3
How will Eskom treat a Local supplier with above 25% black
shareholding in a Joint Venture with a foreign company with overseas
4 manufacturing capabilities?
5 Does Eskom have the budget for these transformers?
Will the full contract of 1,116 transformers be given to a single supplier?
6
Will the transformer Purchase Orders be issued one at a time over the
7 duration of the Project?
Will all 1,116 transformers identified in the Tender documents be
8 ordered during the Project?
Eskom has put stringent requirements on Localisation. 30% of the
localisation requirements are meant to be split amongst BYO, BWO,
BPLD and BO organisations. Can Eskom recommend companies that fall
into these designated sectors and would add value to a project like this?
9
Eskom gives stringent localisation requirements to local companies, i.e.
70%. Is this also applicable to local companies with Foreign suppliers?
10
Will a two month extension be granted on this tender? The onerous
requirements requires more time to put a Proposal together.
11
Is Eskom permitted to order any transformers from a company other
than the successful Tenderer during the Contract Period i.e. 2016 to
12 2020.
1.Confirmation if the current CORP 2997 enquiry has been granted an
extension date. The forecast schedule of the number of transformers
required for this contract.
Please confirm if pricing would still be priced per/unit or would we use
the forecast quantities to quantify the total offer price to Eskom as
would be reflected on the contract data.
There are two documents for Declaration of Fair Bidding Practices with
different formats, one is the document 3)
Declaration_of_Fair_Bidding_Practices_Rev_0 and the other is Tender
Schedule T2.2a No.2 in document 4)
Authority_to_submit_a_Tender_&_Commercial_Returnables_Rev_0.
Please confirm which one we should comply with.
Please find the Page 3 (Form of Offer & Acceptance) and Page 23 (Pro
forma Parent Company Guarantee) of document 5) ECC3 NEC3 Power
Transformers & Reactors Contract CORP 2997, which only indicates GSU
Power Transformer. We think it should be applicable for all types of
transformers. Is it correct?
There are two documents for Eskoms B-BBEE Policy with different
formats, one is the document 10) Tender Returnables Documents4)
Authority_to_submit_a_Tender_&_Commercial_Returnables_Rev_0 and the
other is document 4)
Authority_to_submit_a_Tender_&_Commercial_Returnables_Rev_0. Please
confirm which one we should comply with.
Detail on SEIFSA's latest indices are required for study and consider for pricing.
We refer your document named "NEC3 Engineering & Construction
Contract" Page 8 of 37, Clause No.: 5. The payment terms is mentioned
as : Thirty (30) days after the submission of a valid Tax Invoice with
supporting documentation based on the agreed assessment. And, it will
be released only after verification by ESKOM Engineer as per approved
payment certificate.
We would like to receive the wether data of various sites and severity of
those critical values of the weather.
In case, one single PO is placed for all requirement then what will be the
LD charges levied on the manufacturer due to delay attributed to delay
in supply of one single equipment out of the whole PO ?
32
Regarding online drying system Item 3.21.3 of
Specification for Power Transformers (240-68973110)
requires that an option for an on line drying system to
be provided & installed with transformer must be given
on the tender return.
We think above requirement is not applicable for GSU
transformer and Station unit&service transformer,
because Item AB.31.13 of their Schedule AB (Excel
Version) indicates On-line drying unit required No. Is
it correct?
Besides, online drying system is not listed in Activity
Schedule. Does it mean that we should add its price to
Other Transformer Components?
51
Referring to Item a) 3.4.8 Ability to Withstanding Short
Circuit of 240-68973110R2 1_NEW POWER
TRANSFORMER SPECIFICATION, Pre-fault voltage is
1.1Un for network transformers, and our design of Pre-
fault voltage for GSU Transformers is 1.0 Un due to no
requirements in the specification. Please kindly
Confirm!
59 Compliance with new IEC 60076-3 from 2013 Table 2: AB Schedules 20-
for the BIL indicated 1050kV, the values should be 300kV 700MVA
460kV instead of 510kV specified, and 850 instead of Lethabo/Matla.xls
950kV for Switching impulse? and Test sequence:
short duration not applicable anymore(table 1). Please
confirm.
77 Item 106: The data sheet specifies the voltage of 11kV 58MVA 20/11.5
and does not inform the power ratings. The list
specifies 11,5kV and 58MVA. Please confirm
78 Item 107: The data sheet specifies the voltage of 11kV. 60MVA 24/6.9kV
The list specifies 6,9kV. Please confirm
80 Datasheets for the transformers 800 MVA 400/22kV
and 700 300/20 kV following temperature rise
norms are mentioned:
AB.2.3.5 Yearly average C 30
AB.2.3.6 Monthly average, of the hottest month C
AB.2.4 Amount by which the temperature rise limits
are reduced according to IEC60076-2, section 4.3.1. C
AB2.3.5 (30) - IEC (20) = 10
Note that this value excludes the height above sea
level reduction as stipulated in IEC60076-2. As per
GGS1074
AB.2.5 Additional amount by which the temperature
rise limit is reduced above the values stipulated in
IEC60076-2, as per additional safety margin C 5
AB.2.6 Total amount by which the temperature rise
limit is reduced C (10 + 5) = 15
104
Please confirm that switching devices(AEG S2-300-
0932, ABB DR 1750 D, OIL C.B. SPRECHER HGF SERIES, AB Schedules (GSU
Air Blast Circuit Breaker by ALSTHOM. transformers)
DELLE PKG 2V CIRCUIT BREAKER, Sprecher & Schub It.13
Model HPF 516T6D, etc.) are not in in scope of
transformer manufacturer
110 -We understand that GGSS1074 Rev 14.1 Gen
Trfr Specification.pdf is the general specification to be
used for GSU transformers and 240-68973110
Specification for Power Transformers - NEW
07.07.2014.pdf for transmission transformers. Please
confirm.
WethinkthatalltypesoftransformerincludingGSUtransformer
shouldbedesignedinaccordancewiththeSpecificationforPower
Transformers(240-68973110),andGGS1074onlyforreference.Is
itcorrect?
140
147
148
160 Please provide drawings for LV terminal and IPD GSU LV Terminal and
information. IPD
161
Please confirm Impedance requirment, some sites
information is missed in Schedule AB
GSU Impedance
Gariep 100MVA
Gariep 130MVA
Palmiet 260MVA
162
As schedule A for Grootvleie 250MVA, the LV
termainal is brought out 6 terminals.
We thought that 3 LV terminals for 250MVA unit is
GSU LV Terminal
enough.
Please confirm that nember of LV terminal is 3 or 6.
176
179
Please confirm that switching devices(AEG S2-300-
0932, ABB DR 1750 D, OIL C.B. SPRECHER HGF SERIES, AB Schedules (GSU
Air Blast Circuit Breaker by ALSTHOM. transformers)
DELLE PKG 2V CIRCUIT BREAKER, Sprecher & Schu It.13
Model HPF 516T6D, etc.) are not in in scope of
transformer manufacturer
190 In the GSU transformers category: the SC impedance in
three of the Transformers: 100MVA 13.2-132KV,
130MVA 13.2-132KV, 260MVA 16.5-420KV are not
specified in their TDs. The SC impedance has great
effect in the design of the transformer and should be
clarified for these transformers.
199
200
201
No information is provided about required short circuit
impedances for this type of transformer. Also not within 240- AB Schedules 16.5-
68973110 Specification for Power Transformers - NEW 420kV 260MVA
07.07.2014. In order to proceed with design we would Palmiet_Gouirkwa_Anke
appreciate to receive required short circuit impedance data. rlig Transformers(1)
202
AB Schedules 16.5-420kV 260MVA
Palmiet_Gouirkwa_Ankerlig Transformers(1): At
AB Schedules 16.5-
several items the remark is made Same as existing
420kV 260MVA
transformers, refer to nameplate diagram. However,
Palmiet_Gouirkwa_An
the nameplate diagram drawing is not submitted
kerlig
with the tender and we would appreciate to receive
Transformers(1)
this information in order to proceed with design.
203 The requirements in compliance with the AB Specification 240-
schedule will overrule the requirements of 240- 68973110 and AB
68973110 Specification for Power Transformers - Schedules GSU
NEW 07.07.2014. However, for the avoidance of Transformers
doubt and the end of each AB schedule for generator
transformers following remark is made:
204
208
According to the name plate this unit is design for
opperation at 1800 meter above see level. However,
at item 2.2. of the A nd B schedule for Palmiet only Name plate diagram
400 meter is specified. Please advise for which sea plate of Palmiet
level this unit should be designed?
209
To proceed with design we need to receive requested
clarification at TCQ 4 and 5. As this unit should be
design as mutually spare for two power station, we A and B Schedule
would like to receive also some outline drawings of Palmiet, Ankerlig and
the transformers in order to check the Gourikwa Spare
interchangeability?
Please offer a single transformer that will be able to be utilised at both sites or offer a
solution for each site
Please refer to schedules all information is provided. If not, please be specific in your
request. Cooling Method for GSU is ODAF
Correct data sheet to be provided. Both 20MVA and 25MVA 15.75-6.9kV are required.
1) We do not refer to brand - the device is not in scope for Transmission and Distribution,
but the preperation of the unit for retrofit of the fast depresurisation devices is in scope.
2) The Sergi system is required for GSU for the main tank and OLTC where
applicable. Unit and Service trfrs only need to provided with the interfaces to fit the system
in the future. The water spray system (pipe work and nozzles) is all that is required. The
provided pipework and nozzles will tie-in to the existing system.
Please note that all GSU's the tap changer selector may be housed in the main tank, the
divertor compartment will be separate. The 250MVA Grootvlei design requires a link board
not an OLTC.
Since the activities take place at the power station, the same works information is
applicable for the Unit, Service & Station Trfrs.
This is not a range. These are the impedance values of the two types of Station trfrs used
with 132-11.5kV 45MVA ratings. Please provide two designs.
Apply 1.1Un.
Design for 1800m above sea level. The 10+5K reduction is applicable. Any correction for
temperature will be verified at FAT depending on factory height above sea level.
Please follow the value. Note the preference for vacuum OLTC.
Please apply the formula provided in the Matla Schedules.
25MVA 15.75-6.9kV
35MVA 18/11.5kV
38MVA 20/11.5kV
58MVA 20/11.5
60MVA 24/6.9kV
See Note 2.
Please offer a single transformer that will be able to be utilised at both sites or offer a
solution for each site
Please refer to schedules all information is provided. If not, please be specific in your
request. Cooling Method for GSU is ODAF
YES
1) We do not refer to brand - the device is not in scope for Transmission and Distribution,
but the preperation of the unit for retrofit of the fast depresurisation devices is in scope.
2) The Sergi system is required for GSU for the main tank and OLTC where
applicable. Unit and Service trfrs only need to provided with the interfaces to fit the system
in the future. The water spray system (pipe work and nozzles) is all that is required. The
provided pipework and nozzles will tie-in to the existing system.
See Note 2.
Please note that all GSU's the tap changer selector may be housed in the main tank, the
divertor compartment will be separate. The 250MVA Grootvlei design requires a link board
not an OLTC.
This is applicable to GSU's only, not Unit & Station transformers. GIC detection refers to a
full system such as Sunburst monitor etc and is not required.
Since the activities take place at the power station, the same works information is
applicable for the Unit, Service & Station Trfrs.
This is not a range. These are the impedance values of the two types of Station trfrs used
with 132-11.5kV 45MVA ratings. Please provide two designs.
Oil Temp rise: (60) (10) (5) (3.2) = 41.8K
Winding Temp rise : (70) (10) (5) (3.2) = 51.8K
Copper (Hot spot) : (78) - (10) - (5) - (3.2) = 59.8K
IPD drawings will be provided at detailed design review. At this stage LV terminal
arrangements are provided.
25MVA 15.75-6.9 KV
Proceed accordingly.
Generator Transformer Short circuit experience, but similar transformers can be considered
if found suitable by Eskom.
See information provided. Note that the original GSU's were 220MVA.
See Note 1
Please apply the requirements of Specification 240-68973110
In the case of Palmiet please design for 1800 Meters for external clearances.
estions as possible
Reference
(Section /
No Clarification Questions
Page
Number)
Response / Comments