3. Mechanical Erection & Piping Work : Phonska Fertilizer Plant, PT. Petrokimia Gresik
Mechanical & Steel Structure Erection
Piping Work
!
Xf!bsf!sfbez!up!cf!zpvs!sfmjbcmf!qbsuofs!jo!dpotusvdujpo!
COMPANY PROFILE
CERTIFICATE
COMPANY PROFILE
The Civil Construction has been developing and growing of its capabilities to
became your partners especially to carry out all the works from piling, foundation,
building, concrete road, asphalt road, concrete works, pier harbor and finishing.
Some of our customer are such as on the list below :
Storage
Harbor
Office Building
Housing
CIVIL CONSTRUCTIONS
EQUIPMENT & TOOLS
LIST OF REFERENCE
CIVIL WORK & BUILDING
1 Cigarette Depot Development - Kreongan- Jember 2011 PT. Gudang Garam Tbk.
3 Building Renovation for SKT Unit Kartasura 2010 PT. Gudang Garam Tbk.
4 Pile Cap & Struktur Beton Limestone Storage Tonasa V 2010 PT. Semen Tonasa
Pile Cap & Structure Beton Raw Mill, Raw Mill Feed Bin & Coal
2010 PT. Semen Tonasa
5 Mill Tonasa V Project
7 SKT Building Renovation and Facilities - Unit Kartasura 2010 PT. Gudang Garam Tbk.
9 SKT Building Renovation & Facilities, Unit Kartasura 2010 PT. Gudang Garam Tbk.
11 Civil Works for SRU Foundation 2009 PT. South Pacific Viscose
12 Foundation & Steel Structure MF Plant 2009 PT. Wilmar Nabati Indonesia
14 Control Room at Spinning Building Line 4 2009 PT. South Pacific Viscose
17 Storage Bahan Bakar Alternatif Sekam di Preheater Pabrik III 2009 PT. Semen Gresik (Persero)
LIST OF REFERENCE
CIVIL WORK & BUILDING
21 Structure and Arcitectur of Warehouse BBP - GG Pandaan 2008 PT. Gudang Garam Tbk.
26 Building Work & Architectureal LOBP UPP Surabaya 2007/2008 PT. Rekayasa Industri
31 Civil Construction of New Balling Press 2007 PT. South Pacific Viscose
32 Foundation and Steel Structure Work of Gereja 2007 Gereja Paroki SP Maria Gresik
33 Guard House and Fence & Gate - GG Pandaan 2007 PT. Gudang Garam Tbk.
42 Civil Construction of SC2 Absorption Plant Project 2006 South Pacific Viscose
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
CIVIL WORK & BUILDING
45 Warehouse Printing office development of Unit XI Kediri 2005 PT. Gudang Garam Tbk.
46 Raw Coal Transport Pabrik Tuban I, II 2005 PT. Semen Gresik (Persero)
49 Finishing dance 3, Building Midwifery & Take care of to lodge 2005 Yayasan Delta Surya
50 Constrcution of Residential Houses II of PT. KIG 2005 PT. Kawasan Industri Gresik
51 Main Office Renovation - PT. GG Kerdiri 2005 PT. Gudang Garam Tbk.
52 Storage Building Ekstentions - PT. GG Unit Pandaan 2004/2005 PT. Gudang Garam Tbk.
53 Main Building Renovation - PT. GG Unit III Kediri 2004/2005 PT. Gudang Garam Tbk.
54 Main Building Process SKT - PT. GG Unit VIII Phase II Kediri 2004/2005 PT. Gudang Garam Tbk.
59 Office Building Renovation - PT. GG Unit Paiton 2004 PT. Gudang Garam Tbk.
62 Motor's Storage Construction at Laydown Area, Technical 2003/2004 PT. Powergen Jawa Timur
Office Refurbisment & Security Pos Construction
63 Provision of Store Extension Paiton II Power Station 2003/2004 PT. Powergen Jawa Timur
64 Construction of Store Extension, Fence & Parking Area 2003/2004 PT. IKSG
65 Construction of General Polyclinic Building 2003 RSUD Dr. Moh. Saleh
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
CIVIL WORK & BUILDING
Probolinggo
66 Building for Storm Water Drainage (PH - 2 & 3) 2003 Juanda Airport
PT. Teguh Raksa Jaya
67 Constrcution of Residential Houses of PT. KIG (29 Unit) 2003 PT. Kawasan Industri Gresik
68 Official Housing Complex of Regent Phase II 2003 Pemda Tk. II Kab. Bulungan
East Kalimantan
69 Office, Warehouse and Store of Kopkar Gudang Garam 2003 KOPKAR Gudang Garam
71 Renovation of Warehouse A, B & D Gambiran, Jember 2002/2003 PT. Gudang Garam Tbk.
75 Truck Garage Area of Unit III - Gudang Garam Kediri 2002 PT. Gudang Garam Tbk.
77 Building & Toilet Block, Road Work and Land Fill 2002 PT. Kingfurn International
78 EPC for ORF Maintenance Workshop Building 2002 Kodeco Energy Co. Ltd.
79 Araya Driving Range Club House & Family Club Malang 2001/2002 PT. Araya Bumi Megah
81 Construction of Ruko Puri Niaga Pondok Blimbing 2001/2002 PT. Araya Bumi Megah
Indah - Malang
82 Club House 2000/2001 PT. Araya Bumi Megah
- Caddy & Staff Room Including Pray Room
83 Gudang Garam Office Building Code 21- Unit VIII 2001 PT. Gudang Garam
- Office 01 A Building
- Factory Building #31
85 Residential Houses PT. Semen Gresik - Graha 2000 PT. Swadaya Graha
Kembangan Asri Phase VII
86 Residential Houses PT.Semen Gresik Tuban 1999/2000 Dana Pensiun
Phase IX Semen Gresik
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
CIVIL WORK & BUILDING
88 Building & Architectural work - Phonska Plant 1999 PT. Petrokimia Gresik
89 Additional Building for Varia Usaha Office 1999 PT. Varia Usaha
90 Residential Houses PT. Semen Gresik - Graha 1999 PT. Swadaya Graha
Kembangan Asri Phase VI
91 Fence for outside security port & Pavement 1999 Dana Pensiun
Semen Gresik
94 Maintenance and Office Building - Smelting Plant 1998 Chiyoda International Indonesia
95 Residential Houses PT. Semen Gresik - Graha 1998 PT. Swadaya Graha
Kembangan Asri Phase V
99 Residential Houses PT. Semen Gresik - Graha 1997 PT. Swadaya Graha
Kembangan Asri Phase IV
100 IKSG Tuban Project 1996/1997 PT. Industri Kemasan
- Industri Kemasan Semen Gresik Building (electrical) Semen Gresik (IKSG)
105 Office Building of STO Telkom Balongpanggang-Gresik 1995 PT. Telkom Indonesia
106 Residential Houses PT. Semen Gresik - Graha 1994/1996 PT. Swadaya Graha
Kembangan Asri Gunung Malang in Gresik
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
CIVIL WORK & BUILDING
107 Building and Finishing I Tonasa IV Project 1994/1995 PT. Semen Tonasa
108 Project Office of Semen Tuban II 1994/1995 PT. Semen Gresik
109 Building and Finishing I Tonasa IV Project 1994/1995 PT. Semen Tonasa
110 Urea Storage Pupuk Kaltim Project 1994/1995 PT. Pupuk Kaltim
111 Structure and Finishing Hospital Building 1994 PT. Semen Gresik
112 Dormitory Building PT.SG - Tuban I Project 1993/1994 PT. Semen Gresik
Warehouse
WWTP
BUILDING TPPI 19
Picture 2
BUILDING INFRASTRUCTURE UTILITY & OFFICE AREA BUILDING INFRASTRUCTURE UTILITY & OFFICE AREA
TUBAN AROMATIC PROJECT TUBAN AROMATIC PROJECT
Client / Owner : PT. IKPT / PT. TPPI Client / Owner : PT. IKPT / PT. TPPI
Project Location : Tuban, East Java Project Location : Tuban, East Java
Periods : 2004-2005 Periods : 2004-2005
Scope of Work : Architecture & Structure Scope of Work : Architecture & Structure
STRUCTURE TPPI
Building TPPI 10
Unit VIII
Technical Data :
Scope of Work : Foundation, Architecture, Structure, Finishing,
Mechanical & Electrical
Technical Data :
Scope of Work : Foundation, Architecture, Structure, Finishing, Technical Data :
Mechanical & Electrical Scope of Work : Foundation, Structure, Architecture, Finishing,
Mechanical & Electrical
Building Data :
- Total Area : 20.810 square meters
- Building Floor : 17.441 square meters
- Number of Floors : 6 ( six ) floors ( with basement )
Client / Owner : Semen Gresik (Persero) Tbk, PT. Client / Owner : Airlangga University
Project Location : Gresik, East Java Project Location : Surabaya, East Java
Periods : 1992 1993 Periods : 2001 2002
Building Data :
- Building Floor : 21.000 square meters
- Number of Floors : 9 ( nine ) floors
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture
Technical Data :
Scope of Work : Foundation, Architecture, Structure, Finishing
Technical Data :
Scope of Work : Foundation, Architecture, Structure, Finishing
Mechanical & Electrical
Client / Owner : Probolinggo General Hospital Client / Owner : Yayasan Rumah Sakit Islam Surabaya
Project Location : Probolinggo, East Java Project Location : Surabaya, East Java
Periods : 2003 Periods : 2000 2001
LIST OF REFERENCE
CIVIL WORK & BUILDING
1 Gallery and Hopper Raw Materials Facility Tuban I & II 2010/2011 PT. Semen Gresik
7 Foundation, Concrete Structure, Steel Erection, Architectural 2010 PT. Semen Gresik
Cement Mill Facility & Gypsum Crusher - Tuban IV Project
Foundation & Concrete Structure, Steel Erection &
Architectural for Preheater, Rotary Kiln and Cooler EP - Tuban
8 2010 PT. Semen Gresik
IV Project
17 Bored Pile Area Cement Silo & Clinker Storage Tuban IV 2010 PT. Semen Gresik
LIST OF REFERENCE
CIVIL WORK & BUILDING
21 Bored Pile 147 Ttk Packaer TB-IV 2009 PT. Semen Gresik
24 Pipe Rack (Grid 99-188) for Line 4 2009 PT. South Pacific Viscose
25 Fre-Cast Fencing for Easthern & Northern for OTF / LPG 2009 HESS
26 Pipe Rack NGBC Car to Tank Farm 2008/2009 PT. South Pacific Viscose
28 Construction of Duct Bank for Parking Area 2008 PT. South Pacific Viscose
31 Provision of Pre Cast Fencing for North & Wesh Side of OPF 2008 HESS
33 Replacement of wood Cooling Tower CT-1201-B Cell B 2007 PT. Petrokimia Gresik
40 Place Park & Road; Street of Paving PT.GG Unit V. 2006 PT. Gudang Garam Tbk.
LIST OF REFERENCE
CIVIL WORK & BUILDING
47 Access road and Lighting roof - Unit of Sumenep - Madura 2005 PT. Gudang Garam Tbk
48 Building Infrastructure, Utility & Office Area - Tuban 2004/2005 PT. TPPI
Aromatic Project
49 Infrastructure : Road SKM 2 to PHR2 and Estabilishment of 2004 PT. HM. Sampoerna Tbk.
Delta Sukorejo Plant Area
50 Clove Tank Foundation Unit IX Building 2004 PT. Gudang Garam Tbk
53 Civil Work (Monsoon Drainage) Paiton II Power Station 2003/2004 PT. Powergen Jatim
56 Truck Weigher, and Utilities Work - Gempol Plant 2003 PT. Gudang Garam, Tbk.
61 Pek. Land Scape Perumahan DPRD Kabupaten Bulungan 2002 Pemda TK II Bulungan
- East Kalimantan East Kalimantan
62 Sub & Upper Structure Sand Storage 2002 PT. IGLAS (Persero)
63 Fence, Retaining Wall of HFO Tank Area - Sukorejo 2002 PT. HM. Sampoerna Tbk.
64 Plant Fences of Unit VIII - Gudang Garam Kediri 2001 PT. Gudang Garam
65 Foundation and Soil Replacement of Acid Storage Tank 2001 Copper Smelting
PT. Sanko Eng.
66 External Fence Work of YMKI Plant - PIER 2001 PT. Takenaka Indonesia
LIST OF REFERENCE
CIVIL WORK & BUILDING
69 Paving Road, Irrigation & Gorong-gorong - Unit VIII 2001 PT. Gudang Garam
73 Lower Solo River Improvement Project - Babat 2001 PT. Teguh Raksa Jaya
(Package I - 1)
74 Factory of Unit VIII Plant - Gudang Garam Kediri 2000/2001 PT. Gudang Garam
- Water Tower
- Toilet, Bath Rom, Rest Room
- Poer & Sloof 21 Building
- Driving Range Area and building
76 Earth Work - CPO Plant of Long Kali 2000 PT. Rekayasa Industri
77 Bored pilling and civil work - Smelting Plant 1999/2000 Copper Smelting
PT. Chiyoda
78 Transfer tower I & II gallery conveyors - Tuban 1999 PT. Semen Gresik
90 Plant Extention PT. Eternit Gresik Project 1995/1996 PT. Eternit Gresik
- Reparation & Finishing Cement Road , Foundation
- Concrete Road Behind SM4-SM5, CCR SM2 Bldg.
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
CIVIL WORK & BUILDING
91 Rigid Pavement for Cable Dump Hopper Road Devp. 1995 PT. Semen Gresik
TB III
Picture 2
Picture 1
SEA WATER INTAKE MARINE WORK UPD PROJECT SEA WATER INTAKE MARINE WORK UPD PROJECT
Client / Owner : IKPT, PT Client / Owner : IKPT, PT
Project Location : Ujung Pangkah - Gresik Project Location : Ujung Pangkah - Gresik
Periods : 2006 Periods : 2006
Picture 3
Picture 4
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture
CIVIL WORK FOR ALL FACILITY - TUBAN IV PLANT TPPI ACCESS ROAD
Client : Bintang Cement Mandiri, PT. Client : AEC International, PT.
Project Location : Tuban, East Java Owner : Trans Pacific Petrochemical Indotama, PT.
Periods : 1996-1997 (13 Months) Project Location : Tuban, East Java
Periods : 1997 - 1998 (6 Months)
Scope Of Work : Asphalt Road Pavement
Steel Structure
Plate Work
Conveyors
Fabrication
Covered : 11,700.00 M2
Open Yard : 20,000.00 M2 (With Mobile Crane 25 Ton)
Conveyor Shop : 840.00 M2
Painting
Covered : 600.00 M2
Open Yard : 1,000.00 M2
Finish Good
Open Yard : 18,600.00 M2
Building A
Building B
Open Area
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
4. WORKSHOP EQUIPMENT
5. ENGINEERING
Design Engineering
Only for Conveyor System & Tank
Case Tools
Drafting Machine
CAD
Software
AutoCAD 14 & 2000
STAAD III
SAP 90
X-Steel
6. CAPACITY
LIST OF REFERENCE
PLATE WORK (NON TANK)
5 Steel Fabrication for Limestone Storage Package A Tuban IV 2010 PT. Semen Gresik
6 Fabrication and Install Dryer Stair / Platforms 2010 PT. Branita Snadhini
7 Fabrication New Coal Mill at Package L-1 P2KPT 2010 PT. Semen Gresik
8 Supply, Fabrication and Installation Weigher M-2306 2009/2010 PT. Petrokimia Gresik
9 Fabrication Service for Finishing Work of Wellhead Platform 2009/2010 Kangean Energy Indonesia
12 HRSG Stack for Cikarang Listrindo Project 2008/2009 PT. Alstom Power ESI
13 AIG Fabrication Work / Catalys Steel Structure - RAS LAFFAN 2008/2009 Hitachi Zosen
14 Compax Cooler dia 6000 X 2000 - Sabah Malaysia 2008/2009 FLSmidth Mineral
16 Bypass Stack Exhaust System for Sino Iron Project - Australia 2008 Baltec Inlet
17 Module Casing & Inlet Duct for Thorold Project 2008 PT. Alstom Power ESI
18 Supply & Fabrication Catalyst Structure - Marafiq Project 2007/2008 Hitachi Zosen
19 Fabrication & Assembly Work HRSG Casing & Duct 2007/2008 PT. Alstom Power ESI
LIST OF REFERENCE
PLATE WORK (NON TANK)
22 Supply & Fab. of Bucket Elevator - NPK II Petrokimia 2007/2008 PT. Wijaya Karya
23 Fabrication Services of Pagerungan Utara Platform 2007 PT. Kutilang Pakis Mas
24 Supply & Fabr. Mini Platform for Sepanjang Project 2007 Kangean Energy Indonesia
25 Fabrication and Assembly Stack Unit #11 - HRSG 2007 PT. Alstom Power ESI
26 Supply Inlet Duct Unit #11 & #12 2007 PT. Alstom Power ESI
27 Frame 6B & &B Duct Work & Expansion Joint 2007 Baltec Inlet System
29 Supply & Fabrication Movable Hoppers - Abu Dhabi 2007 Techint Italimpianti
32 Fabrication OCC Frame Module T 605 PSP Tallawara Project 2007 PT. Alstom Power ESI
36 Bypass Stack System for Frame 6-B Gas Turbine - Indralaya 2006 Baltec Inlet System
39 Supply & Fab. 2 unit HRSG Stack R517802 & R517803 2006 PT. Alstom Power ESI
40 Supply & Equipment of Stair Tower #1 & 2 2006 PT. Alstom Power ESI
43 Fabrication Top Sides Gas Production Facilities Platform 2005/2006 EMP Kangean Limited
45 Primary Air Duct to Air Heater WBS-502 - Tarahan Project 2005/2006 PT. Alstom Power ESI
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
PLATE WORK (NON TANK)
46 Fabrication Air Duct, Turbular Air Heater - Tarahan Project 2005/2006 PT. Alstom Power ESI
47 Mfg. Rotating part for Compax Cooler - Riau Andalan 2005/2006 FFE Mineral
49 Steel Mfg. Conductor Clamp - Pagerungan Kecil Project 2005 EMP Kangean Limited
50 Steel Mfg. Conductor Clamp - Pagerungan Project 2005 EMP Kangean Limited
54 Supply & Fabr. Dust Collector System & Poppet Unit 2005 PT. Cemera Siko
57 Fuel Bunker Coal Silo UBS-603 - Tarahan Project 2005 PT. Alstom Power ESI
59 Fabrication of Loose Casing Part - ASTORIA Project 2004 PT. Alstom Power ESI
60 Inlet Box, Leadders & Platforms - Betara Project 2004 PT. Alstom Power ESI
61 Mfg. of Welding Product - Feni Smelting Plant No. 3 2004/2005 PT. Aneka Tambang
PT. Cemara Siko Eng.
62 Boiler Casing Fabrication Work - Tanjung Jati B Project 2004 PT. PLN (Persero)
Babcock & Wilcox
63 Supply 2 (two) Diverter Damper Unit - Baltech System 2004 PT. DEN
Baltech System
64 Steel Manufacture of 2 units E-Filter, Jiang Lin Project 2003 Jiang Lin, China
FLS Airtech
65 Steel Parts & Roof Parts for 4 pcs ESP, Jiang Lin 2003/2004 Jiang Lin, China
Project
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
PLATE WORK (NON TANK)
67 Fabrication & Assembly 2 units Loose Casing 2003 PT. Alstom Power ESI
for Port of Washington Project
68 Fabrication of Ducting & Stack - MAP I Project, 2003 PT. Cemara Siko Eng.
Cikampek
69 Supply & Fabrication of 2 units Frame 7 PG-7821 2003 Baltec System Pty. Ltd.
Bypass Exhaust System - PLTG Pemaron Project
70 Fabrication of Fabric Filter Bechtel Project - Australia 2002/2003 FLS Airtech a/s
71 3 Unit Fabric Filter for Project Thiess - Australia 2002 FLS Miljo a/s
83 Fabrication & Install Hatch Cover PB. 400 1998 PT. PAL Indonesia
LIST OF REFERENCE
PLATE WORK (NON TANK)
LIST OF REFERENCE
PLATE WORK (NON TANK)
104 AQC & Bag Filters (Casing & Support) 1995 KAWASAKI H I
Balcke Durr
105 Fabrication Roller Mill Part-Qinhuangdao - China 1995 KAWASAKI H I
PT. PKT
106 Supply Material & Fabr. Fluxo Slide for Bishah 1995 PT. Tirta Kencana Teknindo
Cement Saudi Arabia (FULLER Co.)
108 Grati - Suralaya Power Plant (CCPP) 1995 Mitsubishi Heavy Industry
- Fabrication Plat Form and miscellaneous support POSSY Indonesia
PT. SWADAYA GRAHA
Project Reference Picture
FRAME 6B GAS TURBINE DIVERTER DAMPER FABRICATION TOP SIDES GAS PRODUCTION
FOR MALAYSIA FACILITIES PLATFORM
Picture 2
LIST OF REFERENCE
TANK PROJECT
3 Floating Roof Storage Tank Foundation - UPD Project 2007 PT. Tripatra Engineering
7 Fabrication of Steel Structure Platform & Tank 2004 Mitra Paramuda Mandiri
12 CP-13 Non Standard Tank Supply - Kaltim Sahid 1996/1997 PT. Kaltim Sahid Baritosodakimia
Baritosodakimia Plant / PT. Endrapura Swarnawaja
13 Crude Oil Tank, Mutiara Oil Facilities Expansion 1995 PT. VICO IND
Project, South Kalimantan PT. Rekayasa Industri
14 Fabrication & Erection Filtered Water Tank and Oil 1995 PT. Semen Tonasa
Feed Tank (ME-06A Package) Tonasa IV Project / PT Rekayasa Industri
15 Oil tank - Semen Gresik Tuban Plant I Project 1992 -1993 PT Semen Gresik
PT. SWADAYA GRAHA
Project Reference Picture
Scope of Work :
Sour Water Stripper Tank Fabrication
Installation / Erection
Scope of Work : Painting
Fabrication Test refer to API 650 Standard
Installation / Erection
Painting
Test refer to API 650 Standard
Client : Cemara Siko Eng. Ind., PT Client : Cemara Siko Eng. Ind., PT
Project Location : Pomala - Sulawesi Tenggara Project Location : Pomala - Sulawesi Tenggara
Periods : 2004 2005 Periods : 2004 2005
Scope of Work : Procurement, Fabrication & Painting Scope of Work : Procurement, Fabrication & Painting
Client : Semen Gresik (Persero) Tbk, PT. Client : Rekayasa industri, PT.
Project Location : Tuban, East Java Owner : Vico Indonesia, PT.
Periods : 1992 1993 (8 Months) Project Location : Balikpapan, East Kalimantan
Periods : 1995
Technical Data :
- Diameter 6 to 30 meters
- Material SS 400 N A
283.63.C
Scope of Work :
- Procurement Material
- Fabrication
- Installations
- Test API 650 Standard
Technical Data :
CP-13 NON STANDARD TANK FILTERED WATER TANK & OIL FEED TANK
Number of tanks :
13 units
Scope of Work :
- Procurement
Material
(A-36 & A 283.65.C)
- Fabrication
- Installation/
Erection
- Painting
- Test (Refer to API
650 Standard)
- Diameter 9 to 19
meters (various )
Technical Data :
Client : Rekayasa Industri, PT. Client / Client : Gudang Garam Tbk, PT.
Owner : Petrokimia Gresik, PT. Project Location : Kediri, East Java
Project Location : Gresik, East Java Periods : 2003 (4 months)
Periods : 2002 - 2003 (10 months)
LIST OF REFERENCE
FABRICATION & ERECTION OF STEEL STRUCTURE PROJECT
2 Upper Structure 461RM100, 461BF300 & Preduser P2KPT 2010 PT. Semen Gresik
3 Module Structural Pre Assembly C-Frame - Flevo Project 2008 PT. Alstom Power
4 C Frame Module & Structure Fre Assembly - Cycofos HRSG 2007 PT. Alstom Power
5 Supply & Fabrication Structural Steel for LNG Catwalk 2007 Penta Ocean
6 Structural Steel of C-Frame Module - Kwinana Project 2006/2007 PT. Alstom Power
10 Steel Mfg. C775 Arthit IIA, Gen Gas Platforms - Gulf of 2006 PT. Alstom Power
11 C Frame Module T 50 BPSP - Port of Washington Project ( 2006 PT. Alstom Power
12 Struc. Steel C Frame Port of Washington Project (POW) 2005/2006 PT. Alstom Power
13 Fabrication Miscellaneous Structural Steel - Alcan Project 2005/2006 PT. Alstom Power
20 Steel Mfg. of 2 Units Electrostatic Precipitator Feni-3 - ANTAM 2004 PT. Rekayasa Industri
22 Mfg. of Structural Steel, Stair/Railings, Ducting & 2003/2004 FFE Minerals Denmark
Chute - Jiang Lin Mill Project
23 Steel Structure for No. 2 Stacker Reclaimer & for No. 2 2003/2004 Techint Italimpianti
Shipunloaders - Tanjung Jati B Project PT. PLN (Persero)
24 Office Building & warehouse on Tarakan - Kaltim 2002/2003 PT. Gudang Garam Tbk.
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
FABRICATION & ERECTION OF STEEL STRUCTURE PROJECT
25 Building of Cement Packer Plant - Kupang - NTT 2002/2003 PD. P2KS - KUPANG
26 Fab. Of Boiler Steel Structure & Casing Panel - 2002/2003 PT Alstom Power ESI
Washington Project - Workshop Gresik
27 Fabr. & Erection of Air Slide & Steel Structure - Tuban 2002/2003 PT Semen Gresik
28 Build of Trass Storage - Tuban Plant 2002/2003 PT Semen Gresik
37 Steel Structure Work of Workshop & Office PT. 2000/2001 PT. Trakindo Utama
Trakindo Utama - Samarinda PT. Irawan Prima Utama
38 Building & Architectural Work, NPK Project-Gresik 1999/2000 PT Petrokimia Gresik
PT. Rekayasa Industri
39 Bulk & Bag Storage Work, Bagging Unit NPK - Gresik 1999/2000 PT Petrokimia Gresik
42 Fab. Erection of transfer tower #1 & #2 of gallery tube 1999 PT. Semen Gresik
Conveyor
LIST OF REFERENCE
FABRICATION & ERECTION OF STEEL STRUCTURE PROJECT
Shipunloader
BUILDING & WAREHOUSE SECTION VIII PROJECT - KEDIRI NPK FERTILIZER (PHONSKA) PROJECT
STEEL STRUCTURE FOR GALLERY CONVEYOR & BUILDING & WAREHOUSE SECTION VIII PROJECT - KEDIRI
TRANSFER TOWER, NPK FERTILIZER (PHONSKA) PROJECT Picture 2.
Gallery Conveyor
Fabrication & Erection Steel Structure of Limestone Storage Cyclone Fabrication & Erection Steel Structure of Limestone Storage Cyclone
& Separator, Conditioning Tower, EP, Coal Storage and Belt & Separator, conditioning Tower, EP, Coal Storage and Blet
Conveyor Tuban III Project Conveyor Tuban III Project
Picture 1. Picture 2.
Client / Owner : Semen Gresik (Persero) Tbk., PT. Client / Owner : Semen Gresik (Persero) Tbk., PT.
Project Location : Tuban, East Java Project Location : Tuban, East Java
Periods : 1996 Periods : 1996
Scope of Work : - Fabrication of Steel Structure Scope of Work : - Fabrication of Steel Structure
- Erection of Steel Structure - Erection of Steel Structure
EP Steel Structure
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
HANDLING AND CONVEYING EQUIPMENT
Design Engineering
1 Operation Optimization of Conveyor System to Plant Manufacture 2010 PT. Petrokimia
Installation
Design Engineering
Fabricate, Supply, Install & Commissioning of
1 Manufacture 2009 PT. IPMOMI - PAITON
Portable Conveyor
Installation
Design Engineering
1 Coal Handling Plant PLTU 1 NTT 2x7 MW - NTT Manufacture 2008/2009 PT. Rekadaya Elektrika
Installation
Design Engineering
Structural & Mechanical Hopper 6 Extension -
2 Manufacture 2008 PT. Wijaya Karya
ADARO KELANIS Project
Installation
4 Supply & Fabr. Bracket Idler - Petrosea Design Engineering 2007/2008 PT. Vortex Conveyor
Manufacture
Installation
5 Supply & Installation of Conveyor NPK II Petrokimia Design Engineering 2007/2008 PT. Wijaya Karya
Manufacture
Installation
8 Fabrication Cooling Conveyor for Side Load Furnace 2007 PT. Alstom Power ESI
Design Engineering
Manufacture
Installation
10 Supply & Fabrication Roller Conveyor X-Ray Design Engineering 2005 PT. Alstom Power ESI
Manufacture
Installation
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
HANDLING AND CONVEYING EQUIPMENT
11 Mfg. of Conveyor - Feni Smelting Plant No. 3 Design Engineering 2004 PT. Aneka Tambang
Manufacture PT. Cemara Siko Eng.
Installation
Spare Part Supplier
12 Fabrication of Conveyor - Rio Tuba HPP Nickel Design Engineering 2003 Sumitomo /JGC Corp.
Project, Philipines Manufacture PT. Cemara Siko Eng.
Installation
Spare Part Supplier
13 Conveyor Roller Supplier of PT. Smelting Part Supplier 2003 PT. Smelting Co.
14 Gypsum & Wet Ash Conveyor for Maizuru Design Engineering 2002 PT. Cemara Siko Eng.
Project Manufacture
Installation
Spare Part Supplier
15 Conveyor Idler of Semen Kupang II Project Supply 2002 PT. Semen Kupang
16 Belt Conveyor System c/w Tripper - Phonska Design Engineering 1999/2000 PT. Petrokimia Gresik /
Fertelizer Plant Gresik Manufacture PT. Rekayasa Industri
Installation
17 Belt Conveyor of Cheil Samsung Pasuruan Plant Manufacture 1999 PT. Cheil Samsung Ind.
18 Belt Conveyor System & Pruduct Sampler, Design Engineering 1999 PT. Petrokimia Gresik /
Phonska fertelizer Plant, Gresik Manufacture PT. Rekayasa Industri
Installation
19 Bin Gate, Diverter Gate, Screw Conveyor - Design Engineering 1999 PT. Petrokimia Gresik /
Phonska fertelizer Plant, Gresik Manufacture PT. Rekayasa Industri
Installation
21 Conveyor Frame and Limestone Bin Manufacture 1997 PT. Semen Gresik
Installation
23 Bin Cyclone and Baggage Conveyor of Engineering 1997 PT. Rajawali Nusantara /
Sugar Plant Erection PT. Mitra Nusantara
24 Belt Conveyor All Area Tuban III Project Design Engineering 1996 - 1997 PT. Semen Gresik
Manufacture
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
HANDLING AND CONVEYING EQUIPMENT
Installation
25 Blending Silo and Blending Conveyor of Engineering 1996 PT. HM Sampoerna, Tbk
Sukorejo Cigarette Plant Manufacture
Installation
Conveying
PT. SWADAYA GRAHA
Project Reference Picture
Technical Data :
Technical Data :
Technical Data :
Scope of Work : Engineering, Manufacture and Erection
Scope of Work : Engineering, Manufacture and Erection
PT. SWADAYA GRAHA
Project Reference Picture
Technical Data :
MECHANICAL ERECTION
& PIPING WORK
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
To improve and development the human resources of this division, the company
have the program by participating on the project with local or under foreign
company supervision to produce higher capabilities and supported by complete
enough equipments to handle the projects:
1. Theodolite : 6 Units
2. Electric Tools & Equipment : 1 Unit
3. Chain Block s/d 10 T : 45 Units
4. Level Block 1,5 3 T : 10 Units
5. Hand Winch 3 10 T : 6 Units
6. Impact Wrench 4 & 7 : 9 Units
7. Shear Wrench : 7 Units
8. Rachet Puller 1,5 T : 2 Units
9. Torque Meter : 3 Units
10. Hydraulic Jack 50 T : 7 Units
11. Hydraulic Jack 100 T : 6 Units
12. Hydraulic Jack 150 T : 4 Units
13. Generator Set : 1 Unit
14. SMAW Welding Machine 400 A : 5 Units
15. Water Pump : 2 Units
16. Dial Indicator : 6 Units
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
MECHANICAL INSTALLATION / ERECTION PROJECT
GENERAL
Erection Structure Raw Mill, Raw Feed Bin & Coal Mill,
3 Limestone Crusher Tonasa V (Package C1202-6, C1202- 2010/2011 PT. Semen Tonasa
7 & C1202-5)
10 Cross Yard Installation Sheller Bulk Bagger 2010 PT. Branita Sandhini
12 Fabrication and Install Cross Yard Conveyor 2010 PT. Branita Sandhini
14 Erection Mechanical New Coal Mill Tuban I P2KPT 2010 PT. Semen Gresik
15 Spinbath and Viscose Plant Project 2010 PT. South Pacivic Viscose
16 Upgrade Belt Bucket Elevator Roto Package Tuban III 2010 PT. Semen Gresik
17 Modification Hydraulic HRC System Finishing Tuban I 2010 PT. Semen Gresik
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
MECHANICAL INSTALLATION / ERECTION PROJECT
18 Dryer, Sorting & Discard Erection Package 2010 PT. Branita Sandhini
21 Mechanical & Piping Fabrication Work Zone 2, 3 & 4 2009/2010 PT. South Pacivic Viscose
NGBC Project
Fabrication & Mechanical Semen Silo & Packer P3C -
22 2009 PT. Semen Gresik
Ciwandan
23 Coal Handling System for PLTU-1 - Rembang 2008/2009 PT. Tecgates Engineering
24 ME Work for OTFR & LPGF Recovery Plant - HESS 2 2008 PT. TRIPATRA Eng
28 Install Hatch Cover & Hatch Fitting Cargo Hold 2, 3, 4 2005/2006 PT. PAL Indonesia
Install Hatch Cover & Hatch Fitting Cargo Hold 5 2005/2006
33 Mechanical & Erection Work - Feni 3 Project 2004/2005 PT. Aneka Tambang
PT. Rekayasa Industri
34 Mechanical Feeding Installation 2004 PT. Gudang Garam Tbk.
35 HDT Machine American Blend Plant Installation 2004 PT. Gudang Garam Tbk.
37 On Site Low Pressure Pipe Modifications - Tanjung 2003/2004 PT. PLN (Persero)
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
MECHANICAL INSTALLATION / ERECTION PROJECT
38 Supply, Fabrication & Installation of Water Chiller 2003 PT. Gudang Garam Tbk.
SKM 3, Phase I
39 Mine Refueling & PM Facilities - Batu Hijau Project 2003 PT. Newmont Nusatenggara
PT. Mitra Paramuda Mandiri
42 Installation of Waste Water Treatment - Unit VIII 2001 PT. Gudang Garam Tbk.
46 Erection & Ass Block OHBC, PB. 1600 Teus 1999/2000 PT. PAL Indonesia
51 Steel Works Mfg & Erection for EP 1999 PT. ANEKA TAMBANG
53 Equipment Installation work for Material handling & 1997/1998 COPPER SMELTING
Off Site PT. Cemara Siko
LIST OF REFERENCE
MECHANICAL INSTALLATION / ERECTION PROJECT
57 Dust Collector Cement Bin Area #65 Gresik Plant 1996 PT. SEMEN GRESIK
59 Mechanical And Erection Grati Combine Cycle Power 1995/1996 PLTGU - GRATI
Plant PLTGU - Grati PT. Wijaya Karya
62 VCM-Liquid & Vapor loading - unloading facility of 1997/1998 PT. SIAM MASPION
SIAM Maspion terminal project of Jetty loading dock
63 Mechanical Erection Ship Unloading (CSU), GRESIK 1996 PT. SEMEN GRESIK
64 Mechanical Erection Continuous Ship Un-loader Ass 1995/1996 PT. Petrokimia Gresik
(CSU) & Relocation /Modification Kangaroo Crane
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
REPAIR OF BOILER
1 HRSG Inlet Duct & Boiler CSG Filler Panel - YARWUN 2008/2009 PT. Alstom Power
3 Boiler Casing Packaging & Shipping Frame 2007 PT. Alstom Power
5 Rehebilitation Boiler PLTU Unit #2 PT. PLN PJB II 2002 PT. PLN PJB II
PT. ABB ESI
6 Retubing Pipa & Tembokan Ketel KTR & JTA 2000 PG. Jombang Baru
PT. PN X
7 Pengadaan Support untuk Superheater Tube Boiler 2000 PT. PLN PJB II
Unit IV
14 Erection Boiler Plant & Equipment Project Incinerator 1996/1997 PT. KERTAS LECES
PT. Bosto Pasuruan
15 Retubing Ketel Yoshimine 900 untuk PG. Meritjan 1996 PG. Meritjan
PT. Perkebunan Nusantara
16 Perbaikan Ketel Sisi Depan Tembokan Ketel Yoshimine 1996 PG. Meritjan
untuk PG. Meritjan PT. Perkebunan Nusantara
LIST OF REFERENCE
REPAIR OF BOILER
19 Perbaikan Air Heater Tubes Ketel Yoshimine untuk 1996 PG. Krebet Baru II
PG. Krebet Baru II Malang PT. RNI
20 Perbaikan Ketel CCJT I & Yoshimine untuk PG. Krebet 1996 PG. Krebet Baru II
Baru II Malang PT. RNI
23 Perbaikan Ketel Yoshimine untuk PG. Krebet Baru I 1995 PG. Krebet Baru I
Bululawang Malang PT. RNI
24 Perbaikan Ketel CCJT dan Ketel Yoshimine untuk 1995 PG. Krebet Baru II
PG. Krebet Baru II Bululawang Malang PT. RNI
PT. SWADAYA GRAHA
Project Reference Picture
Stack Reclaimer
PT. SWADAYA GRAHA
Project Reference Picture
Ship Unloader
PT. SWADAYA GRAHA
Project Reference Picture
MECHANICAL & ERECTION FeNi 3 PROJECT MECHANICAL & ERECTION FeNi 3 PROJECT
POMALAA POMALAA
Rotary Dryer
Rotary Kiln
MECHANICAL & ERECTION FeNi 3 PROJECT MECHANICAL & ERECTION FeNi 3 PROJECT
POMALAA POMALAA
EP for Dryer
EP for Kiln (Dry Type)
PT. SWADAYA GRAHA
Project Reference Picture
MECHANICAL ERECTION SEMEN KUPANG 2 PROJECT MECHANICAL INSTAL. ACID & WWT PLANT OF IGC
PROJECT
Client : Rekayasa Industri, PT.
Client : Inti Karya Persada Teknik, PT.
Owner : Semen Kupang, PT.
Owner : Smelting Co, PT.
Project Location : Kupang, East Nusa Tenggara
Project Location : Gresik, East Java
Periods : 2001 2002 (15 months)
Periods : 1997 1998 (15 months)
Total Weight : 2,700 tons
Total Weight : 4,000 tons
Scope of Work : Inside Battery Limit All Equipments of
Scope of Work : Acid and WWT Plant All Equipments
Cement Plant (600 TPD cap.)
Scrubber Installation
STEEL WORKS MANUFACTURING & ERECTION FOR EP MECHANICAL INSTALLATION & STEEL STRUCTURE
ERECTION OF NPK FERTIZER PROJECT
Client : FLS Miljo Picture 3.
Owner : Aneka Tambang, PT.
Project Location : Soroako, South East Sulawesi Client : Rekayasa Industri, PT.
Periods : 1999 - 2000 (6 months) Owner : Petrokimia Gresik, PT.
Total Weight : 500 tons Project Location : Gresik, East Java
Scope of Work : Steel Manufacturing, Mechanical Installation & Periods : 1999 - 2000 (11 months)
Steel Structure Installation Total Weight : 2700 tons
Scope of Work : - Mechanical Installation Work
- Steel Structure Installation Work
- Installation of Steam Turbine
- Installation of Steam Boiler
ID Fan
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
PIPING & PIPE LINE
4 BKR Offside Piping Table for OLEO Chemical Plant 2010 PT. Wilmar Nabati Indonesia
5 LPG & Fire Water System Piping I, II & III 2010 PT. Branita Sandhini
9 External Piping di Oleo Chemical Plant 2009 PT. Wilmar Nabati Indonesia
10 External Piping Water & Air Distribution General Utility 2009 PT. Wilmar Nabati Indonesia
16 Babat-Gresik 28" Pipe Line Relocation & Recondition 2007/2008 PT. Petrokimia Gresik
Project (Stage VIII)
17 Pipe Gass Interconection Supply of Kodeco to Petrokimia 2006/2007 PT. Petrokimia Gresik
19 Installing 18" Export Pipe - UPD Project 2006 PT. Raga Perkasa Ekaguna
20 Piping Work 24" HDPE Sea Water Intake - UPD Project 2006 PT. IKPT
LIST OF REFERENCE
PIPING & PIPE LINE
24 Stiffner Plate of Steel Pipe Piles - Tangguh LNG Project 2005 PT. Penta Ocean
26 Piping Torn Water & Torn Water Supply 2004 PT. Gudang Garam
27 Relocation of Water Pipe dia 28" Babat - Gresik 2003 PT. Petrokimia Gresik
Stage IV - 3
28 Relocation of Water Pipe dia 28" Babat - Gresik 2003 PT. Petrokimia Gresik
Stage IV - 1
32 Relocation of Water Pipe dia 28" Babat - Gresik 2001 PT. Petrokimia Gresik
Stage I
33 Installation of Plant & Equipment Semarang Urban 2000 PDAM - Semarang
Development Plant and Pump House - Mundu PT. BBI
34 Piping and Instrument 2000 PT. Dovechem
Maspion
35 Install and fabrication cement lined Piping, Tuban 1999 PT. SEMEN GRESIK
Harbor
36 Piping Installation Work Package No. Contract- 1995 PT. SEMEN TONASA
PW-14Tonasa IV Project
PT. SWADAYA GRAHA
Project Reference Picture
MECHANICAL ERECTION WORK TUBAN III CEMENT MECHANICAL & PIPING WORK 7,500 MT AMMONIA
PLANT PROJECT STORAGE TANK
Picture 1
Client : Rekayasa Industri, PT.
Client / Owner : Semen Gresik (Persero) Tbk., PT. Owner : Petrokimia Gresik, PT.
Project Location : Tuban, East Java Project Location : Gresik, East Java
Periods : 1995 - 1996 (15 months) Periods : 2002-2003 (9 Months)
Total Weight : 10,000 tons
Scope of Work : - Limestone Crushing
- Raw Material Transport & Storage
- Clay Crushing
- Raw Material Re-claimer
- Raw Material Feeding
- Raw Grinding
- Raw Material Transport
- Coal Mill
- E/P Raw Mill Package SF-02A
Scope of Work :
Civil Work
Site Fabrication & Installation of Pipe
Supply & Install Wrapping
Relocation of Cathodic Protection
Painting Work
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture
BOILER REHABILITATION OF PT. PLN PJB II UNIT #2 KUDU WATER TREATMENT PLANT OF SEMARANG URBAN
DEVELOPMENT PROJECT
Client : Alstom Power ESI, PT.
Project Location : Gresik, East Java Client : PT. Boma Bisma Indra
Periods : 2000 (5 Months) Project Location : Semarang, Central Java
Periods : 2000 (7 Months)
Wrapping Work
LIST OF REFERENCE
MECHANICAL, ELECTRICAL & INSTRUMENT FOR BUILDING & PLANT
1 Electrical & Instrument Installation ID Fan 2 and ABC Inlet 2010/2011 PT. Semen Gresik
Tuban III
8 Electrical & Instrument Finishing Plant 2009 PT. Wilmar Nabati Indonesia
13 Electrical & Instrument Erection NPK 3 & 4 Petrokimia 2008 PT. Krakatau Engineering
16 Instalasi Listrik Gudang Induk Unit III - GG Kediri 2007 PT. Gudang Garam Tbk.
22 Supply & Installation of Cable Tray 2004 PT. Gudang Garam Tbk.
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122
LIST OF REFERENCE
MECHANICAL, ELECTRICAL & INSTRUMENT FOR BUILDING & PLANT
24 Supply & Install of Water Installation, Hydrant - 2003 Semen Gresik Hospital
RSSG Phase II Project PT. Semen Gresik
26 EPC for ORF Maintenance Workshop Building 2002 Kodeco Energy Co. Ltd.
28 M/E For Semen Gresik Hospital Phase II 2002 PT. Semen Gresik (Persero)
30 Electrical Installation of 21 Building - Unit VIII 2001 PT. Gudang Garam Tbk.
31 Mechanical & Electrical Work - Surabaya Islamic 2000 Yayasan Rumah Sakit Islam
Hospital Surabaya
Control Valve Installation for Reactor Agitator Pressure Transmitter Installation for Air Heater
AC DUCTING INSTALLATION - AUDITORIUM & MAIN AIR CONDITIONER INSTALLATION SURABAYA ISLAMIC
OFFICE SEMEN TONASA, PT. HOSPITAL
Client / Owner : Semen Tonasa, PT. Client / Owner : Yayasan Rumah Sakit Islam Surabaya
Project Location : Pangkep Biringere, South Sulawesi Project Location : Surabaya, East Java
Periods : 1997 1998 (14 Months) Periods : 2000
AC Ducting Installation
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture
POWER ROOM SURABAYA ISLAMIC HOSPITAL FIRE FIGHTING SYSTEM SURABAYA ISLAMIC HOSPITAL
Client / Owner : Yayasan Rumah Sakit Islam Surabaya Client / Owner : Yayasan Rumah Sakit Islam Surabaya
Project Location : Surabaya, East Java Project Location : Surabaya, East Java
Periods : 2000 Periods : 2000