Professional Documents
Culture Documents
Vessel'S Midnight Ullage Report
Vessel'S Midnight Ullage Report
Vessel'S Midnight Ullage Report
TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
Gross Volume :(T.O.V.) 155,220 Oil Volume @ 60 F :(T.C.V.) 151,118 DRAFT FWD 9.00 m AFT
Less Free Water : 1,716 Less OBQ/ROB :
Oil Volume :(G.O.V.) 153,504 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 151,118 Long tons/Metric tons :
Long Tons/Metric Tons : 18,967 19,271 Vessel Experience Factor :
API 60 F : 44.5 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.05 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 2-Dec-16
18,967 19,271
Staff
Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bah
Water Offtake
PFW PH 0
Note: PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
Type Reference Comments
NIL
Drills
Type Time Comment
29-Oct-16
60,545
deg C
deg C
O COT 2C
32861 / 150985
e Vessel
Comment
equipment
gency machinery
tainer at laydown
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
23.00: Adventure 1 Port Side Alongside
03.00: Adventure 1 Cast Off
17.00: AHT. Tegap Jaya Port Side Alongside
21.00: AHT. Tegap Jaya Cast Off
Bunkering/Debunkering :
23.15: Commenced Transferred Fresh Water to Adventure 1
02.40: Completed Transferred Fresh Water 15T to Adventure 1
ENGINE :
1. Maintenance Of RO No.1
2. Continued Maintenance Of Auxiliary Boiler
3. Maintenance Of Auxiliary Engine No. 2
4. Overhaul Of Electromotor Swing Gear For Provision Crane
5. Received Running Store & Materials Food Stuff
6. Running up A/E No.1 and 3 for :
10.00 - 12.00: - Transferred Materials Food Stuff
9. EHS AUDIT/INSPECTION
TOTAL
3374
3372
TRANS ROB
0 270,112
0 28,893
ROB `
85
216
ROB
200
POB
43
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
NIL
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 270,112 0 0 0 0 270,112
02 270,112 0 0 0 0 270,112
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 373 368 393 361 383 363 363 381 369 370 360 26
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 240 227 242 227 239 234 239 230 227 237 226 16
LOG SHEET COOLING WATER
TOTAL 153,529 143,947 154,096 148,766 153,882 149,184 154,039 153,898 148,948 154,148 148,907 9,959
Averag
e/Day 4,953 5,141 4,971 4,959 4,964 4,973 4,969 4,964 4,965 4,973 4,803 321
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
TOTAL 3,155 2,465 3,200 3,200 2,655 2,540 2,215 2,825 2,900 3,080
DATA PERSONNEL ON BOARD
TOTAL 48 2 35 85
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 2/Dec/16
Action/Commen Positive /
Reported by Rank Location Description Total
t Negative
Advised to Galley team Clean and coating Galley Will discussed with
1 BOY R.TOGAS Master Galley
room and equipments Ch/Off
Positive 1
Prepare and check wire for Provision crane New Wire and Ready
2 IYYANG C/O Deck Office
Renewal to use
Positive 1
4 INDRA 3/O Pump Room Marked all Cargo Line in pump room In Progress Positive 1
Will Be arrange
5 MARTHEN KAMMA C/E Engine Store Engine Store in Engine Room untidy
soonest
Negative 1
6 ACO AKBAR 2/E RO Room RO.No.1 Membran shell cover did not tight Repaired Done Positive 1
7 RATNO SITUMORANG 3/E Engine Room Maintenance Aux.Engine No.2 in progress In Progress Positive 1
8 LILIK WAHYUWANTO 4/E Engine Room Maintenance Boiler for offtake preparation In Progress Positive 1
9 HENDRA PRATAMA 4/E Engine Room Maintenance Boiler for offtake preparation In Progress Positive 1
10 NIKO E/E Port Quarter Installed Provision Crane Electromotor Done Positive 1
11 A.AFANDI Bosun Port Quarter Diesel Oil Line on Port quarter slightly leaks Report to C/E Negative 1
12 RISRIS RISWANTO AB Office Repaired Chair Seat Bolt In Deck Office Repaired Done Positive 1
16 SAIFUL IMAM FTR Engine Room Assist 4/E Maintenance Boiler In Progress Positive 1
17 ALFIAN FTR Port Quarter Assist 4/E Maintenance Boiler In Progress Positive 1
18 SAHONO MTM Engine Room Cleaning DO Filter for Aux.Engine no.2 Positive 1
20 NUR ALI MTM Engine Room Renewed Aux.Engine no.2 LO Cooler Gasket well done Positive 1
Gandrum
22 ROCHIM COOK Store
Arranged Received Food Stuff Positive 1
23 RANGGUN JAWI STWD Deck B House Keeping Toilet in Deck B Clean & Tidy Positive 1
TOTAL 23