SITE VISIT

REPORT
DMRC, Greater Noida

SITE VISIT REPORT


4TH YEAR, B. ARCH

CONTENT LIST

Introduction
INSITU construction
Pre-fab construction
Photos

INTRODUCTION
Construction site visit to DMRC site of Greater Noida was conducted.
Under this visit, various modern construction techniques of construction
were seen in form of In-situ construction along with Pre-fab units installed
at the site using latest mechanized construction equipment. Site varies in
the construction terms as it contains housing, control units, warehouses
and power backup or control units. This makes the site itself a best
SITE VISIT REPORT

example to showcase the modern methods of construction as DMRC is


among one of the leading public sectors in India. The construction was in
its full swing as DMRC is always known for their timely deliverance of
projects.
About DMRC
The Delhi Metro has been instrumental in ushering in a new era in the
sphere of mass urban transportation in India. The swanky and modern
Metro system introduced comfortable, air conditioned and eco-friendly
services for the first time in India and completely revolutionized the mass
transportation scenario not only in the National Capital Region but the
entire country.
Fig. 1 Model showing the proposed site under this project.

INSITU CONSTRUCTION
In situ refers to construction which is carried out at the building site
using raw materials. Compare that with prefabricated construction, in
which building components are made in a factory and then transported to
the building site for assembly .
Fig 2. Steel framework
for
pouring
Fig
4. Diagram showing
concrete
and construct that
the
components
cast
in situ
make
the column
basic structure
i.e. cast in situ columns
and footings and pre-fab

SITE VISIT REPORT

Fig 3. Columns constructed by the method of


Cast In situ technique

PRE FAB CONSTRUCTION


Prefabrication is
a structure in

the

practice of
a factory or

assembling components of
other manufacturing site,
SITE VISIT REPORT

and transporting complete


assemblies
or
sub-assemblies
the construction site where the structure is to be located.

to

Fig
5.
Metro
warehouse
roof
trusses constructed
out
of
Pre
fab

Fig 6. Column casted


inside
the
ground
level which will act
as pier and further
above
the
ground
Fig 7. Connection between the cast in
situ foundation pier and pre fabricated
steel column through bolts and nuts,
here columns are of depth of 2 mts for
Raft foundation

PHOTOS
Fig
8.
Steel
framework
of
Warehouse
showing
various
components like purlin, columns &
rafter
SITE VISIT REPORT 5

Fig 9. Septic Tank

Fig 10 & 11. Machine used


to pump concrete and pour
it into the framework of
steel to construct column.
This will simultaneously
also act as a vibrator and
will remove any air gaps in
the poured concrete.

SITE VISIT REPORT

SITE VISIT REPORT

SITE VISIT REPORT

SITE VISIT REPORT

SITE VISIT REPORT