Vessel'S Midnight Ullage Report
Vessel'S Midnight Ullage Report
VESSEL:
PRODUCT:
TANK
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.73
17.71
16.70
18.03
18.22
10.63
11.14
13.28
18.22
6.72
18.452
17.454
16.439
17.764
17.951
10.371
10.880
13.032
17.929
6.420
0
143
559
53
0
3,032
2,809
1,719
9
375
0
899
3,518
334
0
19,074
17,670
10,813
59
2,358
Nil
Nil
Nil
Nil
Nil
17.613
NIL
NIL
18.492
11.499
8,701
54,726
961
SL.S
OIL VOL
Volume
CU.M.
VOL.(BBLS)
V.C.F.
G.O.V.
TEMP
BBLS
31.0
32.5
31.2
31.0
30.6
32.6
32.0
31.9
29.8
30.8
87.8
90.5
88.2
87.8
87.1
90.7
89.6
89.4
85.6
87.4
17.347
207.087
1,303
18.204
11.200
0.6
222.14
4
1,397
0
899
3,518
334
0
17,771
17,670
10,813
55
961
430
2,704
65
52,020
896
OIL VOLUME
W.C.F
@ 60F
TABLE 11
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98615
0.98478
0.98593
0.98613
0.98648
0.98468
0.98525
0.98533
0.98723
0.98633
G.S.V.
G.S.V.
N.S.V.
0
885
3,468
329
0
17,499
17,410
10,655
54
948
0.000
1.770
5.202
0.659
0.000
35.00
34.820
21.309
0.135
2.370
0
883
3,463
329
0
17,464
17,375
10,633
54
946
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
51,248
882
51,146
880
54,726
2,704
52,020
51,248
6,430
6,533
44.6
51,248
DRAFT FWD
6.40 m
AFT
0.20
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
19-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
0.000
111.012
435.032
41.331
0.000
2,195.040
2,185.105
1,336.523
6.783
118.911
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
6,430
8.60 m
0.000
112.791
442.003
41.994
0.000
2230.212
2220.098
1357.939
6.892
120.816
6,533
TRIM
LIST
2.20 m
NIL
MASTER
Staff
Surya Putra Jaya Master
Crude Storage
Santos Rep.
Lifting
961
Last Lifting
BS and W %
0.20
52,020
51,248
51,146
288
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
51,248
Water
Offtake
65
2,704
84,678
Loading/Incoming Temp
42.0
Specific Gravity
32.6
PFW PH
0
Note:
10
Vol (m3)
Kg
Soft Waste
0.00
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Biological Waste
Note :
Comments
FSO-MFO
Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)
FSO-MDO
228,862
Service Vessel
MDO
### 70,208
###
1,310
228,862
68,898
Meetings
Type
Time
Supervisory Meeting
06.30
16.30
Comment
1. Review previous day activity
2. Marking label on deck
3. Repainting gyro repeater, standard compass, etc at top
4. Maintenance main deck etc COT 6C
5. Corrective action for the workplace inspection
6. Maintenance RO no.1
7. Continued maintenance spare cyl head Aux. Eng
8. Checked & maintenance COPT no.2
9. Install rubber packing DO tank manhole
Incidents
Type
NIL
Reference
Comments
Drills
Type
Time
Comment
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
17443 / 51303
e Vessel
Comment
t. activity
lace inspection
tc at COT 6C
Comment
Mooring/Unmooring :
06.00 : SMS Vision port side alongside
10.00 : SMS Vision cast off
Bunkering/Debunkering :
ENGINE :
1. Continued maintenance cylinder head auxiliary engine for spare
2. Installed gland packing steam inlet valve water ballast pump tank
3. Maintenance RO no.1
- Replacement fine filter and HP pump water seal
4. Renewed rubber packing Diesel oil tank manhole
5. Checked & repaired steam inlet valve spindle COPT no.2
6. Running up A/E 1 & 3 :
10.00 - 10.30 - Lifted sea good materials by KST. 51 ( out )
16.15 - 16.45 - Lifted sea good materials by KST. 51 ( in )
2.
2.1
PERMIT TO WORK
J HA
PW
MW
HW
CSE
IP
VAL
442
1697
1697
374
170
937
374
170
937
442
M.F.O
M.D.O
CONS
0
1,310
RCVD
0
0
CONS
RCV
TRNSF
PROD
0
10
0
0
0
0
0
11
OSD
200
REC
0
IN
CONS
0
OUT
28
28
3. BUNKERS(M3)
214656
252
214908
1148
Since
214908
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
28-Nov-13
19-Jan-17
TOTAL
3627
3625
@2400 HRS
TRANS
0
0
ROB
ROB
228,862
68,898
`
45
130
ROB
200
POB
44
28-Nov-13
Previous
Today
Total
0
0
0
0
1629
1964
3
0
58
0
0
0
0
2
21
0
0
0
0
0
0
0
1631
1985
3
0
58
NIL
NIL
NIL
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
Remarks
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
73,030
1,752
4.0
0.0
24.0
71,278
04
71,278
1,808
8.0
0.0
24.0
69,470
05
69,470
1,338
3.0
0.0
24.0
68,132
Transferred Materials
06
0
0
0
0
1,324
1,394
0
0
2.0
17.0
0.0
0.0
24.0
14.0
66,808
Transferred Materials
07
68,132
66,808
65,414
Transferred Materials
08
65,414
1,324
24.0
0.0
2.0
64,090
Transferred Materials
09
64,090
1,296
24.0
0.0
0.0
62,794
10
62,794
1,310
13.0
0.0
12.0
61,484
Transferred Materials
11
61,484
1,310
1.0
0.0
24.0
60,174
Transferred Materials
12
60,174
1,310
1.0
0.0
24.0
58,864
Transferred Materials
13
0
0
0
0
1,324
1,352
0
0
14.0
15.0
0.0
4.0
12.0
9.0
57,540
Transferred Materials
14
58,864
57,540
56,188
Transferred Materials
15
56,188
1,303
0.5
0.0
24.0
54,885
Transferred Materials
16
54,885
1,352
4.0
0.0
24.0
53,533
Transferred Materials
17
53,533
30,000
1,524
2.0
0.0
24.0
82,009
Warming up boiler
18
82,009
10,000
1,801
7.5
0.0
24.0
70,208
19
70,208
1,310
1.0
0.0
24.0
68,898
Transferred Materials
20
21
22
23
24
25
26
27
28
29
30
31
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
Remarks
01
235,612
235,612
02
235,612
235,612
03
235,612
1,000
234,612
04
05
06
234,612
231,612
0
0
0
0
3,000
0
0
0
231,612
231,612
231,612
231,612
07
231,612
231,612
08
231,612
231,612
09
231,612
231,612
10
231,612
231,612
11
231,612
231,612
12
231,612
231,612
13
231,612
231,612
14
231,612
231,612
15
231,612
231,612
16
231,612
231,612
17
231,612
231,612
18
231,612
2,750
228,862
19
228,862
228,862
20
21
22
23
24
25
26
27
28
29
30
31
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
238
Jul
13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
13
11
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
144
Jul
7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
7
7
TOTAL 94,431
Averag
e/Day
3,046
80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
95
55
1,725
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
18-Jan-2017
19-Jan-2017
22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
21
21
0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
1
1
0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22
22
22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
44
44
TOTAL
409
227
644
REMARKS
Positive /
Negative
Total
Done
Positive
Well Done
Positive
Bridge
Well Done
Positive
Slop S
Done
Positive
Done
Positive
Done
Positive
Done
Positive
Done
Positive
Done
Positive
Lay down
Done
Positive
AB
Main Deck
Lifted materials
Positive
12 UDIYANTO
AB
Main Deck
Progress
Positive
13 BAYU SEGARA
AB
Slop S
Done
Positive
14 DEDI
OS
Main Deck
Progress
Positive
15 ELIK BUDIANTO
FTR
RO room
Done
Positive
16 SUAIB
MTM
Engine room
Done
Positive
Reported by
Rank
Location
Master
Crew mess
room
C/O
CCR
3 CENG UMAR
2/O
4 INDRA
3/O
5 JULY MANGIRI
C/E
6 AGUNG RISTIANTO
2/E
7 IRVAN TAHIR
3/E
8 HENDRA PRATAMA
4/E
9 SURYADINATA
E/E
RO room
Bosun
1 IHWAN ASRUL
10 AANG
Description
Advice to galley team about additional provision
Maintenance RO no.1
RO room
Done
Positive
18 MASRUDI
C/Cook
Provision
store
Good
Positive
19 ROCHIM
COOK
Galley
Good
Positive
20 BOBY MANGONTO
STWD
Galley
Well Done
Positive
Deck C
Done
Positive
TOTAL 21