Philipp's Technical Consultants Corp.: Cost Estimate
Philipp's Technical Consultants Corp.: Cost Estimate
Philipp's Technical Consultants Corp.: Cost Estimate
Consultants Corp.
SUBGRADE PREPARATION
Dimensions:
Length (L) Width (W) Area (A)
126.6 137 12213.2
EXCAVATION
Dimensions:
Length (L) Width (W) Depth (d) No. of Footings Volume (V)
SURPLUS EXCAVATION
Dimensions:
Volume of Excavation -Volume of Backfill & Compaction Volume (V)
V1 V2
12,997.09 9,756.81 TOTAL 3,240.27
II. SUBSTRUCTURE
POLYETHYLENE SHEET
Dimensions:
Length (L) Width (W) Area (A)
126.6 137 12213.2
GRAVEL BEDDING
Dimensions:
Length (L) Width (W) Thickness(t) No. of Footings Volume (V)
Slab 126.6 137 0.10 1221.32
LEAN CONCRETE
Dimensions:
Length (L) Width (W) Thickness(t) No. of Footings Volume (V)
TOTAL 344.57
PRESTRESSED PILE
Dimensions:
Length (L) No. of Piles per foot No. of Footings TOTAL PCS TOTAL LENGTH ZONE 1 -(PCS) ZONE 2-(PCS)
CONCRETE
Pile Cap & FTB
Dimensions:
Length (L) Width (W) Depth (d) No. of Footings Volume (V)
TOTAL 2,880.66
TOTAL 162.25
140.40
TOTAL BACKFILL 21.85
SURPLUS EXCAVATION
Dimensions:
Volume of Excavation -Volume of Backfill & Compaction Volume (V)
V1 V2
162.25 21.85 TOTAL 140.40
GRAVEL BEDDING
Dimensions:
Length (L) Width (W) Thickness(t) No. of Footings Volume (V)
FOOTING 6.00 6.00 0.10 2 7.20
LEAN CONCRETE
Dimensions:
Length (L) Width (W) Thickness(t) No. of Footings Volume (V)
FOOTING 6 6 0.10 2 7.20
PRESTRESSED PILE
Length (L) No. of Piles per foot No. of Footings TOTAL PCS TOTAL LENGTH
FOOTING 20 9 2 18 360.00
FORMWORKS
Dimensions:
Length (L) Width (W) Depth (d) Sides No. of Footings & Col. Area (A)
FOOTING 6 6 1.50 4 2 72.00
CONCRETE
Dimensions:
Length (L) Width (W) Depth (d) No. of Footings Volume (V)
FOOTING 6.00 6 1.50 2 108.00
#VALUE!
BEAM SCHEDULE
SIZE LENGTH
MARK No.of Beam
b d d-ts l
2ND FLOOR LEVEL
1-7/A-G G2 450 600 500 53.30 7
8-9/A-O G2 450 600 500 126.60 2
10-15/B-N G2 450 600 500 113.80 6
10-11/A-B RG2 600 800 700 8.45 2
1-8/A-G B5/B4 400 600 500 13.30 21
1-8/A-G B2 350 600 500 40.00 21
8-9/A-O B5/B4 400 600 500 13.30 6
9-10/A-O B3 400 600 500 6.90 6
9-10/A-O B2 350 600 500 100.00 3
10-11/A-O B4/B3 400 600 500 13.30 6
10-11/A-O B2 350 600 500 100.00 3
11-15/A-O B3 400 600 500 6.90 22
11-15/A-O B2 350 600 500 100.00 11
A/1-9 G3 600 800 700 80.00 1
A-B/8-9 G4 600 800 700 10.00 1
A/10-11 RG3 600 800 700 10.00 1
A-B/10-11 RG-1 600 800 700 10.00 1
B/1-9 G1 600 800 700 80.00 1
B/9-10 G1B 600 800 700 10.00 1
B/10-11 G1 600 800 700 10.00 1
B/11-15 G3 600 800 700 37.00 1
C-G/1-15 G1 600 800 700 137.00 5
H-M/8-15 G1 600 800 700 67.00 6
N/8-11 G1 600 800 700 30.00 1
N/11-15 G3 600 800 700 37.00 1
N-O/8-9 G4 600 800 700 10.00 1
N-O/10-11 RG1 600 800 700 10.00 1
O/8-9 G3 600 800 700 10.00 1
O/10-11 RG3 600 800 700 10.00 1
SUB-TOTAL
BEAM SCHEDULE
SIZE LENGTH
MARK No.of Beam
b d d-ts l
2ND-3RD FLOOR-RAMP
RG-2 600 800 700 6.400 1.000
RB-4 400 600 500 6.400 1.000
RG-3 600 800 700 20.224 1.000
RG-3 600 800 700 20.224 1.000
SUB-TOTAL
STAIR
SIZE LENGTH
MARK No.of Steps
b d l
2ND-3RD FLOOR
STAIR-1
SG-1 400 650 500 2.050 2
SB-2 Eric: 400 650 500 2.050 2
STEPS 415 200 200 2.050 14
No Beam Schedule;
STEPS-SLAB 6486
value=assumption only 150 150 2.050 1
LANDING 2125 150 150 2.050 15
STAIR-2
SG-1 400 650 500 2.050 2
SB-2 Eric: 400 650 500 2.050 2
STEPS 415 200 200 2.050 14
No Beam Schedule;
STEPS-SLAB 6486
value=assumption only 150 150 2.050 1
LANDING 2125 150 150 2.050 15
Eric:
STAIR-3
SG-1 No Beam Schedule;
400 650 500 2.050 2
SB-2 value=assumption
400 only 650 500 2.050 2
STEPS 200 200 200 2.050 14
STEPS-SLAB 4070 150 150 2.050 1
LANDING 2125 150 150 2.050 15
SUB-TOTAL
COLUMN SCHEDULE
SIZE HEIGHT
MARK No.of Column
b d h
SECOND FLOOR
SUB-TOTAL
TOTAL
PLASTERING PAINTING
FORMWORKS CONCRETE
WORKS WORKS
PLASTERING PAINTING
FORMWORKS CONCRETE ERIC:
WORKS WORKS
No Ramp Framing
8.96 2.69 8.96 8.96
6.40 1.28 6.40 6.40
28.31 8.49 28.31 28.31
28.31 8.49 28.31 28.31
PLASTERING PAINTING
FORMWORKS CONCRETE
WORKS WORKS
PLASTERING PAINTING
FORMWORKS CONCRETE
WORKS WORKS