

19 ROCHIM

COOK

Galley

Galley area clean and tidy

20 BOBY MANGONTO

STWD

Galley

Daily cleaning in galley area

21 HARIANTO SULE TANAN STWD

Deck B

Prepared new visitor cabin

TOTAL 21