1904 Franco Tosi Company manufactures its first steam turbine (6000 Kw)
utilizing its own technology. Production of steam turbines expands a lot
in volume and size catering the growing industrial and power
generation application markets.
1990 Franco Tosi, still a fully privately Company, has a worldwide aggregate
installed power of about 75.000 MW, out of which 27.000 Mw of STS
in more than 40 different Countries.
Number of steam turbines manufactured by Franco Tosi is in excess
of 1.000 units.
2000 In late summer 2000, and in the frame of the privatising of Ansaldo
Energia, the Legnano facilities including all the shops and former
Franco Tosi personnel, products (with the only exception of boilers)
and experience are spun-off from Ansaldo Energia to Casti Group, an
Italian private group.
The new Company so formed takes the name of Franco Tosi
Meccanica.
Franco Tosi Meccanica renewes technology agreements with
Westinghouse, today Siemens Westinghouse, and signs a new
license agreement for Steam Turbines of American Technology.
This allows Franco Tosi Meccanica full title to its own past experience
and access to developments implemented by Siemens Westinghouse
since the expiring of previous license agreement.
Today the historical name of Franco Tosi, very well appreciated all
around the world, and backed by vast experience, dedicated people,
up to date design tools, modern manufacturing facilities and financial
strength is here with its proactive, focused and entrepreneurial
organisation for the satisfaction of old and new customers.
Between
And
M. Scandellari
AFC Administration
Fin.&Conrt.
Inform.System
M. Affri M. Croci
PER
Personnel Environment ASR
APR Purchasing
& Safety
& Contract R. Verga
S. Morellini
QUA
Quality
G. Gaianigo
VEN GCC
Project Mgt.&
Sales PE Shop Part Lists CML TFA Manufact. AL Mech.Mach.
Cost Control Project Engin.
Coordination Tech./Tools Tech. Process
Site PRG Mech./Fluid. Heat Exchange STE PRG Manufact. Blades Mach. OPA
Service Erection Design Equipment Planning Al Mech.Mach.
IMP
SER MES
TVA Steam Mechanical IME SDM Maintenance Machining OFF
Plants
Turbines Plans Eng. Services Workshop
IEL MON
IDR Hydraulic Innovation & RS Electrical IGS Welding Assembly
Turbines Development Plants Eng. Engineering Workshop
Hierarchical Liaison
RE
AVV Plants Estimation Governing G Steel Struct. CAR
Start-up PRE MAG Warehouse
System Workshop
PRODUCT RANGE
STEAM TURBINES
HEAT EXCHANGE APPARATUSES
AGGREGATE PLANT SUPPLY
HYDRAULIC TURBINES
COMPRESSORS & GAS EXTRACTORS
SERVICE SUPPORT
Condensing / Backpressure
Single / double reheat
Single / double flow
Single/double extraction
With induction
Power generation /Cogeneration
Pedestal / Skid installation
Upward, downward, axial exhaust
Franco Tosi Meccanica S.p.A.
PRODUCT RANGE
HEAT EXCHANGE APPARATUSES
Steam condensers
Direct contact condensers
Auxiliary systems for condensate (vacuum systems,
condensate systems, on line cleaning systems)
Francis
Kaplan
Pelton
Bulb
Vertical / Horizontal
Spare parts
Repowering
Revamping
Conventional maintenance
Multiannual maintenance contracts
supporting operation
Monitoring / diagnostic
Franco Tosi Meccanica S.p.A.
Workshop facilities
ASME STAMPS U - U2
(AND NATIONAL BOARD CERTIFICATE OF AUTHORIZATION)
- REFERENCE CODES : ASME VIII Div. 1 (U) Div. 2 (U2)
- CERTIFICATION BODY : ASME INTERNATIONAL
(NEW YORK)
- CERTIFICATES N. : (U) 32367 (U2) 32368
- FIRST ISSUE : 1979
- CURRENT CERTIFICATE VALIDITY : UP TO 2007
- APPLICABILITY : PRESSURE VESSELS CONSTRUCTION
(EXCHANGERS, etc)