VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 18.67 18.372 15 94 Nil 0 94 30.9 87.6 44.5 0.98625 93 0.033 93 0.12551


2C 3.29 2.999 5,357 33,695 18.043 17.753 46.830 295 33,401 33.0 91.4 44.5 0.98435 32,878 16.439 32,861 0.12551
3C 4.26 3.964 5,599 35,217 Nil 35,217 33.8 92.8 44.5 0.98365 34,641 34.641 34,606 0.12551
4C 11.69 11.399 2,614 16,444 Nil 16,444 33.3 91.9 44.5 0.98410 16,182 16.182 16,166 0.12551
5C 17.69 17.396 200 1,258 Nil 1,258 32.4 90.3 44.5 0.98490 1,239 0.434 1,239 0.12551
6C 17.52 17.231 251 1,581 Nil 0 1,581 31.7 89.1 44.5 0.98550 1,558 0.78 1,557 0.12551
7C 3.63 3.334 5,865 36,888 18.100 17.811 39.014 245 36,643 32.3 90.1 44.5 0.98500 36,093 36.093 36,057 0.12551
8C 5.64 5.351 4,501 28,309 18.360 18.073 23.648 149 28,160 32.3 90.1 44.5 0.98500 27,738 27.738 27,710 0.12551
SL.P 11.12 10.809 238 1,496 13.430 13.124 163.401 1,028 468 31.6 88.9 44.5 0.98560 461 0.692 461 0.12551
SL.S 17.28 16.964 38 238 Nil 238 32.3 90.1 44.5 0.98500 235 0.352 235 0.12551
TOTAL
TOTAL 24,678 155,220 273 1,716 153,504 151,118 150,985
REMARKS: 924 68 855 845 844

PRODUCTION LOADING INTO COT 2C

Gross Volume :(T.O.V.) 155,220 Oil Volume @ 60 F :(T.C.V.) 151,118 DRAFT FWD 9.00 m AFT
Less Free Water : 1,716 Less OBQ/ROB :
Oil Volume :(G.O.V.) 153,504 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 151,118 Long tons/Metric tons :
Long Tons/Metric Tons : 18,967 19,271 Vessel Experience Factor :
API 60 F : 44.5 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.05 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 2-Dec-16

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

11.687 0.12752 11.874


4,126.499 0.12752 4192.583
4,347.777 0.12752 4417.406
2,031.017 0.12752 2063.543
155.510 0.12752 158.000
195.526 0.12752 198.657
4,530.084 0.12752 4602.632
3,481.401 0.12752 3537.154
57.918 0.12752 58.846
29.483 0.12752 29.955

18,967 19,271

10.00 m TRIM 1.00 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 2-Dec-16 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bah

Crude Storage Lifting

24 Hours Total (bbls) 924 Last Lifting 29-O

BS and W % 0.05 Lifting Vol (bbls) 60,5

Storage Gross (bbls) Next Lifting


153,504

Storage Net / G.S.V (Nbbls) 151,118 Next Lifting Vol (bbls)

Storage Net / N.S.V (Nbbls) 150,985

Days to Tank Tops 183 Vessel ETA

Total Crude This Month (Nbbls) 151,118

Water Offtake

Water Received 24hrs (bbls) 68 Offtake 24 Hours (bbls)

Total Water in Cargo (bbls) 1,716

Total P/W Received (bbls) 81,197

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 33.0

PFW PH 0
Note: PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 270,112 ### 30,217 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,324

Closing (m3) 270,112 28,893 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day activity


2. Marking label on deck
3. Transfer Materials Food Stuff
4. Maintenance on deck 8C area
5. Haouse Keeping Lay Down Area
6. Maintenance Auxiliary Engine No.2
7. Fabrication Electro Motor Provision
8. Overhaul Of Electromotor Swing Gear For Provision Cra
Tool box meeting 06.30

1. Deck and engine dept. daily activity


2. Weekly test LSA, FFA, Nav/GMDSS equipment
3. Weekly test safety device and emergency machinery
Supervisory Meeting 16.30 4. Collecting garbage into garbage container at laydown
5. Workplace inspection
6. House Keeping

Incidents
Type Reference Comments
NIL

Drills
Type Time Comment

S.T.O.P. Audit program

Observation Card Report : 23


The details see SPKK sheet *)
###
Capt. Saiful Bahri

29-Oct-16

60,545

deg C

deg C

O COT 2C

32861 / 150985
e Vessel

Comment

ar For Provision Crane

equipment
gency machinery
tainer at laydown
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 2C

Mooring/Unmooring :
23.00: Adventure 1 Port Side Alongside
03.00: Adventure 1 Cast Off
17.00: AHT. Tegap Jaya Port Side Alongside
21.00: AHT. Tegap Jaya Cast Off

Bunkering/Debunkering :
23.15: Commenced Transferred Fresh Water to Adventure 1
02.40: Completed Transferred Fresh Water 15T to Adventure 1

Personnel & Material Transfer :


05.30: 4 Persons Gearindo & 13 Persons PKP by. KST. 51 ( Out )
07.00: 1 Person Santos Rep by Adventure ( Out )
11.20: 3 Cradle Food stuff, 70 Gallons Fresh Water by KST. 51 ( In )
16.00: 6 Persons SPJ by KST.51 ( Out )
16.00: 1 Person PKP by Adventure ( In )
16.30: 2 Persons Gearindo by Adventure ( In )
21.25: 6 Persons SPJ, ! Person Santos Rep, 1 Person PKP by KST. 51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred Santos & contractor personnel
2. Marked label on deck area
3. Corrective action for the workplace inspection / SPKK
4. Chipping & Brushing Main Deck COT 8C Area
5. Transferred Materials Food Stuff
6. House keeping

ENGINE :
1. Maintenance Of RO No.1
2. Continued Maintenance Of Auxiliary Boiler
3. Maintenance Of Auxiliary Engine No. 2
4. Overhaul Of Electromotor Swing Gear For Provision Crane
5. Received Running Store & Materials Food Stuff
6. Running up A/E No.1 and 3 for :
10.00 - 12.00: - Transferred Materials Food Stuff

2. PERMIT TO WORK PW MW HW CSE IP VAL


420 1547 371 162 7 867
2.1 J HA 420 1547 371 162 5 867
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,324 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 15 14
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
26 24
MAN HOURS ( POB X 12 HRS )
Previous man hours 201612 Days W/O LTI 1099 Since 28-Nov-13
Man hours today 288
Total man hours 201900
Safe man hours 201900
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


01-Dec-16 @2400 HRS

TOTAL
3374
3372
TRANS ROB
0 270,112
0 28,893
ROB `
85
216
ROB
200
POB
43

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1534 2 1536
1954 23 1977
3 0 3
0 0 0
1386 0 1386

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Dec-16

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 31,555 0 0 1,338 0 3.0 12.0 9.0 30,217
02 30,217 0 0 1,324 0 16.0 0.0 8.0 28,893
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Dec-16

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 270,112 0 0 0 0 270,112
02 270,112 0 0 0 0 270,112
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 11 12 12 11 10 14 11 12 13 11 11 14
2 10 10 12 13 10 12 12 11 12 13 11 12
3 14 14 13 11 12 13 11 13 11 12 12
4 13 13 12 14 11 11 13 12 14 11 11
5 12 11 11 12 13 13 12 11 11 12 12
6 11 13 13 12 13 11 11 12 13 12 11
7 14 14 13 10 14 12 11 10 14 13 12
8 13 12 12 10 14 12 12 10 12 11 11
9 10 13 14 11 13 13 12 12 13 12 12
10 11 14 14 14 13 11 11 13 11 12 13
11 11 14 14 13 12 12 13 14 13 11 10
12 14 12 13 13 14 12 12 11 14 13 14
13 10 13 14 11 11 11 11 11 13 12 12
14 10 14 13 11 11 12 12 12 11 12 12
15 12 13 14 12 13 13 13 13 12 11 13
16 13 14 12 12 13 14 13 12 12 11 13
17 10 11 14 11 14 14 11 14 11 13 11
18 11 13 14 14 14 11 13 11 14 12 11
19 12 12 12 13 12 11 12 13 12 11 13
20 14 11 13 13 11 12 13 14 11 12 10
21 10 13 12 12 14 11 12 12 14 11 10
22 12 12 13 12 12 11 12 11 12 12 12
23 11 12 14 14 12 13 10 13 14 11 12
24 12 14 12 11 10 11 10 12 11 13 13
25 14 13 11 12 11 14 11 14 13 12 13
26 13 14 13 12 13 12 11 13 12 13 12
27 12 12 10 11 14 12 12 14 12 13 14
28 14 11 12 11 13 11 12 12 11 13 13
29 12 14 11 13 11 12 11 13 11 12 12
30 14 14 12 13 12 12 14 12 11 14
31 13 12 12 11 12 12

TOTAL 373 368 393 361 383 363 363 381 369 370 360 26
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 7 8 8 7 7 8 8 8 7 7 7 8
2 8 7 8 7 7 8 8 8 7 7 7 8
3 8 8 8 8 8 7 8 7 8 8 8
4 7 8 8 8 8 8 7 8 7 8 7
5 8 8 7 8 8 8 8 8 7 8 7
6 8 8 8 7 7 8 7 8 8 7 8
7 7 8 8 7 8 7 8 7 8 8 7
8 8 7 8 8 8 8 8 7 8 7 7
9 8 8 8 7 8 8 8 7 8 8 8
10 8 8 8 8 7 7 7 5 7 8 8
11 8 8 8 8 8 8 8 6 8 8 7
12 8 8 8 8 8 8 8 8 7 7 8
13 7 8 7 7 8 8 8 7 8 8 8
14 8 8 8 8 7 8 8 8 7 8 8
15 7 8 8 8 8 8 8 7 8 7 7
16 7 8 8 8 8 8 7 8 8 7 8
17 8 7 8 7 8 8 8 7 8 8 8
18 8 8 8 8 8 7 8 8 7 8 7
19 8 8 8 8 7 8 8 8 8 7 7
20 8 8 7 7 8 8 8 7 8 8 7
21 7 7 8 7 8 8 8 7 8 8 7
22 8 8 8 8 7 8 7 8 7 8 8
23 8 8 8 8 8 8 7 7 8 7 8
24 8 8 8 7 7 7 7 8 8 8 8
25 8 8 8 7 8 8 8 7 8 8 7
26 8 8 7 8 8 8 7 7 7 8 8
27 7 8 7 8 8 8 8 8 7 8 8
28 8 7 7 8 8 7 8 8 7 8 8
29 8 8 8 7 7 8 7 8 7 8 7
30 8 8 7 8 8 8 7 8 7 8
31 8 8 8 8 8 7

TOTAL 240 227 242 227 239 234 239 230 227 237 226 16
LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,952 4,977 4,963 4,977 4,942 4,980 4,969 4,951 4,979 4,943 4,977 4,978
2 4,938 4,956 4,971 4,945 4,981 4,975 4,974 4,941 4,951 4,982 4,976 4,981
3 4,973 4,962 4,969 4,952 4,975 4,982 4,970 4,962 4,983 4,976 4,978
4 4,961 4,971 4,967 4,961 4,965 4,968 4,977 4,961 4,962 4,966 4,975
5 4,946 4,968 4,970 4,988 4,931 4,972 4,969 4,975 4,945 4,962 4,972
6 4,927 4,955 4,972 4,959 4,929 4,975 4,965 4,972 4,971 4,965 4,973
7 4,938 4,962 4,968 4,935 4,942 4,973 4,968 4,952 4,939 4,972 4,971
8 4,981 4,966 4,977 4,964 4,983 4,969 4,971 4,938 4,983 4,975 4,970
9 4,972 4,959 4,975 4,972 4,957 4,968 4,970 4,944 4,962 4,969 4,971
10 4,963 4,957 4,968 4,951 4,975 4,977 4,968 4,981 4,955 4,975 4,952
11 4,959 4,963 4,973 4,974 4,981 4,975 4,972 4,965 4,982 4,970 4,967
12 4,945 4,968 4,975 4,967 4,939 4,969 4,971 4,976 4,952 4,965 4,978
13 4,937 4,961 4,972 4,931 4,968 4,971 4,974 4,960 4,984 4,971 4,945
14 4,962 4,966 4,969 4,925 4,975 4,975 4,969 4,969 4,929 4,973 4,981
15 4,976 4,971 4,970 4,982 4,952 4,970 4,972 4,975 4,955 4,977 4,962
16 4,948 4,967 4,968 4,943 4,981 4,982 4,970 4,959 4,972 4,970 4,936
17 4,952 4,959 4,966 4,954 4,949 4,968 4,971 4,978 4,968 4,975 4,972
18 4,928 4,967 4,971 4,958 4,975 4,969 4,977 4,965 4,946 4,978 4,954
19 4,942 4,960 4,977 4,951 4,935 4,973 4,968 4,956 4,982 4,972 4,942
20 4,965 4,965 4,975 4,985 4,991 4,970 4,975 4,972 4,971 4,975 4,948
21 4,928 4,963 4,970 4,976 4,972 4,975 4,970 4,982 4,982 4,979 4,951
22 4,951 4,961 4,969 4,972 4,958 4,977 4,952 4,959 4,973 4,976 4,957
23 4,972 4,966 4,973 4,961 4,978 4,971 4,945 4,964 4,959 4,969 4,963
24 4,938 4,972 4,974 4,972 4,984 4,977 4,962 4,987 4,982 4,974 4,952
25 4,944 4,968 4,982 4,931 4,975 4,974 4,980 4,949 4,962 4,978 4,962
26 4,958 4,962 4,958 4,983 4,963 4,970 4,971 4,969 4,981 4,972 4,970
27 4,967 4,951 4,981 4,925 4,961 4,968 4,981 4,935 4,949 4,979 4,982
28 4,935 4,966 4,963 4,971 4,964 4,971 4,975 4,981 4,964 4,977 4,963
29 4,951 4,958 4,972 4,964 4,960 4,968 4,965 4,959 4,977 4,982 4,959
30 4,962 4,957 4,937 4,972 4,972 4,951 4,982 4,948 4,973 4,948
31 4,958 4,981 4,969 4,967 4,979 4,978

TOTAL 153,529 143,947 154,096 148,766 153,882 149,184 154,039 153,898 148,948 154,148 148,907 9,959

Averag
e/Day 4,953 5,141 4,971 4,959 4,964 4,973 4,969 4,964 4,965 4,973 4,803 321
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 130 65 25 140 95 50 45 30 75 95 85 100
2 30 80 90 105 60 45 50 55 95 125 120 70
3 130 125 105 140 70 50 70 90 95 90 115
4 40 120 35 115 55 85 80 60 125 40 90
5 75 125 95 135 80 65 135 50 45 65 80
6 40 70 120 120 120 55 70 60 60 110 130
7 125 100 95 125 120 115 85 85 105 90 95
8 100 75 115 140 125 110 110 70 130 100 60
9 110 85 90 70 105 115 105 80 115 100 110
10 135 85 105 135 85 120 100 120 120 55 115
11 120 65 75 120 105 115 75 75 90 50 180
12 80 105 90 155 115 120 55 80 115 45 140
13 50 110 110 60 105 80 45 75 105 140 95
14 125 90 75 100 95 95 40 65 115 155 90
15 120 60 85 70 40 145 45 45 60 105 140
16 95 95 75 60 75 75 45 90 80 105 110
17 115 80 85 80 80 40 55 140 115 65 60
18 100 95 100 110 65 60 50 130 110 70 105
19 105 100 55 120 20 125 55 140 90 145 155
20 145 95 125 125 75 135 105 105 125 140 100
21 95 85 105 120 115 145 110 130 120 85 75
22 120 100 135 115 70 85 90 65 115 100 95
23 110 70 120 100 105 75 90 80 120 135 120
24 80 50 130 95 100 80 75 125 130 125 150
25 105 25 120 60 60 115 45 110 45 95 105
26 115 70 130 115 100 55 50 120 85 105 155
27 100 70 155 115 85 40 85 125 70 90 105
28 110 75 125 110 95 45 85 130 55 130 105
29 105 95 145 65 90 55 85 100 65 80 130
30 145 135 80 75 45 30 115 125 140 140
31 100 150 70 50 80 105

TOTAL 3,155 2,465 3,200 3,200 2,655 2,540 2,215 2,825 2,900 3,080
DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Dec 2016

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Dec-2016 24 1 16 41
2-Dec-2016 24 1 19 44

TOTAL 48 2 35 85
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 2/Dec/16
Action/Commen Positive /
Reported by Rank Location Description Total
t Negative

Advised to Galley team Clean and coating Galley Will discussed with
1 BOY R.TOGAS Master Galley
room and equipments Ch/Off
Positive 1

Prepare and check wire for Provision crane New Wire and Ready
2 IYYANG C/O Deck Office
Renewal to use
Positive 1

Gang Way Motor Starboard side Not Working Progress repaired in


3 ANDI A UNIT 2/O Main Deck
Properly Workshop
Negative 1

4 INDRA 3/O Pump Room Marked all Cargo Line in pump room In Progress Positive 1

Will Be arrange
5 MARTHEN KAMMA C/E Engine Store Engine Store in Engine Room untidy
soonest
Negative 1

6 ACO AKBAR 2/E RO Room RO.No.1 Membran shell cover did not tight Repaired Done Positive 1

7 RATNO SITUMORANG 3/E Engine Room Maintenance Aux.Engine No.2 in progress In Progress Positive 1

8 LILIK WAHYUWANTO 4/E Engine Room Maintenance Boiler for offtake preparation In Progress Positive 1

9 HENDRA PRATAMA 4/E Engine Room Maintenance Boiler for offtake preparation In Progress Positive 1

10 NIKO E/E Port Quarter Installed Provision Crane Electromotor Done Positive 1

11 A.AFANDI Bosun Port Quarter Diesel Oil Line on Port quarter slightly leaks Report to C/E Negative 1

12 RISRIS RISWANTO AB Office Repaired Chair Seat Bolt In Deck Office Repaired Done Positive 1

Assist Chief Officer Prepare Provision crane wire


13 M.ARKHAM AB Main Deck
renewal
Positive 1

14 M. SAFARI AB Main Deck Maintenance chipping, Brushing COT 8C Positive 1

Assist crane operator Transferred food stuff


15 ANTONY OS Main Deck
cradle to SUV
Positive 1

16 SAIFUL IMAM FTR Engine Room Assist 4/E Maintenance Boiler In Progress Positive 1

17 ALFIAN FTR Port Quarter Assist 4/E Maintenance Boiler In Progress Positive 1

18 SAHONO MTM Engine Room Cleaning DO Filter for Aux.Engine no.2 Positive 1

19 HAEROJI MTM RO Room Hose in RO no.2 Leakage Repaired done Negative 1

20 NUR ALI MTM Engine Room Renewed Aux.Engine no.2 LO Cooler Gasket well done Positive 1

21 MASRUDI C/Cook Galley Received 2 weeks food stuff Positive 1

Gandrum
22 ROCHIM COOK Store
Arranged Received Food Stuff Positive 1

23 RANGGUN JAWI STWD Deck B House Keeping Toilet in Deck B Clean & Tidy Positive 1

24 HERIANTO SULE T STWD

TOTAL 23

You might also like