HV Tests Procedure RevB
HV Tests Procedure RevB
DIELECTRIC TEST
PROCEDURE D'ESSAI
TEST PROCEDURE
Le transformateur d'essai est connect au poste blind suivant schma d'essai ci-joint.
Test transformer is connected to GIS as shown in single line diagram.
Le poste sera essay phase par phase et section par section suivant schma unifilaire ci-joint.
The complete substation is tested section by section according to attached single line diagram.
HV TEST EQUIPMENT
CONTRACT N-7733
NEW 220/33kV GRID STATION IN ZAKHER
HV TEST EQUIPMENT
CONTRACT N-7733
NEW 220/33kV GRID STATION IN ZAKHER
ALL COMPARTMENTS ARE FILLED WITH SF6 GAS AT RATED SF6 PRESSURE OK
TOUS LES TRANSFORMATEURS DE TENSION SONT DEPOSES OU ISOLES AU MOYEN D'UN SECTIONNEUR
NA OK
VT'S NOT DESIGNED FOR GIS TEST VOLTAGE ARE REMOVED OR INSULATED BY OPENING OF A DISCONNECTOR
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV R 3 min
1 380 kV R 1 min
170 kV R 1 min 5 pC
304 kV R 3 min
2 380 kV R 1 min
170 kV R 1 min 5 pC
304 kV R 3 min
3 380 kV R 1 min
170 kV R 1 min 5 pC
304 kV R 3 min
4 380 kV R 1 min
170 kV R 1 min 5 pC
304 kV R 3 min
5 380 kV R 1 min
170 kV R 1 min 5 pC
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV R 3 min
6 380 kV R 1 min
170 kV R 1 min 5 pC
304 kV R 3 min
7 380 kV R 1 min
170 kV R 1 min 5 pC
304 kV R 3 min
8 380 kV R 1 min
170 kV R 1 min 5 pC
304 kV R 3 min
9 380 kV R 1 min
170 kV R 1 min 5 pC
304 kV R 3 min
10 380 kV R 1 min
170 kV R 1 min 5 pC
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV R 3 min
11 380 kV R 1 min
170 kV R 1 min 5 pC
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV Y 3 min
1 380 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV Y 3 min
2 380 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV Y 3 min
3 380 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV Y 3 min
4 380 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV Y 3 min
5 380 kV Y 1 min
170 kV Y 1 min 5 pC
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV Y 3 min
6 380 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV Y 3 min
7 380 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV Y 3 min
8 380 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV Y 3 min
9 380 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV Y 3 min
10 380 kV Y 1 min
170 kV Y 1 min 5 pC
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV Y 3 min
11 380 kV Y 1 min
170 kV Y 1 min 5 pC
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV B 3 min
1 380 kV B 1 min
170 kV B 1 min 5 pC
304 kV B 3 min
2 380 kV B 1 min
170 kV B 1 min 5 pC
304 kV B 3 min
3 380 kV B 1 min
170 kV B 1 min 5 pC
304 kV B 3 min
4 380 kV B 1 min
170 kV B 1 min 5 pC
304 kV B 3 min
5 380 kV B 1 min
170 kV B 1 min 5 pC
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV B 3 min
6 380 kV B 1 min
170 kV B 1 min 5 pC
304 kV B 3 min
7 380 kV B 1 min
170 kV B 1 min 5 pC
304 kV B 3 min
8 380 kV B 1 min
170 kV B 1 min 5 pC
304 kV B 3 min
9 380 kV B 1 min
170 kV B 1 min 5 pC
304 kV B 3 min
10 380 kV B 1 min
170 kV B 1 min 5 pC
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV B 3 min
11 380 kV B 1 min
170 kV B 1 min 5 pC
TEST EQUIPMENT :
Pr amplifier 25 dB Sensor
Calibrator
Spectrum analyzer
SENSITIVITY TEST :
UHF TESTS
TESTS CIRCUITS
CIRCUITS 1 TO 11
DIELECTRIC TEST
BAY 14 at 460 kV
PROCEDURE D'ESSAI
TEST PROCEDURE
Le transformateur d'essai est connect au poste blind suivant schma d'essai ci-joint.
Test transformer is connected to GIS as shown in single line diagram.
Le poste sera essay phase par phase et section par section suivant schma unifilaire ci-joint.
The complete substation is tested section by section according to attached single line diagram.
HV TEST EQUIPMENT
CONTRACT N-7733
NEW 220/33kV GRID STATION IN ZAKHER
HV TEST EQUIPMENT
CONTRACT N-7733
NEW 220/33kV GRID STATION IN ZAKHER
ALL COMPARTMENTS ARE FILLED WITH SF6 GAS AT RATED SF6 PRESSURE OK
TOUS LES TRANSFORMATEURS DE TENSION SONT DEPOSES OU ISOLES AU MOYEN D'UN SECTIONNEUR
NA OK
VT'S NOT DESIGNED FOR GIS TEST VOLTAGE ARE REMOVED OR INSULATED BY OPENING OF A DISCONNECTOR
Acceptance
(Hz)
criteria
CIRCUIT APPLIED PHASE TIME PD Measurement or DATE REMARKS
SECTION VOLTAGE UHF
at
pC/dB kV
304 kV R 3 min
1 460 kV R 1 min
170 kV R 1 min 5 pC
304 kV Y 3 min
1 460 kV Y 1 min
170 kV Y 1 min 5 pC
304 kV B 3 min
1 460 kV B 1 min
170 kV B 1 min 5 pC