PT SWADAYA GRAHA

Jl. RA Kartini 25 Gresik 61122

VISION : PT. Swadaya Graha wants to be an


excellent and reliable company in construction &
fabrication work.

QUALITY POLICY : PT. Swadaya Graha is always


committed to costumers satisfaction by producing
good quality product, on time delivery and reasonable
price.

LINES OF BUSINESSES : Main Office of PT. Semen Tonasa

1. Civil Work & Building :


General Civil Work
Building and Housing

2. Steel Fabrication & Manufacturing :


Plate Work (Tank, Ducting, Dust Collector & Oil Tank, VICO East Kalimantan
Electrostatic Precipitator, Stack)
Steel Structures Works (Storage, Platform,
Gallery)
Handling and Conveying Equipment (Belt
Conveyor, Bucket Elevator, Stacker Reclaimer
& Ship Loader - Unloader Cranes etc.)

3. Mechanical Erection & Piping Work : Phonska Fertilizer Plant, PT. Petrokimia Gresik
Mechanical & Steel Structure Erection
Piping Work

4. Mechanical, Electrical & Instrument for


Building & Plant

5. Construction and Heavy Equipment Rental :


Bulldozer, Compressor, Forklift, Excavator,
Personal Lift PT. Swadaya Grahas Mobile Crane
Genzet Diesel 125 KVA, Welding Machine
Crawler Crane 20,60,125,200 Ton
Hydraulic Crawler Crane 50,80,150 Ton
Hydraulic Truck Crane 20,30,35,45,50 Ton
Rough Terrain Crane 18,25,45 Ton
Trailer Head 20,60 Ton, Tower Crane 7 Ton

!
Xf!bsf!sfbez!up!cf!zpvs!sfmjbcmf!qbsuofs!jo!dpotusvdujpo!
COMPANY PROFILE

CERTIFICATE
COMPANY PROFILE

CIVIL WORK & BUILDING


PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

OUR CUSTOMERS in CIVIL CONSTRUCTION

The Civil Construction has been developing and growing of its capabilities to
became your partners especially to carry out all the works from piling, foundation,
building, concrete road, asphalt road, concrete works, pier harbor and finishing.
Some of our customer are such as on the list below :

Storage

- Limestone Storage PT. Semen Gresik at Tuban


- Limestone Storage PT. Semen Tonasa at Pangkep Ujung Pandang
- Warehouse and office Unit VIII Gudang Garam at Kediri
- Others

Harbor

- Harbor Project PT. Semen Gresik at Gresik

Office Building

- Main Office PT. Semen Gresik at Gresik


- Main Office PT. Semen Tonasa at Pangkep Ujung Pandang
- Surabaya General Islamic Hospital YARSIS at Surabaya
- Others

Concrete & Steel Structure

- Cement Silo for Tuban Harbor at Tuban


- Blending Silo and Clinker Storage for PT. BCM at Tuban
- Steel Structure and Installation work for PT. Semen Tonasa at
Pangkep Ujung Pandang and others

Road and Irrigation

- Access road for PT. Cement Dwima Agung at Tuban


- Access road for PT. Tuban Petrochemical Project at Tuban
- Others

Housing

- Residential House for PT. Semen Gresik employee at Tuban


- Residential House for PT. Semen Gresik employee at Kembangan Asri
at Gresik and others
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

CIVIL CONSTRUCTIONS
EQUIPMENT & TOOLS

1. Vibro Roller / Compactor : 1 Unit


2. Mouisture Meter : 1 Unit
3. Theodolite & Accessories : 18 Units
4. Statip / Tripod : 25 Units
5. CBR Testing Equipment : 1 Unit
6. Compressor : 6 Units
7. Concrete Bucket : 4 Units
8. Hydraulic Handpalet : 2 Units
9. Jack Hammer : 11 Units
10. Jig Saw : 2 Units
11. Torque Meter : 2 Units
12. Water Pump : 8 Units
13. Stamper Machine : 13 Units
14. Concrete Trowel : 1 Unit
15. Vibrator Machine : 13 Units
16. Vibrator : 7 Units
17. Vibra Scred : 1 Unit
18. Water Jet Cleaner : 1 Unit
19. Generator Electric : 9 Units
20. Concrete Molend : 16 Units
21. SMAW Welding Machine 400 A : 10 Units
22. Wood Machine : 21 Units
23. Auto Level : 16 Units
24. Other Supporting Equipments (Scaffolding, etc)
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT

BUILDING AND FACTORY

1 Cigarette Depot Development - Kreongan- Jember 2011 PT. Gudang Garam Tbk.

2 Printing House Unit XI - Kediri 2010/2011 PT. Gudang Garam Tbk.

3 Building Renovation for SKT Unit Kartasura 2010 PT. Gudang Garam Tbk.

4 Pile Cap & Struktur Beton Limestone Storage Tonasa V 2010 PT. Semen Tonasa

Pile Cap & Structure Beton Raw Mill, Raw Mill Feed Bin & Coal
2010 PT. Semen Tonasa
5 Mill Tonasa V Project

Pile Cap & Concrete Structure Building Cement Mill Feed,


6 2010 PT. Semen Tonasa
Clinker Cooler & Clinker Storage Semen Tonasa V

7 SKT Building Renovation and Facilities - Unit Kartasura 2010 PT. Gudang Garam Tbk.

8 EPC of Warehouse KCL 2010 PT. Petrokimia

9 SKT Building Renovation & Facilities, Unit Kartasura 2010 PT. Gudang Garam Tbk.

10 Construction of ISBL Piperack X 1 - X 39 2009 PT. South Pacific Viscose

11 Civil Works for SRU Foundation 2009 PT. South Pacific Viscose

12 Foundation & Steel Structure MF Plant 2009 PT. Wilmar Nabati Indonesia

13 Foundation Tank Farm ME Fractionation 2009 PT. Wilmar Nabati Indonesia

14 Control Room at Spinning Building Line 4 2009 PT. South Pacific Viscose

15 NGBC - Production Integrated Building 2009 PT. South Pacific Viscose

16 Renovation warehouse Unit Ambon 2009 PT. Gudang Garam Tbk.

17 Storage Bahan Bakar Alternatif Sekam di Preheater Pabrik III 2009 PT. Semen Gresik (Persero)

18 Storage Oil Slude Pabrik II 2009 PT. Semen Gresik (Persero)

19 Hopper Stacker Reclaimer BC-8 PLTU 1 Rembang 2008/2009 ZELAN

20 Renovation of Building "JTV" 2008 PT. Graha Pena


PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT

21 Structure and Arcitectur of Warehouse BBP - GG Pandaan 2008 PT. Gudang Garam Tbk.

Main Civil & Building Work - Package RD-05 PLTU 1


22 2008/2009 ZELAN
Rembang

23 Warehouse Extension of PT. IKSG 2008 PT. IKSG

24 Finishing of DBL Arena 2008 PT. Graha Pena

25 Building Works of DBL Arena 2008 PT. Graha Pena

26 Building Work & Architectureal LOBP UPP Surabaya 2007/2008 PT. Rekayasa Industri

27 Foundation Tank LOBP UPP Surabaya 2007 PT. Rekayasa Industri

28 Extention Evaporator 2007 PT. South Pacific Viscose

29 Development of Office & Warehouse-Waingapu. 2007/2008 MINTARYA

30 Equipment Foundation and Civil Work 2007/2008 PT. Tripatra Engineering

31 Civil Construction of New Balling Press 2007 PT. South Pacific Viscose

32 Foundation and Steel Structure Work of Gereja 2007 Gereja Paroki SP Maria Gresik

33 Guard House and Fence & Gate - GG Pandaan 2007 PT. Gudang Garam Tbk.

34 Development of factory fertilize petroganik. 2007 PT. Gresik Cipta Sejahtera

35 Renovate Office & Warehouse of Panamas Berbek 2006 PT. HM Sampoerna

36 Palet Building Extension 2006 PT. Eternit

37 Development Of House On duty PT. UTSG Phase II 2006 PT. UTSG

Structure, Arsitecture, Mechanical Electrical Renovate


2006 PT. HM Sampoerna
38 "Koperasi & Kantin" - Malang Plant

39 Roof Warehouse of Purufied Gypsum 8000 Ton. 2006 PT. Petrokimia

40 Development Of House On duty PT. UTSG Phase I 2006 PT. UTSG

41 Architecture, Structure & Infrastructure Building 2006 PT. HM Sampoerna


of SETC Phase 2

42 Civil Construction of SC2 Absorption Plant Project 2006 South Pacific Viscose
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT

43 Development of Building "LPA Manba'ul Fallah" 2006 PT. Semen Gresik

44 Building Works - UPD Project 2005/2006 PT. IKPT

45 Warehouse Printing office development of Unit XI Kediri 2005 PT. Gudang Garam Tbk.

46 Raw Coal Transport Pabrik Tuban I, II 2005 PT. Semen Gresik (Persero)

Office Renovation and Main Warehouse development - Unit III


47 Kediri 2005 PT. Gudang Garam Tbk.
48 Warehouse and Office Renovation - SBU Unit VIII - Kediri 2005 PT. Gudang Garam Tbk.

49 Finishing dance 3, Building Midwifery & Take care of to lodge 2005 Yayasan Delta Surya

50 Constrcution of Residential Houses II of PT. KIG 2005 PT. Kawasan Industri Gresik

51 Main Office Renovation - PT. GG Kerdiri 2005 PT. Gudang Garam Tbk.

52 Storage Building Ekstentions - PT. GG Unit Pandaan 2004/2005 PT. Gudang Garam Tbk.

53 Main Building Renovation - PT. GG Unit III Kediri 2004/2005 PT. Gudang Garam Tbk.

54 Main Building Process SKT - PT. GG Unit VIII Phase II Kediri 2004/2005 PT. Gudang Garam Tbk.

55 Civil Work of WWTP - TPPI 2004/2005 Kormac Pratama

56 Main Office Operation - PT. UTSG Tuban 2004/2005 PT. UTSG

57 Provision of Generator Transformer Storage 2004 PT. Powergen Jatim

58 Fullerton Place Bridge 2004 Ciputra Surya

59 Office Building Renovation - PT. GG Unit Paiton 2004 PT. Gudang Garam Tbk.

Water Intake & General Civil Rehabilitations PLU #3 & #4


60 Tanjung Priok 2004 PT. PAL Indonesia

61 Building of Delta Surya Hospital 2004/2005 Yayasan Delta Surya

62 Motor's Storage Construction at Laydown Area, Technical 2003/2004 PT. Powergen Jawa Timur
Office Refurbisment & Security Pos Construction

63 Provision of Store Extension Paiton II Power Station 2003/2004 PT. Powergen Jawa Timur

64 Construction of Store Extension, Fence & Parking Area 2003/2004 PT. IKSG
65 Construction of General Polyclinic Building 2003 RSUD Dr. Moh. Saleh
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT

Probolinggo
66 Building for Storm Water Drainage (PH - 2 & 3) 2003 Juanda Airport
PT. Teguh Raksa Jaya
67 Constrcution of Residential Houses of PT. KIG (29 Unit) 2003 PT. Kawasan Industri Gresik

68 Official Housing Complex of Regent Phase II 2003 Pemda Tk. II Kab. Bulungan
East Kalimantan

69 Office, Warehouse and Store of Kopkar Gudang Garam 2003 KOPKAR Gudang Garam

70 Semen Gresik Hospital Phase II 2002/2003 Semen Gresik Hospital


- Chlorine Contantc Tank & WWT PT. Semen Gresik (Persero)

71 Renovation of Warehouse A, B & D Gambiran, Jember 2002/2003 PT. Gudang Garam Tbk.

72 Construction of Cement Packing Plant Building - 2002/2003 P2KS - Kupang


Kupang NTT

73 Construction of Paviliun Building 2002/2003 RSUD Dr. Moh. Saleh


Probolinggo
74 Renovation of Office, and Warehouse - Tikusan Warehouse 2002 PT. Gudang Garam Tbk.

75 Truck Garage Area of Unit III - Gudang Garam Kediri 2002 PT. Gudang Garam Tbk.

76 Renovation of Warehouse A Unit Paiton 2002 PT. Gudang Garam Tbk.

77 Building & Toilet Block, Road Work and Land Fill 2002 PT. Kingfurn International

78 EPC for ORF Maintenance Workshop Building 2002 Kodeco Energy Co. Ltd.

79 Araya Driving Range Club House & Family Club Malang 2001/2002 PT. Araya Bumi Megah

80 Unair Student Dormitory two floors 2001/2002 Unair - Surabaya

81 Construction of Ruko Puri Niaga Pondok Blimbing 2001/2002 PT. Araya Bumi Megah
Indah - Malang
82 Club House 2000/2001 PT. Araya Bumi Megah
- Caddy & Staff Room Including Pray Room
83 Gudang Garam Office Building Code 21- Unit VIII 2001 PT. Gudang Garam
- Office 01 A Building
- Factory Building #31

84 Surabaya General Islamic Hospital Phase II 2000 YARSIS / PT. IKPT

85 Residential Houses PT. Semen Gresik - Graha 2000 PT. Swadaya Graha
Kembangan Asri Phase VII
86 Residential Houses PT.Semen Gresik Tuban 1999/2000 Dana Pensiun
Phase IX Semen Gresik
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT

87 Continuation Civil Construction Building of D3 Program 1999 UGM - Yogyakarta

88 Building & Architectural work - Phonska Plant 1999 PT. Petrokimia Gresik

89 Additional Building for Varia Usaha Office 1999 PT. Varia Usaha

90 Residential Houses PT. Semen Gresik - Graha 1999 PT. Swadaya Graha
Kembangan Asri Phase VI

91 Fence for outside security port & Pavement 1999 Dana Pensiun
Semen Gresik

92 Margomulyo Warehouse 1998 PT. Semen Gresik

93 Medical Clinic - Tuban 1998 PT. Semen Gresik

94 Maintenance and Office Building - Smelting Plant 1998 Chiyoda International Indonesia

95 Residential Houses PT. Semen Gresik - Graha 1998 PT. Swadaya Graha
Kembangan Asri Phase V

96 Residential Houses PT.Semen Gresik Tuban 1998 PT. Semen Gresik


Phase VIII
97 PT. Semen Tonasa Main Office and Dormitory 1997/1998 PT. Semen Tonasa
- Civil, Arcitektur,Electrical & Mechanical Erection
- Additional work
98 Residential Houses PT.Semen Gresik Tuban T.70 - 1997/1998 PT. Semen Gresik
T. 300

99 Residential Houses PT. Semen Gresik - Graha 1997 PT. Swadaya Graha
Kembangan Asri Phase IV
100 IKSG Tuban Project 1996/1997 PT. Industri Kemasan
- Industri Kemasan Semen Gresik Building (electrical) Semen Gresik (IKSG)

101 Residential Houses PT.Semen Gresik Tuban 1996/1997 Dana Pensiun


Phase VI Semen Gresik
102 Student Dormitory & Lecture Building of STPN Yogjakarta 1996 BPN STPN
Yogyakarta
103 Kejayan East Java MILO Plant Project 1996 PT. Nestle Indonesia
- Supply & Erect. Steel Structure & Cladding
- Supply & Erect. Of Concrete & Steel Structure
Warming Tunnel
104 Office Building of Kawitel Yogyakarta 1995 PT. Telkom Indonesia

105 Office Building of STO Telkom Balongpanggang-Gresik 1995 PT. Telkom Indonesia
106 Residential Houses PT. Semen Gresik - Graha 1994/1996 PT. Swadaya Graha
Kembangan Asri Gunung Malang in Gresik
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT

107 Building and Finishing I Tonasa IV Project 1994/1995 PT. Semen Tonasa
108 Project Office of Semen Tuban II 1994/1995 PT. Semen Gresik
109 Building and Finishing I Tonasa IV Project 1994/1995 PT. Semen Tonasa
110 Urea Storage Pupuk Kaltim Project 1994/1995 PT. Pupuk Kaltim

111 Structure and Finishing Hospital Building 1994 PT. Semen Gresik
112 Dormitory Building PT.SG - Tuban I Project 1993/1994 PT. Semen Gresik

113 Semen Gresik Hospital Phase I 1993/1994 PT. Semen Gresik


- Foundation
- Structure and Finishing

114 Main Office - Semen Gresik 1992 PT. Semen Gresik


PT. SWADAYA GRAHA
Project Reference Picture

CONSTRUCTION OF DUCT BANK & PIPE RACK NGBC


MSPS PROJECT

Client / Owner : PT. SOUTH PACIVIC VISCOSE


Project Location : Purwakarta
Periods : 2009-2010
PT. SWADAYA GRAHA
Project Reference Picture

MAIN CIVIL & BUILDING WORKS


PLTU 1 JAWA TENGAH 2 X (300-400 MW) COAL FIRED POWER PLANT
AT REMBANG INDONESIA
Client / Owner : ZELAN HOLDING (M) SDN BHD - MALAYSIA
Project Location : Rembang Middle Java
Periods : 2008 - 2009
PT. SWADAYA GRAHA
Project Reference Picture

MAIN CIVIL & BUILDING WORKS


PLTU 1 JAWA TENGAH 2 X (300-400 MW) COAL FIRED POWER PLANT
AT REMBANG INDONESIA
Client / Owner : ZELAN HOLDING (M) SDN BHD - MALAYSIA
Project Location : Rembang Middle Java
Periods : 2008 - 2009

Fire Fighting Building WTP & WWTP

Desalinasation Plant Administration Building


PT. SWADAYA GRAHA
Project Reference Picture

BUILDING WORKS OF DBL ARENA - GRAHA PENA


(JAWA POS GROUP)
Client / Owner : GRAHA PENA, PT
Project Location : Surabaya East Java
Periods : 2008
PT. SWADAYA GRAHA
Project Reference Picture

EQUIPMENT FOUNDATION AND CIVIL WORK


UPD PROJECT
Client / Owner : TRIPATRA ENGINEERING, PT
Project Location : Gresik East Java
Periods : 2007/2008 -
PT. SWADAYA GRAHA
Project Reference Picture

WAREHOUSE - IKSG TUBAN


Client / Owner : INDUSTRI KEMASAN SEMEN GRESIK, PT
Project Location : TUBAN East Java
Periods : 2008

Warehouse
WWTP

DEVELOPMENT OF HOUSE ON DUTY (PHASE II)


UTSG TUBAN
Client / Owner : UNITED TRACTOR SEMEN GRESIK, PT
Project Location : TUBAN East Java
Periods : 2007
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

BUILDING INFRASTRUCTURE UTILITY & OFFICE AREA


CIVIL CONSTRUCTION OF SC2 ABSORPTION TUBAN AROMATIC PROJECT
PLANT PROJECT
Client / Owner : PT. IKPT / PT. TPPI
Client / Owner : PT. South Pacific Viscose Project Location : Tuban, East Java
Project Location : Purwakarta Periods : 2004-2005
Periods : 2006 Scope of Work : Architecture & Structure
Scope of Work : Architecture & Structure

BUILDING TPPI 19

Picture 2

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

BUILDING INFRASTRUCTURE UTILITY & OFFICE AREA BUILDING INFRASTRUCTURE UTILITY & OFFICE AREA
TUBAN AROMATIC PROJECT TUBAN AROMATIC PROJECT
Client / Owner : PT. IKPT / PT. TPPI Client / Owner : PT. IKPT / PT. TPPI
Project Location : Tuban, East Java Project Location : Tuban, East Java
Periods : 2004-2005 Periods : 2004-2005
Scope of Work : Architecture & Structure Scope of Work : Architecture & Structure

Building TPPI 18 Building TPPI 17


PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

BUILDING INFRASTRUCTURE UTILITY & OFFICE AREA


BUILDING INFRASTRUCTURE UTILITY & OFFICE AREA TUBAN AROMATIC PROJECT
TUBAN AROMATIC PROJECT
Client / Owner : PT. IKPT / PT. TPPI
Client / Owner : PT. IKPT / PT. TPPI Project Location : Tuban, East Java
Project Location : Tuban, East Java Periods : 2004-2005
Periods : 2004-2005 Scope of Work : Architecture & Structure
Scope of Work : Architecture & Structure

STRUCTURE TPPI

Building TPPI 10

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

GUDANG GARAM OFFICE


BUILDING INFRASTRUCTURE UTILITY & OFFICE AREA
TUBAN AROMATIC PROJECT Client / Owner : Gudang Garam Tbk, PT.
Project Location : Kediri, East Java
Client / Owner : PT. IKPT / PT. TPPI Periods : 2004 - 2005
Project Location : Tuban, East Java
Periods : 2004-2005
Scope of Work : Architecture & Structure
:

Unit VIII

Technical Data :
Scope of Work : Foundation, Architecture, Structure, Finishing,
Mechanical & Electrical

Waste Water Treatment


PT. SWADAYA GRAHA
Project Reference Picture PT. SWADAYA GRAHA
Project Reference Picture

GUDANG GARAM OFFICE


AUDITORIUM & MAIN OFFICE BUILDING
Client / Owner : Gudang Garam Tbk, PT.
Project Location : Kediri, East Java Client / Owner : Semen Tonasa, PT.
Periods : 2000 2001 Project Location : Pangkep Biringere, South Sulawesi
Periods : 1997 1998 (14 Months)

Main Office Semen Tonasa

Technical Data :
Scope of Work : Foundation, Architecture, Structure, Finishing, Technical Data :
Mechanical & Electrical Scope of Work : Foundation, Structure, Architecture, Finishing,
Mechanical & Electrical

Building Data :
- Total Area : 20.810 square meters
- Building Floor : 17.441 square meters
- Number of Floors : 6 ( six ) floors ( with basement )

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

MAIN OFFICE - SEMEN GRESIK DORMITORY BUILDING UNAIR

Client / Owner : Semen Gresik (Persero) Tbk, PT. Client / Owner : Airlangga University
Project Location : Gresik, East Java Project Location : Surabaya, East Java
Periods : 1992 1993 Periods : 2001 2002

Main Office - Semen Gresik Technical Data :


Scope of Work : Preparation, Foundation, Architecture (Interior & Exterior,
Technical Data : Structure, Finishing, Mechanical & Electrical
Scope of Work : Foundation, Structure, Architecture, Utilities

Building Data :
- Building Floor : 21.000 square meters
- Number of Floors : 9 ( nine ) floors
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

CAMPUS BUILDING - UGM SEMEN GRESIK HOSPITAL EXPANSION


Client / Owner : Gajah Mada University Client / Owner : Semen Gresik (Persero) Tbk, PT.
Project Location : Yogyakarta Project Location : Gresik, East Java
Periods : 1999 2000 Periods : 2002 2003

Technical Data :
Scope of Work : Foundation, Architecture, Structure, Finishing

Technical Data :
Scope of Work : Foundation, Architecture, Structure, Finishing
Mechanical & Electrical

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

PROBOLINGGO GENERAL HOSPITAL SURABAYA ISLAMIC HOSPITAL

Client / Owner : Probolinggo General Hospital Client / Owner : Yayasan Rumah Sakit Islam Surabaya
Project Location : Probolinggo, East Java Project Location : Surabaya, East Java
Periods : 2003 Periods : 2000 2001

Surabaya Islamic Hospital

Probolinggo General Hospital


Technical Data :
Scope of Work : Structure, Architecture, Finishing,
Technical Data : Mechanical & Electrical
Scope of Work : Structure, Architecture, Finishing, Number of Floors : 2 ( two ) floors
Mechanical & Electrical

Number of Floors : 2 ( two ) floors


PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT


GENERAL CIVIL WORK

1 Gallery and Hopper Raw Materials Facility Tuban I & II 2010/2011 PT. Semen Gresik

Pile Cap & Structure Main Building Substation Tonasa V


2 2010/2011 PT. Semen Tonasa
Package C1201-3

Concrete Structure Foundation, Fabrication & Steel Erection,


3 Architectural Gallery Aeroslide Cement Transport for Cement 2010 PT. Semen Gresik
Mill to Cement Silo, Cement Transport from Cement Silo to
Cement Packer - Tuban IV Project

4 Jetty Construction Packing Plant Banyuwangi 2010/2011 PT. Semen Gresik

Bored Pile Limestone Crusher, Surge Bin, Gallery Transport


5 from Limestone Crusher to Surge Bin and Long Belt Conveyor 2010 PT. Semen Gresik
- Tuban IV Project

6 Digester Carbon Brick Linning - Petrokimia 2010/2011 PT. Multinas Indonesia

7 Foundation, Concrete Structure, Steel Erection, Architectural 2010 PT. Semen Gresik
Cement Mill Facility & Gypsum Crusher - Tuban IV Project
Foundation & Concrete Structure, Steel Erection &
Architectural for Preheater, Rotary Kiln and Cooler EP - Tuban
8 2010 PT. Semen Gresik
IV Project

9 Bored Pile Package B - Tuban IV Project 2010 PT. Semen Gresik

10 Bored Pile Package A - Tuban IV Project 2010 PT. Semen Gresik

Concrete, erection & Architectural Limestone Storage


11 2010 PT. Semen Gresik
Package B Tuban IV Project

Foundation Concrete Structure, Steel Erection & Arch Cement


12 2010 PT. Semen Gresik
Packer Tuban III Package B

13 Bored Pile Test Tuban IV Project 2010 PT. Semen Gresik

14 New Loading Area 2010 PT. Eternit Gresik

15 Bored Pile Clinker Grinding 2010 PT. Semen Gresik

16 General Civil Work MNK-2 Cikampek Project 2010/2011 PT. IKPT

17 Bored Pile Area Cement Silo & Clinker Storage Tuban IV 2010 PT. Semen Gresik

Foundations Rotary Kiln, Preheater Tower, Cement Silo -


2010 PT. Semen Tonasa
18 Tonasa V

Slabing Open Yard & Plengseng Area Sekam Storage Pabrik


19 2009/2010 PT. Semen Gresik
Tuban
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT


20 Works Road Concrete, Paving and Packing Plant Ciwandan 2009 PT. Semen Gresik

21 Bored Pile 147 Ttk Packaer TB-IV 2009 PT. Semen Gresik

Dryer, Sorting & Discard Foundation Package -Monsanto


2009 PT. Branita Sandhini
22 Project

23 Storm Water Drainage By Pass Area 2009 ZELAN

24 Pipe Rack (Grid 99-188) for Line 4 2009 PT. South Pacific Viscose

25 Fre-Cast Fencing for Easthern & Northern for OTF / LPG 2009 HESS

26 Pipe Rack NGBC Car to Tank Farm 2008/2009 PT. South Pacific Viscose

Stormwork, Drainage System, Roadwork, Fencing Work &


27 2008 ZELAN
Main Entrance Gates to 150 KV Switchard Area

28 Construction of Duct Bank for Parking Area 2008 PT. South Pacific Viscose

29 Jetty and Dolphine at PT. Semen Gresik 2008 PT. JES

30 Water House Logistic & Extension 2008 PT. Eternit Gresik

31 Provision of Pre Cast Fencing for North & Wesh Side of OPF 2008 HESS

32 Civil Foundation for 2 X 10 Tons Gantry Crane 2007/2008 PT. Alstom

33 Replacement of wood Cooling Tower CT-1201-B Cell B 2007 PT. Petrokimia Gresik

Provision of Construction Services for Gas Expansion Phase 2


34 2007 Kodeco Energy
- ORF Project

Earth Work Onshore Oil Treating Facilities & LPG Recovery


35 2007 PT. Tripatra Engineering
Plant - UPD Project

Civil/Structural Services at Gresik ORF for Gas Expension


36 2006/2007 Kodeco Energy
Phase II

37 Raw Coal Transport Pabrik I-II 2006 PT. Semen Gresik

38 Sea Water Intake Marine Work - UPD 2006 PT. IKPT

39 Perimeter Road at TPPI Project 2006 WAIJO

40 Place Park & Road; Street of Paving PT.GG Unit V. 2006 PT. Gudang Garam Tbk.

41 Autoclave Foundation 2005/2006 PT. Eternit

42 Civil Work - UPD Project 2005/2006 PT. IKPT

43 Jetty Extention of Pelsus PTSG Tuban 2005/2006 PT. Semen Gresik

44 Add. Civil Work of WWTP - TPPI 2005 PT. Kormac Pratama


PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT

45 Concrete Road of Workshop UTSG 2005 PT. UTSG

46 Main Office Construction 2005 PT. CJ Feed Jombang

47 Access road and Lighting roof - Unit of Sumenep - Madura 2005 PT. Gudang Garam Tbk

48 Building Infrastructure, Utility & Office Area - Tuban 2004/2005 PT. TPPI
Aromatic Project
49 Infrastructure : Road SKM 2 to PHR2 and Estabilishment of 2004 PT. HM. Sampoerna Tbk.
Delta Sukorejo Plant Area

50 Clove Tank Foundation Unit IX Building 2004 PT. Gudang Garam Tbk

51 Urea Handling Work Kujang 1B Project 2004 PT. Pupuk Kujang


PT. IKPT

52 Box Culvert Emeral Mansion 2004 PT. Ciputra Surya Tbk.

53 Civil Work (Monsoon Drainage) Paiton II Power Station 2003/2004 PT. Powergen Jatim

54 Concrete Work in Various Location at Paiton II 2003 PT. Powergen Jatim


Power Station
55 Clove Cleaning & Clove Tank - PT. Gudang Garam Tbk. 2003 PT. Gudang Garam, Tbk.
Unit Produksi Gempol

56 Truck Weigher, and Utilities Work - Gempol Plant 2003 PT. Gudang Garam, Tbk.

57 Construction of Transportation Office Building 2002/2003 PT. Varia Usaha

58 Trash Storage - Tuban Plant 2002/2003 PT. Semen Gresik

59 Fence of Sidomukti Storage - Bojonegoro 2002 PT. Gudang Garam Tbk.

60 Tanjung Harapan Airport Extension - Tanjung Selor - 2002 Pemda TK II Bulungan


Bulungan - East Kalimantan East Kalimantan

61 Pek. Land Scape Perumahan DPRD Kabupaten Bulungan 2002 Pemda TK II Bulungan
- East Kalimantan East Kalimantan

62 Sub & Upper Structure Sand Storage 2002 PT. IGLAS (Persero)

63 Fence, Retaining Wall of HFO Tank Area - Sukorejo 2002 PT. HM. Sampoerna Tbk.

64 Plant Fences of Unit VIII - Gudang Garam Kediri 2001 PT. Gudang Garam

65 Foundation and Soil Replacement of Acid Storage Tank 2001 Copper Smelting
PT. Sanko Eng.
66 External Fence Work of YMKI Plant - PIER 2001 PT. Takenaka Indonesia

67 Tunnel (Phase II) 2001 PT. Suryajaya Abadiperkasa


68 Lower Solo River Improvement Project - Babat 2001 PT. Teguh Raksa Jaya
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT


(Package I - 3)

69 Paving Road, Irrigation & Gorong-gorong - Unit VIII 2001 PT. Gudang Garam

70 Waste Water Treatment and Facility 2001 PT. Gudang Garam

71 - Concrete Pavement 2001 PT. Ume Persada


- New Water Foundation Indonesia

72 Road Maintenance 2001 PEMDA Bulungan

73 Lower Solo River Improvement Project - Babat 2001 PT. Teguh Raksa Jaya
(Package I - 1)

74 Factory of Unit VIII Plant - Gudang Garam Kediri 2000/2001 PT. Gudang Garam
- Water Tower
- Toilet, Bath Rom, Rest Room
- Poer & Sloof 21 Building
- Driving Range Area and building

75 Coal Slab of Yard D area - Tuban 2000 PT. Semen Gresik

76 Earth Work - CPO Plant of Long Kali 2000 PT. Rekayasa Industri

77 Bored pilling and civil work - Smelting Plant 1999/2000 Copper Smelting
PT. Chiyoda
78 Transfer tower I & II gallery conveyors - Tuban 1999 PT. Semen Gresik

79 Ink Jet Paper Building 1999 PT. Tjiwi Kimia

80 General Civil Work - Phonska Plant 1999 PT. Petrokimia Gresik


PT. Rekayasa Industri
81 Bulk, Bag Storage Bagging unit 1999 PT. Petrokimia Gresik

82 Truck Loading - Unloading phase I & II 1998/1999 PT. Semen Gresik

83 Tuban Petrochemical Project 1997/1998 AEC International


- Access Road Phase I & II
84 Cement Silo for Tuban Port 1997 PT. Semen Gresik
85 Varia Usaha Beton Project 1996/1997 PT. Varia Usaha Beton
- BPC Plant Relocation in Gresik
86 Gresik Copper Smelter Project, WWTP 1996/1997 Copper Smelting
- Civil & Concrete Structure Foundation PT. IKPT
- Building Work
- Filter Press storage
87 Water reservoir Struct. & Raw - Feed Temandang 1996 PT. Semen Gresik
88 Water Intake & Raw water system PT. Semen Tonasa 1996 PT. Semen Tonasa
89 Terminal Access for Cement Dwima Agung Factory 1996 PT. Semen Cibinong

90 Plant Extention PT. Eternit Gresik Project 1995/1996 PT. Eternit Gresik
- Reparation & Finishing Cement Road , Foundation
- Concrete Road Behind SM4-SM5, CCR SM2 Bldg.
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
CIVIL WORK & BUILDING

NO. PROJECT TITLE PERIODS OWNER / CLIENT

91 Rigid Pavement for Cable Dump Hopper Road Devp. 1995 PT. Semen Gresik
TB III

92 Relocation of PT. IGLAS Plant in Gresik 1994/1996 PT. IGLAS (Persero)


- Batch Plant, Batch Transport Cullet Recycling,
Silo Support Foundation
- Retaining Wal

93 Semen Tuban II Project 1994/1995 PT. Semen Gresik


- Quay Renovation
- Coal Package II
- Tunnel Clinker Storage
- Cement Packer
- Foundation & Concrete Structure for : Clay Storage,
Limestone Storage, Iron Sand/Silica Handling & Raw
Material Feed Bin
94 Water Supply Facilities Gunung Sari - Surabaya 1994/1995 PT. Semen Gresik
95 Access Road for PT. Industri Kemasan Semen - Gresik 1994 PT. IKSG Gresik
(Cement Pocket Plant) Tuban
96 Tonasa IV Project - Pangkep, Sulsel 1993/1995 PT. Semen Tonasa
- Cable Pit
- Raw Feed Water System
- Finishing Work Raw Mill, Bending Silo, Compressor
Room & Water Treatment
- Road Pavement & Drainage Section II
- Open Ditch, Cross Road
97 Harbour Project Gresik 1993/1995 PT. Semen Gresik
- Jetty Extention and Reparation Project package I - II
98 Cause Way for Harbour Project - Tuban 1992 PT. Semen Gresik
PT. SWADAYA GRAHA
Project Reference Picture

FOUNDATION TANK LOBP PROJECT


Client / Owner : REKAYASA INDUSTRI, PT
Project Location : Gresik East Java
Periods : 2008

EQUIPMENT FOUNDATION AND CIVIL WORK UPD II


Client / Owner : TRIPATRA ENGINEERING, PT
Project Location : Gresik East Java
Periods : 2007 / 2008
PT. SWADAYA GRAHA
Project Reference Picture

OFFSHORE RECEIVING FACILITY FOR GAS EXPANSION


PHASE II
Client / Owner : KODECO ENERGY, PT
Project Location : Gresik East Java
Periods : 2007
PT. SWADAYA GRAHA
Project Reference Picture PT. SWADAYA GRAHA
Project Reference Picture

SEA WATER INTAKE MARINE WORK UPD PROJECT


SEA WATER INTAKE MARINE WORK UPD PROJECT
Client / Owner : IKPT, PT
Project Location : Ujung Pangkah - Gresik Client / Owner : IKPT, PT
Periods : 2006 Project Location : Ujung Pangkah - Gresik
Periods : 2006

Picture 2

Picture 1

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

SEA WATER INTAKE MARINE WORK UPD PROJECT SEA WATER INTAKE MARINE WORK UPD PROJECT
Client / Owner : IKPT, PT Client / Owner : IKPT, PT
Project Location : Ujung Pangkah - Gresik Project Location : Ujung Pangkah - Gresik
Periods : 2006 Periods : 2006

Picture 3
Picture 4
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

CEMENT SILOS FOR LOADING FACILITY OF TUBAN PORT


CLINKER STORAGE - TUBAN III PLANT
Client / Owner : Semen Gresik (Persero) Tbk, PT
Project Location : Tuban, East Java Client / Owner : Semen Gresik (Persero) Tbk, PT
Periods : 1996 (12 Months) Project Location : Tuban, East Java
Periods : 1995 (10 Months)

Clinker Storage of Tuban III Plant

Cement Silos for Loading facility - Tuban Port


Scope of Work : Structure

Main Contractor : Swadaya Graha, PT.


Scope of Work : Foundation, Concrete Structure and Finishing

Main Contractor : Swadaya Graha, PT

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

CIVIL WORK FOR ALL FACILITY - TUBAN IV PLANT TPPI ACCESS ROAD
Client : Bintang Cement Mandiri, PT. Client : AEC International, PT.
Project Location : Tuban, East Java Owner : Trans Pacific Petrochemical Indotama, PT.
Periods : 1996-1997 (13 Months) Project Location : Tuban, East Java
Periods : 1997 - 1998 (6 Months)
Scope Of Work : Asphalt Road Pavement

Civil Work for All Facility

TPPI Access Road

Scope of Work : Foundations, Structure, Finishing

Main Contractor : Swadaya Graha, PT.


PT. SWADAYA GRAHA
Project Reference Picture

PT. SWADAYA GRAHA


JETTY EXTENSION AND REPARATION PROJECT Project Reference Picture
PACKAGE I II, GRESIK HARBOUR
Client / Owner : Semen Gresik (Persero) Tbk, PT.
Project Location : Gresik, East Java GENERAL CIVIL WORK FOR NPK FERTILIZER PLANT
Periods : 1993/1995 (15 Months)
Client : Rekayasa Industri, PT.
Owner : Petrokimia Gresik, PT.
Project Location : Gresik, East Java
Periods : 1999 (10 Months)
Scope of Work : General Civil Work

Main Process Area

Jetty Extension and Reparation Project package I - II


COMPANY PROFILE

STEEL FABRICATION &


MANUFACTURING
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

OUR CUSTOMERS in STEEL MANUFACTURING

We have capacity to manufacture large and small equipment under the


experience human resources, sophisticated equipment and supporting by a
large, wide and representative workshop to carry out the works such as :

Steel Structure

- Limestone Storage for PT. Semen Gresik at Tuban


- Steel structure For Pre Heater P.10 Indocemet Project at Cirebon
- Bulk Bag Storage Bagging Unit PT. Petrokimia at Gresik
- Others

Plate Work

- ESP for Myanmar - FLS Miljo


- Pre-heater, Calciner, Ducting for P.11 at Indocement Ciuterep - FLS
- Fan casing for power plant at Taiwan - PT. Alstom Power ESI
- Oil Tank Vico at East Kalimantan
- Others

Conveyors

- Gallery Conveyor and Transfer Tower for PT. Petrokimia at Gresik


- Tripper Conveying System for PT. Petrokimia at Gresik
- Others
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

STEEL MANUFACTURING FACILITIES

1. WORKSHOP ALL AREA

Fabrication
Covered : 11,700.00 M2
Open Yard : 20,000.00 M2 (With Mobile Crane 25 Ton)
Conveyor Shop : 840.00 M2

Painting
Covered : 600.00 M2
Open Yard : 1,000.00 M2

Raw Material Warehouse


Covered : 200.00 M2
Open Yard : 1,200.00 M2

Finish Good
Open Yard : 18,600.00 M2

Workshop I : Out Door View

2. WORKSHOP I COVERED AREA ( L X W X H )

Building A : 120 x 20 x 7 M (With Overhead Crane 7,5 & 5 T)


Building B : 112 x 10 x 7 M ( With Overhead Crane 5 T )
Building C : 112 x 20 x 10 M ( With Overhead Crane 15 T )
Building D : 112 x 10 x 7 M ( With Overhead Crane 5 T )
Building E : 110 x 20 x 7 M ( With Overhead Crane 10 T )
Conveyor Building : 84 x 10 x 6 M ( With Overhead Crane 5 T )
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

Building A

Building B

Workshop I : Indoor View


PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

Workshop I : Open Yard

3. WORKSHOP II COVERED AREA ( L X W X H )


PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

Building A : 66 x 40 x 12 M (With Overhead Crane 5 & 20 T)


Outdoor Area : 29,100.00 M2

Open Area
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

4. WORKSHOP EQUIPMENT

1. Auto Level : 3 Units


2. Air Less Spray 30 : 1 : 1 Unit
3. Coordinate Flame Cutting CN up to 100t mm : 1 Unit
4. Manual Flame Cutting : 53 Units
5. Bevel Scrafing Pipa : 1 Unit
6. Rolling Pipe Machine up to 2 : 1 Unit
7. Bending Plate : 2 Units
8. Plate Rolling Machine : 3 Units
9. Profile Rolling Machine : 1 Unit
10. Shear Cutting 10t x 2000 mm : 3 Units
11. CNC Lathe : 2 Unit
12. Lathe Machine : 9 Units
13. Milling Machine : 2 Units
14. Band Saw : 1 Unit
15. Mesin Cutting Profile : 2 Units
16. Hydraulic Press Brake : 2 Units
17. Scrap Machine : 1 Unit
18. Mesin Snay RIDGID 1224 : 1 Unit
19. Drilling Machine : 65 Units
20. Radial Drilling Machine : 3 Units
21. Blasting Equipment : 3 Units
22. SMAW Welding Machine 400A : 136 Units
23. TIG Welding Machine : 5 Unit
24. SAW Welding Machine : 1 Units
25. MIG / FCAW Welding Machine 400A : 88 Units
26. Stud Welding Machine : 4 Units
27. Plasma Cutting Machine : 8 Units
28. Over Head Crane : 10 Units
29. Weld Rotator : 2 Units
30. Hack Saw : 2 Units
31. Hydraulic Jac Enerpac 100T : 2 Units
32. Hydraulic Press 100T : 2 Units
33. Theodolite : 3 Units
34. Painting Thickness Gauge : 9 Units
35. Digital Clamp Meter : 3 Units
36. Digital Protactor P360 : 3 Units
37. Hardness Tester : 1 Unit
38. Sling Hygrometer / Paychrometer : 3 Units
39. Digital Surface Thermometer : 1 Unit
40. Ultrasonic Test Equipment : 1 Unit
41. DC Holiday Detector : 1 Unit
42. CNC Ponching Line for Plate : 1 Ea
43. Mesin Punch Manual (Hydraulic Punch) : 5 Ea
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

5. ENGINEERING

Design Engineering
Only for Conveyor System & Tank

Shop Drawing/Cutting Plant


Steel Structure, Plate Works, Conveyor, etc
Checker

Case Tools
Drafting Machine
CAD

Software
AutoCAD 14 & 2000
STAAD III
SAP 90
X-Steel

6. CAPACITY

Shop Drawing : 22 Ton/day ( SWG Capacity )


10 Ton/day ( Sub Con Capacity )

Production Cap. : 50 - 60 kg/man days ( for Steel Structure )


35 - 45 kg/man days ( for Plate Work )
1000 Idler/per month

Primer Coat : 3.750 M2 / per month


Intermediate Coat : 2.250 M2 / per month
Finish Coat : 1.500 M2 / per month
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
PLATE WORK (NON TANK)

NO. PROJECT TITLE YEAR OWNER / CLIENT

Fabrication & Steel Erection, Architectural Raw Grinding -


1 2011 PT. Semen Gresik
Tuban IV Project

Fabrication 2B - Air Heater, Bin and Rod Gate, Process Gas


2 Duct, Expansion Joint Stack, Cement Mill Aeroslide Package A 2010/2011 PT. Semen Gresik
- Tuban IV Project

Fabrication 2B - Bag Filter, Cement Mill Filter Fan, Bag Filter


3 2010/2011 PT. Semen Gresik
Cement Mill Package B - Tuban IV Project

Fabrication Work for Roof Casing & Shipping Fixture of North


4 2010/2011 PT. Alstom Power ESI
Battle Project

5 Steel Fabrication for Limestone Storage Package A Tuban IV 2010 PT. Semen Gresik

6 Fabrication and Install Dryer Stair / Platforms 2010 PT. Branita Snadhini

7 Fabrication New Coal Mill at Package L-1 P2KPT 2010 PT. Semen Gresik

8 Supply, Fabrication and Installation Weigher M-2306 2009/2010 PT. Petrokimia Gresik

9 Fabrication Service for Finishing Work of Wellhead Platform 2009/2010 Kangean Energy Indonesia

AIG Fabrication & Catalys Support Structure for CSR System -


10 2009 Hitachi Zosen
ASTORIA

AIG Fabrication Work / Catalys Steel Structure (MATERIAL) -


2009 Hitachi Zosen
11 RAS LAFFAN

12 HRSG Stack for Cikarang Listrindo Project 2008/2009 PT. Alstom Power ESI

13 AIG Fabrication Work / Catalys Steel Structure - RAS LAFFAN 2008/2009 Hitachi Zosen

14 Compax Cooler dia 6000 X 2000 - Sabah Malaysia 2008/2009 FLSmidth Mineral

15 Bypass Exhaust System for NESHR Proj. 2008 Baltec Inlet

16 Bypass Stack Exhaust System for Sino Iron Project - Australia 2008 Baltec Inlet

17 Module Casing & Inlet Duct for Thorold Project 2008 PT. Alstom Power ESI

18 Supply & Fabrication Catalyst Structure - Marafiq Project 2007/2008 Hitachi Zosen

19 Fabrication & Assembly Work HRSG Casing & Duct 2007/2008 PT. Alstom Power ESI

20 Condamine Project, Siemens SGT-800 Exhaust System 2007/2008 Baltec Inlet


PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
PLATE WORK (NON TANK)

NO. PROJECT TITLE YEAR OWNER / CLIENT

21 Fabrication Transfer Beam 2007 PT. Kutilang Paksi Mas

22 Supply & Fab. of Bucket Elevator - NPK II Petrokimia 2007/2008 PT. Wijaya Karya

23 Fabrication Services of Pagerungan Utara Platform 2007 PT. Kutilang Pakis Mas

24 Supply & Fabr. Mini Platform for Sepanjang Project 2007 Kangean Energy Indonesia

25 Fabrication and Assembly Stack Unit #11 - HRSG 2007 PT. Alstom Power ESI

26 Supply Inlet Duct Unit #11 & #12 2007 PT. Alstom Power ESI

27 Frame 6B & &B Duct Work & Expansion Joint 2007 Baltec Inlet System

28 Compax Cooler 6000 X 3000 - Niigata, Japan 2007 FFE Mineral

29 Supply & Fabrication Movable Hoppers - Abu Dhabi 2007 Techint Italimpianti

30 Flash Dryer - Lime Reburning Kiln 2007 FFE Mineral

31 Extension Roof North #3 & #4 2007 PT. Alstom Power ESI

32 Fabrication OCC Frame Module T 605 PSP Tallawara Project 2007 PT. Alstom Power ESI

33 Fabrication of Support T-Girder Holder - Tanggh LNG 2006 Penta Ocean

34 Modifikasi H-Beam for Fender Fire 2006 Penta Ocean

35 Frame 6B Guillotine Damper - Malaysia 2006 Baltec Inlet System

36 Bypass Stack System for Frame 6-B Gas Turbine - Indralaya 2006 Baltec Inlet System

37 Diverter Damper for Malaysia 2006 Baltec Inlet System

38 I Girder Assembling Work 2006 Penta Ocean

39 Supply & Fab. 2 unit HRSG Stack R517802 & R517803 2006 PT. Alstom Power ESI

40 Supply & Equipment of Stair Tower #1 & 2 2006 PT. Alstom Power ESI

41 Tiguard Paint for Fender - Tangguh LNG 2006 Penta Ocean

42 Fabrication Concrete Buckets - Tangguh LNG Project 2006 Penta Ocean

43 Fabrication Top Sides Gas Production Facilities Platform 2005/2006 EMP Kangean Limited

Steel Fab. Of Conductor Installation Aid Work - Pagerungan


44 Project 2005 EMP Kangean Limited

45 Primary Air Duct to Air Heater WBS-502 - Tarahan Project 2005/2006 PT. Alstom Power ESI
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
PLATE WORK (NON TANK)

NO. PROJECT TITLE YEAR OWNER / CLIENT

46 Fabrication Air Duct, Turbular Air Heater - Tarahan Project 2005/2006 PT. Alstom Power ESI

47 Mfg. Rotating part for Compax Cooler - Riau Andalan 2005/2006 FFE Mineral

48 Steel Mfg. Subsea Template Kangean 2005 EMP Kangean Limited

49 Steel Mfg. Conductor Clamp - Pagerungan Kecil Project 2005 EMP Kangean Limited

50 Steel Mfg. Conductor Clamp - Pagerungan Project 2005 EMP Kangean Limited

Gas Turbine Diverter Damper, Expansion Joint - Tutong I


51
Brunai Project 2005/2006 BALTEC

Fabrication Stacks, Inlet Duct & HRSG Casing - Fajar Surya


52 Wisesa Project 2005 PT. Alstom Power ESI

53 Pallet & Packing Line Installation 2005 PT. CJ Feed Jombang

54 Supply & Fabr. Dust Collector System & Poppet Unit 2005 PT. Cemera Siko

Supply & Fabrication Inlet Vane Control Assembly - Tarahan


55 Project 2005 TLT-Babcock

Shaft Guard, Pedestal/Sole Plate & Coupling Guard - Tarahan


56 Project 2005 TLT-Babcock

57 Fuel Bunker Coal Silo UBS-603 - Tarahan Project 2005 PT. Alstom Power ESI

Fabrication Fan Houshings, Inlet Boxes & Inlet Cones -


58 Tarahan Project 2005/2006 TLT-Babcock

59 Fabrication of Loose Casing Part - ASTORIA Project 2004 PT. Alstom Power ESI

60 Inlet Box, Leadders & Platforms - Betara Project 2004 PT. Alstom Power ESI

61 Mfg. of Welding Product - Feni Smelting Plant No. 3 2004/2005 PT. Aneka Tambang
PT. Cemara Siko Eng.

62 Boiler Casing Fabrication Work - Tanjung Jati B Project 2004 PT. PLN (Persero)
Babcock & Wilcox

63 Supply 2 (two) Diverter Damper Unit - Baltech System 2004 PT. DEN
Baltech System

64 Steel Manufacture of 2 units E-Filter, Jiang Lin Project 2003 Jiang Lin, China
FLS Airtech

65 Steel Parts & Roof Parts for 4 pcs ESP, Jiang Lin 2003/2004 Jiang Lin, China
Project
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
PLATE WORK (NON TANK)

NO. PROJECT TITLE YEAR OWNER / CLIENT


66 Supply & Fabrication fo Hopper for Rio Tuba Nickel 2003 PT. Cemara Siko Eng
HPP Project

67 Fabrication & Assembly 2 units Loose Casing 2003 PT. Alstom Power ESI
for Port of Washington Project

68 Fabrication of Ducting & Stack - MAP I Project, 2003 PT. Cemara Siko Eng.
Cikampek

69 Supply & Fabrication of 2 units Frame 7 PG-7821 2003 Baltec System Pty. Ltd.
Bypass Exhaust System - PLTG Pemaron Project
70 Fabrication of Fabric Filter Bechtel Project - Australia 2002/2003 FLS Airtech a/s

71 3 Unit Fabric Filter for Project Thiess - Australia 2002 FLS Miljo a/s

72 Cooling Tower, Tank Support, Fab. Tube Restraint 2001 ABB-ESI

73 Fabrication of Compax Cooler, Riau Andalan Project 2001 PAPER FACTORY


FLS Indonesia
74 Supply material and manufacture of Furniture 2001 PT. BMJ
75 Expansion Shop Bay 8 for Relocation Basket 2001 PT. Alstom Power ESI
Machine & Accessories
76 ESP for Myanmar 1999/2000 FLS - Miljo

77 ESP for Jambi 1999/2000 FLS - Miljo

78 Fab and Install single tray clarifier 1999 PG. TJANDI


PT. Rajawali
79 Bored pilling, civil work, Steel fabrication work 1999 Copper Smelting
Chiyoda

80 Fabrication & Install Ducting (SUS&CS) 1999 Copper Smelting


PT. IKPT
81 Furnace Smoke Hood and exhaust fan 1999 PT. Emdeki Utama

82 Fan Casing for Power Plant - Taiwan 1998 ABB-ESI

83 Fabrication & Install Hatch Cover PB. 400 1998 PT. PAL Indonesia

84 Fab. & Erection Cooling Tower 1998 Copper Smelting


Chiyoda
85 Semen Andalas 1998 PT. Semen Andalas
86 Optimation II Plant Baturaja Project 1997/1998 PT. Semen Baturaja

87 - Fab. Ducting, Equipment, Support for Indo-Kodeco 1997/1998 INDOKODECO


- Fab Equipment for Cement Project Indo-cement PT. Intan Srikaya
88 Plate work and structure for Crane Jib 1997/1998 PT. PAL
Krupp Fordertechnik
89 Teluk Bayur Port Loading Project 1997/1998 VENTOMATIC SPA
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
PLATE WORK (NON TANK)

NO. PROJECT TITLE YEAR OWNER / CLIENT

90 Petrochemical Complex Project in Tuban 1997 TPPI


- Air Duct for Fired Heaters JGC Corporation
91 - Wharf Fender Support Panel 1997 Copper Smelting
- Wharf Riser Pipe Support Ballast Nierdam
- Supply & delivery Wharf Rail Girder
- Coating of Wharf Fender Support Panel
- Temporary Fixation Riser Support
92 Gas Conditioning Tower 1997 INDOCEMENT
93 Tuban IV Project 1997 PT. BCM
- Fabrication of Hopper KHD- Humbolt
- Fabrication of Ducting
- Slab top Area Blending Silo
94 2 x Osepa Air Separator, Gravity feeder two way Chute 1997 P.11 CIUTEREP
Hitachi
95 Pre-heater, Calciner, Ducting, Lift, Supports & Valves 1997 P.11 CIUTEREP
FLS - Ind
96 Water Treatment Plant Project in Gresik 1997 Copper Smelting
- Stack Fabrication Sulfuric & Acid PT. IKPT

97 Gresik Copper Smelter Project 1997 Copper Smelting


- Stack Fabrication Sulfuric & Acid PT. Cemara Siko

98 Tuban III Project 1996 PT. Semen Gresik


- Fabr. & Erect. Steel Structure. Limestone Storage, FULLER Co.
Cyclone & Separator, Conditioning Tower, EP, Coal
Storage and Belt Conveyor

99 PT. Iglas Plant Project 1996 PT. IGLAS (Persero)


- Fab & Erection Chimney G1 & G2

100 H.M. Sampoerna Project 1996 PT. HM Sampoerna


- Fab. Dust Ducting SKM 1 incl. Exhaust fan & ducting
- Fab. & Erection Dust Ducting for Site SKM3 Plant
- Blending Silo & Blending Conveyor
- Prototype Screw Conditioner, Air Tank, Silencer
101 Coal Mill, Cyclone, Jet Pulse Dust Collector, Rod 1996 INDOKODECO
Gate FLS - Ind

102 Cement Cirebon Plant 1995/1996 KAWASAKI H I


- Fab. Plate Work Include with structure Pre-heater P.10
- Supply Material for AQC Piping Work
- Site Aisy Work of Bag Filters

103 Tuban II Project 1995 PT. Semen Gresik


- Fabrication of Bucket Elevator FULLER Co.
- Fabrication of Clinker Grinding Cyclone
- Supply and Fabrication Air Duct Pre-heater
- Supply and Fabrication for Raw mill and Mill Body
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
PLATE WORK (NON TANK)

NO. PROJECT TITLE YEAR OWNER / CLIENT


- Supply & Fabrication of Bridge Scraper
- Supply & Fabrication of Bag Filter for coal mill

104 AQC & Bag Filters (Casing & Support) 1995 KAWASAKI H I
Balcke Durr
105 Fabrication Roller Mill Part-Qinhuangdao - China 1995 KAWASAKI H I
PT. PKT

106 Supply Material & Fabr. Fluxo Slide for Bishah 1995 PT. Tirta Kencana Teknindo
Cement Saudi Arabia (FULLER Co.)

107 Gresik Eternit Plant 1995 PT. Eternit Gresik


- Fabr. Cement Silo & Water Cone
- Fabr. Gutter & Pipe Support
- Fabrication Steel Structure for Workshop

108 Grati - Suralaya Power Plant (CCPP) 1995 Mitsubishi Heavy Industry
- Fabrication Plat Form and miscellaneous support POSSY Indonesia
PT. SWADAYA GRAHA
Project Reference Picture

MECHANICAL & FABRICATION WORK OF NGBC


MSPS PROJECT

Client / Owner : PT. SOUTH PACIVIC VISCOSE


Project Location : Purwakarta
Periods : 2009-2010
PT. SWADAYA GRAHA
PT. SWADAYA GRAHA Project Reference Picture
Project Reference Picture

FRAME 6B GAS TURBINE DIVERTER DAMPER FABRICATION TOP SIDES GAS PRODUCTION
FOR MALAYSIA FACILITIES PLATFORM

Client : Baltec Inlet System Client : EMP Kangean Limited


Project Location : Malaysia Project Location : Pagerungan Project
Periods : 2006 Periods : 2005-2006

Picture 2

Scope of Work : Fabrication, Mechanical & Erection

PT. SWADAYA GRAHA


Project Reference Picture PT. SWADAYA GRAHA
Project Reference Picture

FAN CASING For Export to China & Taiwan


JIB CRANE
Client : ALSTOM Power ESI (d/h ABB ESI)
Project Location : China & Taiwan Client : Krupp Fordertechnik
Periods : 1998 1999 (6 Months) Project Location : Tuban, East Java
Periods : 1998 (4 Months)

Fabrication of Jib Crane


Preassembly of Fan Casing
Scope of Work : Procurement Material & Fabrication
Scope of Work : Fabrication
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

FILTAX FILTER SECTION OF DUCT

Client : FL Smidth Client : FL Smidth


Owner : Andalas Cement, PT. Owner : Indokodeco Cement, PT.
Project Location : D.I. Aceh Project Location : Batulicin, South Kalimantan
Periods : 1999 Periods : 1997

Scope of Work : - Procurement Material Scope of Work : - Procurement Material


- Fabrication - Fabrication
- Painting - Painting
- Delivery - Delivery

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

CHANGE OVER GATE DIA. 1000 PART OF ROLLER MILL


Client : FL Smidth Client : Kawasaki Heavy Industry
Owner : Indokodeco Cement, PT. Project Location : Qinhuangdao Cement - China
Project Location : Batulicin, South Kalimantan Periods : 1995 (5 Months)
Periods : 1997

Part of Roller Mill

Scope of Work : - Procurement Material


- Fabrication Scope of Work :
- Painting  Procurement Material
- Delivery  Fabrication
 Delivery to Qinhuangdao Cement - China
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
TANK PROJECT

NO. PROJECT TITLE YEAR OWNER / CLIENT

1 Fire Water Tank - UPD Project 2007 PT. Tripatra Engineering

Field Fabricated Tank & Foundation Work - LOBP


2 2007/2008 PT. Rekayasa Industri
Project

3 Floating Roof Storage Tank Foundation - UPD Project 2007 PT. Tripatra Engineering

4 Tankage Work - UPD Project 2005/2006 PT. IKPT

5 Fabrication & Installation - Tank Case 3 - TPPI Project 2005 WAIJO

6 Manufacturing of Welding Project - Antam Project 2004/2005 PT. Cemara Siko

7 Fabrication of Steel Structure Platform & Tank 2004 Mitra Paramuda Mandiri

8 Engineering, Procurement & Construction of Tank Case 2004 PT. TPPI


Tuban Aromatic Project

9 Clove Tank Installation 2003 PT Gudang Garam Tbk.

10 7.500 MT Amonia Storage Tank 2002 PT Petrokimia Gresik


- Supply Material, Transportation & Erection PT Rekayasa Industri

11 Paiton Project 1996 TOYO Eng. Corp


- Carbon Steel Tank 4 Unit PPSP BC-01019 / ARTAWA
- Fabrication of Bucket Elevator

12 CP-13 Non Standard Tank Supply - Kaltim Sahid 1996/1997 PT. Kaltim Sahid Baritosodakimia
Baritosodakimia Plant / PT. Endrapura Swarnawaja

13 Crude Oil Tank, Mutiara Oil Facilities Expansion 1995 PT. VICO IND
Project, South Kalimantan PT. Rekayasa Industri

14 Fabrication & Erection Filtered Water Tank and Oil 1995 PT. Semen Tonasa
Feed Tank (ME-06A Package) Tonasa IV Project / PT Rekayasa Industri

15 Oil tank - Semen Gresik Tuban Plant I Project 1992 -1993 PT Semen Gresik
PT. SWADAYA GRAHA
Project Reference Picture

FIRE WATER TANK & CRUDE OIL STORAGE TANK


UPD PROJECT
Client / Owner : TRIPATRA ENGINEERING, PT
Project Location : Gresik East Java
Periods : 2007
PT. SWADAYA GRAHA
Project Reference Picture

FAB. AND ERECTION TANK LOBP PROJECT


Client / Owner : REKAYASA INDUSTRI, PT
Project Location : Gresik East Java
Periods : 2007-2008

FAB. AND ERECTION CONDENSATE STORAGE TANK


UPD PROJECT
Client / Owner : TRIPATRA ENGINEERING, PT
Project Location : Gresik East Java
Periods : 2006-2007
PT. SWADAYA GRAHA
Project Reference Picture
PT. SWADAYA GRAHA
Project Reference Picture

FABRICATION & INSTALLATION - TANKAGE CASE 3


TPPI PROJECT
FABRICATION & INSTALLATION - TANKAGE CASE 3
TPPI PROJECT
Client : WAIJO
Project Location : Tuban Client : WAIJO
Periods : 2005 Project Location : Tuban
Periods : 2005

Slop Oil Tank and Sour Water Stripper Tank

Scope of Work :
Sour Water Stripper Tank  Fabrication
 Installation / Erection
Scope of Work :  Painting
 Fabrication  Test refer to API 650 Standard
 Installation / Erection
 Painting
 Test refer to API 650 Standard

PT. SWADAYA GRAHA


Project Reference Picture
PT. SWADAYA GRAHA
Project Reference Picture

FABRICATION & INSTALLATION - TANKAGE CASE 3


TPPI PROJECT
FABRICATION & INSTALLATION - TANKAGE CASE 3
Client : WAIJO TPPI PROJECT
Project Location : Tuban
Periods : 2005 Client : WAIJO
Project Location : Tuban
Periods : 2005

Sour Water Stripper Tank


Service Water Tank and Cooling Water Break Tank
Scope of Work :
 Fabrication
Scope of Work :
 Installation / Erection
 Fabrication
 Painting
 Installation / Erection
 Test refer to API 650 Standard
 Painting
 Test refer to API 650 Standard
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

MANUFACTURING OF WELDING PRODUCT MANUFACTURING OF WELDING PRODUCT


For FeNI Smelting Plant No. 3 Project Antam Project For FeNI Smelting Plant No. 3 Project Antam Project

Client : Cemara Siko Eng. Ind., PT Client : Cemara Siko Eng. Ind., PT
Project Location : Pomala - Sulawesi Tenggara Project Location : Pomala - Sulawesi Tenggara
Periods : 2004 2005 Periods : 2004 2005
Scope of Work : Procurement, Fabrication & Painting Scope of Work : Procurement, Fabrication & Painting

Hot Air Generator (For Coal)

Tank (Industrial Diesel Oil)

PT. SWADAYA GRAHA


Project Reference Picture PT. SWADAYA GRAHA
Project Reference Picture

OIL TANKS (TANGKI MINYAK D.O) CEMENT TUBAN


PLANT CRUDE OIL TANK VICO

Client : Semen Gresik (Persero) Tbk, PT. Client : Rekayasa industri, PT.
Project Location : Tuban, East Java Owner : Vico Indonesia, PT.
Periods : 1992 1993 (8 Months) Project Location : Balikpapan, East Kalimantan
Periods : 1995

Number of tanks : 17 units

Technical Data :
- Diameter 6 to 30 meters
- Material SS 400 N A
283.63.C

Scope of Work :
- Procurement Material
- Fabrication
- Installations
- Test API 650 Standard

Technical Data :

Number of tanks : 4 (four) units


Raw Material : Steel Plate SS 400
Tank Diameter : 20 meter
Height : 15 meter
Scope of Work : Fabrication and Erection
Test : API 650 Standard
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

CP-13 NON STANDARD TANK FILTERED WATER TANK & OIL FEED TANK

Client : Endrapura Swarnawaja, PT Client : Rekayasa Industri, PT


Owner : Kaltim Sahid Baritosodakimia, PT. Owner : Semen Tonasa, PT.
Project Location : Bontang, East Kalimantan Project Location : Pangkep - Makasar, South Sulawesi
Periods : 1996 1997 (12 months) Periods : 1996 1997 (4 months)

Number of tanks :
13 units

Scope of Work :
- Procurement
Material
(A-36 & A 283.65.C)
- Fabrication
- Installation/
Erection
- Painting
- Test (Refer to API
650 Standard)
- Diameter 9 to 19
meters (various )

Technical Data :

Number of Tanks : 2 units


Diameter : 20 meter
Material : SS 400
Scope of Work :
- Fabrication
- Installation/Erection
- Painting
- Test refer to API 650 Standard.

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

AMMONIA ( NH3 ) STORAGE TANK ERECTION CLOVE TANK

Client : Rekayasa Industri, PT. Client / Client : Gudang Garam Tbk, PT.
Owner : Petrokimia Gresik, PT. Project Location : Kediri, East Java
Project Location : Gresik, East Java Periods : 2003 (4 months)
Periods : 2002 - 2003 (10 months)

Technical Data : Technical Data :

Number of Tanks : 1 units Number of Tanks : 3 units


Diameter : 26 meter Diameter : 8,5 meter
Material : A 283 High : 21 meter
Scope of Work : Material : SS 304, Carbon Glass Coating
- Installation / Erection Scope of Work :
- Painting - Erection
- Test refer to API 650 Standard - Clove Tank
- Painting
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
FABRICATION & ERECTION OF STEEL STRUCTURE PROJECT

NO. PROJECT TITLE YEAR OWNER / CLIENT

Fabrication St.StructureTransport Phase 3, Kiln of Standart,


1 2011 PT. Semen Tonasa
Clinker Silo & Frame Phase 3 - Tonasa V

2 Upper Structure 461RM100, 461BF300 & Preduser P2KPT 2010 PT. Semen Gresik

3 Module Structural Pre Assembly C-Frame - Flevo Project 2008 PT. Alstom Power

4 C Frame Module & Structure Fre Assembly - Cycofos HRSG 2007 PT. Alstom Power

5 Supply & Fabrication Structural Steel for LNG Catwalk 2007 Penta Ocean

6 Structural Steel of C-Frame Module - Kwinana Project 2006/2007 PT. Alstom Power

Stecker Steel Structures, Trucks and Bogies, Brackets for Idler


7 2006/2007 Techint Italimpianti
- Abu Dhabi (EAU) Project

8 Steel Mfg. Compax Cooler - Perawang Jambi 2006 FFE Mineral

9 Fabrication of C-Frame Module 2006 PT. Alstom Power

10 Steel Mfg. C775 Arthit IIA, Gen Gas Platforms - Gulf of 2006 PT. Alstom Power

11 C Frame Module T 50 BPSP - Port of Washington Project ( 2006 PT. Alstom Power

12 Struc. Steel C Frame Port of Washington Project (POW) 2005/2006 PT. Alstom Power

13 Fabrication Miscellaneous Structural Steel - Alcan Project 2005/2006 PT. Alstom Power

14 Uncinnerator Fabrication for TPPI Project 2005 PT. Kormac Pratama

15 Steel Structure TPPI (Indirect Cost) 2005 WAIJO

Mfg. Interlas Parts (Colecting & Discharge System) - Jiang Lin -


16 2005 FLS Airtech
China

17 Steel Structure Erection Work 2004/2005 WAIJO

18 Steel Structure Stacker Reclaimer 2004 WAIJO

Steel Mfg. of Electrostatic Precipitator (EP) Feni-3 - Antam -


19 2004 Kawasaki Heavy Ind.
Pomala

20 Steel Mfg. of 2 Units Electrostatic Precipitator Feni-3 - ANTAM 2004 PT. Rekayasa Industri

Fabrication & Structural Steel C Frame Module - Becancour


21 2004 PT. Alstom Power
Project

22 Mfg. of Structural Steel, Stair/Railings, Ducting & 2003/2004 FFE Minerals Denmark
Chute - Jiang Lin Mill Project

23 Steel Structure for No. 2 Stacker Reclaimer & for No. 2 2003/2004 Techint Italimpianti
Shipunloaders - Tanjung Jati B Project PT. PLN (Persero)

24 Office Building & warehouse on Tarakan - Kaltim 2002/2003 PT. Gudang Garam Tbk.
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
FABRICATION & ERECTION OF STEEL STRUCTURE PROJECT

NO. PROJECT TITLE YEAR OWNER / CLIENT

25 Building of Cement Packer Plant - Kupang - NTT 2002/2003 PD. P2KS - KUPANG

26 Fab. Of Boiler Steel Structure & Casing Panel - 2002/2003 PT Alstom Power ESI
Washington Project - Workshop Gresik
27 Fabr. & Erection of Air Slide & Steel Structure - Tuban 2002/2003 PT Semen Gresik
28 Build of Trass Storage - Tuban Plant 2002/2003 PT Semen Gresik

29 Trass Handling System Area - Tuban Plant 2002/2003 PT Semen Gresik


30 Sidomukti Warehouse on Bojonegoro 2002 PT. Gudang Garam Tbk.
31 Buildings & toilet Block, Road Work and Land Fill for 2002 PT. Kingfurn International
Building Site - Gresik
32 Build of Plant Building Ready to Use (BPSP) 2002 PT Kawasan Industri Gresik
Type 1920 Kav. G 12-13
33 Mechanical & Steel Structure, Piping Erection, Supply 2001/2002 PT Pupuk Kaltim
& Application of Painting, Supply & Application of PT. Rekayasa Industri
Insulation - Bontang - Kaltim
34 Supply and Mfg. Of platform and Ladder for Kupang II 2001 PT. Semen Kupang
- Checkered Plate PT. Rekayasa Industri
35 Modification & Maintenance Building Fabrication & 2001 PT Alstom Power ESI
Erection Flapper Door Paiton Project - Probolinggo
36 Building & Warehouse Section VIII Project - Kediri 2000/2001 PT. Gudang Garam Tbk.

37 Steel Structure Work of Workshop & Office PT. 2000/2001 PT. Trakindo Utama
Trakindo Utama - Samarinda PT. Irawan Prima Utama
38 Building & Architectural Work, NPK Project-Gresik 1999/2000 PT Petrokimia Gresik
PT. Rekayasa Industri

39 Bulk & Bag Storage Work, Bagging Unit NPK - Gresik 1999/2000 PT Petrokimia Gresik

40 Bored Piling, Civil Work, Steel Fabrication/Erection 1999/2000 PT Chiyoda International


Work - Gresik Indonesia
41 Steel Structure for Gallery Conveyor & transfer Tower, 1999 PT. Petrokimia Gresik
NPK Project - Gresik PT. Rekayasa Industri

42 Fab. Erection of transfer tower #1 & #2 of gallery tube 1999 PT. Semen Gresik
Conveyor

43 Equipment for Andalas Cement 1998 PT. Semen Andalas


FL Smidth

44 Optimation II Plant Baturaja Project 1997/1998 PT. Semen Baturaja


Haver and Boecker

45 Filter Press and Gypsum Storage Building 1997/1998 PT Smelting Co.


PT Inti Karya Persada Tehnik

46 Tuban III Project 1996 PT. Semen Gresik


- Fabr. & Erect. Steel Structure of Limestone Storage FULLER Co.
Cyclone & Separator, Conditioning Tower, EP, Coal
Storage and Belt Conveyor
47 Cement Cirebon Plant 1995/1996 KAWASAKI H I
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
FABRICATION & ERECTION OF STEEL STRUCTURE PROJECT

NO. PROJECT TITLE YEAR OWNER / CLIENT


- Fabrication Steel Structure & Plate Work Include
Pre-heater (P-10) Project
- Fabrication Aqc (Casing) & Bag Filter
(Casing Support) P-10 Project
- Supply Material for AQC Piping Work
- Site Aisy Work of Bag Filters
48 Tuban II Project 1995 PT. Semen Gresik
- Fabrication and Erection Steel Structure limestone FULLER Co.
Storage and additional
- Fabrication Steel Structure Cement Packer Line
49 Steel Structure Fabrication for non process Area 1994/1995 PT. Semen Tonasa
Package BTG Power Plant, Tonasa IV
PT. SWADAYA GRAHA
Project Reference Picture

PT. SWADAYA GRAHA


Project Reference Picture
SHIP UNLOADER CRANE
Picture 1

Client : Techint Italimpianti STACKER RECLAIMER


Project Location : Jepara, Central Java Picture 2
Periods : 2004
Type : Grab Bucket Ship Unloader Client : Techint Italimpianti
Project Location : Jepara, Central Java
Periods : 2003 2004 (8 Months)

Shipunloader

Scope of Work : Fabrication


Stacker Reclaimer 0f Tanjung Jati 1B - Power Plant

Scope of Work : Fabrication

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

BUILDING & WAREHOUSE SECTION VIII PROJECT - KEDIRI NPK FERTILIZER (PHONSKA) PROJECT

Client : Rekayasa Industri, PT.


Client / Owner : Gudang Garam Tbk., PT Owner : Petrokimia Gresik, PT.
Project Location : Kediri, East Java Project Location : Gresik, East Java
Periods : 2000 2001 Periods : 1999 - 2000
Scope of Work : - Foundation Scope of Work : - Steel Structure Fabrication & Erection
- Structure Building (Steel Structure) - Civil & Architectural Work
- Building & Architecture - Mechanical Installation Work
- Mechanical & Electrical - Installation of Steam Turbine
- Installation of Steam Boiler

Factory building Unit VIII

Main Process Building


PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

STEEL STRUCTURE FOR GALLERY CONVEYOR & BUILDING & WAREHOUSE SECTION VIII PROJECT - KEDIRI
TRANSFER TOWER, NPK FERTILIZER (PHONSKA) PROJECT Picture 2.

Client : Rekayasa industri, PT.


Owner : Petrokimia Gresik, PT. Client / Owner : Gudang Garam Tbk., PT
Project Location : Gresik, East Java Project Location : Kediri, East Java
Periods : 1999 - 2000 Periods : 2000 2001
Scope of Work : Steel structure Fabrication & Erection Scope of Work : - Foundation
- Structure Building (Steel Structure)
- Building & Architecture
- Mechanical & Electrical

Gallery Conveyor

Steel Structure Erection

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

Fabrication & Erection Steel Structure of Limestone Storage Cyclone Fabrication & Erection Steel Structure of Limestone Storage Cyclone
& Separator, Conditioning Tower, EP, Coal Storage and Belt & Separator, conditioning Tower, EP, Coal Storage and Blet
Conveyor Tuban III Project Conveyor Tuban III Project
Picture 1. Picture 2.

Client / Owner : Semen Gresik (Persero) Tbk., PT. Client / Owner : Semen Gresik (Persero) Tbk., PT.
Project Location : Tuban, East Java Project Location : Tuban, East Java
Periods : 1996 Periods : 1996
Scope of Work : - Fabrication of Steel Structure Scope of Work : - Fabrication of Steel Structure
- Erection of Steel Structure - Erection of Steel Structure

Limestone storage Tuban III

EP Steel Structure
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
HANDLING AND CONVEYING EQUIPMENT

NO. PROJECT TITLE SCOPE OF WORK YEAR OWNER / CLIENT

Design Engineering
1 Operation Optimization of Conveyor System to Plant Manufacture 2010 PT. Petrokimia
Installation

Design Engineering
Fabricate, Supply, Install & Commissioning of
1 Manufacture 2009 PT. IPMOMI - PAITON
Portable Conveyor
Installation

Design Engineering
1 Coal Handling Plant PLTU 1 NTT 2x7 MW - NTT Manufacture 2008/2009 PT. Rekadaya Elektrika
Installation

Design Engineering
Structural & Mechanical Hopper 6 Extension -
2 Manufacture 2008 PT. Wijaya Karya
ADARO KELANIS Project
Installation

Supply & Fabrication Transfer Belt Conveyor bypass Design Engineering


3 Conveyor Barce Loading Conveyor & Bin for PAKAR Manufacture 2008 PT. Petrosea
Project Installation

4 Supply & Fabr. Bracket Idler - Petrosea Design Engineering 2007/2008 PT. Vortex Conveyor
Manufacture
Installation

5 Supply & Installation of Conveyor NPK II Petrokimia Design Engineering 2007/2008 PT. Wijaya Karya
Manufacture
Installation

Design & Fabrication of Hopper and Conveyor -


6 2007/2008 PETROSEA
Timbara (Pakar) Coal Mine Development Project Design Engineering
Manufacture
Installation

7 Frame Conveyor System Design Engineering 2007 Vortex Conveyor Int.


Manufacture
Installation

8 Fabrication Cooling Conveyor for Side Load Furnace 2007 PT. Alstom Power ESI
Design Engineering
Manufacture
Installation

EPC Mechanical & Erection Steel Structure By Pass


9
Rock Conveyor Petrokimia Design Engineering 2006 PT. Krakatau Engineering
Manufacture
Installation

10 Supply & Fabrication Roller Conveyor X-Ray Design Engineering 2005 PT. Alstom Power ESI
Manufacture
Installation
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
HANDLING AND CONVEYING EQUIPMENT

NO. PROJECT TITLE SCOPE OF WORK YEAR OWNER / CLIENT

Spare Part Supplier

11 Mfg. of Conveyor - Feni Smelting Plant No. 3 Design Engineering 2004 PT. Aneka Tambang
Manufacture PT. Cemara Siko Eng.
Installation
Spare Part Supplier

12 Fabrication of Conveyor - Rio Tuba HPP Nickel Design Engineering 2003 Sumitomo /JGC Corp.
Project, Philipines Manufacture PT. Cemara Siko Eng.
Installation
Spare Part Supplier

13 Conveyor Roller Supplier of PT. Smelting Part Supplier 2003 PT. Smelting Co.

14 Gypsum & Wet Ash Conveyor for Maizuru Design Engineering 2002 PT. Cemara Siko Eng.
Project Manufacture
Installation
Spare Part Supplier

15 Conveyor Idler of Semen Kupang II Project Supply 2002 PT. Semen Kupang

16 Belt Conveyor System c/w Tripper - Phonska Design Engineering 1999/2000 PT. Petrokimia Gresik /
Fertelizer Plant Gresik Manufacture PT. Rekayasa Industri
Installation

17 Belt Conveyor of Cheil Samsung Pasuruan Plant Manufacture 1999 PT. Cheil Samsung Ind.

18 Belt Conveyor System & Pruduct Sampler, Design Engineering 1999 PT. Petrokimia Gresik /
Phonska fertelizer Plant, Gresik Manufacture PT. Rekayasa Industri
Installation
19 Bin Gate, Diverter Gate, Screw Conveyor - Design Engineering 1999 PT. Petrokimia Gresik /
Phonska fertelizer Plant, Gresik Manufacture PT. Rekayasa Industri
Installation

20 Equipment Installation Work for Material Manufacture 1997/1998 Smelting, PT


Handling & Conveying - Gresik Smelting Plant Installation PT. Cemara Siko

21 Conveyor Frame and Limestone Bin Manufacture 1997 PT. Semen Gresik
Installation

22 Bucket Elevator of Tuban I Plant Manufacture 1997 PT. Semen Gresik


Installation

23 Bin Cyclone and Baggage Conveyor of Engineering 1997 PT. Rajawali Nusantara /
Sugar Plant Erection PT. Mitra Nusantara

24 Belt Conveyor All Area Tuban III Project Design Engineering 1996 - 1997 PT. Semen Gresik
Manufacture
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
HANDLING AND CONVEYING EQUIPMENT

NO. PROJECT TITLE SCOPE OF WORK YEAR OWNER / CLIENT

Installation

25 Blending Silo and Blending Conveyor of Engineering 1996 PT. HM Sampoerna, Tbk
Sukorejo Cigarette Plant Manufacture
Installation

26 Bucket Elevator of Paiton Plant Manufacture 1996 Toyo Eng. Corp./


Artawa
PT. SWADAYA GRAHA
Project Reference Picture

PLTU 1 JAWA TENGAH 2 X (300-400 MW) COAL FIRED POWER


PLANT AT REMBANG INDONESIA

Client / Owner : TECGATES ENGINEERING


Project Location : Rembang Middle Java
Periods : 2008 - 2009

Conveying
PT. SWADAYA GRAHA
Project Reference Picture

FAB. AND INSTALLATION CONVEYOR SYSTEM


NPK GRANULASI II PT. PETROKIMIA
Client / Owner : WIJAYA KARYA, PT
Project Location : Gresik East Java
Periods : 2007-2008
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

FABRICATION OF CONVEYOR RIO TUBA HPP NICKEL


FABRICATION OF CONVEYOR FeNi 3 ANTAM POMALA PROJECT, PHILIPPINES
Picture 2

Client : Rekayasa Inddustri, PT. Client : Cemara Siko Engineering, PT.


Owner : Aneka Tambang, PT Owner : Sumitomo/JGC Corp.
Project Location : Pomalaa - Sulawesi Project Location : Philippines
Periods : 2005/2006 Periods : 2003

Technical Data :

Scope of Work : Supply Material and Fabrication

Belt Conveyor & Rain Cover

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

BELT CONVEYOR PHONSKA FERTILIZER PLANT


BELT CONVEYOR PHONSKA FERTILIZER PLANT
Client : Rekayasa Industri, PT.
Client : Rekayasa Industri, PT. Owner : Petromikia Gresik, PT.
Owner : Petromikia Gresik, PT. Project Location : Gresik, East Java
Project Location : Gresik, East Java Periods : 1999 2000
Periods : 1999 2000

Belt Conveyor 900 mm BW Phonska Plant


Belt Conveyor 1200 mm BW Phonska Plant

Technical Data :
Technical Data :
Scope of Work : Engineering, Manufacture and Erection
Scope of Work : Engineering, Manufacture and Erection
PT. SWADAYA GRAHA
Project Reference Picture

BELT CONVEYOR PHONSKA FERTILIZER PLANT

Client : Rekayasa Industri, PT.


Owner : Petromikia Gresik, PT.
Project Location : Gresik, East Java
Periods : 1999 2000

Belt Conveyor 600 mm BW Phonska Plant

Technical Data :

Scope of Work : Engineering, Manufacture and Erection


COMPANY PROFILE

MECHANICAL ERECTION
& PIPING WORK
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

OUR CUSTOMERS in MECHANICAL ELECTRICAL WORK

To improve and development the human resources of this division, the company
have the program by participating on the project with local or under foreign
company supervision to produce higher capabilities and supported by complete
enough equipments to handle the projects:

Plant Equipment Installation

- Limestone Crushing, Clay crushing, Raw Material Transport, etc


PT. Semen Gresik Tuban II, III Project at Tuban
- Steel Structure P2& P3 PT. Semen Kupang at Kupang
- Mechanical Installation continuous ship unloader PT. Petrokimia at
Gresik
- Others

Piping and Instrument Installation

- Installation of plant & equipment Semarang urban development plant


at Semarang
- Piping and Instrument PT. Dovecem Siam Maspion at Gresik
- Plumbing, Piping, Electrical for Main Office PT. Semen Tonasa at
Pangkep Ujung Pandang
- Electrical Work for Warehouse and facility PT. Gudang Garam at Kediri
- Others
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

MECHANICAL AND ELECTRICALS


EQUIPMENT & TOOLS

1. Theodolite : 6 Units
2. Electric Tools & Equipment : 1 Unit
3. Chain Block s/d 10 T : 45 Units
4. Level Block 1,5 3 T : 10 Units
5. Hand Winch 3 10 T : 6 Units
6. Impact Wrench 4 & 7 : 9 Units
7. Shear Wrench : 7 Units
8. Rachet Puller 1,5 T : 2 Units
9. Torque Meter : 3 Units
10. Hydraulic Jack 50 T : 7 Units
11. Hydraulic Jack 100 T : 6 Units
12. Hydraulic Jack 150 T : 4 Units
13. Generator Set : 1 Unit
14. SMAW Welding Machine 400 A : 5 Units
15. Water Pump : 2 Units
16. Dial Indicator : 6 Units
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
MECHANICAL INSTALLATION / ERECTION PROJECT

NO. PROJECT TITLE YEAR OWNER / CLIENT

GENERAL

Erection Structure Exhaust Gas Conditioning & Coal


1 2010/2011 PT. Semen Tonasa
Crusher Tonasa V
(Package C1202-5 & P1202-7)
Erection Steel Structure Cement Mill Feed, Clinker Cooler
2 & Clinker Storage Tonasa V (Package C1202-4, C1202-8 2010/2011 PT. Semen Tonasa
& C1202-9)

Erection Structure Raw Mill, Raw Feed Bin & Coal Mill,
3 Limestone Crusher Tonasa V (Package C1202-6, C1202- 2010/2011 PT. Semen Tonasa
7 & C1202-5)

Mechanical Construction Package M2A-5 - Tuban IV


4 2011 PT. Semen Gresik
Project

Mechanical Construction Package M2A-1 Raw Mill Paket


5 2010/2011 PT. Semen Gresik
E - Tuban IV Project

Erection Equipment Crusher (Clay, Limestone, Silica,


6 Coal) Equipment Raw Mill, Coal Mill & Pyroprocess 2010/2011 PT. Semen Tonasa
Tonasa V (Package C2101, C2102 & C2103)

Mechanical Fabrication & Construction of Bridge


7 Reclaimer, Portal Reclaimer, Traffeling Tripper for 2010 PT. Semen Gresik
Limestone Storage - Tuban IV Project

Mech. Construction Package M2A-2 & Steel Erection,


8 Concrete Structure, Architecture for Preheater (Preheater 2010/2011 PT. Semen Gresik
Facility Package 4) - Tuban IV Project

Package E - Requistion for Mechanical Construction


9 2010/2011 PT. Semen Gresik
Package M2B-1 - Tuban IV Project

10 Cross Yard Installation Sheller Bulk Bagger 2010 PT. Branita Sandhini

11 Cross Yard Conveyor Installation 2010 PT. Branita Sandhini

12 Fabrication and Install Cross Yard Conveyor 2010 PT. Branita Sandhini

Erection Cement Mill, Storage Silo & Packing Plant (Paket


13 2010/2011 PT. Semen Tonasa
C2204) - Tonasa V

14 Erection Mechanical New Coal Mill Tuban I P2KPT 2010 PT. Semen Gresik

15 Spinbath and Viscose Plant Project 2010 PT. South Pacivic Viscose

16 Upgrade Belt Bucket Elevator Roto Package Tuban III 2010 PT. Semen Gresik

17 Modification Hydraulic HRC System Finishing Tuban I 2010 PT. Semen Gresik
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
MECHANICAL INSTALLATION / ERECTION PROJECT

NO. PROJECT TITLE YEAR OWNER / CLIENT

18 Dryer, Sorting & Discard Erection Package 2010 PT. Branita Sandhini

Modification ID Fan 441FN1, FN2, FN6 and Installation


19 331 FN110, FN130, FN400 Exhaust Gas Conditioning 2009 PT. Semen Gresik
Tuban I

Supply & Fabrication Mechanical Cooler Tuban I and


20 2009 PT. Semen Gresik
Installation Mechanical Cooler Tuban I

21 Mechanical & Piping Fabrication Work Zone 2, 3 & 4 2009/2010 PT. South Pacivic Viscose
NGBC Project
Fabrication & Mechanical Semen Silo & Packer P3C -
22 2009 PT. Semen Gresik
Ciwandan

23 Coal Handling System for PLTU-1 - Rembang 2008/2009 PT. Tecgates Engineering

24 ME Work for OTFR & LPGF Recovery Plant - HESS 2 2008 PT. TRIPATRA Eng

25 Fabrication Transfer Beam 2007 PT. Kutilang Paksi Mas

Dismantling & Installation of Water Wall Tubes -


26 2006/2007 Dinamika Energytama N.
Semarang
27 Add Work - MEP - Building Infrastructure & Utility Area - 2006 WAIJO
Add Work - Road & Drainage at Infrastrucute Area - TAP 2006 WAIJO

28 Install Hatch Cover & Hatch Fitting Cargo Hold 2, 3, 4 2005/2006 PT. PAL Indonesia
Install Hatch Cover & Hatch Fitting Cargo Hold 5 2005/2006

Fabrication & Installation of Chiller No. 5 & 6 - PT. GG


PT. Gudang Garam
29 Pandaan 2005

30 Add. Mechanical & Electrical (SG.2) 2005 WAIJO


Add. Civil (SG.2) Building Work 2005 WAIJO
Add. Fabrication (SG.3) 2005 WAIJO

31 Clove Tank Installation Work - GG Pandaan 2005 PT. Gudang Garam

32 Thresing & Loosening Unit IX 2004 PT. Gudang Garam

33 Mechanical & Erection Work - Feni 3 Project 2004/2005 PT. Aneka Tambang
PT. Rekayasa Industri
34 Mechanical Feeding Installation 2004 PT. Gudang Garam Tbk.

35 HDT Machine American Blend Plant Installation 2004 PT. Gudang Garam Tbk.

36 Thresing & Loosening Unit IX 2004 PT. Gudang Garam Tbk.

37 On Site Low Pressure Pipe Modifications - Tanjung 2003/2004 PT. PLN (Persero)
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
MECHANICAL INSTALLATION / ERECTION PROJECT

NO. PROJECT TITLE YEAR OWNER / CLIENT

Jati B Project Black & Veatch

38 Supply, Fabrication & Installation of Water Chiller 2003 PT. Gudang Garam Tbk.
SKM 3, Phase I

39 Mine Refueling & PM Facilities - Batu Hijau Project 2003 PT. Newmont Nusatenggara
PT. Mitra Paramuda Mandiri

40 Floating Production Unit (FPU) 2002 PT. PAL Indonesia

41 Modification Classifier Raw Mill 2001 PT. SEMEN TONASA

42 Installation of Waste Water Treatment - Unit VIII 2001 PT. Gudang Garam Tbk.

43 Steel Structure Erection UBS - IV 2001 PT. Pupuk Kaltim


PT. Rekayasa Industri

44 Mechanical Work of Package 2 2000/2001 PT. SEMEN KUPANG


- Steel Structure Erection P2 & P3 PT. Rekayasa Industri

45 ME Install of steel structure work 1999/2000 PT. Petrokimia Gresik

46 Erection & Ass Block OHBC, PB. 1600 Teus 1999/2000 PT. PAL Indonesia

47 Erection & Insulation HP-Heater Suralaya 1999 PT. PAL Indonesia

48 Bulk & Bag Storage NPK 1999 PT. Petrokimia Gresik

49 Fabrication & Install Ducting (SUS&CS) 1999 COPPER SMELTING


PT IKPT
50 Inst. Single Tray Clarifier Cap. 2500 TCD 1999 PG. TJANDI Sidoarjo
PT. Rajawali

51 Steel Works Mfg & Erection for EP 1999 PT. ANEKA TAMBANG

52 Mechanical Installation, Steel Structure Erection, Piping 1997/1998 COPPER SMELTING


& Ducting, Painting Waste Water Treatment Plant PT IKPT

53 Equipment Installation work for Material handling & 1997/1998 COPPER SMELTING
Off Site PT. Cemara Siko

54 Tuban IV 1997 BINTANG CEMENT


- ME Work Tuban IV MANDIRI
- Clay & Limestone Crusher Shelter

55 Erection Limestone Filler 1997 PT. SEMEN GRESIK

56 Tuban III Project 1996/1997 PT. SEMEN GRESIK


- Limestone Crushing
- Raw Material Transport & Storage
- Clay Crushing
- Raw Material Reclaim
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
MECHANICAL INSTALLATION / ERECTION PROJECT

NO. PROJECT TITLE YEAR OWNER / CLIENT

- Raw Material Feeding


- Raw Grinding
- Raw Material Transport
- Coal Mill
- E/P Raw Mill Package SF-02A

57 Dust Collector Cement Bin Area #65 Gresik Plant 1996 PT. SEMEN GRESIK

58 Tuban II Project 1995/1996 PT. SEMEN GRESIK


- Limestone Crushing
- Raw Material Transport & Storage
- Clay Crushing
- Raw Material Reclaim
- Raw Material Feeding
- Raw Grinding
- Raw Material Transport
- Coal Mill

59 Mechanical And Erection Grati Combine Cycle Power 1995/1996 PLTGU - GRATI
Plant PLTGU - Grati PT. Wijaya Karya

60 Mechanical Erection Tonasa IV Project 1994/1995 PT. SEMEN TONASA


- Limestone Crushing & Transportation PT REKAYASA INDUSTRI
- Clay Crushing & Transportation
- Silica Crusher & Transportation
- Limestone Storage & Transportation
- Clay Storage & Transportation
- Silica Storage & Transportation
- Coal Storage & Transportation
- Gypsum Storage & Transportation

HARBOUR LOADING & UN-LOADING FACILITY

61 Installation Mechanical of Equipment for Cement 1999 PT. SEMEN GRESIK


Load & un-load device

62 VCM-Liquid & Vapor loading - unloading facility of 1997/1998 PT. SIAM MASPION
SIAM Maspion terminal project of Jetty loading dock

63 Mechanical Erection Ship Unloading (CSU), GRESIK 1996 PT. SEMEN GRESIK

64 Mechanical Erection Continuous Ship Un-loader Ass 1995/1996 PT. Petrokimia Gresik
(CSU) & Relocation /Modification Kangaroo Crane
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
REPAIR OF BOILER

NO. PROJECT TITLE YEAR OWNER / CLIENT

1 HRSG Inlet Duct & Boiler CSG Filler Panel - YARWUN 2008/2009 PT. Alstom Power

2 HRSG Boiler Casing - MUARA TAWAR #5 2008 PT. Alstom Power

3 Boiler Casing Packaging & Shipping Frame 2007 PT. Alstom Power

4 Repair Tubing Evaporator Boiler 2002 PT. Emdeki Utama

5 Rehebilitation Boiler PLTU Unit #2 PT. PLN PJB II 2002 PT. PLN PJB II
PT. ABB ESI

6 Retubing Pipa & Tembokan Ketel KTR & JTA 2000 PG. Jombang Baru
PT. PN X

7 Pengadaan Support untuk Superheater Tube Boiler 2000 PT. PLN PJB II
Unit IV

8 Retubing & Perbaikan Ketel PG. Watoetoelis 2000 PG. Watoetoelis


PT. PN X

9 Boiler rehabilitation, piping and support of PUSRI 2000 PUSRI - Palembang


ABB -Esi

10 Repair work of Boiler Part - MDQ Utama 1999 MDQ Utama


PT. Aalborg

11 Boiler rehabilitation of Gresik Power Station 1999 PLN - Gresik


ABB -Esi

12 Perbaikan Ketel Yoshimine H.2200 S 1999 PG. Krebet Baru II


PT. RNI

13 Repair HP Heater Boiler #5 PLTU Suralaya 1998 PLTU Suralaya


Unit #2 - Jawa Barat PT. PAL Indonesia

14 Erection Boiler Plant & Equipment Project Incinerator 1996/1997 PT. KERTAS LECES
PT. Bosto Pasuruan

15 Retubing Ketel Yoshimine 900 untuk PG. Meritjan 1996 PG. Meritjan
PT. Perkebunan Nusantara

16 Perbaikan Ketel Sisi Depan Tembokan Ketel Yoshimine 1996 PG. Meritjan
untuk PG. Meritjan PT. Perkebunan Nusantara

17 Pemasangan Side Header Ketel Yoshimine untuk 1996 PG. Meritjan


PG. Meritjan PT. Perkebunan Nusantara
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
REPAIR OF BOILER

NO. PROJECT TITLE YEAR OWNER / CLIENT


18 Perbaikan Ketel Yoshimine Type 2200 S Kapasitas 1996 PG. Krebet Baru II
80 Ton/Jam untuk PG. Krebet Baru II Malang PT. RNI

19 Perbaikan Air Heater Tubes Ketel Yoshimine untuk 1996 PG. Krebet Baru II
PG. Krebet Baru II Malang PT. RNI
20 Perbaikan Ketel CCJT I & Yoshimine untuk PG. Krebet 1996 PG. Krebet Baru II
Baru II Malang PT. RNI

21 Reparasi Ketel PG. Jatiroto 1995 PG. Jatiroto


PT. Perkebunan Nusantara

22 Reparasi Ketel Uap PG. Prajekan 1995 PG. Prajekan


PT. Perkebunan Nusantara

23 Perbaikan Ketel Yoshimine untuk PG. Krebet Baru I 1995 PG. Krebet Baru I
Bululawang Malang PT. RNI

24 Perbaikan Ketel CCJT dan Ketel Yoshimine untuk 1995 PG. Krebet Baru II
PG. Krebet Baru II Bululawang Malang PT. RNI
PT. SWADAYA GRAHA
Project Reference Picture

PLTU 1 JAWA TENGAH 2 X (300-400 MW) COAL FIRED POWER


PLANT AT REMBANG INDONESIA

Client / Owner : TECGATES ENGINEERING


Project Location : Rembang Middle Java
Periods : 2008 - 2009

Stack Reclaimer
PT. SWADAYA GRAHA
Project Reference Picture

PLTU 1 JAWA TENGAH 2 X (300-400 MW) COAL FIRED POWER


PLANT AT REMBANG INDONESIA

Client / Owner : TECGATES ENGINEERING


Project Location : Rembang Middle Java
Periods : 2008 - 2009

Ship Unloader
PT. SWADAYA GRAHA
Project Reference Picture

PLTU 1 JAWA TENGAH 2 X (300-400 MW) COAL FIRED POWER


PLANT AT REMBANG INDONESIA

Client / Owner : TECGATES ENGINEERING


Project Location : Rembang Middle Java
Periods : 2008 - 2009

Assembly & Setting Coal Bunker


PT. SWADAYA GRAHA
Project Reference Picture

PLTU 1 JAWA TENGAH 2 X (300-400 MW) COAL FIRED POWER


PLANT AT REMBANG INDONESIA

Client / Owner : TECGATES ENGINEERING


Project Location : Rembang Middle Java
Periods : 2008 - 2009
PT. SWADAYA GRAHA
Project Reference Picture

MECHANICAL ERECTION WORK for OTFR & LPGF


RECOVERY PLANT HESS II
Client / Owner : TRIPATRA ENGINEERING, PT
Project Location : Gresik East Java
Periods : 2007-2008

FAB. & ERECTION DRYER CYCLONE


PROYEK PROCESSING PT KDM
Client / Owner : KARYA DIBYA MAHARDHIKA, PT
Project Location : Pandaan East Java
Periods : 2008
LOUD OF PLATFORM KANGEAN
Client / Owner : KUTILANG PAKSI MAS, PT
Project Location : Kangean
Periods : 2008
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

MECHANICAL & ERECTION FeNi 3 PROJECT MECHANICAL & ERECTION FeNi 3 PROJECT
POMALAA POMALAA

Client : Rekayasa Industri, PT. Client : Rekayasa Industri, PT.


Owner : Aneka Tambang, PT. Owner : Aneka Tambang, PT.
Project Location : Pomala, Sulawesi Project Location : Pomala, Sulawesi
Periods : 2004-2005 Periods : 2004-2005
Total Weight : 1.700 Tons Total Weight : 333.200 Kgs

Rotary Dryer
Rotary Kiln

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

MECHANICAL & ERECTION FeNi 3 PROJECT MECHANICAL & ERECTION FeNi 3 PROJECT
POMALAA POMALAA

Client : Rekayasa Industri, PT. Client : Rekayasa Industri, PT.


Owner : Aneka Tambang, PT. Owner : Aneka Tambang, PT.
Project Location : Pomala, Sulawesi Project Location : Pomala, Sulawesi
Periods : 2004-2005 Periods : 2004-2005
Total Weight : 340.500 Kgs Total Weight : 180.000 Kgs

EP for Dryer
EP for Kiln (Dry Type)
PT. SWADAYA GRAHA
Project Reference Picture

MECHANICAL & ERECTION FeNi 3 PROJECT PT. SWADAYA GRAHA


Project Reference Picture
POMALAA

Client : Rekayasa Industri, PT. MECHANICAL & ERECTION FeNi 3 PROJECT


Owner : Aneka Tambang, PT. POMALAA
Project Location : Pomala, Sulawesi
Periods : 2004-2005 Client : Rekayasa Industri, PT.
Total Weight : 142.650 Kgs Owner : Aneka Tambang, PT.
Project Location : Pomala, Sulawesi
Periods : 2004-2005
Total Weight : 12.000 Kgs

EP for Refining Casting

Cooling Water Circulation System

PT. SWADAYA GRAHA


Project Reference Picture

PT. SWADAYA GRAHA


Project Reference Picture MECHANICAL ERECTION SEMEN KUPANG 2 PROJECT

MECHANICAL & ERECTION FeNi 3 PROJECT


Client : Rekayasa Industri, PT.
POMALAA Owner : Semen Kupang, PT.
Client : Rekayasa Industri, PT.
Project Location : Kupang, East Nusa Tenggara
Owner : Aneka Tambang, PT. Periods : 2001 2002 (15 months)
Project Location : Pomala, Sulawesi Total Weight : 2,700 tons
Periods : 2004-2005 Scope of Work : Inside Battery Limit All Equipments of
Total Weight : 12.000 Kgs Cement Plant (600 TPD cap.)

Gear Kiln 1 Installation


Cooling Tower
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

MECHANICAL ERECTION SEMEN KUPANG 2 PROJECT MECHANICAL INSTAL. ACID & WWT PLANT OF IGC
PROJECT
Client : Rekayasa Industri, PT.
Client : Inti Karya Persada Teknik, PT.
Owner : Semen Kupang, PT.
Owner : Smelting Co, PT.
Project Location : Kupang, East Nusa Tenggara
Project Location : Gresik, East Java
Periods : 2001 2002 (15 months)
Periods : 1997 1998 (15 months)
Total Weight : 2,700 tons
Total Weight : 4,000 tons
Scope of Work : Inside Battery Limit All Equipments of
Scope of Work : Acid and WWT Plant All Equipments
Cement Plant (600 TPD cap.)

Scrubber Installation

Mill Body Raw Mill 2 Installation

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

STEEL WORKS MANUFACTURING & ERECTION FOR EP MECHANICAL INSTALLATION & STEEL STRUCTURE
ERECTION OF NPK FERTIZER PROJECT
Client : FLS Miljo Picture 3.
Owner : Aneka Tambang, PT.
Project Location : Soroako, South East Sulawesi Client : Rekayasa Industri, PT.
Periods : 1999 - 2000 (6 months) Owner : Petrokimia Gresik, PT.
Total Weight : 500 tons Project Location : Gresik, East Java
Scope of Work : Steel Manufacturing, Mechanical Installation & Periods : 1999 - 2000 (11 months)
Steel Structure Installation Total Weight : 2700 tons
Scope of Work : - Mechanical Installation Work
- Steel Structure Installation Work
- Installation of Steam Turbine
- Installation of Steam Boiler

Electrostatic Precipitator Manufacturing & Installation Work

ID Fan
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
PIPING & PIPE LINE

NO. PROJECT TITLE YEAR OWNER / CLIENT

Material Procurement of KPI Ammonia Project Tie-In


1 2011 PT. Kaltim Nitrate Indonesia
System

2 Piping Line Jetty 2 2010 PT. Wilmar Nabati Indonesia

3 Internal Piping Soap Plant 2010 PT. Wilmar Nabati Indonesia

4 BKR Offside Piping Table for OLEO Chemical Plant 2010 PT. Wilmar Nabati Indonesia

5 LPG & Fire Water System Piping I, II & III 2010 PT. Branita Sandhini

6 Instalasi Pipe Main Line Chiller Water 2010 PT. KDM

Mechanical & Piping Fabrication Work of NGBC - MSPS


7 2009/2010 PT. South Pacivic Viscose
Project

8 Fabrication of Pipe Spool 2009 PT. Timas Suplindo

9 External Piping di Oleo Chemical Plant 2009 PT. Wilmar Nabati Indonesia

10 External Piping Water & Air Distribution General Utility 2009 PT. Wilmar Nabati Indonesia

11 Pipe Gas Supply Petrochina (Lengowangi-Petrokimia) 2008/2009 PT. Petrokimia Gresik

Dust Suppression System, Piping for Sump Pump and


12 2008 Tecgates Engineering
Compressor Piping

Piping Works at Tankage / Pipe Sleeper Area & Onshore


13 2008 PT. Tripatra Engineering
Pipe Line Work & Manpower/Equipment

14 Instalasi Chiller Water, Pipe Support 2008 PT. KDM

15 Piping Installation 2007 PT. KDM

16 Babat-Gresik 28" Pipe Line Relocation & Recondition 2007/2008 PT. Petrokimia Gresik
Project (Stage VIII)
17 Pipe Gass Interconection Supply of Kodeco to Petrokimia 2006/2007 PT. Petrokimia Gresik

18 Piping Work Distribution Area - UPD 2006 PT. IKPT

19 Installing 18" Export Pipe - UPD Project 2006 PT. Raga Perkasa Ekaguna

20 Piping Work 24" HDPE Sea Water Intake - UPD Project 2006 PT. IKPT

Welding Stiffener of Steel Pipe Piles - Tangguh LNG


21 2005 PT. Penta Ocean
Project

22 Fabrication & Installation of Piping Work TPPI 2005 WAIJO


23 Steel Pipe Splicing & Coating - Tangguh LNG Project 2005 PT. Penta Ocean
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
PIPING & PIPE LINE

NO. PROJECT TITLE YEAR OWNER / CLIENT

24 Stiffner Plate of Steel Pipe Piles - Tangguh LNG Project 2005 PT. Penta Ocean

25 Fire Protection System Piping Pre-Fabrication 2005 Black & Veacth

26 Piping Torn Water & Torn Water Supply 2004 PT. Gudang Garam

27 Relocation of Water Pipe dia 28" Babat - Gresik 2003 PT. Petrokimia Gresik
Stage IV - 3
28 Relocation of Water Pipe dia 28" Babat - Gresik 2003 PT. Petrokimia Gresik
Stage IV - 1

29 Mechanical & Piping Work - 7,500 MT Ammonia 2002/2003 PT Petrokimia Gresik


Storage Tank PT Rekayasa Industri
30 Fabrication and Installation of CO2 Pipe 2002 PT. Gudang Garam Tbk.
31 Instalasi Jalur Induk Air Bersih - Unit VIII 2001 PT. Gudang Garam Tbk.

32 Relocation of Water Pipe dia 28" Babat - Gresik 2001 PT. Petrokimia Gresik
Stage I
33 Installation of Plant & Equipment Semarang Urban 2000 PDAM - Semarang
Development Plant and Pump House - Mundu PT. BBI
34 Piping and Instrument 2000 PT. Dovechem
Maspion

35 Install and fabrication cement lined Piping, Tuban 1999 PT. SEMEN GRESIK
Harbor
36 Piping Installation Work Package No. Contract- 1995 PT. SEMEN TONASA
PW-14Tonasa IV Project
PT. SWADAYA GRAHA
Project Reference Picture

RELOCATION AND RECONDITION PIPA 28


BABAT- GRESIK (PHASE VIII)
Client / Owner : PETROKIMIA GRESIK, PT
Project Location : Gresik Gresik
Periods : 2007-2008

PIPE GASS INTERCONECTION SUPPLY OF KODECO TO


PETROKIMIA
Client : Petrokimia, PT.
Project Location : Gresik
Periods : 2006-2007
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

MECHANICAL ERECTION WORK TUBAN III CEMENT MECHANICAL & PIPING WORK 7,500 MT AMMONIA
PLANT PROJECT STORAGE TANK
Picture 1
Client : Rekayasa Industri, PT.
Client / Owner : Semen Gresik (Persero) Tbk., PT. Owner : Petrokimia Gresik, PT.
Project Location : Tuban, East Java Project Location : Gresik, East Java
Periods : 1995 - 1996 (15 months) Periods : 2002-2003 (9 Months)
Total Weight : 10,000 tons
Scope of Work : - Limestone Crushing
- Raw Material Transport & Storage
- Clay Crushing
- Raw Material Re-claimer
- Raw Material Feeding
- Raw Grinding
- Raw Material Transport
- Coal Mill
- E/P Raw Mill Package SF-02A

Piping Work of 7,500 MT Ammonia Storage Tank

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

OFF SHORE PIPE LINE 8 STAINLESS STEEL AND


RELOCATION OF 28 WATER PIPE LINE BABAT-GRESIK CARBON STEEL PIPE AT DOVECHEM MASPION TERMINAL,
FIRST STAGE
Client : Dovechem Maspion Terminal, PT.
Client / Owner : Petrokimia Gresik, PT. Project Location : Gresik, East Java
Project Location : Lamongan, East Java Periods : 2000 (6 Months)
Periods : 2001-2002 (6 Months)

Relocation of Babat Pipe Line

Scope of Work :
 Civil Work
 Site Fabrication & Installation of Pipe
 Supply & Install Wrapping
 Relocation of Cathodic Protection
 Painting Work
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

BOILER REHABILITATION OF PT. PLN PJB II UNIT #2 KUDU WATER TREATMENT PLANT OF SEMARANG URBAN
DEVELOPMENT PROJECT
Client : Alstom Power ESI, PT.
Project Location : Gresik, East Java Client : PT. Boma Bisma Indra
Periods : 2000 (5 Months) Project Location : Semarang, Central Java
Periods : 2000 (7 Months)

Wrapping Work

PT. SWADAYA GRAHA


Project Reference Picture

VCM LIQUID AND VAPOUR LOADING-UNLOADING


FACILITY OF SIAM MASPION TERMINAL

Client : Siam Maspion Terminal, PT.


Project Location : Gresik, East Java
Periods : 1998 (5 Months)

Vcm Liquid and Vapour Loading-Unloading Facility


PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
MECHANICAL, ELECTRICAL & INSTRUMENT FOR BUILDING & PLANT

NO. PROJECT TITLE YEAR OWNER / CLIENT

1 Electrical & Instrument Installation ID Fan 2 and ABC Inlet 2010/2011 PT. Semen Gresik
Tuban III

Package D - Supply & Installation of Electrical Equipment


2 2010/2011 PT. Semen Gresik
& Control WTP - Tuban IV Project

Electrical & Instrumentation for Cement Packer Area


3 2010/2011 PT. Semen Gresik
Packing Plant -Tuban IV Project

Electrical & Instrumentation Installation of New Coal Mill


4 2010 PT. Semen Gresik
(Package E) P2KPT

Intallation Electrical Power Distribution EPD ER 16D &


5 2010 PT. Semen Gresik
EPD ER 16F

Lighting Installation, Ladder Tray & Pulling Cable at


6 2010 PT. Wilmar Nabati Indonesia
Chemical Water Plant & Boiler Power Plant Area

Electrical & Instrument Installation for Preheater & Cooler


7 2010 PT. Semen Gresik
Tuban IV

8 Electrical & Instrument Finishing Plant 2009 PT. Wilmar Nabati Indonesia

9 Electrical in Consumer Pack 2009 PT. Wilmar Nabati Indonesia

Elektrikal & Instrumen Proyek RFO PF II - Petrokimia


10 2008/2009 PT. Wijaya Karya
Gresik

Erection Electrical & Instrument Granulation I - NPK


11 2008 PT. Krakatau Engineering
Project Petrokimia

12 Electrical of Building "JTV" 2008 PT. Graha Pena

13 Electrical & Instrument Erection NPK 3 & 4 Petrokimia 2008 PT. Krakatau Engineering

Electrical & Instrument NPK Granulation II - Petrokimia


14 2007/2008 PT. Wijaya Karya
Gresik

Renovation of Mechanical & electrical for "Menara


15 2007 PT. Pakuwon Jati
Mandiri" - Tunjungan Plaza

16 Instalasi Listrik Gudang Induk Unit III - GG Kediri 2007 PT. Gudang Garam Tbk.

17 Electric Installation at Maintenance 2006/2007 PT. TPPI

18 Instalasi Listrik Rumah Dinas 2006 PT. UTSG

19 Elektrikal Proyek Renovasi TP-2 2006 PT. Pakuwon Jati

20 Instalasi Kabel Lan, Telepon & Accessories 2005/2006 PT. UTSG

21 Supply Electrical Material TPPI Projecr 2005 WAIJO

22 Supply & Installation of Cable Tray 2004 PT. Gudang Garam Tbk.
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF REFERENCE
MECHANICAL, ELECTRICAL & INSTRUMENT FOR BUILDING & PLANT

NO. PROJECT TITLE YEAR OWNER / CLIENT


23 Supply & Installation of Air Conditioner (Merk DAIKIN) 2003 PT. Varia Usaha

24 Supply & Install of Water Installation, Hydrant - 2003 Semen Gresik Hospital
RSSG Phase II Project PT. Semen Gresik

25 Construction of Garage Unit III 2002 PT. Gudang Garam Tbk.

26 EPC for ORF Maintenance Workshop Building 2002 Kodeco Energy Co. Ltd.

27 Electrical & Instrumentation UBS IV Project 2002 PT. Rekayasa Industri

28 M/E For Semen Gresik Hospital Phase II 2002 PT. Semen Gresik (Persero)

29 Electrical for Driving Range 2001 PT. Gudang Garam Tbk.

30 Electrical Installation of 21 Building - Unit VIII 2001 PT. Gudang Garam Tbk.

31 Mechanical & Electrical Work - Surabaya Islamic 2000 Yayasan Rumah Sakit Islam
Hospital Surabaya

32 M/E for Continuation Civil Construction Building of 1999 UGM


Program D3
33 PT. Semen Tonasa Main Office and Dormitory 1997/1998 PT. Semen Tonasa
- Civil, Arcitektur,Electrical & Mechanical Erection
- Additional work

34 IKSG Tuban Project 1996/1997 PT. Industri Kemasan


- Industri Kemasan Semen Gresik Building (electrical) Semen Gresik (IKSG)
PT. SWADAYA GRAHA
Project Reference Picture

ELECTRICAL & INSTRUMENT WILMAR PROJECT


Client / Owner : PT Wilmar Nabati Indonesia
Project Location : Gresik East Java
Periods : 2009 2010
PT. SWADAYA GRAHA
Project Reference Picture

ELECTRICAL & INSTRUMENT WILMAR PROJECT


Client / Owner : PT Wilmar Nabati Indonesia
Project Location : Gresik East Java
Periods : 2009 2010

Biodiesel Plant Consumer Pack Area


PT. SWADAYA GRAHA
Project Reference Picture

ELECTRICAL & INSTRUMENT WILMAR PROJECT


Client / Owner : PT Wilmar Nabati Indonesia
Project Location : Gresik East Java
Periods : 2009 2010
PT. SWADAYA GRAHA
Project Reference Picture

ELECTRICAL & INSTRUMENT WILMAR PROJECT


Client / Owner : PT Wilmar Nabati Indonesia
Project Location : Gresik East Java
Periods : 2009 2010
PT. SWADAYA GRAHA
Project Reference Picture

ELECTRICAL & INSTRUMENT WILMAR PROJECT


Client / Owner : PT Wilmar Nabati Indonesia
Project Location : Gresik East Java
Periods : 2009 2010
PT. SWADAYA GRAHA
Project Reference Picture

ELECTRICAL & INSTRUMENT WILMAR PROJECT


Client / Owner : PT Wilmar Nabati Indonesia
Project Location : Gresik East Java
Periods : 2009 2010
PT. SWADAYA GRAHA
Project Reference Picture

ELECTRICAL & INSTRUMENT RFO PF II PROJECT


Client / Owner : PT Wijaya Karya / PT Petrokimia Gresik
Project Location : Gresik East Java
Periods : 2008 2009 (8 Months)

Control Valve Installation for Reactor Agitator Pressure Transmitter Installation for Air Heater

Power Motor Electrical for Tail Gas Scrubber


PT. SWADAYA GRAHA
Project Reference Picture

ELECTRICAL & INSTRUMENT NPK 3 & 4 PROJECT


Client / Owner : PT Krakatau Engineering / PT Petrokimia Gresik
Project Location : Gresik East Java
Periods : 2008 2009 (8 Months)

Power Motor Installation for Granule NPK 3 & 4

Safety Device Installation for Conveyor ROP 1


Elektrikal & Instrument Biodiesel PT Wilmar Nabati Indonesia
Client / Owner : Wilmar Nabati Indonesia, PT
Project Location : Gresik, East Java
Periods : 2009 (2 Months)

INSTALL MCC PANEL & DCS PANEL BIO DIESEL


Elektrikal & Instrument FA & Oleo PT Wilmar Nabati Indonesia
Client / Owner : Wilmar Nabati Indonesia, PT
Project Location : Gresik, East Java
Periods : 2009 (2 Months)

INSTALL INSTRUMENTATION & POWER MOTOR FOR FA & OLEO


Elektrikal & Instrument WTP PT Wilmar Nabati Indonesia
Client / Owner : Wilmar Nabati Indonesia, PT
Project Location : Gresik, East Java
Periods : 2009 (2 Months)

INSTALL PANEL MCC & INSTRUMENT FOR WTP


PT. SWADAYA GRAHA
Project Reference Picture PT. SWADAYA GRAHA
Project Reference Picture

COOLING TOWER FOR AC AUDITORIUM & MAIN OFFICE


SEMEN TONASA, PT.
MAIN PUMPS FOR COLD WATER CHILLER - AUDITORIUM &
MAIN OFFICE SEMEN TONASA, PT.
Client / Owner : Semen Tonasa, PT.
Project Location : Pangkep Biringere, South Sulawesi Client / Owner : Semen Tonasa, PT.
Periods : 1997 1998 (14 Months) Project Location : Pangkep Biringere, South Sulawesi
Periods : 1997 1998 (14 Months)

Cooling Tower for AC

Main Pumps for Cold Water Chiller

PT. SWADAYA GRAHA PT. SWADAYA GRAHA


Project Reference Picture Project Reference Picture

AC DUCTING INSTALLATION - AUDITORIUM & MAIN AIR CONDITIONER INSTALLATION SURABAYA ISLAMIC
OFFICE SEMEN TONASA, PT. HOSPITAL

Client / Owner : Semen Tonasa, PT. Client / Owner : Yayasan Rumah Sakit Islam Surabaya
Project Location : Pangkep Biringere, South Sulawesi Project Location : Surabaya, East Java
Periods : 1997 1998 (14 Months) Periods : 2000

Air Conditioner Installation

AC Ducting Installation
PT. SWADAYA GRAHA PT. SWADAYA GRAHA
Project Reference Picture Project Reference Picture

POWER ROOM SURABAYA ISLAMIC HOSPITAL FIRE FIGHTING SYSTEM SURABAYA ISLAMIC HOSPITAL

Client / Owner : Yayasan Rumah Sakit Islam Surabaya Client / Owner : Yayasan Rumah Sakit Islam Surabaya
Project Location : Surabaya, East Java Project Location : Surabaya, East Java
Periods : 2000 Periods : 2000

Power Room Surabaya Islamic Hospital Fire Fighting System


COMPANY PROFILE

CONSTRUCTION & HEAVY


EQUIPMENT RENTAL
PT SWADAYA GRAHA
Jl. RA Kartini 25 Gresik 61122

LIST OF HEAVY EQUIPMENT RENTAL

EQUIPMENT NAME BRAND/TYPE QTY

1. Compressor 125 Cpm Joy 1 Unit


2. Compressor 250 Cfm Atlas Copco 1 Unit
3. Welding Machine Miller (Dx 401) 27 Units
4. Welding Machine Lincoln 20 Units
5. Welding Machine Essab 20 Units
6. Welding Machine Hobart 5 Units
7. Genzet Diesel 125 Kva Kato/Gm, Stamford 4 Units
8. Bulldozer Komatsu D31 1 Unit
9. Excavator Caterpillar E200b 2 Unit
10. Vibro Roller 20 Ton Bitelli 115.940574 1 Unit
11. Forklift 5 Ton Patria 1 Unit
12. Forklift 5 Ton Hyster (H 005 Xl) 7 Units
13. Trailer Head 40 Ton Nissan 2 Units
14. Trailer Head 60 Ton Nissan (Cw 66 Gt) 1 Unit
15. Truck Crane 25 Ton P & H (445 B) 1 Unit
16. Truck Crane 40 Ton P & H (440-Tc) 1 Unit
17. Crawler Crane 20 Ton Hitachi 1 Unit
18. Crawler Crane 60 Ton P & H 1055b 1 Unit
19. Crawler Crane 125 Ton Be (61 B) 2 Units
20. Crawler Crane 200 Ton Manitowoc 4100 S-2 1 Unit
21. Hydraulic Crawler Crane 50 Ton P&H Kobelco (550-As) 1 Unit
22. Hydraulic Crawler Crane 80 Ton P&H Kobelco (880s) 3 Units
23. Hydraulic Crawler Crane 150 Ton P&H (5170) 1 Unit
24. Hydraulic Truck Crane 20 Ton Tadano (Tl 200 M-4) 1 Unit
25. Hydraulic Truck Crane 30 Ton P & H (T 300) 1 Unit
26. Hydraulic Truck Crane 35 Ton P & H Century (Cnt-350) 2 Units
27. Hydraulic Truck Crane 45 Ton Tadano (Tg-452) & 450hm 4 Units
28. Hydraulic Truck Crane 50 Ton P & H Century (Cnt-500) 1 Unit
29. Rough Terrain Crane 18 Ton P & H (R-180) 2 Units
30. Rough Terrain Crane 25 Ton Kato (Kr 25h) 2 Units
31. Rough Terrain Crane 45 Ton Kato (Kr 45h) 1 Unit
32. Tower Crane 7 Ton Favco (Std 350) 1 Unit
33. Tower Crane 12 Ton POTAIN TOP KIT F3/25 PA 459 P325G12 1 Unit
TOWER CRANE 12 TON
CRAWLER CRANE 200 TON &
TOWER CRANE 7 TON

HYDRAULIC CRAWLER CRANE 150 T


HYDRAULIC TRUCK CRANE 45 TON

ROUGH TERRAIN CRANE 45 T


HYDRAULIC TRUCK CRANE 45 T

HYDRAULIC TRUCK CRANE 45 T


HYDRAULIC TRUCK CRANE 35 T

ROUGH TERRAIN CRANE 25 T


ROUGH TERRAIN CRANE 18 TON

ROUGH TERRAIN CRANE 18 T