Kest 5th Septic Tank & Soak Away MT 1
Kest 5th Septic Tank & Soak Away MT 1
Kest 5th Septic Tank & Soak Away MT 1
:-.-04/475
Contract No.
-05
Statement No.
Site Name: Main Town
Page no. __
Total / Birr/
Contract Executed
2,074,148.28 1,346,591.88
Approved by:-
Consultant
BILL O
Item No.
3
3.1
3.01
3.02
3.03
3.04
3.06
3.07
3.08
3.2.01
3.2.02
3.2.03
3.04
3.2.05
3.2.06
3.3.01
3.4.01
3.5.01
3.6.01
3.6.02
3.6.03
Prepared by:-
Contractor :-..
BILL OF QUANT
Description
Septick Tank
Excavation & Earth Work
Clear and remove top soil to an avarage depth of 200mm.
Pit excavation in ordinary soil to for septic tank to adepth not exceeding 1500mm.
Ditto as item 3.02 but to a depth exceeding 1500mm but not exceeding 3000mm.
Ditto as item 3.02 but to a depth exceeding 3000mm but not exceeding 4500mm.
Fill around stone masonry retaining wall in non expansive excavated material from the
site well rolled and compacted in layers not exceeding 200mm thick.
Load and cart away surplus excavated material to an appropriate tip.
250mm thick basaltic stone hardcore well rolled, consolidated and blinded with
crushed stone.
TOTAL CARRED TO SUMMARY-----------
3.2.0 CONCRETE WORK
50mm lean concrete qulity C-5, with minimum cement content of 150kg/m3,of
concrete:
a) Under bottom slab
Reinforced concrete quality C-25,360 kg of cement/m3 filled in to form work and
vibrated around rod reinforcement (Formwork and reinforcement measured
separately)
a) In RC bottom slab
c) Top slab
b) In RC man hole cover
Size : 700 x 700x 80mm
Ribbed slab for suspended top slab made of 60 mm thick RC concrete slab in C-25,
80x120 mm one way concrete girder with c/c spacing of 600mm ,including 220x520
mm hollow concrete ribbed block all according to structural detail drawing.
Pre-cast elements (PB1) to the size of 4200x120x80mm.made of
0.0403m3/beam.Price includes mould,reinforcement bar placed in position and
welded.
(a) Dia 6mm plain bar (2.16pcs )
(b) Dia 10 mm deformed bar ( 0.37pc )
(c) Dia 12 mm deformed bar ( 0.73pc )
to be placed in position.
Provide, cut and fix in position sawn structural wood or steel formwork which ever is
appropriate.
a) In RC bottom slab
b) Top slab
f) In RC man hole cover
Size : 700 x 700x 80mm
Mild steel reinforcement according to structural drawings. Price includes cutting,
bending, placing in position, tying wire and concrete spacers.
a) Dia 6mm diformed bar
b) Dia 8mm diformed bar
c) Dia 10 mm deformed bar
d) Dia 12 mm deformed bar
TOTAL CARRED TO SUMMARY-----------
3.3.0 MASONRY WORKS
600mm thick Trychatic or equivalent stone masonry retaining wall below ground level
bedded in cement mortar mix (1:3) and one side left for plastering.
(Amount)
Unit
Unite Rate
Contract Executed (Contract birr)
Pcs 978.50
kg 750.00 35.47
kg 1819.90 35.47 0.00
Kg 5500.00 1488.52 35.47 195085.00
Kg 1200.00 1599.93 35.47 42564.00
656,466.20
Page no. __
(Executed
birr)
4308.20
24492.85
30060.95
41441.63
6578.89
103344.40
16821.14
227,048.05
23795.10
103981.24
69618.84
658.76
4034.70
15800.31
304.51
0.00
64551.97
52797.98
56749.42
392,292.81
676284.65
676,284.65
0.00
0.00
0.00
50966.37
50,966.37
0.00
0.00
0.00
0.00
Consultant
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
12.60
6.70 3.01. Clear and remove top soil to an avarage depth
84.42 m2 Net total
11.10
3.02. Pit excavation in ordinary soil to for septic tank
5.20 not exceeding 1500mm.
1.50
86.58 m3 Net total
11.10
3.03. Ditto as item 3.02, but to a depth exceeding 15
5.20 not exceeding 3000mm.
1.50
86.58 m3 Net total
11.10
3.04. Ditto as item 3.02 but to a depth exceeding 30
5.20 not exceeding 4500mm.
1.80
103.90 m3 Net total
Pit Volume:Vp=L*W*H
11.10 Length L=
5.20 Width W=
4.80 Height H=
277.06 m3
10.60 Length L=
4.70 Width W=
49.82 m2
Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
c) In RC grade beam
2.70 Length L=
2 0.30 Width W=
1.62 m2
2.70 Length L=
1 0.20 Width W=
0.54 m2
2.70 Length L=
2 0.05 Width W=
0.27 m2
2.70 Length L=
1 0.20 Width W=
0.54 m2
f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2
Prepared by:
Contractor :-
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work
10.60
4.70
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.
8.40
2.70
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15
5.2m =0.25+W+0.25
4.8m =Hm+0.45
3.70
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20
rd core Volume:Vsh=L*W*H
10.6m =L 4.70
4.7m =W 0.20
0.45m 1 0.20
k Volume:Vst=L*W*H
8.6m =A-(0.5+0.5)
2.7m =B-(0.5+0.5)
0.70
10.6m =L
4.7m =W
Checked by:-
Consultant
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
26.6m=2*(A+B))
0.2m 26.60
0.75
4.35
For scum board sides
2.7m =B-(0.5+0.5)
0.3m 0.50
0.50
For scum board bottom 4 4.35
2.7m =B-(0.5+0.5)
0.2m
1.00
1.00
1/3 4.35
0.05m
2.70
2 2.50
22.60
eel reinforcement according to structural drawing
4.35
eformed bar
NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.
1.00
0 1.00
W id th :W
1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00
Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) In RC bottom slab
Length L= 10.6m =L
Width W= 4.7m =W
Thickness t= 0.15m
7.47 m3
b) In RC top slab
Length L= 8.4m =A-(0.5+0.2+0.5)
Width W= 2.7m =B-(0.5+0.5)
Thickness t= 0.15m
3.40 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m
0.15 m3
3.26 m3 Net total
c) In RC grade beam
Total Length L= 24.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.42 m3
d) In RC scum board
Length L= 3.7m=B
Width W= 0.3m
Thickness t= 0.2m
0.22 m3
e) In RC cross beam
Length L= 4.7m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.19 m3
f) In RC manhole cover
2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 30.6m =2*(L+W)
Width W= 0.2m
6.12 m2
b) In RC top slab
Length L= 8.4m =A-(0.5+0.2+0.5)
Width W= 2.7m =B-(0.5+0.5)
22.68 m2
0.98 m2
Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
a) Retaing wall
Height H= 4.35m
86.78 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.35m
4.35 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 1m=2*C
Height H= 4.35m
1.45 m3
b) Partition wall:V=L*W*H
Length L= 2.7m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.5m
3.38 m3
3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.7m =B-(0.5+0.5)
Height H= 2.5m
13.50 m2
0.00 pcs
4.00 m
Approved by:
Implementing Agent...
n
5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape
Main
Reinforcment: L= 10.55
Bottom Slab
Main
Reinforcment: W= 4.65
Main
Reinforcment: L= 9.35
Deduction for
manhole 0.70
Main
Reinforcment: L= 9.35
Stirrup 0.45
Main
Reinforcment: W= 3.65
Cross Beam
Stirrup 0.15
Main
Reinforcment: W= 3.65
Scum Board Beam
Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover
Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k
8 10.55 32 1 337.60
8 4.65 72 1 334.80
10 19.04 20 1 380.80
10 7.64 58 1 443.12
10 1.40 6 -4 -33.60
12 18.90 5 2 189.00
12 7.50 5 2 75.00
8 1.34 88 2 235.84
12 7.50 4 1 30.00
8 0.74 26 1 19.24
12 7.50 4 1 30.00
8 0.94 26 1 24.44
8 0.65 6 2 7.80
8 0.65 6 2 7.80
Total Length 0.00 967.52 790.32 324.00 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 382.17 487.63 287.71 0.00
Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6
Remark
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
11.50
6.30 3.01. Clear and remove top soil to an avarage depth
72.45 m2 Net total
10.00
3.02. Pit excavation in ordinary soil to for septic tank
4.80 not exceeding 1500mm.
1.50
72.00 m3 Net total
10.00
3.03. Ditto as item 3.02, but to a depth exceeding 15
4.80 not exceeding 3000mm.
1.50
72.00 m3 Net total
10.00
3.04. Ditto as item 3.02 but to a depth exceeding 30
4.80 not exceeding 4500mm.
1.75
84.00 m3 Net total
Pit Volume:Vp=L*W*H
10.00 Length L=
4.80 Width W=
4.75 Height H=
228.00 m3
9.50 Length L=
4.30 Width W=
40.85 m2
Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
c) In RC grade beam
2.30 Length L=
2 0.30 Width W=
1.38 m2
2.30 Length L=
1 0.20 Width W=
0.46 m2
2.30 Length L=
2 0.05 Width W=
0.23 m2
2.30 Length L=
1 0.20 Width W=
0.46 m2
f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2
Prepared by:
Contractor :-
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work
9.50
4.30
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.
7.30
2.30
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15
4.8m =0.25+W+0.25
4.75m =Hm+0.45
3.30
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20
rd core Volume:Vsh=L*W*H
9.5m =L 4.30
4.3m =W 0.20
0.45m 1 0.20
k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)
2.3m =B-(0.5+0.5)
0.70
9.5m =L
4.3m =W
Checked by:-
Consultant
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
23.6m=2*(A+B))
0.2m 23.60
0.75
4.30
For scum board sides
2.3m =B-(0.5+0.5)
0.3m 0.50
0.50
For scum board bottom 4 4.30
2.3m =B-(0.5+0.5)
0.2m
1.00
1.00
1/3 4.30
0.05m
2.30
2 2.30
19.60
eel reinforcement according to structural drawing
4.30
eformed bar
NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.
1.00
0 1.00
W id th :W
1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00
Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) In RC bottom slab
Length L= 9.5m =L
Width W= 4.3m =W
Thickness t= 0.15m
6.13 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m
0.15 m3
2.37 m3 Net total
c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3
d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3
e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3
f) In RC manhole cover
2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 27.6m =2*(L+W)
Width W= 0.2m
5.52 m2
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2
0.98 m2
Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
a) Retaing wall
Height H= 4.3m
76.11 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.3m
4.30 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 1m=2*C
Height H= 4.3m
1.43 m3
b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m
2.65 m3
3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2
0.00 pcs
4.00 m
Approved by:
Implementing Agent...
n
5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape
Main
Reinforcment: L= 9.45
Bottom Slab
Main
Reinforcment: W= 4.25
Main
Reinforcment: L= 8.25
Deduction for
manhole 0.70
Main
Reinforcment: L= 8.25
Stirrup 0.45
Main
Reinforcment: W= 3.25
Cross Beam
Stirrup 0.15
Main
Reinforcment: W= 3.25
Scum Board Beam
Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover
Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k
8 9.45 30 1 283.50
8 4.25 64 1 272.00
10 16.84 17 1 286.28
10 6.84 50 1 342.00
10 1.40 6 -4 -33.60
12 16.70 5 2 167.00
12 6.70 5 2 67.00
8 1.34 78 2 209.04
12 6.70 4 1 26.80
8 0.74 23 1 17.02
12 6.70 4 1 26.80
8 0.94 23 1 21.62
8 0.65 6 2 7.80
8 0.65 6 2 7.80
Total Length 0.00 818.78 594.68 287.60 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 323.42 366.92 255.39 0.00
Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6
Remark
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
11.50
6.30 3.01. Clear and remove top soil to an avarage depth
72.45 m2 Net total
10.00
3.02. Pit excavation in ordinary soil to for septic tank
4.80 not exceeding 1500mm.
1.50
72.00 m3 Net total
10.00
3.03. Ditto as item 3.02, but to a depth exceeding 15
4.80 not exceeding 3000mm.
1.50
72.00 m3 Net total
10.00
3.04. Ditto as item 3.02 but to a depth exceeding 30
4.80 not exceeding 4500mm.
0.95
45.60 m3 Net total
Pit Volume:Vp=L*W*H
10.00 Length L=
4.80 Width W=
3.95 Height H=
189.60 m3
9.50 Length L=
4.30 Width W=
40.85 m2
Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
c) In RC grade beam
2.30 Length L=
2 0.30 Width W=
1.38 m2
2.30 Length L=
1 0.20 Width W=
0.46 m2
2.30 Length L=
2 0.05 Width W=
0.23 m2
2.30 Length L=
1 0.20 Width W=
0.46 m2
f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2
Prepared by:
Contractor :-
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work
9.50
4.30
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.
7.30
2.30
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15
4.8m =0.25+W+0.25
3.95m =Hm+0.45
3.30
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20
rd core Volume:Vsh=L*W*H
9.5m =L 4.30
4.3m =W 0.20
0.45m 1 0.20
k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)
2.3m =B-(0.5+0.5)
0.70
9.5m =L
4.3m =W
Checked by:-
Consultant
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
23.6m=2*(A+B))
0.2m 23.60
0.75
3.50
For scum board sides
2.3m =B-(0.5+0.5)
0.3m 0.50
0.50
For scum board bottom 4 3.50
2.3m =B-(0.5+0.5)
0.2m
1.00
1.00
1/3 3.50
0.05m
2.30
2 2.30
19.60
eel reinforcement according to structural drawing
3.50
eformed bar
NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.
1.00
0 1.00
W id th :W
1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00
Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) In RC bottom slab
Length L= 9.5m =L
Width W= 4.3m =W
Thickness t= 0.15m
6.13 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m
0.15 m3
2.37 m3 Net total
c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3
d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3
e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3
f) In RC manhole cover
2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 27.6m =2*(L+W)
Width W= 0.2m
5.52 m2
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2
0.98 m2
Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
a) Retaing wall
Height H= 3.5m
61.95 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 3.5m
3.50 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 1m=2*C
Height H= 3.5m
1.17 m3
b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m
2.65 m3
3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2
0.00 pcs
4.00 m
Approved by:
Implementing Agent...
n
5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape
Main
Reinforcment: L= 9.45
Bottom Slab
Main
Reinforcment: W= 4.25
Main
Reinforcment: L= 8.25
Deduction for
manhole 0.70
Main
Reinforcment: L= 8.25
Stirrup 0.45
Main
Reinforcment: W= 3.25
Cross Beam
Stirrup 0.15
Main
Reinforcment: W= 3.25
Scum Board Beam
Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover
Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k
8 9.45 30 1 283.50
8 4.25 64 1 272.00
10 16.84 17 1 286.28
10 6.84 50 1 342.00
10 1.40 6 -4 -33.60
12 16.70 5 2 167.00
12 6.70 5 2 67.00
8 1.34 78 2 209.04
12 6.70 4 1 26.80
8 0.74 23 1 17.02
12 6.70 4 1 26.80
8 0.94 23 1 21.62
8 0.65 6 2 7.80
8 0.65 6 2 7.80
Total Length 0.00 818.78 594.68 287.60 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 323.42 366.92 255.39 0.00
Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6
Remark
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
12.60
7.40 3.01. Clear and remove top soil to an avarage depth
93.24 m2 Net total
11.10
3.02. Pit excavation in ordinary soil to for septic tank
5.90 not exceeding 1500mm.
1.50
98.24 m3 Net total
11.10
3.03. Ditto as item 3.02, but to a depth exceeding 15
5.90 not exceeding 3000mm.
1.50
98.24 m3 Net total
11.10
3.04. Ditto as item 3.02 but to a depth exceeding 30
5.90 not exceeding 4500mm.
0.95
62.22 m3 Net total
Pit Volume:Vp=L*W*H
11.10 Length L=
5.90 Width W=
3.95 Height H=
258.69 m3
10.60 Length L=
5.40 Width W=
57.24 m2
Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
c) In RC grade beam
2.30 Length L=
2 0.30 Width W=
1.38 m2
2.30 Length L=
1 0.20 Width W=
0.46 m2
2.30 Length L=
2 0.05 Width W=
0.23 m2
2.30 Length L=
1 0.20 Width W=
0.46 m2
f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2
Prepared by:
Contractor :-
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work
10.60
5.40
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.
7.30
2.30
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15
5.9m =0.25+W+0.25
3.95m =Hm+0.45
3.30
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20
rd core Volume:Vsh=L*W*H
10.6m =L 4.30
5.4m =W 0.20
0.45m 1 0.20
k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)
2.3m =B-(0.5+0.5)
0.70
10.6m =L
5.4m =W
Checked by:-
Consultant
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
23.6m=2*(A+B))
0.2m 23.60
1.03
3.50
For scum board sides
2.3m =B-(0.5+0.5)
0.3m 0.50
0.50
For scum board bottom 4 3.50
2.3m =B-(0.5+0.5)
0.2m
2.10
2.10
1/3 3.50
0.05m
2.30
2 2.30
19.60
eel reinforcement according to structural drawing
3.50
eformed bar
NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.
1.00
0 1.00
W id th :W
1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00
Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) In RC bottom slab
Length L= 10.6m =L
Width W= 5.4m =W
Thickness t= 0.15m
8.59 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m
0.15 m3
2.37 m3 Net total
c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3
d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3
e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3
f) In RC manhole cover
2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 32m =2*(L+W)
Width W= 0.2m
6.40 m2
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2
0.98 m2
Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
a) Retaing wall
Height H= 3.5m
84.67 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 3.5m
3.50 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 2.1m=2*C
Height H= 3.5m
5.15 m3
b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m
2.65 m3
3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2
0.00 pcs
4.00 m
Approved by:
Implementing Agent...
n
5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape
Main
Reinforcment: L= 10.55
Bottom Slab
Main
Reinforcment: W= 5.35
Main
Reinforcment: L= 8.25
Deduction for
manhole 0.70
Main
Reinforcment: L= 8.25
Stirrup 0.45
Main
Reinforcment: W= 3.25
Cross Beam
Stirrup 0.15
Main
Reinforcment: W= 3.25
Scum Board Beam
Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover
Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k
8 10.55 37 1 390.35
8 5.35 72 1 385.20
12 16.84 10 1 168.40
12 6.84 33 1 225.72
12 1.40 5 -4 -28.00
12 16.70 5 2 167.00
12 6.70 5 2 67.00
8 1.34 78 2 209.04
12 6.70 4 1 26.80
8 0.74 23 1 17.02
12 6.70 4 1 26.80
8 0.94 23 1 21.62
8 0.65 6 2 7.80
8 0.65 6 2 7.80
Total Length 0.00 1,038.83 0.00 653.72 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 410.34 0.00 580.50 0.00
Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6
Remark
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
11.70
7.60 3.01. Clear and remove top soil to an avarage depth
88.92 m2 Net total
10.20
3.02. Pit excavation in ordinary soil to for septic tank
6.10 not exceeding 1500mm.
1.50
93.33 m3 Net total
10.20
3.03. Ditto as item 3.02, but to a depth exceeding 15
6.10 not exceeding 3000mm.
1.50
93.33 m3 Net total
10.20
3.04. Ditto as item 3.02 but to a depth exceeding 30
6.10 not exceeding 4500mm.
2.05
127.55 m3 Net total
Pit Volume:Vp=L*W*H
10.20 Length L=
6.10 Width W=
5.05 Height H=
314.21 m3
9.70 Length L=
5.60 Width W=
54.32 m2
Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent
Size
No (L/W/D) Quantity Description
c) In RC grade beam
2.00 Length L=
2 0.30 Width W=
1.20 m2
2.00 Length L=
1 0.20 Width W=
0.40 m2
2.00 Length L=
2 0.05 Width W=
0.20 m2
2.00 Length L=
1 0.20 Width W=
0.40 m2
f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2
Prepared by:
Contractor :-
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work
9.70
5.60
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.
5.90
2.00
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15
6.1m =0.25+W+0.25
5.05m =Hm+0.45
3.00
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20
rd core Volume:Vsh=L*W*H
9.7m =L 4.00
5.6m =W 0.20
0.45m 1 0.20
k Volume:Vst=L*W*H
6.1m =A-(0.5+0.5)
2m =B-(0.5+0.5)
0.70
9.7m =L
5.6m =W
Checked by:-
Consultant
Takeoff Sheet
g Dev. Aegency
nstruction Supervision Works Enterprise
Size
Description No (L/W/D)
20.2m=2*(A+B))
0.2m 20.20
1.15
4.60
For scum board sides
2m =B-(0.5+0.5)
0.3m 0.50
0.50
For scum board bottom 4 4.60
2m =B-(0.5+0.5)
0.2m
2.60
2.60
1/3 4.60
0.05m
2.00
2 1.80
16.20
eel reinforcement according to structural drawing
4.60
eformed bar
NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.
1.00
0 1.00
W id th :W
1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00
Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5
a) In RC bottom slab
Length L= 9.7m =L
Width W= 5.6m =W
Thickness t= 0.15m
8.15 m3
b) In RC top slab
Length L= 5.9m =A-(0.5+0.2+0.5)
Width W= 2m =B-(0.5+0.5)
Thickness t= 0.15m
1.77 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m
0.15 m3
1.62 m3 Net total
c) In RC grade beam
Total Length L= 17.8m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
1.78 m3
d) In RC scum board
Length L= 3m=B
Width W= 0.3m
Thickness t= 0.2m
0.18 m3
e) In RC cross beam
Length L= 4m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.16 m3
f) In RC manhole cover
2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 30.6m =2*(L+W)
Width W= 0.2m
6.12 m2
b) In RC top slab
Length L= 5.9m =A-(0.5+0.2+0.5)
Width W= 2m =B-(0.5+0.5)
11.80 m2
0.98 m2
Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __
Quantity Description
a) Retaing wall
Height H= 4.6m
106.86 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.6m
4.60 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 2.6m=2*C
Height H= 4.6m
10.37 m3
b) Partition wall:V=L*W*H
Length L= 2m =B-(0.5+0.5)
Width W= 0.5m
Height H= 1.8m
1.80 m3
3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2m =B-(0.5+0.5)
Height H= 1.8m
7.20 m2
0.00 pcs
4.00 m
Approved by:
Implementing Agent...
n
5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E
Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape
Main
Reinforcment: L= 9.65
Bottom Slab
Main
Reinforcment: W= 5.55
Main
Reinforcment: L= 6.85
Deduction for
manhole 0.70
Main
Reinforcment: L= 6.85
Stirrup 0.45
Main
Reinforcment: W= 2.95
Cross Beam
Stirrup 0.15
Main
Reinforcment: W= 2.95
Scum Board Beam
Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover
Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k
8 9.65 38 1 366.70
8 5.55 66 1 366.30
10 14.04 15 1 210.60
10 6.24 41 1 255.84
10 1.40 6 -4 -33.60
12 13.90 5 2 139.00
12 6.10 5 2 61.00
8 1.34 67 2 179.56
12 6.10 4 1 24.40
8 0.74 21 1 15.54
12 6.10 4 1 24.40
8 0.94 21 1 19.74
8 0.65 6 2 7.80
8 0.65 6 2 7.80
Total Length 0.00 963.44 432.84 248.80 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 380.56 267.06 220.93 0.00
Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6
Remark