Professional Documents
Culture Documents
33 Trip SheetV1.1
33 Trip SheetV1.1
Drillingformulas.com
Pipe displacement#1
0.55
bbl/single
Pipe displacement#2
0.8
bbl/single
Manual Input
Pipe displacement#3
0.92
bbl/stand
Calculated values
Pipe displacement#4
bbl/stand
Pipe displacement#5
1.1
bbl/stand
Differences
Trip tank
Cumulative
between
Volume
displacement actual and rig
(Rig Sensor)
(rig sensor)
sensor
0.9
0.9 Lose 0.1 bbl
0.8
1.7 Lose 0.1 bbl
0.8
2.5 Lose 0.1 bbl
0.7
3.2 Lose 0 bbl
0.7
3.9 Gain 0.1 bbl
0.6
4.5 Gain 0.3 bbl
0.5
5 Gain 0.6 bbl
0.5
5.5 Gain 0.9 bbl
0.4
5.9 Gain 1.3 bbl
0.5
6.4 Gain 1.6 bbl
Differences
Trip tank
Cumulative
between
Volume
displacement
actual and
(Mud Logger)
(mud logger)
mud logger
0.9
0.9 Lose 0.1 bbl
0.8
1.7 Lose 0.1 bbl
0.8
2.5 Lose 0.1 bbl
0.7
3.2 Lose 0 bbl
0.7
3.9 Gain 0.1 bbl
0.5
4.4 Gain 0.4 bbl
0.5
4.9 Gain 0.7 bbl
0.7
5.6 Gain 0.8 bbl
0.4
6 Gain 1.2 bbl
0.5
6.5 Gain 1.5 bbl
Remarks