VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.73
17.71
16.70
18.03
18.22
10.63
11.14
13.28
18.22
6.72

18.452
17.454
16.439
17.764
17.951
10.371
10.880
13.032
17.929
6.420

0
143
559
53
0
3,032
2,809
1,719
9
375

0
899
3,518
334
0
19,074
17,670
10,813
59
2,358

Nil
Nil
Nil
Nil
Nil
17.613
NIL
NIL
18.492
11.499

8,701

54,726
961

SL.S

OIL VOL

Volume
CU.M.

VOL.(BBLS)

V.C.F.

G.O.V.

TEMP

BBLS

31.0
32.5
31.2
31.0
30.6
32.6
32.0
31.9
29.8
30.8

87.8
90.5
88.2
87.8
87.1
90.7
89.6
89.4
85.6
87.4

17.347

207.087

1,303

18.204
11.200

0.6
222.14

4
1,397

0
899
3,518
334
0
17,771
17,670
10,813
55
961

430

2,704
65

52,020
896

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98468
0.98525
0.98533
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
885
3,468
329
0
17,499
17,410
10,655
54
948

0.000
1.770
5.202
0.659
0.000
35.00
34.820
21.309
0.135
2.370

0
883
3,463
329
0
17,464
17,375
10,633
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

51,248
882

51,146
880

PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

54,726
2,704
52,020
51,248
6,430
6,533
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

51,248

DRAFT FWD

6.40 m

Capt. Juanda Pardede

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
19-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
111.012
435.032
41.331
0.000
2,195.040
2,185.105
1,336.523
6.783
118.911

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

6,430

8.60 m

0.000
112.791
442.003
41.994
0.000
2230.212
2220.098
1357.939
6.892
120.816
6,533

TRIM
LIST

Capt. Ihwan Asrul

2.20 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

19-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Juanda Pard

Lifting

24 Hours Total (bbls)

961

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

52,020

Storage Net / G.S.V (Nbbls)

51,248

Storage Net / N.S.V (Nbbls)

51,146

Days to Tank Tops

288

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

51,248

Water

Offtake

Water Received 24hrs (bbls)

65

Total Water in Cargo (bbls)

2,704

Total P/W Received (bbls)

84,678

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

32.6

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

228,862

Service Vessel
MDO

### 70,208

###

1,310

228,862

68,898

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment
1. Review previous day activity
2. Marking label on deck
3. Repainting gyro repeater, standard compass, etc at top
4. Maintenance main deck etc COT 6C
5. Corrective action for the workplace inspection
6. Maintenance RO no.1
7. Continued maintenance spare cyl head Aux. Eng
8. Checked & maintenance COPT no.2
9. Install rubber packing DO tank manhole

1. Review deck, engine and galley dept. activity


2. Marking label on deck
3. Corrective action for SPKK & work place inspection
4. Progress maintenance main deck, etc at COT 6C
5. Crew change

Incidents
Type
NIL

Reference

Comments

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 21
The details see SPKK sheet *)
###

Time

Comment

Capt. Juanda Pardede

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

17443 / 51303

e Vessel

Comment

compass, etc at top deck area


C
nspection

ead Aux. Eng


2
hole

t. activity

lace inspection
tc at COT 6C

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
06.00 : SMS Vision port side alongside
10.00 : SMS Vision cast off

Bunkering/Debunkering :

Personnel & Material Transfer :


05.30 : 19 Persons PKP, 1 person mafhindo, 2 person spectra & 1 person santos rep by KST.51 ( Out )
10.15 : 1 person santos rep, 1 person nalco, 1 person oryx & 2 person PKP by KST. 51 ( in )
10.30 : 1 person santos rep & 2 person PKP by KST. 51 ( out )
10.35 : 2 sea good yellow pipes & 1 coil staging pipe by KST. 51 ( Out )
16.00 : 1 person oryx & 1 person nalco by SMS Vision ( out )
16.45 : 1 coil sea good pipe by KST. 51 ( in )
17.00 : 6 person PKP by KST. 51 ( in )
17.30 : 10 persons PKP, 1 person mafhindo & 2 persons spectra by SMS Vision ( in )
18.50 : 1 person satos rep by KST. 51 ( in )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos rep, Mafhindo, Spectra, Nalco, Oryx & PKP Personnel's
2. Marked label ,etc at Slop S
3. Repainted gyro repeater, standard compass, etc at top deck area
4. Maintenance chipping brushing main deck, etc at COT 6C
5. Final coating Slop S area
6. Corrective action for SPKK & work place inspection
7. Calibrated & tested gas / flame detector on deck

ENGINE :
1. Continued maintenance cylinder head auxiliary engine for spare
2. Installed gland packing steam inlet valve water ballast pump tank
3. Maintenance RO no.1
- Replacement fine filter and HP pump water seal
4. Renewed rubber packing Diesel oil tank manhole
5. Checked & repaired steam inlet valve spindle COPT no.2
6. Running up A/E 1 & 3 :
10.00 - 10.30 - Lifted sea good materials by KST. 51 ( out )
16.15 - 16.45 - Lifted sea good materials by KST. 51 ( in )

2.
2.1

PERMIT TO WORK
J HA

PW

MW

HW

CSE

IP

VAL

442

1697
1697

374

170

937

374

170

937

442

M.F.O
M.D.O

CONS
0
1,310

RCVD
0
0

CONS

RCV

TRNSF

PROD

0
10

0
0

0
0

0
11

OSD
200

REC
0
IN

CONS
0
OUT

28

28

3. BUNKERS(M3)

4. FRESH WATER (MT)


BLR
DOM
5. DISPERSANT, FOAM, CHEMICALS (LTRS)
REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

214656
252
214908

Days W/O LTI

1148

Since

214908
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

28-Nov-13

19-Jan-17

TOTAL
3627
3625

@2400 HRS

TRANS
0
0
ROB

ROB
228,862
68,898
`

45
130
ROB
200
POB

44
28-Nov-13

Previous

Today

Total

0
0
0
0
1629
1964
3
0
58

0
0
0
0
2
21
0
0
0

0
0
0
0
1631
1985
3
0
58

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06

0
0

0
0

1,324
1,394

0
0

2.0
17.0

0.0
0.0

24.0
14.0

66,808

Transferred Materials

07

68,132
66,808

65,414

Transferred Materials

08

65,414

1,324

24.0

0.0

2.0

64,090

Transferred Materials

09

64,090

1,296

24.0

0.0

0.0

62,794

10

62,794

1,310

13.0

0.0

12.0

61,484

Transferred Materials

11

61,484

1,310

1.0

0.0

24.0

60,174

Transferred Materials

12

60,174

1,310

1.0

0.0

24.0

58,864

Transferred Materials

13

0
0

0
0

1,324
1,352

0
0

14.0
15.0

0.0
4.0

12.0
9.0

57,540

Transferred Materials

14

58,864
57,540

56,188

Transferred Materials

15

56,188

1,303

0.5

0.0

24.0

54,885

Transferred Materials

16

54,885

1,352

4.0

0.0

24.0

53,533

Transferred Materials

17

53,533

30,000

1,524

2.0

0.0

24.0

82,009

Warming up boiler

18

82,009

10,000

1,801

7.5

0.0

24.0

70,208

Internal Cargo Transferred

19

70,208

1,310

1.0

0.0

24.0

68,898

Transferred Materials

20
21
22
23
24
25
26
27
28
29
30
31

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

231,612

231,612

07

231,612

231,612

08

231,612

231,612

09

231,612

231,612

10

231,612

231,612

11

231,612

231,612

12

231,612

231,612

13

231,612

231,612

14

231,612

231,612

15

231,612

231,612

16

231,612

231,612

17

231,612

231,612

18

231,612

2,750

228,862

19

228,862

228,862

20
21
22
23
24
25
26
27
28
29
30
31

Internal Cargo Transferred

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

238

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
13
11

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

144

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
7
7

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
4,966
4,958
4,963
4,974
4,988
4,964
4,978

TOTAL 94,431
Averag
e/Day

JUL AUG SEP OCT NOV DEC

3,046

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
95
55

1,725

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
18-Jan-2017
19-Jan-2017

22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
21
21

0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
1
1

0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22
22

22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
44
44

TOTAL

409

227

644

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
19/Jan/17
Action/Commen
t

Positive /
Negative

Total

Done

Positive

Assisted tested flame/gas detector

Well Done

Positive

Bridge

Repainted compass repeater on the bridge

Well Done

Positive

Slop S

Marked label at Slop S

Done

Positive

Done

Positive

Done

Positive

Engine room Maintenance Auxiliary engine for spare

Done

Positive

Engine room Installed gland packing steam inlet valve WBPT

Done

Positive

Assisted 2/E aintenance RO no.1

Done

Positive

Lay down

Lifted materials as crane operator

Done

Positive

AB

Main Deck

Assisted boatswain lifted materials as signal man

Lifted materials

Positive

12 UDIYANTO

AB

Main Deck

Assisted boarswain maintenance chipping


brushing at etc 6C

Progress

Positive

13 BAYU SEGARA

AB

Slop S

Final coating etc at slop starboard side

Done

Positive

14 DEDI

OS

Main Deck

Maintenance chipping brushing etc 6C

Progress

Positive

15 ELIK BUDIANTO

FTR

RO room

Assisted 2/E aintenance RO no.1

Done

Positive

16 SUAIB

MTM

Engine room

Assisted 3/E maintenance Auxiliary engine for


spare

Done

Positive

Reported by

Rank

Location

Master

Crew mess
room

2 DENNY DAVID PAULUS

C/O

CCR

3 CENG UMAR

2/O

4 INDRA

3/O

5 JULY MANGIRI

C/E

6 AGUNG RISTIANTO

2/E

7 IRVAN TAHIR

3/E

8 HENDRA PRATAMA

4/E

9 SURYADINATA

E/E

RO room

Bosun

11 ACHMAD NURUL HUDA

1 IHWAN ASRUL

10 AANG

Description
Advice to galley team about additional provision

Engine room Checked maintenance cylinder head AE for spare


RO room

Maintenance RO no.1

17 CHULWAN NURFALLAH WIPER

RO room

Assisted 2/E aintenance RO no.1

Done

Positive

18 MASRUDI

C/Cook

Provision
store

Rechecked additional food list & reported to


master for requisition

Good

Positive

19 ROCHIM

COOK

Galley

Daily prepared crew coffee time

Good

Positive

20 BOBY MANGONTO

STWD

Galley

Flushing wasteful by hot water

Well Done

Positive

21 HARIANTO SULE TANAN STWD

Deck C

House keeping in deck C passage

Done

Positive

TOTAL 21