Professional Documents
Culture Documents
Vessel'S Midnight Ullage Report
Vessel'S Midnight Ullage Report
VESSEL:
PRODUCT:
TANK
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.73
17.71
16.70
18.03
18.22
11.00
11.14
13.28
18.22
6.72
18.452
17.454
16.439
17.764
17.951
10.746
10.880
13.032
17.929
6.420
0
143
559
53
0
2,880
2,809
1,719
9
375
0
899
3,518
334
0
18,113
17,670
10,813
59
2,358
Nil
Nil
Nil
Nil
Nil
17.640
NIL
NIL
18.492
11.499
8,548
53,765
946
SL.S
OIL VOL
Volume
CU.M.
VOL.(BBLS)
V.C.F.
G.O.V.
TEMP
BBLS
31.0
32.5
31.2
31.0
30.6
32.6
32.0
31.9
29.8
30.8
87.8
90.5
88.2
87.8
87.1
90.7
89.6
89.4
85.6
87.4
17.374
196.869
1,238
18.204
11.200
0.6
222.14
4
1,397
0
899
3,518
334
0
16,875
17,670
10,813
55
961
420
2,639
68
51,124
876
OIL VOLUME
W.C.F
@ 60F
TABLE 11
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98615
0.98478
0.98593
0.98613
0.98648
0.98468
0.98525
0.98533
0.98723
0.98633
G.S.V.
G.S.V.
N.S.V.
0
885
3,468
329
0
16,617
17,410
10,655
54
948
0.000
1.770
5.202
0.659
0.000
33.23
34.820
21.309
0.135
2.370
0
883
3,463
329
0
16,583
17,375
10,633
54
946
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
50,366
866
50,266
861
53,765
2,639
51,124
50,366
6,319
6,420
44.6
50,366
DRAFT FWD
6.40 m
AFT
0.20
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
18-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
0.000
111.012
435.032
41.331
0.000
2,084.376
2,185.105
1,336.523
6.783
118.911
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
6,319
8.60 m
0.000
112.791
442.003
41.994
0.000
2117.775
2220.098
1357.939
6.892
120.816
6,420
TRIM
LIST
2.20 m
NIL
MASTER
Staff
Surya Putra Jaya Master
Crude Storage
Santos Rep.
Lifting
946
Last Lifting
BS and W %
0.20
51,124
50,366
50,266
296
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
50,366
Water
Offtake
68
2,639
84,613
Loading/Incoming Temp
42.0
Specific Gravity
32.6
PFW PH
0
Note:
10
Vol (m3)
Kg
Soft Waste
0.00
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Biological Waste
Note :
Comments
FSO-MFO
Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)
FSO-MDO
Service Vessel
MDO
231,612
### 82,009
0
###
11,801
70,208
2,750
228,862
Meetings
Type
Time
Supervisory Meeting
06.30
16.30
Comment
Incidents
Type
NIL
Reference
Comments
Drills
Type
Time
Comment
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
16553 / 50413
e Vessel
Comment
ng
nspection
t. activity
lace inspection
tc at COT 6C
Comment
Mooring/Unmooring :
05.50 : SMS Vision port side alongside
07.10 : SMS Vision cast off
14.42 : SMS Vision port side alongside
18.10 : SMS Vision cast off
Bunkering/Debunkering :
05.55 : Commenced transferred fresh water to SMS Vision
07.00 : Completed transferred fresh water 15T to SMS Vision
16.45 : Commenced transferred HSD to SMS Vision
17.46 : Completed transferred HSD 10T to SMS Vision
ENGINE :
1. Checked & repaired aldis lamp on the bridge
2. Painted garbage drums in engine room
3. Internal cargo transferred
4. Installed SDV close speaker alarm
5. Repaired the polyurethane tube sand filter pressure gauge RO no.1
6. Renewed system oil HP pump RO no.2
7. Transferred HSD 10T to SMS Vision
8. Continued maintenance cylinder head auxiliary engine for spare
9. Running up A/E 1 & 3 :
08.00 - 15.30 - Internal cargo transferred
2.
PERMIT TO WORK
PW
MW
HW
CSE
IP
VAL
442
1695
374
170
933
2.1
J HA
3. BUNKERS(M3)
442
1695
374
170
933
M.F.O
M.D.O
CONS
2,750
1,801
RCVD
0
0
CONS
RCV
TRNSF
PROD
0
10
0
0
0
15
0
19
OSD
200
REC
0
IN
CONS
0
OUT
24
23
214404
252
214656
1147
Since
214656
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
28-Nov-13
18-Jan-17
TOTAL
3621
@2400 HRS
3619
TRANS
0
10,000
ROB
ROB
228,862
70,208
`
45
129
ROB
200
POB
44
28-Nov-13
Previous
Today
Total
0
0
0
0
1627
1943
3
0
58
0
0
0
0
2
21
0
0
0
0
0
0
0
1629
1964
3
0
58
NIL
NIL
NIL
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
Remarks
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
73,030
1,752
4.0
0.0
24.0
71,278
04
71,278
1,808
8.0
0.0
24.0
69,470
05
69,470
1,338
3.0
0.0
24.0
68,132
Transferred Materials
06
0
0
0
0
1,324
1,394
0
0
2.0
17.0
0.0
0.0
24.0
14.0
66,808
Transferred Materials
07
68,132
66,808
65,414
Transferred Materials
08
65,414
1,324
24.0
0.0
2.0
64,090
Transferred Materials
09
64,090
1,296
24.0
0.0
0.0
62,794
10
62,794
1,310
13.0
0.0
12.0
61,484
Transferred Materials
11
61,484
1,310
1.0
0.0
24.0
60,174
Transferred Materials
12
60,174
1,310
1.0
0.0
24.0
58,864
Transferred Materials
13
0
0
0
0
1,324
1,352
0
0
14.0
15.0
0.0
4.0
12.0
9.0
57,540
Transferred Materials
14
58,864
57,540
56,188
Transferred Materials
15
56,188
1,303
0.5
0.0
24.0
54,885
Transferred Materials
16
54,885
1,352
4.0
0.0
24.0
53,533
Transferred Materials
17
53,533
30,000
1,524
2.0
0.0
24.0
82,009
Warming up boiler
18
82,009
10,000
1,801
7.5
0.0
24.0
70,208
19
20
21
22
23
24
25
26
27
28
29
30
31
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
Remarks
01
235,612
235,612
02
235,612
235,612
03
235,612
1,000
234,612
04
05
06
234,612
231,612
0
0
0
0
3,000
0
0
0
231,612
231,612
231,612
231,612
07
231,612
231,612
08
231,612
231,612
09
231,612
231,612
10
231,612
231,612
11
231,612
231,612
12
231,612
231,612
13
231,612
231,612
14
231,612
231,612
15
231,612
231,612
16
231,612
231,612
17
231,612
231,612
18
231,612
2,750
228,862
19
20
21
22
23
24
25
26
27
28
29
30
31
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
227
Jul
13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
13
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
137
Jul
7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
7
TOTAL 89,453
Averag
e/Day
2,886
80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
95
1,670
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
18-Jan-2017
22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
21
0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
1
0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22
22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
44
TOTAL
388
205
600
REMARKS
Positive /
Negative
Total
Done
Positive
Positive
Done
Positive
Done
Positive
Main Deck
Done
Positive
2/E
Main Deck
Done
Positive
7 IRVAN TAHIR
3/E
RO room
Done
Positive
8 HENDRA PRATAMA
4/E
Boiler
Done
Positive
9 SURYADINATA
E/E
CCR
Done
Positive
Valve/pump operator
Positive
Reported by
Rank
Location
Master
Crew Mess
Room
C/O
CCR
3 CENG UMAR
2/O
Induction
room
4 INDRA
3/O
CCR
5 JULY MANGIRI
C/E
6 AGUNG RISTIANTO
1 IHWAN ASRUL
10 AANG
Bosun
Description
AB
Main Deck
Monitoring COT
Positive
12 UDIYANTO
AB
Bridge
Done
Positive
13 BAYU SEGARA
AB
Main Deck
Monitoring WBT
Positive
14 DEDI
OS
Main Deck
Done
Positive
15 ELIK BUDIANTO
FTR
RO room
Done
Positive
16 SUAIB
MTM
Engine room
Done
Positive
Work shop
Done
Positive
Good
Positive
Good
Positive
Well Done
Positive
Done
Positive
C/Cook
Provision
store
19 ROCHIM
COOK
Galley
20 BOBY MANGONTO
STWD
Galley
Deck B
TOTAL 21