Table View. To Switch Back To The Graphic View, Click Graphic

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

The so called Metric Monitor is available in different locations within Technical

Monitoring.
The x-axis shows the date and time; in the example illustrated, the y-axis shows the
CPU Utilization for one specific host. The aim of this kind of display is to allow a quick
identification of how the CPU Utilization changed during the selected time frame. This
helps you to identify if the problem only occurs only at specific times in the system.
You can change the time frame by clicking on the table symbol next to the date. On the
left-hand side, you can change the start date; on the right-hand side, you can set the
end date. If you are interested in the threshold values too, you can switch the graphic by
using the radio buttons on top of the Metric Monitor view, which is shown as additional
line within the graphic. You can switch from the Standard Graphic view to the table view
by clicking Table. The Table view shows the period (date and time) when the data
collector received the value, and the value itself. You can also see the thresholds in the
Table view. To switch back to the Graphic view, click Graphic.

You might also like