The document outlines the procedure, requirements, and timescale for assessing requests for Full or Partial Nakheel Compliance Certification (NCC) in 3 steps:
1. Applicants must submit documentation including as-built drawings, site plans, and letters of undertaking.
2. The application will be checked for completeness and compliance with Nakheel design standards. Site inspections will also be conducted.
3. Within 30 working days, the application will either be declined and rectification works requested, or conditionally approved for a Full or Partial NCC.
The document outlines the procedure, requirements, and timescale for assessing requests for Full or Partial Nakheel Compliance Certification (NCC) in 3 steps:
1. Applicants must submit documentation including as-built drawings, site plans, and letters of undertaking.
2. The application will be checked for completeness and compliance with Nakheel design standards. Site inspections will also be conducted.
3. Within 30 working days, the application will either be declined and rectification works requested, or conditionally approved for a Full or Partial NCC.
The document outlines the procedure, requirements, and timescale for assessing requests for Full or Partial Nakheel Compliance Certification (NCC) in 3 steps:
1. Applicants must submit documentation including as-built drawings, site plans, and letters of undertaking.
2. The application will be checked for completeness and compliance with Nakheel design standards. Site inspections will also be conducted.
3. Within 30 working days, the application will either be declined and rectification works requested, or conditionally approved for a Full or Partial NCC.
be submitted as part of any application for either a Full or As-built drawings compared Partial Nakheel Compliance with Nakheel stamp Certificate (NCC): approved drawings; or if applicable, the Trakhees 1. 1. Letter from Application Building Permit stamp Consultant/Contractor requesting formally approved drawings a Full or Partial NCC submitted
2. Plan clearly illustrating the Plot and building coordinates
building(s) to which the checked application relates Application Application checked for deemed 3. A copy of the Nakheel Detailed completenes complete Design stamp approved s Schedule of Alterations (if drawings; or if these are not applicable) checked for available, copy of the Trakhees Application Consultant DCR compliance Building permit stamp approved deemed notified and drawings incomplete NCC advised of timescale declined and DCR DCR 4. A copy of the as-built drawings rectification Breaches Compliant works Consultant Identified 5. A survey report confirming both requested building and plot coordinates notified with DRB deficiencies Assessment 6. A letter of undertaking and highlighted indemnity on approved format template, and signed and Accompanied Site Full or stamped by the developer; or Inspection and survey Partial signed and stamped by the carried out conditional Consultant/Contractor if NCC issued accompanied by signed and 30 working stamped letter from the days developer confirming power of attorney to 15 working days (excluding additional time for DRB cycle) Consultant/Contractor.