The new design will require different hardware for installation due to the removed counterbores.
Kits have been created to supply the necessary component, which include:
Split Ring
Capscrews
Lockwashers
Safety Wire
Ferrules
Top Drive Model
AY21894
275T
AY21895
RigLine 24/7 Support Line: 866.433.4345 | International: +1 281.774.5649 | Fax: 281.774.1940 | E-mail: riglinesupport@canrig.com
Document ID 15-037 v 1.0 | Copyright 2015 Canrig Drilling Technology Ltd. All rights reserved.
1 of 3
SPLIT RING
MUDLINE
90
RigLine 24/7 Support Line: 866.433.4345 | International: +1 281.774.5649 | Fax: 281.774.1940 | E-mail: riglinesupport@canrig.com
Document ID 15-037 v 1.0 | Copyright 2015 Canrig Drilling Technology Ltd. All rights reserved.
2 of 3
3. Following the torque sequence indicated in Figure 4, torque the capscrews in two passes. In
the first pass, apply 100 ft-lb torque to the capscrews. In the second pass, apply 350 ft-lb of
torque. See Canrig ENG 725.
1
12
10
3
11
RigLine 24/7 Support Line: 866.433.4345 | International: +1 281.774.5649 | Fax: 281.774.1940 | E-mail: riglinesupport@canrig.com
Document ID 15-037 v 1.0 | Copyright 2015 Canrig Drilling Technology Ltd. All rights reserved.
3 of 3