FIRE PROTECTION & SAFETY DIVISION

DATE : 20/08/13 REV : 00

DESIGN CRITERIA &


CALCULATIONS

STANDPIPE SYSTEM
WET SPRINKLER SYSTEM
(FOR BUILDING NO. 1 & 2)
for

AL MADEAN
COMPLEX
Quality

Reliability

Services

P.O. Box 55644,New Industrial, Gate No. 1,Street 41, Qatar Tel.: (00-974) 44025888 Fax (00-974) 44114630
Email : qsales@naffco.ae Website: www.naffco.com

DESIGN CRITERIA & CALCULATIONS


Q A T A R

AL MADEAN COMPLEX

HYDRAULIC CALCULATION
REPORT

Ref.: NQ13-CALC-AMC-00
Date: 20 AUG. 2013
Revision: 00

Control Stamp

Eng'g By:

Issued By:

Approved By:

JBRIII

ZTT

Consultant

P.O. Box 55644, Doha, Qatar Tel.: (00-974) 4694168 Fax (00-974) 4694174

DESIGN CRITERIA & CALCULATIONS

AL MADEAN COMPLEX

Q A T A R

1.0 Design Criteria for Standpipe System for Building no.1 & 2

DESCRIPTION

Calculation No.1
th

Roof Level and 7 Floor


Design Standard

NFPA 14 (2010 edition)

Type of System

Standpipe System

Class of standpipe

Class I

Size of Hose Connection


Minimum Flow per Hose
Connection
Minimum Required residual
pressure at the remotest hose
outlet
No. of Hose Connection
calculated
Friction Loss Coefficient
(Hazen-Williams Value, C)

65 mm

5
6
7

946 lpm (250 gpm)


6.9 bar (100 psi)

2 nos.
Black Steel/ Hot Dipped Galvanized=
120

2.0 Design Criteria for Sprinkler System for Building no.1 & 2

DESCRIPTION

Calculation No.2
Basement Level 2 Parking Area

Design Standard

NFPA 13 (2010 Edition)

Type of System

Wet Sprinkler System

Occupancy Classification

Ordinary Hazard Group I

Minimum Design Density

6.10 lpm / m

4
5

Type of Sprinkler Used


Minimum Area of Sprinkler
Operation

Max. Sprinkler Coverage

12.00 m

Hose Stream Allowance

946 lpm

Minimum flow per Sprinkler


Friction Loss Coefficient
(Hazen-Williams Value, C)

Upright, K=80.6, NPT


139 m

2
2

73.20 lpm
Black Steel/ Hot Dipped Galvanized=
120

P.O. Box 55644, Doha, Qatar Tel.: (00-974) 4694168 Fax (00-974) 4694174

DESIGN CRITERIA & CALCULATIONS


Q A T A R

AL MADEAN COMPLEX

CALCULATION SUMMARY
CALCULATION NO. 1 STANDPIPE SYSTEM FOR BUILDING NO.1
Total Flow Demand

: 1892 lpm (500 gpm)

Pressure Required at Pump Discharge

: 11.941 bar (173.15 psi)

CALCULATION NO. 2 - SPRINKLER SYSTEM FOR BUILDING NO.1


Sprinkler Demand Flow

: 1104.80 lpm (291.86 gpm)

Total Demand Flow

: 1484.80 lpm (392.24 gpm)

Pressure Required at Pump Discharge

: 3.295 bar (47.78 psi)

CALCULATION NO. 3 - SPRINKLER SYSTEM FOR BUILDING NO.2


Sprinkler Demand Flow

: 1287.90 lpm (340.23 gpm)

Total Demand Flow

: 1667.90 lpm (440.62 gpm)

Pressure Required at Pump Discharge

: 3.336 bar (48.37 psi)

CALCULATION NO. 4 STANDPIPE SYSTEM FOR BUILDING NO.2


Total Flow Demand

: 1892 lpm (500 gpm)

Pressure Required at Pump Discharge

: 11.903 bar (172.59 psi)

PROPOSED PUMP CAPACITY


FOR BUILDING NO. 1 & 2

: 500 GPM @ 12.10 BAR

CALCULATION NOTES:
1. As per the above results, it shows that the pump capacity as
proposed in IFC drawing is NOT enough to deliver the required water
demand (in terms of pressure) as per minimum requirement of NFPA
standard and QCDD requirement.
2. The calculation was performed using the available data as per IFC
drawing, any changes as per IFC drawing may result to pressure
adjustment.

P.O. Box 55644, Doha, Qatar Tel.: (00-974) 4694168 Fax (00-974) 4694174

DESIGN CRITERIA & CALCULATIONS

AL MADEAN COMPLEX
Q A T A R

HYDRAULIC
CALCULATION NO.1

NQ13-FFS-AMC-B1-SC101
STANDPIPE SYSTEM CLASS I
CONNECTION

P.O. Box 55644, Doha, Qatar Tel.: (00-974) 44025888 Fax (00-974) 44114630

NAFFCO-QATAR FACTORY
FOR FIRE PROTECTION AND SAFETY EQUIPMENTS
P.O. BOX 55644,DOHA, QATAR

HYDRAULIC CALCULATION NO.1


CALC.

REF.: NQ13-FFS-AMC-B1-SC1-01
- DESIGN DATA -

DESIGN STANDARD

: NFPA-14 (2010 EDITION)

TYPE OF SYSTEM

: STANDPIPE SYSTEM

CLASS OF HOSE CONNECTION

: CLASS I

SIZE OF HOSE CONNECTION

: 65 MM

NO. OF STANDPIPE RISER / MAIN

: 1 NOS.

NO. OF HOSE CONNECTION CONSIDERED

: 2 NOS.

MINIMUM FLOW PER HOSE CONNECTION

: 946 LPM (250 GPM)

MINIMUM RESIDUAL PRESSURE REQUIRED

: 6.9 BAR (100 PSI)

TOTAL HOSE STREAM ALLOWANCE AT


SOURCE

: 1892 LPM (500 GPM)

PRESSURE REQUIRED AT PUMP


DISCHARGE

: 11.941 BAR (173.15 PSI)

PROJECT

: AL MADEAN COMPLEX

CONSULTANT

: JAMES CUBBIT & PARTNERS


ENGINEERING CONSULTANCY

AUTHORITY HAVING JURISDICTION

: QATAR CIVIL DEFENCE

Calculations performed by HASS under license # 5011081930,


granted by HRS SYSTEMS, INC. PETERSBURG, TN 37144 USA.

ENG'G BY
JBRIII

CHECKED BY
ENGR. ZTT

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 2
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SC1-01
JOB TITLE: NQ13-FFS-AMC-B1-SC1-01
WATER SUPPLY DATA
SOURCE
NODE
TAG

STATIC
PRESS.
(BAR)

SOURCE

(N/A)

RESID.
PRESS.
(BAR)
0.00

FLOW
(LPM)

AVAIL.
PRESS.
(BAR)

(N/A)

0.000

TOTAL
@ DEMAND
(LPM)
1892.1

REQ'D
PRESS.
(BAR)
11.941

AGGREGATE FLOW ANALYSIS:

TOTAL
TOTAL
OTHER
TOTAL

FLOW AT SOURCE
1892.1 LPM
HOSE STREAM ALLOWANCE AT SOURCE
0.0 LPM
HOSE STREAM ALLOWANCES
1892.0 LPM
DISCHARGE FROM ACTIVE SPRINKLERS
0.0 LPM

NODE ANALYSIS DATA


NODE TAG
ELEVATION
(M)
H1
H2
1
2
3
4
5
6
7
8
9
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SOURCE

34.50
30.70
34.50
38.00
38.00
38.00
30.70
33.00
33.00
33.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
-0.40
-0.40
-0.40
-0.40
-0.40
-0.40
-4.00
-4.00
-4.00
-4.00
-4.00
-7.00
-7.00

NODE TYPE

HOSE STREAM
HOSE STREAM
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SOURCE

PRESSURE
(BAR)
6.900
7.334
6.999
6.916
6.947
6.962
7.433
7.409
7.426
7.455
10.769
10.793
10.850
10.876
10.887
10.801
10.834
10.983
10.995
11.008
11.033
11.090
11.115
11.485
11.531
11.573
11.591
11.605
11.939
11.941

DISCHARGE
(L/MIN)
946.0
946.0
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1892.1

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 3
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SC1-01
JOB TITLE: NQ13-FFS-AMC-B1-SC1-01
PIPE DATA
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

H1
1

Pipe: 1
34.50
34.50

H.S.
0.0

6.900
6.999

946.0
0.0

1
2

Pipe: 2
34.50
38.00

0.0
0.0

6.999
6.916

0.0
0.0

2
3

Pipe: 3
38.00
38.00

0.0
0.0

6.916
6.947

0.0
0.0

3
4

Pipe: 4
38.00
38.00

0.0
0.0

6.947
6.962

0.0
0.0

4
8

Pipe: 5
38.00
33.00

0.0
0.0

6.962
7.455

0.0
0.0

H2
5

Pipe: 6
30.70
30.70

H.S.
0.0

7.334
7.433

946.0
0.0

5
6

Pipe: 7
30.70
33.00

0.0
0.0

7.433
7.409

0.0
0.0

6
7

Pipe: 8
33.00
33.00

0.0
0.0

7.409
7.426

0.0
0.0

7
8

Pipe: 9
33.00
33.00

0.0
0.0

7.426
7.455

8
9

Pipe: 10
33.00
0.00

9
11

LENGTH
(M)

PRESS.
SUM.
(BAR)

-946.0
5.10

62.71 PL
120 FTG
0.0487 TL

0.20
E
2.03

PF 0.099
PE 0.000
PV

-946.0
5.10

62.71 PL
120 FTG
0.0487 TL

3.50
E
5.33

PF 0.260
PE-0.343
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

3.90
E
6.95

PF 0.031
PE 0.000
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

0.34
E
3.39

PF 0.015
PE 0.000
PV

-946.0
0.85

154.05 PL
120 FTG
0.0006 TL

5.00
---5.00

PF 0.003
PE 0.490
PV

-946.0
5.10

62.71 PL
120 FTG
0.0487 TL

0.20
E
2.03

PF 0.099
PE 0.000
PV

-946.0
5.10

62.71 PL
120 FTG
0.0487 TL

2.30
E
4.13

PF 0.201
PE-0.225
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

0.76
E
3.81

PF 0.017
PE 0.000
PV

0.0
0.0

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

0.30
T
6.40

PF 0.029
PE 0.000
PV

0.0 7.455
0.0 10.769

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

33.00
E
37.27

PF 0.082
PE 3.232
PV

Pipe: 11
0.00
0.00

0.0 10.769
0.0 10.793

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

6.46
E
10.73

PF 0.024
PE 0.000
PV

11
12

Pipe: 13
0.00
0.00

0.0 10.793
0.0 10.850

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

21.62
E
25.89

PF 0.057
PE 0.000
PV

12
13

Pipe: 14
0.00
0.00

0.0 10.850
0.0 10.876

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

7.40
E
11.67

PF 0.026
PE 0.000
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 4
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SC1-01
JOB TITLE: NQ13-FFS-AMC-B1-SC1-01
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

LENGTH
(M)

PRESS.
SUM.
(BAR)

13
14

Pipe: 15
0.00
0.00

0.0 10.876
0.0 10.887

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

1.10
E
5.37

PF 0.012
PE 0.000
PV

14
15

Pipe: 16
0.00
1.00

0.0 10.887
0.0 10.801

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

1.00
E
5.27

PF 0.012
PE-0.098
PV

15
16

Pipe: 17
1.00
1.00

0.0 10.801
0.0 10.834

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

2.00
EGA
14.84

PF 0.033
PE 0.000
PV

16
17

Pipe: 18
1.00
-0.40

0.0 10.834
0.0 10.983

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

1.40
E
5.67

PF 0.013
PE 0.137
PV

17
18

Pipe: 19
-0.40
-0.40

0.0 10.983
0.0 10.995

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

0.73
E
5.00

PF 0.011
PE 0.000
PV

18
19

Pipe: 20
-0.40
-0.40

0.0 10.995
0.0 11.008

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

1.63
E
5.90

PF 0.013
PE 0.000
PV

19
20

Pipe: 21
-0.40
-0.40

0.0 11.008
0.0 11.033

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

7.45
E
11.72

PF 0.026
PE 0.000
PV

20
21

Pipe: 22
-0.40
-0.40

0.0 11.033
0.0 11.090

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

21.57
E
25.84

PF 0.057
PE 0.000
PV

21
22

Pipe: 23
-0.40
-0.40

0.0 11.090
0.0 11.115

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

7.12
E
11.39

PF 0.025
PE 0.000
PV

22
23

Pipe: 24
-0.40
-4.00

0.0 11.115
0.0 11.485

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

3.60
E
7.87

PF 0.017
PE 0.353
PV

23
24

Pipe: 25
-4.00
-4.00

0.0 11.485
0.0 11.531

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

16.54
E
20.81

PF 0.046
PE 0.000
PV

24
25

Pipe: 26
-4.00
-4.00

0.0 11.531
0.0 11.573

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

14.68
E
18.95

PF 0.042
PE 0.000
PV

25
26

Pipe: 27
-4.00
-4.00

0.0 11.573
0.0 11.591

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

4.00
E
8.27

PF 0.018
PE 0.000
PV

26
27

Pipe: 28
-4.00
-4.00

0.0 11.591
0.0 11.605

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

2.00
E
6.27

PF 0.014
PE 0.000
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 5
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SC1-01
JOB TITLE: NQ13-FFS-AMC-B1-SC1-01
PIPE TAG
END
NODES

ELEV.
(M)

Pipe: 29
-4.00
-7.00

27
28

Pipe: 30
28
-7.00
SOURCE
-7.00

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

LENGTH
(M)

PRESS.
SUM.
(BAR)

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

3.00
ECG
18.12

PF 0.040
PE 0.294
PV

-1892.1
0.0 11.939
0.0 1.69
SRCE 11.941 (N/A)

154.05 PL
120 FTG
0.0022 TL

1.00
---1.00

PF 0.002
PE 0.000
PV

0.0 11.605
0.0 11.939

NOTES (HASS):
(1) Calculations were performed by the HASS 8.3 computer program
under license no. 5011081930 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to provide an average
imbalance at each node of 0.0118 lpm and a maximum
imbalance at any node of 0.3435 lpm.
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 5.10 m/sec at pipe 1.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.

(5) PIPE FITTINGS TABLE


Pipe Table Name: STANDARD.PIP
PAGE: A
Diameter
(mm)

62.71
102.26
154.05

MATERIAL: S40
HWC: 120
Equivalent Fitting Lengths in Meters
E
T
L
C
B
G
A
D
N
Ell
Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee
-------------------------------------------------------F
FOURTY
1.83
3.66
1.22
4.27
2.13
0.30
3.05
3.05
3.66
0.90
3.05
6.10
1.83
6.71
3.66
0.72
6.10
6.10
6.10
1.20
4.27
9.14
2.74
9.75
3.38
1.10
7.47
8.53
9.14
2.10

(
b
a
r
)

P
R
E
S
S
U
R
E

-1.0

0.0

2.0

4.0

6.0

8.0

12.0
G
A
U
G
E 10.0

14.0

BA

800

1200

1600

2000

2400

FLOW (LPM)

2800

WATER SUPPLY ANALYSIS

3200

3600

Required pressure
11.94 bar @ 1892.1 l/min
A. Source Supply Curve
B. System Demand Curve

Available pressure
0.00 bar @ 1892.1 l/min

Fixed Source Pressure: 0.00 bar


LEGEND

4000

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 6
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SC1-01
JOB TITLE: NQ13-FFS-AMC-B1-SC1-01

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 7
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SC1-01
JOB TITLE: NQ13-FFS-AMC-B1-SC1-01
WATER SUPPLY CURVE
12.0+
X
|
|
|
11.0+
|
|
|
10.0+
|
|
|
9.0+
|
|
|
P8.0+
R
|
E
|
S
|
S7.0+
U
|
R
|
E
|
6.0+
(
|
B
|
A
|
R5.0+
)
|
|
|
4.0+
|
|
|
3.0+
|
|
|==============================
2.0+
LEGEND
"
|
"
| X = Required Water Supply
"
|
11.94 bar @ 1892 l/min
"
1.0+
"
|
"
|
"
|
"
0.0*\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\-\\\\\+
400 600 800 1000
1200
1400
1600
1800
2000
FLOW (LPM)

MOST REMOTE
CLASS I HOSE
CONNECTION

2ND MOST
REMOTE CLASS I
HOSE
CONNECTION

DESIGN CRITERIA & CALCULATIONS

AL MADEAN COMPLEX
Q A T A R

HYDRAULIC
CALCULATION NO.2

NQ13-FFS-AMC-B1SPRK-02
WET SPRINKLER SYSTEM

P.O. Box 55644, Doha, Qatar Tel.: (00-974) 44025888 Fax (00-974) 44114630

NAFFCO-QATAR FACTORY
FOR FIRE PROTECTION AND SAFETY EQUIPMENTS
P.O. BOX 55644,DOHA, QATAR

HYDRAULIC CALCULATION NO.2


CALC.

REF.: NQ13-FFS-AMC-B1-SPRK-02
- DESIGN DATA -

DESIGN STANDARD

: NFPA-13 (2010 EDITION)

TYPE OF SYSTEM

: WET SPRINKLER SYSTEM

OCCUPANCY CLASSIFICATION

: ORDINARY HAZARD GROUP I


(PARKING AREA)

MINIMUM DESIGN DENSITY

: 6.1 LPM/M2

DESIGN METHOD

: ROOM DESIGN METHOD

TYPE OF SPRINKLER USED

: UPRIGHT, K=80.6, 1/2 NPT

MINIMUM AREA OF SPRINKLER OPERATION

: 139 M2

MAXIMUM SPRINKLER COVERAGE AREA

: 12.00 SQ.M.

HOSE STREAM ALLOWANCE

: 380 LPM (INSIDE HOSE)

MINIMUM FLOW PER SPRINKLER

: 73.20 LPM (19.34 GPM)

SPRINKLER WATER DEMAND

: 1104.80 LPM (291.86 GPM)

TOTAL WATER DEMAND (INCLUDING


HOSE ALLOWANCE)

: 1484.80 LPM (392.24 GPM)

PRESSURE REQUIRED AT PUMP


DISCHARGE

: 3.295 BAR (47.78 PSI)

PROJECT

: AL MADEAN COMPLEX

CONSULTANT

: JAMES CUBBIT AND PARTNERS


ENGINEERING CONSULTANCY

AUTHORITY HAVING JURISDICTION

: QATAR CIVIL DEFENCE

Calculations performed by HASS under license # 5011081930,


granted by HRS SYSTEMS, INC. PETERSBURG, TN 37144 USA.
ENG'G BY
JBRIII

CHECKED BY
ENGR. ZTT

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 2
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02
WATER SUPPLY DATA
SOURCE
NODE
TAG

STATIC
PRESS.
(BAR)

SOURCE

(N/A)

RESID.
PRESS.
(BAR)
0.00

FLOW
(LPM)

AVAIL.
PRESS.
(BAR)

(N/A)

0.000

TOTAL
@ DEMAND
(LPM)
1484.8

REQ'D
PRESS.
(BAR)
3.295

AGGREGATE FLOW ANALYSIS:

TOTAL
TOTAL
OTHER
TOTAL

FLOW AT SOURCE
1484.8 LPM
HOSE STREAM ALLOWANCE AT SOURCE
0.0 LPM
HOSE STREAM ALLOWANCES
380.0 LPM
DISCHARGE FROM ACTIVE SPRINKLERS 1104.8 LPM

NODE ANALYSIS DATA


NODE TAG
ELEVATION
(M)
H1
H2
H3
H4
H5
H6
H7
H8
H9
H10
H11
H12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.40
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.40
-4.40
-4.40
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20

NODE TYPE

K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

PRESSURE
(BAR)
0.902
0.976
1.466
1.708
0.825
0.893
1.476
1.707
1.117
1.204
1.712
2.000
0.946
1.051
1.200
1.448
1.567
1.820
2.029
2.141
0.867
0.964
1.100
1.288
1.578
1.820
2.021
2.207
2.524
2.523
1.166
1.218
1.255
1.346
1.825
2.127
2.301

DISCHARGE
(L/MIN)
76.6
79.6
97.6
105.3
73.2
76.2
97.9
105.3
85.2
88.4
105.4
114.0
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 3
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02
NODE ANALYSIS DATA
NODE TAG
ELEVATION
(M)
26
27
28
29
30
31
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
SOURCE

-4.40
-4.40
-4.40
-4.40
-4.40
-4.40
0.00
0.00
0.00
0.00
0.00
1.00
1.00
-0.40
-0.40
-0.40
-0.40
-0.40
-0.40
-4.00
-4.00
-4.00
-4.00
-4.00
-7.00
-7.00

NODE TYPE

- - - - - - - - - - - - - - - HOSE STREAM
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SOURCE

PRESSURE
(BAR)
2.523
2.532
2.546
2.555
2.563
2.717
2.298
2.313
2.350
2.366
2.374
2.284
2.305
2.450
2.457
2.465
2.482
2.518
2.534
2.898
2.927
2.954
2.966
2.974
3.294
3.295

DISCHARGE
(L/MIN)
- - - - - - - - - - 380.0
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1484.8

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 4
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02
PIPE DATA
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

H1
1

Pipe: 1
-4.00
-4.20

80.6
0.0

0.902
0.946

76.6
0.0

1
2

Pipe: 2
-4.20
-4.20

0.0
0.0

0.946
1.051

0.0
0.0

H2
2

Pipe: 3
-4.00
-4.20

80.6
0.0

0.976
1.051

79.6
0.0

2
3

Pipe: 4
-4.20
-4.20

0.0
0.0

1.051
1.200

0.0
0.0

3
4

Pipe: 5
-4.20
-4.20

0.0
0.0

1.200
1.448

0.0
0.0

4
5

Pipe: 6
-4.20
-4.20

0.0
0.0

1.448
1.567

0.0
0.0

H3
5

Pipe: 7
-4.00
-4.20

80.6
0.0

1.466
1.567

97.6
0.0

5
6

Pipe: 8
-4.20
-4.20

0.0
0.0

1.567
1.820

0.0
0.0

H4
6

Pipe: 9
-4.00
-4.20

80.6
0.0

1.708
1.820

105.3
0.0

6
7

Pipe: 10
-4.20
-4.20

0.0
0.0

1.820
2.029

0.0
0.0

7
8

Pipe: 11
-4.20
-4.40

0.0
0.0

2.029
2.141

0.0
0.0

8
16

Pipe: 12
-4.40
-4.40

0.0
0.0

2.141
2.207

0.0
0.0

H5
9

Pipe: 13
-4.00
-4.20

80.6
0.0

0.825
0.867

73.2
0.0

LENGTH
(M)

PRESS.
SUM.
(BAR)

-76.6
2.29

26.64 PL
120 FTG
0.0301 TL

0.20
E
0.81

PF 0.024
PE 0.020
PV

-76.6
2.29

26.64 PL
120 FTG
0.0301 TL

3.50
---3.50

PF 0.105
PE 0.000
PV

-79.6
2.38

26.64 PL
120 FTG
0.0323 TL

0.20
T
1.72

PF 0.056
PE 0.020
PV

-156.2
4.67

26.64 PL
120 FTG
0.1125 TL

0.71
E
1.32

PF 0.148
PE 0.000
PV

-156.2
4.67

26.64 PL
120 FTG
0.1125 TL

1.60
E
2.21

PF 0.249
PE 0.000
PV

-156.2
4.67

26.64 PL
120 FTG
0.1125 TL

1.05
---1.05

PF 0.118
PE 0.000
PV

-97.6
2.92

26.64 PL
120 FTG
0.0471 TL

0.20
T
1.72

PF 0.081
PE 0.020
PV

-253.8
4.38

35.05 PL
120 FTG
0.0726 TL

3.50
---3.50

PF 0.254
PE 0.000
PV

-105.3
3.15

26.64 PL
120 FTG
0.0542 TL

0.20
T
1.72

PF 0.093
PE 0.020
PV

-359.1
4.56

40.89 PL
120 FTG
0.0651 TL

1.98
E
3.20

PF 0.208
PE 0.000
PV

-359.1
4.56

40.89 PL
120 FTG
0.0651 TL

0.20
E
1.42

PF 0.092
PE 0.020
PV

-359.1
2.76

52.50 PL
120 FTG
0.0193 TL

3.42
---3.42

PF 0.066
PE 0.000
PV

-73.2
2.19

26.64 PL
120 FTG
0.0277 TL

0.20
E
0.81

PF 0.022
PE 0.020
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 5
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

9
10

Pipe: 14
-4.20
-4.20

0.0
0.0

0.867
0.964

0.0
0.0

H6
10

Pipe: 15
-4.00
-4.20

80.6
0.0

0.893
0.964

76.2
0.0

10
11

Pipe: 16
-4.20
-4.20

0.0
0.0

0.964
1.100

0.0
0.0

11
12

Pipe: 17
-4.20
-4.20

0.0
0.0

1.100
1.288

0.0
0.0

12
13

Pipe: 18
-4.20
-4.20

0.0
0.0

1.288
1.578

0.0
0.0

H7
13

Pipe: 19
-4.00
-4.20

80.6
0.0

1.476
1.578

97.9
0.0

13
14

Pipe: 20
-4.20
-4.20

0.0
0.0

1.578
1.820

0.0
0.0

H8
14

Pipe: 21
-4.00
-4.20

80.6
0.0

1.707
1.820

105.3
0.0

14
15

Pipe: 22
-4.20
-4.20

0.0
0.0

1.820
2.021

0.0
0.0

15
16

Pipe: 23
-4.20
-4.40

0.0
0.0

2.021
2.207

0.0
0.0

16
17

Pipe: 24
-4.40
-4.40

0.0
0.0

2.207
2.524

0.0
0.0

17
18

Pipe: 25
-4.40
-4.40

0.0
0.0

2.524
2.523

0.0
0.0

18
26

Pipe: 26
-4.40
-4.40

0.0
0.0

2.523
2.523

0.0
0.0

H9
19

Pipe: 27
-4.00
-4.20

80.6
0.0

1.117
1.166

85.2
0.0

LENGTH
(M)

PRESS.
SUM.
(BAR)

-73.2
2.19

26.64 PL
120 FTG
0.0277 TL

3.50
---3.50

PF 0.097
PE 0.000
PV

-76.2
2.28

26.64 PL
120 FTG
0.0298 TL

0.20
T
1.72

PF 0.051
PE 0.020
PV

-149.4
4.47

26.64 PL
120 FTG
0.1035 TL

0.71
E
1.32

PF 0.137
PE 0.000
PV

-149.4
4.47

26.64 PL
120 FTG
0.1035 TL

1.20
E
1.81

PF 0.187
PE 0.000
PV

-149.4
4.47

26.64 PL
120 FTG
0.1035 TL

2.80
---2.80

PF 0.290
PE 0.000
PV

-97.9
2.93

26.64 PL
120 FTG
0.0474 TL

0.20
T
1.72

PF 0.082
PE 0.020
PV

-247.3
4.27

35.05 PL
120 FTG
0.0692 TL

3.50
---3.50

PF 0.242
PE 0.000
PV

-105.3
3.15

26.64 PL
120 FTG
0.0542 TL

0.20
T
1.72

PF 0.093
PE 0.020
PV

-352.6
4.47

40.89 PL
120 FTG
0.0629 TL

1.98
E
3.20

PF 0.201
PE 0.000
PV

-352.6
4.47

40.89 PL
120 FTG
0.0629 TL

0.20
T
2.64

PF 0.166
PE 0.020
PV

-711.7
5.48

52.50 PL
120 FTG
0.0683 TL

1.59
T
4.64

PF 0.317
PE 0.000
PV

123.8
0.25

102.26 PL
120 FTG
0.0001 TL

0.95
E
4.00

PF 0.000
PE 0.000
PV

123.8
0.25

102.26 PL
120 FTG
0.0001 TL

1.81
---1.81

PF 0.000
PE 0.000
PV

-85.2
2.55

26.64 PL
120 FTG
0.0366 TL

0.20
E
0.81

PF 0.030
PE 0.020
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 6
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

19
20

Pipe: 28
-4.20
-4.20

0.0
0.0

1.166
1.218

0.0
0.0

20
22

Pipe: 29
-4.20
-4.20

0.0
0.0

1.218
1.346

0.0
0.0

H10
21

Pipe: 30
-4.00
-4.20

80.6
0.0

1.204
1.255

88.4
0.0

21
22

Pipe: 31
-4.20
-4.20

0.0
0.0

1.255
1.346

0.0
0.0

22
23

Pipe: 32
-4.20
-4.20

0.0
0.0

1.346
1.825

0.0
0.0

H11
23

Pipe: 33
-4.00
-4.20

80.6
0.0

1.712
1.825

105.4
0.0

23
24

Pipe: 34
-4.20
-4.20

0.0
0.0

1.825
2.127

0.0
0.0

H12
24

Pipe: 35
-4.00
-4.20

80.6
0.0

2.000
2.127

114.0
0.0

24
25

Pipe: 36
-4.20
-4.20

0.0
0.0

2.127
2.301

0.0
0.0

25
26

Pipe: 37
-4.20
-4.40

0.0
0.0

2.301
2.523

0.0
0.0

26
27

Pipe: 38
-4.40
-4.40

0.0
0.0

2.523
2.532

0.0
0.0

27
28

Pipe: 39
-4.40
-4.40

0.0
0.0

2.532
2.546

0.0
0.0

28
29

Pipe: 40
-4.40
-4.40

0.0
0.0

2.546
2.555

0.0
0.0

29
30

Pipe: 41
-4.40
-4.40

0.0
0.0

2.555
2.563

0.0
0.0

LENGTH
(M)

PRESS.
SUM.
(BAR)

-85.2
2.55

26.64 PL
120 FTG
0.0366 TL

0.80
E
1.41

PF 0.052
PE 0.000
PV

-85.2
2.55

26.64 PL
120 FTG
0.0366 TL

3.50
---3.50

PF 0.128
PE 0.000
PV

-88.4
2.64

26.64 PL
120 FTG
0.0393 TL

0.20
E
0.81

PF 0.032
PE 0.020
PV

-88.4
2.64

26.64 PL
120 FTG
0.0393 TL

0.80
T
2.32

PF 0.091
PE 0.000
PV

-173.6
5.19

26.64 PL
120 FTG
0.1368 TL

3.50
---3.50

PF 0.479
PE 0.000
PV

-105.4
3.15

26.64 PL
120 FTG
0.0544 TL

0.20
T
1.72

PF 0.094
PE 0.020
PV

-279.1
4.82

35.05 PL
120 FTG
0.0865 TL

3.50
---3.50

PF 0.303
PE 0.000
PV

-114.0
3.41

26.64 PL
120 FTG
0.0628 TL

0.20
T
1.72

PF 0.108
PE 0.020
PV

-393.0
4.99

40.89 PL
120 FTG
0.0769 TL

1.03
E
2.25

PF 0.173
PE 0.000
PV

-393.0
4.99

40.89 PL
120 FTG
0.0769 TL

0.20
T
2.64

PF 0.203
PE 0.020
PV

-269.2
0.55

102.26 PL
120 FTG
0.0004 TL

15.82
E
18.87

PF 0.008
PE 0.000
PV

-269.2
0.55

102.26 PL
120 FTG
0.0004 TL

29.71
E
32.76

PF 0.014
PE 0.000
PV

-269.2
0.55

102.26 PL
120 FTG
0.0004 TL

17.62
E
20.67

PF 0.009
PE 0.000
PV

-269.2
0.55

102.26 PL
120 FTG
0.0004 TL

17.83
---17.83

PF 0.008
PE 0.000
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 7
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

30
17

Pipe: 42
-4.40
-4.40

0.0
0.0

2.563
2.524

30
31

Pipe: 43
-4.40
-4.40

0.0
H.S.

31
33

Pipe: 44
-4.40
0.00

33
34

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

LENGTH
(M)

PRESS.
SUM.
(BAR)

835.5
1.70

102.26 PL
120 FTG
0.0036 TL

10.92
---10.92

PF 0.039
PE 0.000
PV

2.563
2.717

-1104.7
0.0 2.24
380.0

102.26 PL
120 FTG
0.0060 TL

6.78
ETBA
25.69

PF 0.154
PE 0.000
PV

H.S.
0.0

2.717
2.298

-1484.7
380.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

4.40
E
8.67

PF 0.012
PE-0.431
PV

Pipe: 45
0.00
0.00

0.0
0.0

2.298
2.313

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

6.46
E
10.73

PF 0.015
PE 0.000
PV

34
35

Pipe: 46
0.00
0.00

0.0
0.0

2.313
2.350

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

21.62
E
25.89

PF 0.036
PE 0.000
PV

35
36

Pipe: 47
0.00
0.00

0.0
0.0

2.350
2.366

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

7.40
E
11.67

PF 0.016
PE 0.000
PV

36
37

Pipe: 48
0.00
0.00

0.0
0.0

2.366
2.374

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

1.10
E
5.37

PF 0.008
PE 0.000
PV

37
38

Pipe: 49
0.00
1.00

0.0
0.0

2.374
2.284

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

1.50
E
5.77

PF 0.008
PE-0.098
PV

38
39

Pipe: 50
1.00
1.00

0.0
0.0

2.284
2.305

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

2.00
EGA
14.84

PF 0.021
PE 0.000
PV

39
40

Pipe: 51
1.00
-0.40

0.0
0.0

2.305
2.450

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

1.50
E
5.77

PF 0.008
PE 0.137
PV

40
41

Pipe: 52
-0.40
-0.40

0.0
0.0

2.450
2.457

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

0.73
E
5.00

PF 0.007
PE 0.000
PV

41
42

Pipe: 53
-0.40
-0.40

0.0
0.0

2.457
2.465

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

1.63
E
5.90

PF 0.008
PE 0.000
PV

42
43

Pipe: 54
-0.40
-0.40

0.0
0.0

2.465
2.482

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

7.45
E
11.72

PF 0.017
PE 0.000
PV

43
44

Pipe: 55
-0.40
-0.40

0.0
0.0

2.482
2.518

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

21.57
E
25.84

PF 0.036
PE 0.000
PV

0.0
0.0

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 8
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

LENGTH
(M)

PRESS.
SUM.
(BAR)

44
45

Pipe: 56
-0.40
-0.40

0.0
0.0

2.518
2.534

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

7.12
E
11.39

PF 0.016
PE 0.000
PV

45
46

Pipe: 58
-0.40
-4.00

0.0
0.0

2.534
2.898

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

3.60
E
7.87

PF 0.011
PE 0.353
PV

46
47

Pipe: 59
-4.00
-4.00

0.0
0.0

2.898
2.927

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

16.54
E
20.81

PF 0.029
PE 0.000
PV

47
48

Pipe: 60
-4.00
-4.00

0.0
0.0

2.927
2.954

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

14.68
E
18.95

PF 0.027
PE 0.000
PV

48
49

Pipe: 61
-4.00
-4.00

0.0
0.0

2.954
2.966

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

4.00
E
8.27

PF 0.012
PE 0.000
PV

49
50

Pipe: 63
-4.00
-4.00

0.0
0.0

2.966
2.974

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

2.00
E
6.27

PF 0.009
PE 0.000
PV

50
51

Pipe: 64
-4.00
-7.00

0.0
0.0

2.974
3.294

-1484.7
0.0 1.33
0.0

154.05 PL
120 FTG
0.0014 TL

3.00
ECG
18.12

PF 0.026
PE 0.294
PV

-1484.8
0.0 3.294
0.0 1.33
SRCE 3.295 (N/A)

154.05 PL
120 FTG
0.0014 TL

1.00
---1.00

PF 0.001
PE 0.000
PV

Pipe: 65
51
-7.00
SOURCE
-7.00

NOTES (HASS):
(1) Calculations were performed by the HASS 8.3 computer program
under license no. 5011081930 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to provide an average
imbalance at each node of 0.0061 lpm and a maximum
imbalance at any node of 0.3766 lpm.
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 5.48 m/sec at pipe 24.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 9
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02

(5) PIPE FITTINGS TABLE


Pipe Table Name: STANDARD.PIP
PAGE: A
Diameter
(mm)

26.64
35.05
40.89
52.50
102.26
154.05

MATERIAL: S40
HWC: 120
Equivalent Fitting Lengths in Meters
E
T
L
C
B
G
A
D
N
Ell
Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee
-------------------------------------------------------F
FOURTY
0.61
1.52
0.61
1.52
1.83
0.30
3.05
3.05
1.52
0.30
0.91
1.83
0.61
2.13
1.83
0.30
3.05
3.05
1.83
0.30
1.22
2.44
0.61
2.74
1.83
0.30
3.05
3.05
2.44
0.60
1.52
3.05
0.91
3.35
1.83
0.30
3.05
3.05
3.05
0.60
3.05
6.10
1.83
6.71
3.66
0.72
6.10
6.10
6.10
1.20
4.27
9.14
2.74
9.75
3.38
1.10
7.47
8.53
9.14
2.10

(
b
a
r
)

P
R
E
S
S
U
R
E

G
A
U
G
E

-1.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

800

1200

1600

2000

2400

FLOW (LPM)

2800

WATER SUPPLY ANALYSIS

3200

3600

Required pressure
3.30 bar @ 1484.8 l/min
A. Source Supply Curve
B. System Demand Curve

Available pressure
0.00 bar @ 1484.8 l/min

Fixed Source Pressure: 0.00 bar


LEGEND

4000

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 10
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 11
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B1-SPRK-02
JOB TITLE: NQ13-FFFS-AMC-B1-SPRK-02
WATER SUPPLY CURVE
3.6+
|
|
|
3.3+
X
|
|
|
3.0+
|
|
|
2.7+
|
|
|
P2.4+
R
|
E
|
S
|
S2.1+
U
|
R
|
E
|
1.8+
(
|
B
|
A
|
R1.5+
)
|
|
|
1.2+
|
|
|
0.9+
|
|
|==============================
0.6+
LEGEND
"
|
"
| X = Required Water Supply
"
|
3.30 bar @ 1485 l/min
"
0.3+
"
|
"
|
"
|
"
0.0*\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\-\\\\\\\\\\\\\\\\\\\\\\\\\\\+
400 600 800 1000
1200
1400
1600
1800
2000
FLOW (LPM)

DESIGN CRITERIA & CALCULATIONS

AL MADEAN COMPLEX
Q A T A R

HYDRAULIC
CALCULATION NO.3

NQ13-FFS-AMC-B2SPRK-03
WET SPRINKLER SYSTEM

P.O. Box 55644, Doha, Qatar Tel.: (00-974) 44025888 Fax (00-974) 44114630

NAFFCO-QATAR FACTORY
FOR FIRE PROTECTION AND SAFETY EQUIPMENTS
P.O. BOX 55644,DOHA, QATAR

HYDRAULIC CALCULATION NO.3


CALC.

REF.: NQ13-FFS-AMC-B2-SPRK-03
- DESIGN DATA -

DESIGN STANDARD

: NFPA-13 (2010 EDITION)

TYPE OF SYSTEM

: WET SPRINKLER SYSTEM

OCCUPANCY CLASSIFICATION

: ORDINARY HAZARD GROUP I


(PARKING AREA)

MINIMUM DESIGN DENSITY

: 6.1 LPM/M2

DESIGN METHOD

: ROOM DESIGN METHOD

TYPE OF SPRINKLER USED

: UPRIGHT, K=80.6, 1/2 NPT

MINIMUM AREA OF SPRINKLER OPERATION

: 139 M2

MAXIMUM SPRINKLER COVERAGE AREA

: 12.00 SQ.M.

HOSE STREAM ALLOWANCE

: 380 LPM (INSIDE HOSE)

MINIMUM FLOW PER SPRINKLER

: 73.20 LPM (19.34 GPM)

SPRINKLER WATER DEMAND

: 1287.90 LPM (340.23 GPM)

TOTAL WATER DEMAND (INCLUDING


HOSE ALLOWANCE)

: 1667.90 LPM (440.62 GPM)

PRESSURE REQUIRED AT PUMP


DISCHARGE

: 3.336 BAR (48.37 PSI)

PROJECT

: AL MADEAN COMPLEX

CONSULTANT

: JAMES CUBBIT AND PARTNERS


ENGINEERING CONSULTANCY

AUTHORITY HAVING JURISDICTION

: QATAR CIVIL DEFENCE

Calculations performed by HASS under license # 5011081930,


granted by HRS SYSTEMS, INC. PETERSBURG, TN 37144 USA.
ENG'G BY
JBRIII

CHECKED BY
ENGR. ZTT

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 2
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
WATER SUPPLY DATA
SOURCE
NODE
TAG

STATIC
PRESS.
(BAR)

SOURCE

(N/A)

RESID.
PRESS.
(BAR)
0.00

FLOW
(LPM)

AVAIL.
PRESS.
(BAR)

(N/A)

0.000

TOTAL
@ DEMAND
(LPM)
1667.9

REQ'D
PRESS.
(BAR)
3.336

AGGREGATE FLOW ANALYSIS:

TOTAL
TOTAL
OTHER
TOTAL

FLOW AT SOURCE
1667.9 LPM
HOSE STREAM ALLOWANCE AT SOURCE
0.0 LPM
HOSE STREAM ALLOWANCES
380.0 LPM
DISCHARGE FROM ACTIVE SPRINKLERS 1287.9 LPM

NODE ANALYSIS DATA


NODE TAG
ELEVATION
(M)
H1
H2
H3
H4
H5
H6
H7
H8
H9
H10
H11
H12
H13
H14
H15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.40
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.40
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.20
-4.40

NODE TYPE

K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
K=80.60
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

PRESSURE
(BAR)
0.825
0.880
1.173
1.354
1.513
0.825
0.880
1.173
1.354
1.513
0.828
0.883
1.177
1.358
1.518
0.867
0.950
1.258
1.449
1.616
1.887
2.222
2.329
0.867
0.950
1.259
1.449
1.616
1.887
2.223
2.330
0.870
0.953
1.263
1.454
1.621
1.893
2.230
2.337

DISCHARGE
(L/MIN)
73.2
75.6
87.3
93.8
99.1
73.2
75.6
87.3
93.8
99.1
73.3
75.7
87.4
93.9
99.3
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 3
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
NODE ANALYSIS DATA
NODE TAG
ELEVATION
(M)
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
SOURCE

-4.40
-4.40
-4.40
-4.40
-4.40
-4.40
-4.40
-4.40
-4.40
-0.40
-0.40
-0.40
-0.40
-0.40
-0.40
-0.40
1.00
1.00
-0.40
-0.40
-0.40
-0.40
-0.40
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-7.00
-7.00

NODE TYPE

- - - - - - - - - - - - - - - - - - - - - HOSE STREAM
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SOURCE

PRESSURE
(BAR)
2.372
2.395
2.388
2.381
2.363
2.342
2.333
2.528
2.755
2.377
2.386
2.400
2.417
2.443
2.452
2.460
2.333
2.359
2.506
2.530
2.546
2.560
2.569
2.935
2.944
2.957
2.982
2.998
3.009
3.334
3.336

DISCHARGE
(L/MIN)
- - - - - - - - - - - - - - 380.0
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1667.9

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 4
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
PIPE DATA
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

H1
1

Pipe: 1
-4.00
-4.20

80.6
0.0

0.825
0.867

73.2
0.0

1
2

Pipe: 2
-4.20
-4.20

0.0
0.0

0.867
0.950

0.0
0.0

H2
2

Pipe: 3
-4.00
-4.20

80.6
0.0

0.880
0.950

75.6
0.0

2
3

Pipe: 4
-4.20
-4.20

0.0
0.0

0.950
1.258

0.0
0.0

H3
3

Pipe: 5
-4.00
-4.20

80.6
0.0

1.173
1.258

87.3
0.0

3
4

Pipe: 6
-4.20
-4.20

0.0
0.0

1.258
1.449

0.0
0.0

H4
4

Pipe: 7
-4.00
-4.20

80.6
0.0

1.354
1.449

93.8
0.0

4
5

Pipe: 8
-4.20
-4.20

0.0
0.0

1.449
1.616

0.0
0.0

H5
5

Pipe: 9
-4.00
-4.20

80.6
0.0

1.513
1.616

99.1
0.0

5
6

Pipe: 10
-4.20
-4.20

0.0
0.0

1.616
1.887

0.0
0.0

6
7

Pipe: 11
-4.20
-4.20

0.0
0.0

1.887
2.222

0.0
0.0

7
8

Pipe: 12
-4.20
-4.40

0.0
0.0

2.222
2.329

0.0
0.0

8
16

Pipe: 12A
-4.40
-4.40

0.0
0.0

2.329
2.330

0.0
0.0

H6
9

Pipe: 13
-4.00
-4.20

80.6
0.0

0.825
0.867

73.2
0.0

LENGTH
(M)

PRESS.
SUM.
(BAR)

-73.2
2.19

26.64 PL
120 FTG
0.0277 TL

0.20
E
0.81

PF 0.022
PE 0.020
PV

-73.2
2.19

26.64 PL
120 FTG
0.0277 TL

3.00
---3.00

PF 0.083
PE 0.000
PV

-75.6
2.26

26.64 PL
120 FTG
0.0294 TL

0.20
T
1.72

PF 0.051
PE 0.020
PV

-148.8
4.45

26.64 PL
120 FTG
0.1028 TL

3.00
---3.00

PF 0.308
PE 0.000
PV

-87.3
2.61

26.64 PL
120 FTG
0.0383 TL

0.20
T
1.72

PF 0.066
PE 0.020
PV

-236.1
4.08

35.05 PL
120 FTG
0.0635 TL

3.00
---3.00

PF 0.190
PE 0.000
PV

-93.8
2.80

26.64 PL
120 FTG
0.0438 TL

0.20
T
1.72

PF 0.075
PE 0.020
PV

-329.9
4.19

40.89 PL
120 FTG
0.0556 TL

3.00
---3.00

PF 0.167
PE 0.000
PV

-99.1
2.96

26.64 PL
120 FTG
0.0485 TL

0.20
T
1.72

PF 0.083
PE 0.020
PV

-429.0
5.44

40.89 PL
120 FTG
0.0905 TL

3.00
---3.00

PF 0.271
PE 0.000
PV

-429.0
3.30

52.50 PL
120 FTG
0.0268 TL

11.00
E
12.52

PF 0.335
PE 0.000
PV

-429.0
3.30

52.50 PL
120 FTG
0.0268 TL

0.20
T
3.25

PF 0.087
PE 0.020
PV

-146.1
0.30

102.26 PL
120 FTG
0.0001 TL

4.00
---4.00

PF 0.001
PE 0.000
PV

-73.2
2.19

26.64 PL
120 FTG
0.0277 TL

0.20
E
0.81

PF 0.022
PE 0.020
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 5
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

9
10

Pipe: 14
-4.20
-4.20

0.0
0.0

0.867
0.950

0.0
0.0

H7
10

Pipe: 15
-4.00
-4.20

80.6
0.0

0.880
0.950

75.6
0.0

10
11

Pipe: 16
-4.20
-4.20

0.0
0.0

0.950
1.259

0.0
0.0

H8
11

Pipe: 17
-4.00
-4.20

80.6
0.0

1.173
1.259

87.3
0.0

11
12

Pipe: 18
-4.20
-4.20

0.0
0.0

1.259
1.449

0.0
0.0

H9
12

Pipe: 19
-4.00
-4.20

80.6
0.0

1.354
1.449

93.8
0.0

12
13

Pipe: 20
-4.20
-4.20

0.0
0.0

1.449
1.616

0.0
0.0

H10
13

Pipe: 20A
-4.00
-4.20

80.6
0.0

1.513
1.616

99.1
0.0

13
14

Pipe: 21
-4.20
-4.20

0.0
0.0

1.616
1.887

0.0
0.0

14
15

Pipe: 22
-4.20
-4.20

0.0
0.0

1.887
2.223

0.0
0.0

15
16

Pipe: 23
-4.20
-4.40

0.0
0.0

2.223
2.330

0.0
0.0

16
24

Pipe: 23A
-4.40
-4.40

0.0
0.0

2.330
2.337

0.0
0.0

H11
17

Pipe: 24
-4.00
-4.20

80.6
0.0

0.828
0.870

73.3
0.0

17
18

Pipe: 25
-4.20
-4.20

0.0
0.0

0.870
0.953

0.0
0.0

LENGTH
(M)

PRESS.
SUM.
(BAR)

-73.2
2.19

26.64 PL
120 FTG
0.0277 TL

3.00
---3.00

PF 0.083
PE 0.000
PV

-75.6
2.26

26.64 PL
120 FTG
0.0294 TL

0.20
T
1.72

PF 0.051
PE 0.020
PV

-148.8
4.45

26.64 PL
120 FTG
0.1028 TL

3.00
---3.00

PF 0.308
PE 0.000
PV

-87.3
2.61

26.64 PL
120 FTG
0.0383 TL

0.20
T
1.72

PF 0.066
PE 0.020
PV

-236.1
4.08

35.05 PL
120 FTG
0.0635 TL

3.00
---3.00

PF 0.190
PE 0.000
PV

-93.8
2.80

26.64 PL
120 FTG
0.0438 TL

0.20
T
1.72

PF 0.075
PE 0.020
PV

-329.9
4.19

40.89 PL
120 FTG
0.0557 TL

3.00
---3.00

PF 0.167
PE 0.000
PV

-99.1
2.96

26.64 PL
120 FTG
0.0485 TL

0.20
T
1.72

PF 0.083
PE 0.020
PV

-429.0
5.45

40.89 PL
120 FTG
0.0905 TL

3.00
---3.00

PF 0.271
PE 0.000
PV

-429.0
3.30

52.50 PL
120 FTG
0.0268 TL

11.00
E
12.52

PF 0.335
PE 0.000
PV

-429.0
3.30

52.50 PL
120 FTG
0.0268 TL

0.20
T
3.25

PF 0.087
PE 0.020
PV

-575.1
1.17

102.26 PL
120 FTG
0.0018 TL

4.00
---4.00

PF 0.007
PE 0.000
PV

-73.3
2.19

26.64 PL
120 FTG
0.0278 TL

0.20
E
0.81

PF 0.022
PE 0.020
PV

-73.3
2.19

26.64 PL
120 FTG
0.0278 TL

3.00
---3.00

PF 0.083
PE 0.000
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 6
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

H12
18

Pipe: 26
-4.00
-4.20

80.6
0.0

0.883
0.953

75.7
0.0

18
19

Pipe: 27
-4.20
-4.20

0.0
0.0

0.953
1.263

0.0
0.0

H13
19

Pipe: 28
-4.00
-4.20

80.6
0.0

1.177
1.263

87.4
0.0

19
20

Pipe: 29
-4.20
-4.20

0.0
0.0

1.263
1.454

0.0
0.0

H14
20

Pipe: 30
-4.00
-4.20

80.6
0.0

1.358
1.454

93.9
0.0

20
21

Pipe: 31
-4.20
-4.20

0.0
0.0

1.454
1.621

0.0
0.0

H15
21

Pipe: 32
-4.00
-4.20

80.6
0.0

1.518
1.621

99.3
0.0

21
22

Pipe: 33
-4.20
-4.20

0.0
0.0

1.621
1.893

0.0
0.0

22
23

Pipe: 34
-4.20
-4.20

0.0
0.0

1.893
2.230

0.0
0.0

23
24

Pipe: 35
-4.20
-4.40

0.0
0.0

2.230
2.337

24
25

Pipe: 36
-4.40
-4.40

0.0
0.0

25
26

Pipe: 37
-4.40
-4.40

8
31

31
30

LENGTH
(M)

PRESS.
SUM.
(BAR)

-75.7
2.26

26.64 PL
120 FTG
0.0295 TL

0.20
T
1.72

PF 0.051
PE 0.020
PV

-149.1
4.46

26.64 PL
120 FTG
0.1031 TL

3.00
---3.00

PF 0.309
PE 0.000
PV

-87.4
2.61

26.64 PL
120 FTG
0.0384 TL

0.20
T
1.72

PF 0.066
PE 0.020
PV

-236.5
4.09

35.05 PL
120 FTG
0.0637 TL

3.00
---3.00

PF 0.191
PE 0.000
PV

-93.9
2.81

26.64 PL
120 FTG
0.0439 TL

0.20
T
1.72

PF 0.076
PE 0.020
PV

-330.4
4.19

40.89 PL
120 FTG
0.0558 TL

3.00
---3.00

PF 0.167
PE 0.000
PV

-99.3
2.97

26.64 PL
120 FTG
0.0486 TL

0.20
T
1.72

PF 0.084
PE 0.020
PV

-429.7
5.45

40.89 PL
120 FTG
0.0908 TL

3.00
---3.00

PF 0.272
PE 0.000
PV

-429.7
3.31

52.50 PL
120 FTG
0.0269 TL

11.00
E
12.52

PF 0.336
PE 0.000
PV

0.0
0.0

-429.7
3.31

52.50 PL
120 FTG
0.0269 TL

0.20
T
3.25

PF 0.087
PE 0.020
PV

2.337
2.372

-1004.9
0.0 2.04
0.0

102.26 PL
120 FTG
0.0050 TL

3.90
E
6.95

PF 0.035
PE 0.000
PV

0.0
0.0

2.372
2.395

-1004.9
0.0 2.04
0.0

102.26 PL
120 FTG
0.0050 TL

4.62
---4.62

PF 0.023
PE 0.000
PV

Pipe: 38
-4.40
-4.40

0.0
0.0

2.329
2.333

0.0
0.0

-282.9
0.57

102.26 PL
120 FTG
0.0005 TL

5.47
E
8.52

PF 0.004
PE 0.000
PV

Pipe: 39
-4.40
-4.40

0.0
0.0

2.333
2.342

0.0
0.0

-282.9
0.57

102.26 PL
120 FTG
0.0005 TL

15.14
E
18.19

PF 0.009
PE 0.000
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 7
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

30
29

Pipe: 40
-4.40
-4.40

0.0
0.0

2.342
2.363

0.0
0.0

29
28

Pipe: 41
-4.40
-4.40

0.0
0.0

2.363
2.381

0.0
0.0

28
27

Pipe: 42
-4.40
-4.40

0.0
0.0

2.381
2.388

0.0
0.0

27
26

Pipe: 43
-4.40
-4.40

0.0
0.0

2.388
2.395

0.0
0.0

26
32

Pipe: 44
-4.40
-4.40

0.0
H.S.

32
33

Pipe: 45
-4.40
-4.40

33
34

LENGTH
(M)

PRESS.
SUM.
(BAR)

-282.9
0.57

102.26 PL
120 FTG
0.0005 TL

39.92
E
42.97

PF 0.021
PE 0.000
PV

-282.9
0.57

102.26 PL
120 FTG
0.0005 TL

34.37
E
37.42

PF 0.018
PE 0.000
PV

-282.9
0.57

102.26 PL
120 FTG
0.0005 TL

12.00
E
15.05

PF 0.007
PE 0.000
PV

-282.9
0.57

102.26 PL
120 FTG
0.0005 TL

14.61
---14.61

PF 0.007
PE 0.000
PV

2.395
2.528

-1287.8
0.0 2.61
380.0

102.26 PL
120 FTG
0.0080 TL

3.87
EBA
16.68

PF 0.133
PE 0.000
PV

H.S.
0.0

2.528
2.755

-1667.8
380.0 3.38
0.0

102.26 PL
120 FTG
0.0128 TL

14.61
E
17.66

PF 0.227
PE 0.000
PV

Pipe: 46
-4.40
-0.40

0.0
0.0

2.755
2.377

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

4.00
E
8.27

PF 0.014
PE-0.392
PV

34
35

Pipe: 47
-0.40
-0.40

0.0
0.0

2.377
2.386

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

0.80
E
5.07

PF 0.009
PE 0.000
PV

35
36

Pipe: 48
-0.40
-0.40

0.0
0.0

2.386
2.400

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

3.46
E
7.73

PF 0.013
PE 0.000
PV

36
37

Pipe: 49
-0.40
-0.40

0.0
0.0

2.400
2.417

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

5.45
E
9.72

PF 0.017
PE 0.000
PV

37
38

Pipe: 50
-0.40
-0.40

0.0
0.0

2.417
2.443

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

10.70
E
14.97

PF 0.026
PE 0.000
PV

38
39

Pipe: 51
-0.40
-0.40

0.0
0.0

2.443
2.452

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

0.89
E
5.16

PF 0.009
PE 0.000
PV

39
40

Pipe: 52
-0.40
-0.40

0.0
0.0

2.452
2.460

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

0.46
E
4.73

PF 0.008
PE 0.000
PV

40
41

Pipe: 53
-0.40
1.00

0.0
0.0

2.460
2.333

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

1.40
E
5.67

PF 0.010
PE-0.137
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 8
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

LENGTH
(M)

PRESS.
SUM.
(BAR)

41
42

Pipe: 54
1.00
1.00

0.0
0.0

2.333
2.359

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

2.00
EGA
14.84

PF 0.026
PE 0.000
PV

42
43

Pipe: 55
1.00
-0.40

0.0
0.0

2.359
2.506

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

1.40
E
5.67

PF 0.010
PE 0.137
PV

43
44

Pipe: 56
-0.40
-0.40

0.0
0.0

2.506
2.530

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

9.62
E
13.89

PF 0.024
PE 0.000
PV

44
45

Pipe: 58
-0.40
-0.40

0.0
0.0

2.530
2.546

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

4.80
E
9.07

PF 0.016
PE 0.000
PV

45
46

Pipe: 59
-0.40
-0.40

0.0
0.0

2.546
2.560

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

3.87
E
8.14

PF 0.014
PE 0.000
PV

46
47

Pipe: 60
-0.40
-0.40

0.0
0.0

2.560
2.569

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

0.97
E
5.24

PF 0.009
PE 0.000
PV

47
48

Pipe: 61
-0.40
-4.00

0.0
0.0

2.569
2.935

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

3.60
E
7.87

PF 0.014
PE 0.353
PV

48
49

Pipe: 63
-4.00
-4.00

0.0
0.0

2.935
2.944

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

0.45
E
4.72

PF 0.008
PE 0.000
PV

49
50

Pipe: 64
-4.00
-4.00

0.0
0.0

2.944
2.957

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

3.66
E
7.93

PF 0.014
PE 0.000
PV

50
51

Pipe: 65
-4.00
-4.00

0.0
0.0

2.957
2.982

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

9.53
E
13.80

PF 0.024
PE 0.000
PV

51
52

Pipe: 66
-4.00
-4.00

0.0
0.0

2.982
2.998

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

5.00
E
9.27

PF 0.016
PE 0.000
PV

52
53

Pipe: 67
-4.00
-4.00

0.0
0.0

2.998
3.009

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

2.00
E
6.27

PF 0.011
PE 0.000
PV

53
54

Pipe: 68
-4.00
-7.00

0.0
0.0

3.009
3.334

-1667.8
0.0 1.49
0.0

154.05 PL
120 FTG
0.0017 TL

3.00
ECG
18.12

PF 0.032
PE 0.294
PV

-1667.9
0.0 3.334
0.0 1.49
SRCE 3.336 (N/A)

154.05 PL
120 FTG
0.0017 TL

1.00
---1.00

PF 0.002
PE 0.000
PV

Pipe: 69
54
-7.00
SOURCE
-7.00

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 9
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
NOTES (HASS):
(1) Calculations were performed by the HASS 8.3 computer program
under license no. 5011081930 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to provide an average
imbalance at each node of 0.0063 lpm and a maximum
imbalance at any node of 0.4313 lpm.
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 5.45 m/sec at pipe 33.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.

(5) PIPE FITTINGS TABLE


Pipe Table Name: STANDARD.PIP
PAGE: A
Diameter
(mm)

26.64
35.05
40.89
52.50
102.26
154.05

MATERIAL: S40
HWC: 120
Equivalent Fitting Lengths in Meters
E
T
L
C
B
G
A
D
N
Ell
Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee
-------------------------------------------------------F
FOURTY
0.61
1.52
0.61
1.52
1.83
0.30
3.05
3.05
1.52
0.30
0.91
1.83
0.61
2.13
1.83
0.30
3.05
3.05
1.83
0.30
1.22
2.44
0.61
2.74
1.83
0.30
3.05
3.05
2.44
0.60
1.52
3.05
0.91
3.35
1.83
0.30
3.05
3.05
3.05
0.60
3.05
6.10
1.83
6.71
3.66
0.72
6.10
6.10
6.10
1.20
4.27
9.14
2.74
9.75
3.38
1.10
7.47
8.53
9.14
2.10

(
b
a
r
)

P
R
E
S
S
U
R
E

G
A
U
G
E

-1.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

800

1200

1600

2000

2400

FLOW (LPM)

2800

WATER SUPPLY ANALYSIS

3200

Required pressure
3.34 bar @ 1667.9 l/min
A. Source Supply Curve
B. System Demand Curve

3600

Available pressure
0.00 bar @ 1667.9 l/min

Fixed Source Pressure: 0.00 bar


LEGEND

4000

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 10
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 11
DATE: 8/20/2013CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SPRK-03
JOB TITLE: NQ13-FFS-AMC-B2-SPRK-03
WATER SUPPLY CURVE
3.6+
|
|
|
3.3+
X
|
|
|
3.0+
|
|
|
2.7+
|
|
|
P2.4+
R
|
E
|
S
|
S2.1+
U
|
R
|
E
|
1.8+
(
|
B
|
A
|
R1.5+
)
|
|
|
1.2+
|
|
|
0.9+
|
|
|==============================
0.6+
LEGEND
"
|
"
| X = Required Water Supply
"
|
3.34 bar @ 1668 l/min
"
0.3+
"
|
"
|
"
|
"
0.0*\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\-\\\\\\\\\\\\\\\\\\+
400 600 800 1000
1200
1400
1600
1800
2000
FLOW (LPM)

HYDRAULICALLY
MOST
DEMANDING
AREA

DESIGN CRITERIA & CALCULATIONS

AL MADEAN COMPLEX
Q A T A R

HYDRAULIC
CALCULATION NO.4

NQ13-FFS-AMC-B2-SC104
STANDPIPE SYSTEM CLASS I
CONNECTION

P.O. Box 55644, Doha, Qatar Tel.: (00-974) 44025888 Fax (00-974) 44114630

NAFFCO-QATAR FACTORY
FOR FIRE PROTECTION AND SAFETY EQUIPMENTS
P.O. BOX 55644,DOHA, QATAR

HYDRAULIC CALCULATION NO.4


CALC.

REF.: NQ13-FFS-AMC-B2-SC1-04
- DESIGN DATA -

DESIGN STANDARD

: NFPA-14 (2010 EDITION)

TYPE OF SYSTEM

: STANDPIPE SYSTEM

CLASS OF HOSE CONNECTION

: CLASS I

SIZE OF HOSE CONNECTION

: 65 MM

NO. OF STANDPIPE RISER / MAIN

: 1 NOS.

NO. OF HOSE CONNECTION CONSIDERED

: 2 NOS.

MINIMUM FLOW PER HOSE CONNECTION

: 946 LPM (250 GPM)

MINIMUM RESIDUAL PRESSURE REQUIRED

: 6.9 BAR (100 PSI)

TOTAL HOSE STREAM ALLOWANCE AT


SOURCE

: 1892 LPM (500 GPM)

PRESSURE REQUIRED AT PUMP


DISCHARGE

: 11.903 BAR (172.59 PSI)

PROJECT

: AL MADEAN COMPLEX

CONSULTANT

: JAMES CUBBIT & PARTNERS


ENGINEERING CONSULTANCY

AUTHORITY HAVING JURISDICTION

: QATAR CIVIL DEFENCE

Calculations performed by HASS under license # 5011081930,


granted by HRS SYSTEMS, INC. PETERSBURG, TN 37144 USA.

ENG'G BY
JBRIII

CHECKED BY
ENGR. ZTT

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 2
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SC1-04
JOB TITLE: NQ13-FFS-AMC-B2-SC1-04
WATER SUPPLY DATA
SOURCE
NODE
TAG

STATIC
PRESS.
(BAR)

SOURCE

(N/A)

RESID.
PRESS.
(BAR)
0.00

FLOW
(LPM)

AVAIL.
PRESS.
(BAR)

(N/A)

0.000

TOTAL
@ DEMAND
(LPM)
1892.1

REQ'D
PRESS.
(BAR)
11.903

AGGREGATE FLOW ANALYSIS:

TOTAL
TOTAL
OTHER
TOTAL

FLOW AT SOURCE
1892.1 LPM
HOSE STREAM ALLOWANCE AT SOURCE
0.0 LPM
HOSE STREAM ALLOWANCES
1892.0 LPM
DISCHARGE FROM ACTIVE SPRINKLERS
0.0 LPM

NODE ANALYSIS DATA


NODE TAG
ELEVATION
(M)
H1
H2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

34.50
30.70
34.50
38.00
38.00
38.00
38.00
38.00
38.00
30.70
33.00
33.00
33.00
33.00
33.00
33.00
-0.40
-0.40
-0.40
-0.40
-0.40
-0.40
-0.40
1.00
1.00
-0.40
-0.40
-0.40
-0.40
-0.40
-4.00
-4.00
-4.00
-4.00
-4.00
-4.00
-7.00

NODE TYPE

HOSE STREAM
HOSE STREAM
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

PRESSURE
(BAR)
6.900
7.217
6.999
6.916
6.932
6.946
6.982
6.997
7.015
7.316
7.292
7.314
7.416
7.437
7.464
7.508
10.862
10.873
10.890
10.912
10.945
10.956
10.966
10.842
10.875
11.025
11.055
11.075
11.093
11.105
11.475
11.485
11.503
11.533
11.553
11.567
11.901

DISCHARGE
(L/MIN)
946.0
946.0
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 3
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SC1-04
JOB TITLE: NQ13-FFS-AMC-B2-SC1-04
NODE ANALYSIS DATA
NODE TAG
ELEVATION
(M)
SOURCE

-7.00

NODE TYPE

SOURCE

PRESSURE
(BAR)
11.903

DISCHARGE
(L/MIN)
1892.1

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 4
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SC1-04
JOB TITLE: NQ13-FFS-AMC-B2-SC1-04
PIPE DATA
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

H1
1

Pipe: 1
34.50
34.50

H.S.
0.0

6.900
6.999

946.0
0.0

1
2

Pipe: 2
34.50
38.00

0.0
0.0

6.999
6.916

0.0
0.0

2
3

Pipe: 3
38.00
38.00

0.0
0.0

6.916
6.932

0.0
0.0

3
4

Pipe: 4
38.00
38.00

0.0
0.0

6.932
6.946

0.0
0.0

4
5

Pipe: 5
38.00
38.00

0.0
0.0

6.946
6.982

0.0
0.0

5
6

Pipe: 6
38.00
38.00

0.0
0.0

6.982
6.997

0.0
0.0

6
7

Pipe: 7
38.00
38.00

0.0
0.0

6.997
7.015

0.0
0.0

7
14

Pipe: 8
38.00
33.00

0.0
0.0

7.015
7.508

0.0
0.0

H2
8

Pipe: 9
30.70
30.70

H.S.
0.0

7.217
7.316

946.0
0.0

8
9

Pipe: 10
30.70
33.00

0.0
0.0

7.316
7.292

0.0
0.0

9
10

Pipe: 11
33.00
33.00

0.0
0.0

7.292
7.314

0.0
0.0

10
11

Pipe: 13
33.00
33.00

0.0
0.0

7.314
7.416

0.0
0.0

11
12

Pipe: 14
33.00
33.00

0.0
0.0

7.416
7.437

0.0
0.0

LENGTH
(M)

PRESS.
SUM.
(BAR)

-946.0
5.10

62.71 PL
120 FTG
0.0487 TL

0.20
E
2.03

PF 0.099
PE 0.000
PV

-946.0
5.10

62.71 PL
120 FTG
0.0487 TL

3.50
E
5.33

PF 0.260
PE-0.343
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

0.50
E
3.55

PF 0.016
PE 0.000
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

0.20
E
3.25

PF 0.015
PE 0.000
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

5.02
E
8.07

PF 0.036
PE 0.000
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

0.21
E
3.26

PF 0.015
PE 0.000
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

0.90
E
3.95

PF 0.018
PE 0.000
PV

-946.0
0.85

154.05 PL
120 FTG
0.0006 TL

5.00
---5.00

PF 0.003
PE 0.490
PV

-946.0
5.10

62.71 PL
120 FTG
0.0487 TL

0.20
E
2.03

PF 0.099
PE 0.000
PV

-946.0
5.10

62.71 PL
120 FTG
0.0487 TL

2.30
E
4.13

PF 0.201
PE-0.225
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

2.03
E
5.08

PF 0.023
PE 0.000
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

19.62
E
22.67

PF 0.102
PE 0.000
PV

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

1.41
E
4.46

PF 0.020
PE 0.000
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 5
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SC1-04
JOB TITLE: NQ13-FFS-AMC-B2-SC1-04
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

12
13

Pipe: 15
33.00
33.00

0.0
0.0

7.437
7.464

0.0
0.0

13
14

Pipe: 16
33.00
33.00

0.0
0.0

7.464
7.508

14
15

Pipe: 17
33.00
-0.40

15
16

LENGTH
(M)

PRESS.
SUM.
(BAR)

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

3.00
E
6.05

PF 0.027
PE 0.000
PV

0.0
0.0

-946.0
1.92

102.26 PL
120 FTG
0.0045 TL

3.66
T
9.76

PF 0.044
PE 0.000
PV

0.0 7.508
0.0 10.862

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

33.40
E
37.67

PF 0.083
PE 3.271
PV

Pipe: 18
-0.40
-0.40

0.0 10.862
0.0 10.873

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

0.80
E
5.07

PF 0.011
PE 0.000
PV

16
17

Pipe: 19
-0.40
-0.40

0.0 10.873
0.0 10.890

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

3.46
E
7.73

PF 0.017
PE 0.000
PV

17
18

Pipe: 20
-0.40
-0.40

0.0 10.890
0.0 10.912

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

5.45
E
9.72

PF 0.021
PE 0.000
PV

18
19

Pipe: 21
-0.40
-0.40

0.0 10.912
0.0 10.945

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

10.70
E
14.97

PF 0.033
PE 0.000
PV

19
20

Pipe: 22
-0.40
-0.40

0.0 10.945
0.0 10.956

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

0.89
E
5.16

PF 0.011
PE 0.000
PV

20
21

Pipe: 23
-0.40
-0.40

0.0 10.956
0.0 10.966

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

0.46
E
4.73

PF 0.010
PE 0.000
PV

21
22

Pipe: 24
-0.40
1.00

0.0 10.966
0.0 10.842

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

1.60
E
5.87

PF 0.013
PE-0.137
PV

22
23

Pipe: 25
1.00
1.00

0.0 10.842
0.0 10.875

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

2.00
EGA
14.84

PF 0.033
PE 0.000
PV

23
24

Pipe: 26
1.00
-0.40

0.0 10.875
0.0 11.025

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

1.40
E
5.67

PF 0.013
PE 0.137
PV

24
25

Pipe: 27
-0.40
-0.40

0.0 11.025
0.0 11.055

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

9.62
E
13.89

PF 0.031
PE 0.000
PV

25
26

Pipe: 28
-0.40
-0.40

0.0 11.055
0.0 11.075

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

4.80
E
9.07

PF 0.020
PE 0.000
PV

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 6
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SC1-04
JOB TITLE: NQ13-FFS-AMC-B2-SC1-04
PIPE TAG
END
NODES

ELEV.
(M)

NOZ.
(K)

PT
(BAR)

Q(LPM) DIA(MM)
DISC. VEL(MPS) HW(C)
(LPM)
FL/M

LENGTH
(M)

PRESS.
SUM.
(BAR)

26
27

Pipe: 29
-0.40
-0.40

0.0 11.075
0.0 11.093

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

3.87
E
8.14

PF 0.018
PE 0.000
PV

27
28

Pipe: 30
-0.40
-0.40

0.0 11.093
0.0 11.105

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

0.97
E
5.24

PF 0.012
PE 0.000
PV

28
29

Pipe: 31
-0.40
-4.00

0.0 11.105
0.0 11.475

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

3.60
E
7.87

PF 0.017
PE 0.353
PV

29
30

Pipe: 32
-4.00
-4.00

0.0 11.475
0.0 11.485

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

0.45
E
4.72

PF 0.010
PE 0.000
PV

30
31

Pipe: 33
-4.00
-4.00

0.0 11.485
0.0 11.503

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

3.66
E
7.93

PF 0.017
PE 0.000
PV

31
32

Pipe: 34
-4.00
-4.00

0.0 11.503
0.0 11.533

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

9.53
E
13.80

PF 0.030
PE 0.000
PV

32
33

Pipe: 35
-4.00
-4.00

0.0 11.533
0.0 11.553

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

5.00
E
9.27

PF 0.020
PE 0.000
PV

33
34

Pipe: 36
-4.00
-4.00

0.0 11.553
0.0 11.567

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

2.00
E
6.27

PF 0.014
PE 0.000
PV

34
35

Pipe: 37
-4.00
-7.00

0.0 11.567
0.0 11.901

-1892.0
0.0 1.69
0.0

154.05 PL
120 FTG
0.0022 TL

3.00
ECG
18.12

PF 0.040
PE 0.294
PV

-1892.1
0.0 11.901
0.0 1.69
SRCE 11.903 (N/A)

154.05 PL
120 FTG
0.0022 TL

1.00
---1.00

PF 0.002
PE 0.000
PV

Pipe: 38
35
-7.00
SOURCE
-7.00

NOTES (HASS):
(1) Calculations were performed by the HASS 8.3 computer program
under license no. 5011081930 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to provide an average
imbalance at each node of 0.0081 lpm and a maximum
imbalance at any node of 0.3014 lpm.

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 7
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SC1-04
JOB TITLE: NQ13-FFS-AMC-B2-SC1-04

(3) Total pressure at each node is used in balancing the system.


Maximum water velocity is 5.10 m/sec at pipe 10.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.

(5) PIPE FITTINGS TABLE


Pipe Table Name: STANDARD.PIP
PAGE: A
Diameter
(mm)

62.71
102.26
154.05

MATERIAL: S40
HWC: 120
Equivalent Fitting Lengths in Meters
E
T
L
C
B
G
A
D
N
Ell
Tee LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv NPTee
-------------------------------------------------------F
FOURTY
1.83
3.66
1.22
4.27
2.13
0.30
3.05
3.05
3.66
0.90
3.05
6.10
1.83
6.71
3.66
0.72
6.10
6.10
6.10
1.20
4.27
9.14
2.74
9.75
3.38
1.10
7.47
8.53
9.14
2.10

(
b
a
r
)

P
R
E
S
S
U
R
E

-1.0

0.0

2.0

4.0

6.0

8.0

12.0
G
A
U
G
E 10.0

14.0

BA

800

1200

1600

2000

2400

FLOW (LPM)

2800

WATER SUPPLY ANALYSIS

3200

3600

Required pressure
11.90 bar @ 1892.1 l/min
A. Source Supply Curve
B. System Demand Curve

Available pressure
0.00 bar @ 1892.1 l/min

Fixed Source Pressure: 0.00 bar


LEGEND

4000

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 8
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SC1-04
JOB TITLE: NQ13-FFS-AMC-B2-SC1-04

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 9
DATE: 8/20/2013 CALCULATION\2013\AL MADEAN COMPLEX\NQ13-FFS-AMC-B2-SC1-04
JOB TITLE: NQ13-FFS-AMC-B2-SC1-04
WATER SUPPLY CURVE
12.0+
X
|
|
|
11.0+
|
|
|
10.0+
|
|
|
9.0+
|
|
|
P8.0+
R
|
E
|
S
|
S7.0+
U
|
R
|
E
|
6.0+
(
|
B
|
A
|
R5.0+
)
|
|
|
4.0+
|
|
|
3.0+
|
|
|==============================
2.0+
LEGEND
"
|
"
| X = Required Water Supply
"
|
11.90 bar @ 1892 l/min
"
1.0+
"
|
"
|
"
|
"
0.0*\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\-\\\\\+
400 600 800 1000
1200
1400
1600
1800
2000
FLOW (LPM)

MOST REMOTE
CLASS I HOSE
CONNECTION

2ND MOST
REMOTE CLASS I
HOSE
CONNECTION

You might also like