Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 5

BAR BENDING SCHEDULE

MARK

TYPE OF

N.

SIZE

for type 1 to

for type 6 to

THEORET.

for type 1 to

for type 6 to

CUTTING

BAR

REQ'

OF BAR

DIMENSIONS (mm)
C

OF HOOK

10

LENGTH mm

10

LENGTH mm

2000

200

200

90

2400

2400

2370

2370

2.4

ANGLE
E

N. x CUTTING LENGTH = TOTAL LENGTH m


10

12

10

2000

200

200

90

2400

2400

2360

2360

1A

12

2000

200

200

90

2400

2400

2350

2350

1B

16

2000

200

200

90

2400

2400

2340

2340

1C

20

2000

200

200

90

2400

2400

2320

2320

1D

25

2000

200

200

90

2400

2400

2300

2300

1E

30

2000

200

200

90

2400

2400

2280

2280

1F

32

2000

200

200

90

2400

2400

2270

2270

1G

16

4734

200

200

90

5134

5134

5070

5070

1H

16

5119

200

200

90

5519

5519

5460

5460

1I

16

5504

200

200

90

5904

5904

5840

5840

2A

12

2424

200

200

90

2824

2824

2780

2780

2.8

16

2.4
2.3
2.3
2.3

5.1
5.5
5.8

2B

12

2809

200

200

90

3209

3209

3160

3160

3.2

12

3194

200

200

90

3594

3594

3550

3550

3.6

2D

2E

12

3576

200

200

90

3976

3976

3930

3930

12

3964

200

200

45

4364

4364

4360

4360

2F

12

4349

200

200

90

4749

4749

4700

4700

4.7

2G

12

4734

200

200

90

5134

5134

5090

5090

20.4

2H

12

5119

200

200

90

5519

5519

5470

5470

21.9

2I

12

5504

90

5904

5904

5860

5860

80

20

1720

515

90

2235

2235

2200

2200

18

12

2176

2176

2176

45

8854

8854

8850

8850

159.3

36

12

5250

300

300

90

5850

5850

5800

5800

208.8

5A

200
1163

1163

LOCATION
25

2.4

2C

200

20

3.9
4.4

23.4
176.0

12

2176

300

300

90

2776

2776

2730

2730

10.9

5B

12

2565

300

300

90

3165

3165

3120

3120

12.5

5C

12

2954

300

300

90

3554

3554

3510

3510

14.0

5D

12

3343

300

300

90

3943

3943

3900

3900

15.6

5E

12

3732

300

300

90

4332

4332

4290

4290

17.2

5F

12

4121

300

300

90

4721

4721

4670

4670

18.7

5G

12

4510

300

300

90

5110

5110

5060

5060

20.2

5H

12

4899

300

300

90

5499

5499

5450

5450

21.8

5I

12

2176

300

300

90

2776

2776

2730

2730

10.9

5J

12

2954

300

300

90

3554

3554

3510

3510

5K

12

3732

300

300

90

4332

4332

4290

4290

5L

12

4510

300

300

90

10

375

1325

1325

10

375

375

14.0
17.2

5110

5110

5060

5060

3025

3025

3030

3030

12.1

1700

1700

1700

1700

11.9

20.2

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

GENERAL TOTAL LENGTH (m)

2.4

26.4

651.9

18.7

178.3

2.3

UNIT WEIGHT (Kg/m)

0.395

0.617

0.888

1.578

2.466

3.853

TOTAL WEIGHT (Kg)

17

579

30

440

GENERAL TOTAL WEIGHT (Kg)

1076

OPRNS

Saudi Aramco 2616-ENG (03/99)

FOUNDATION FOR D78-D-0760

REV
NO.

DATE

7/6/2001

31591

JO/EWO

DESCRIPTION

ISSUED FOR REVIEW

BAR BENDING SCHEDULE

DISCIPLINE
ENGINEER
R. PALMUCCI
_______

DATE:

PROJECT
ENGINEER
M. FELICI
_______

DATE:

CERTIFIED

R. INGROSSO
_______

DATE:

CONSTRUCTION
AGENCY
____________
_______

DATE:

REFERENCE DRAWINGS:

OPERATION

BA-396XXX.XXX
____________

_____________
DATE:

CONTROL NUMBER

BY:

THIS INDICATES THAT REV. NO. ________


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________

EDSD

VERIFIC

REVISION CERTIFICATION

________________

_______

DATE:

FOUNDATION FOR XXXXXXXX

DWG.TYPE

BAR BENDING SCHEDULE

STL

Here specify the Plant Unit name


HARADH GAS PLANT

SAUDI ARABIA

PLANT NO.

INDEX

DRAWING NO.

Dxx

BE-396XXX

SHT. NO.

REV. NO.

1 of 4

JO/EWO - 31591

2067-DXX-DW-17XX.XXX

EDSD/2616-0399.XLS

THIS DRAWING AND THE INFORMATION CONTAIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG CERTIFIED PMT

SAUDI ARABIAN OIL COMPANY

BARS BEND TYPOLOGY

0
ISSUED FOR REVIEW
31591
7/6/2001

DATE

REV
NO.
DISCIPLINE
ENGINEER
R. PALMUCCI

_______

DATE:

PROJECT
ENGINEER
M. FELICI
_______

DATE:

CERTIFIED

R. INGROSSO
_______

DATE:

CONSTRUCTION
AGENCY
____________
_______

DATE:

NOTES:

OPERATION

____________

_____________
DATE:

CONTROL NUMBER

BY:

THIS INDICATES THAT REV. NO. ________


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________

EDSD

VERIFIC

________________

_______

DATE:

REVISION CERTIFICATION

- FOR MATERIAL & GENERAL NOTES SEE DWG.: D82-Q-BB-396277.001


- ALL DIMENSIONS ARE MEASURED FROM OUTSIDE TO OUTSIDE OF BARS

FOUNDATION FOR XXXXXXXX

DWG.TYPE

BAR BENDING SCHEDULE

STL

Here specify the Plant Unit name


HARADH GAS PLANT

SAUDI ARABIA

PLANT NO.

INDEX

DRAWING NO.

Dxx

BE-396XXX

SHT. NO.

REV. NO.

2 of 4

JO/EWO - 31591

2067-DXX-DW-17XX.XXX

EDSD/2616-0399.XLS

THIS DRAWING AND THE INFORMATION CONTAIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

0
0

SAUDI ARABIAN OIL COMPANY

0
0
0

0
0

JO/EWO

DESCRIPTION

ENGG CERTIFIED PMT

OPRNS

Saudi Aramco 2616-ENG (03/99)

THIS INDICATES THAT REV. NO. ________


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________

REVISION CERTIFICATION

EDSD

DATE:

DATE:
DISCIPLINE

R. PALMUCCI
ENGINEER

PROJECT
_______

ENGINEER

M. FELICI

CERTIFIED
_______

R. INGROSSO

CONSTRUCTION
_______

____________
AGENCY

OPERATION
_______

____________

_______

FOUNDATION FOR XXXXXXXX

DWG.TYPE

BAR BENDING SCHEDULE

STL

Here specify the Plant Unit name

HARADH GAS PLANT

SAUDI ARABIA

PLANT NO.

INDEX

DRAWING NO.

Dxx

BE-396XXX

2067-DXX-DW-17XX.XXX

SHT. NO.

REV. NO.

3 of 4

JO/EWO - 31591

EDSD/2616-0399.XLS

REV
NO.

7/6/2001

DATE

31591

JO/EWO

ISSUED FOR REVIEW

DESCRIPTION

ENGG CERTIFIED PMT

THIS DRAWING AND THE INFORMATION CONTAIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

_____________

DATE:

DATE:

DATE:

________________

DATE:

BY:

CONTROL NUMBER

VERIFIC

OPRNS

Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

THIS INDICATES THAT REV. NO. ________


OF THIS DRAWING IS COVERED, FOR ALL
APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE
(DCC) NO. _____________

REVISION CERTIFICATION

EDSD

DATE:

DATE:
DISCIPLINE

R. PALMUCCI
ENGINEER

PROJECT
_______

ENGINEER

M. FELICI

CERTIFIED
_______

R. INGROSSO

CONSTRUCTION
_______

____________
AGENCY

OPERATION
_______

____________

_______

FOUNDATION FOR XXXXXXXX

DWG.TYPE

BAR BENDING SCHEDULE

STL

Here specify the Plant Unit name

HARADH GAS PLANT

SAUDI ARABIA

PLANT NO.

INDEX

DRAWING NO.

Dxx

BE-396XXX

2067-DXX-DW-17XX.XXX

SHT. NO.

REV. NO.

4 of 4

JO/EWO - 31591

EDSD/2616-0399.XLS

REV
NO.

7/6/2001

DATE

31591

JO/EWO

ISSUED FOR REVIEW

DESCRIPTION

ENGG CERTIFIED PMT

THIS DRAWING AND THE INFORMATION CONTAIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

_____________

DATE:

DATE:

DATE:

________________

DATE:

BY:

CONTROL NUMBER

VERIFIC

OPRNS

Saudi Aramco 2616-ENG (03/99)

SAUDI ARABIAN OIL COMPANY

You might also like