Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 33

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.73
17.71
16.69
18.03
18.21
10.26
11.13
13.28
18.22
11.72

18.452
17.454
16.439
17.764
17.951
10.009
10.880
13.032
17.929
11.425

0
143
559
53
0
3,180
2,809
1,719
9
215

0
899
3,518
334
0
20,000
17,670
10,813
59
1,352

Nil
Nil
Nil
Nil
Nil
17.584
NIL
NIL
18.491
16.508

8,688

54,646
927

SL.S

OIL VOL

Volume
CU.M.

VOL.(BBLS)

V.C.F.

G.O.V.

TEMP

BBLS

31.0
32.5
31.2
31.0
30.6
32.6
32.0
31.9
29.8
30.8

87.8
90.5
88.2
87.8
87.1
90.7
89.6
89.4
85.6
87.4

17.320

217.249

1,366

18.204
16.210

0.6
62.02

4
390

0
899
3,518
334
0
18,634
17,670
10,813
55
962

280

1,760
63

52,884
864

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98468
0.98525
0.98533
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
885
3,468
329
0
18,349
17,410
10,655
54
949

0.000
1.770
5.202
0.659
0.000
36.70
34.820
21.309
0.135
2.372

0
883
3,463
329
0
18,312
17,375
10,633
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

52,098
850

51,995
849

PRODUCTION LOADING INTO COT 6C


Decanting PW 1007 Bbls

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

54,646
1,760
52,884
52,098
6,536
6,641
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

52,098

DRAFT FWD

6.40 m

Capt. Juanda Pardede

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
20-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
111.012
435.032
41.331
0.000
2,301.636
2,185.105
1,336.523
6.783
119.002

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

6,536

8.70 m

0.000
112.791
442.003
41.994
0.000
2338.517
2220.098
1357.939
6.892
120.909
6,641

TRIM
LIST

Capt. Ihwan Asrul

2.30 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

20-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Lifting

24 Hours Total (bbls)

927

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

52,884

Storage Net / G.S.V (Nbbls)

52,098

Storage Net / N.S.V (Nbbls)

51,995

Days to Tank Tops

298

Total Crude This Month (Nbbls)

19-D

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

Offtake

Water Received 24hrs (bbls)

63

Total Water in Cargo (bbls)

1,760

Total P/W Received (bbls)

84,741

Water Drawn off (bbls)

1,007

Specific Gravity

PFW PH

Offtake 24 Hours (bbls)


Note :

Loading/Incoming Temp

42.0

Storage tanks's temperature

32.6

Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C


Decanting PW 1007 Bbls

Non Regulated Waste


Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

141,

52,098

Water

Category

Capt. Juanda Pard

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

228,862

Service Vessel
MDO

### 68,898

###

1,296

228,862

67,602

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment
1. Review previous day activity
2. Sharing recently incident by Santos Rep
3. Crew change
4. Maintenance main deck etc COT 6C
5. Corrective action for the workplace inspection / SPKK
6. Maintenance RO No. 2
7. Maintenance A/E
8. Maintenance COPT No. 2

1. Review deck, engine and galley dept. activity


2. Weekly test LSA, FFA and Nav/GMDSS equipment
3. Workplace inspection
4. Progress maintenance main deck, etc at COT 6C
5. Weekly test safety device and emergency machinery

Incidents
Type
NIL

Reference

Comments

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 20
The details see SPKK sheet *)
###

Time

Comment

Capt. Juanda Pardede

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

18308 / 51873

e Vessel

Comment

Rep

C
nspection / SPKK

t. activity
DSS equipment

tc at COT 6C

gency machinery

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Decanting PW 1007 Bbls

Mooring/Unmooring :
NIL

Bunkering/Debunkering :
NIL

Personnel & Material Transfer :


05.30: 14 Persons Pkp, 1 Person Mafhindo, 2 Persons Spectra by. SMS Vision ( Out )
2 Persons Spj by KST.51 ( Out )
10.00: 1 Person Pkp by KST. 51 ( in )
10.05: 1 Person Santos Rep by KST. 51 ( out )
12.00: 1 Person Spj by. KST.51 ( In )
12.30: 5 Persons Pkp by. SMS Vision ( Out )
17.00: 18 Persons Pkp & 1 Person Mafhindo by. KST.51 ( In )
18.05: 1 Person Santos Rep by. KST.51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos Rep, Spj and Contractor Personnel
2. Crew changed
3. Sharing recently incident by Santos Rep
4. Maintenance main deck, etc. at COT 6C
5. Repainted IMO Number at forward accommodation structure
6. Corrective action for the work place inspection / SPKK

ENGINE :
1. Lapping intake and exhaust valve cylinder head auxiliary engine for spare
2. Assembled of steam inlet valve and cleaned all drain valve COPT No.2
3. Maintenance tachometer COPT No.1
4. Replaced fine filter RO No.2
5. Checked and repaired portable deck air compressor
6. Transferred waste oil from primary tank to fo tank starboard No.1

2.

PERMIT TO WORK

2.1
J HA
3. BUNKERS(M3)

4. FRESH WATER (MT)

PW

MW

HW

CSE

IP

VAL

442

1698
1698

374

170

942

374

170

942

M.F.O
M.D.O

CONS
0
1,296

RCVD
0
0

RCV

TRNSF

PROD

442

CONS

BLR
DOM

0
10

5. DISPERSANT, FOAM, CHEMICALS (LTRS)


REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

214908
240
215148

Days W/O LTI

0
0

0
0

5
10

OSD
200

REC
0
IN

CONS
0
OUT

21

25

1149

Since

28-Nov-13

215148
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

Sharing recen

20-Jan-17

@2400 HRS

TOTAL
3633
3631

TRANS
0
0
ROB

ROB
228,862
67,602
`

50
136
ROB
200
POB

40
28-Nov-13

Previous

Today

Total

0
0
0
0
1631
1985
3
0
58

0
0
0
0
3
20
0
0
1

0
0
0
0
1634
2005
3
0
59

NIL
NIL
NIL
NIL
Sharing recently incident by Santos Rep : Projectile - Failed instrument

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06

0
0

0
0

1,324
1,394

0
0

2.0
17.0

0.0
0.0

24.0
14.0

66,808

Transferred Materials

07

68,132
66,808

65,414

Transferred Materials

08

65,414

1,324

24.0

0.0

2.0

64,090

Transferred Materials

09

64,090

1,296

24.0

0.0

0.0

62,794

10

62,794

1,310

13.0

0.0

12.0

61,484

Transferred Materials

11

61,484

1,310

1.0

0.0

24.0

60,174

Transferred Materials

12

60,174

1,310

1.0

0.0

24.0

58,864

Transferred Materials

13

0
0

0
0

1,324
1,352

0
0

14.0
15.0

0.0
4.0

12.0
9.0

57,540

Transferred Materials

14

58,864
57,540

56,188

Transferred Materials

15

56,188

1,303

0.5

0.0

24.0

54,885

Transferred Materials

16

54,885

1,352

4.0

0.0

24.0

53,533

Transferred Materials

17

53,533

30,000

1,524

2.0

0.0

24.0

82,009

Warming up boiler

18

82,009

10,000

1,801

7.5

0.0

24.0

70,208

Internal Cargo Transferred

19

70,208

1,310

1.0

0.0

24.0

68,898

Transferred Materials

20

68,898

1,296

0.0

0.0

24.0

67,602

21
22
23
24
25
26
27
28
29
30
31

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

231,612

231,612

07

231,612

231,612

08

231,612

231,612

09

231,612

231,612

10

231,612

231,612

11

231,612

231,612

12

231,612

231,612

13

231,612

231,612

14

231,612

231,612

15

231,612

231,612

16

231,612

231,612

17

231,612

231,612

18

231,612

2,750

228,862

19

228,862

228,862

20

228,862

228,862

21
22
23
24
25
26
27
28
29
30
31

Internal Cargo Transferred

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

250

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
13
11
12

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

152

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
7
7
8

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
4,966
4,958
4,963
4,974
4,988
4,964
4,978
4,971

TOTAL 99,402
Averag
e/Day

JUL AUG SEP OCT NOV DEC

3,207

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
95
55
75

1,800

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
18-Jan-2017
19-Jan-2017
20-Jan-2017

22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
21
21
20

0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
1
1
1

0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22
22
19

22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
44
44
40

TOTAL

429

246

684

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
20/Jan/17
Rank

Location

Description

Action/Commen
t

Positive /
Negative

Total

Master

Crew mess
room

Advice to Duty Officer for check and receive new


spare part on board

Done

Positive

2 DENNY DAVID PAULUS

C/O

Poop deck

MMC found in wrong locker

Shifted

Negative

3 CENG UMAR

2/O

Induction
room

EHS Safety induction to New crew on board

Done

Positive

4 IHSANUDIN

3/O

Induction
room

Attended EHS safety Induction from Duty Officer

Done

Positive

5 JULY MANGIRI

C/E

Done

Positive

6 AGUNG RISTIANTO

2/E

Done

Positive

7 IRVAN TAHIR

3/E

Engine room Maintenance A/E

Done

Positive

8 HENDRA PRATAMA

4/E

Engine room Assamble of steam inlet valve COPT No.2

Done

Positive

9 SURYADINATA

E/E

RO room

Checked and repaired the portable deck air


compressor

Done

Positive

Bosun

Lay down

Maintenance chipping brushing COT 6C area

Progress

Positive

11 ACHMAD NURUL HUDA

AB

Main Deck

FW valve in deck B shower room still open when


Shutted valve(Closed)
unmaned

Negative

12 UDIYANTO

AB

Main Deck

Assisted boatswain maintenance chipping


brushing at COT 6C area

Progress

Positive

13 BAYU SEGARA

AB

Slop S

Assisted boatswain maintenance chipping


brushing at COT 6C area

Done

Positive

14 DEDI

OS

Main Deck

Maintenance chipping brushing COT 6C

Progress

Positive

15 ELIK BUDIANTO

FTR

RO room

Assisted 2/E maintenance RO no.2

Done

Positive

16 SUAIB

MTM

Engine room

Lapping intake and exhaust valve cylinder head


Auxiliary engine for spare

Done

Positive

Reported by

1 IHWAN ASRUL

10 AANG

Engine room Checked maintenance COPT No.2


RO room

Maintenance RO no.2

17 CHULWAN NURFALLAH WIPER

RO room

Cleaned drain valve COPT No.2

Done

Positive

18 MASRUDI

C/Cook

Provision
store

Prepared all personnel breakfast

Well Done

Positive

19 BOBY MANGONTO

STWD

Galley

Assisted C/COOK prepared all personnel


breakfast

Done

Positive

20 HARIANTO SULE TANAN STWD

Deck C

House keeping in Crew Mess room

Done

Positive

TOTAL 20

You might also like