Tilak Maharashtra Vidyapeeth, Pune

BBA VI Semester Project Guidelines


Purpose:
Project work is the best way to practice what you have learnt.
The purpose of including project report in the bachelor program is to provide you an opportunity
to study a problem applying management concepts in a scientific manner. It enables you to apply
your conceptual knowledge in a practical situation and to learn the art of conducting a study in a
systematic way and presenting its findings in a coherent report.

Submission Dates:
Students will normally be expected to complete the Project Report within a period of one month.

The submission date for 201617 Students is 15th February 2017.

The Original copy of Project Report must reach Vidyapeeth on or before the date mentioned
above.

If the students fail to submit the report by the last date, the project report will be accepted
before 21st February 2017 with late fee of Rs. 500/-.

Viva Examination:

If students are unable to complete the project in the maximum time permitted, they will not be
allowed to appear for the Viva Examination.

Please note that the Viva Voce will be conducted after the end of semester examination.

The Choice of Project:

The students must do a Project only in the area of specialization he/she has chosen.
Each student will choose a research topic in consultation with the Internal Guide of the
respective specialization.
The method of data collection would be of survey method.
The students are expected to collect data from the organization within 7 to 10 days.
The Source of data can be primary as well as secondary.
Each students will do the project individually on separate topic (No two projects
must be same).
The role of the faculty member as a project guide is initially to give guidance on the
choice of the project title and the methodology to be employed, develop questionnaires
with students and later to give advice in all aspects of the research.
The students must submit the Company Visit certificate signed by the authorities from the
organization.
Presentation of Project Report:

(A) The main report should follow the following chapter scheme sequentially.

a) Title Page
b) Vidyapeeth Certificate
c) Internal Guide Certificate
d) Company Certificate
e) Acknowledgement
f) Index of Contents with page numbers.

Chapter 1: General Introduction


(Industrial Background)

Chapter 2: Introduction to the problem


Title of the project
Statement of the problem
Purpose of the study
Objectives of the study
Scope of the study

Chapter 3: Profile of the company

Chapter 4: Theoretical Perspective

Chapter 5: Methodology
Data collection methods / sources
Sampling Plan

Chapter 6: Data Analysis and Interpretation

Chapter 7: Findings

Chapter 8: Limitations

Chapter 9: Conclusions and Recommendations

Appendix
Copies of Forms / Questionnaires used
Bibliography

(B) The following are the notes of guidance for the presentations of Project Report.

Paper and Text:


The Project Report must be printed or typed on A4 size white bond paper.
The pages should be numbered consecutively. The preferred position for the page
number is typed at the bottom centre of the page.
The text should be in double or 1.5 line spacing in Times New Roman or Arial
font with font size between 10 and 14 inclusive. Headings should be in a font size
no larger than 16.
The Project report must be of minimum 50 Pages.

Margins:
Margins at the binding left hand side should be not less than 30 mm.
Top, bottom and side margins should be not less than 15 mm.

Title Page:
The format of Title Page is enclosed.
All students must follow the same pattern.

Submission:

Student must make two spiral bond copies of the project report with blue colour cover. One
copy must be submitted to the Vidyapeeth on or before 15 th February 2017 and remaining
one copy of project must be submitted at the time of Viva. These must confirm to the style
described above.

After submission of the Project Report, the students must make themselves available, for a viva
voce examination. Failure to do so will normally be deemed to constitute a failure in that
assessment.

Guides should ensure that the guidelines are thoroughly followed by all the students.
Tilak Maharashtra Vidyapeeth, Pune
(Deemed Under Section 3 of UGC Act 1956 Vide Notification
No. F.9-19/85 U3 dated 24th April 1987 By the Government of India.)
Vidyapeeth Bhavan, Gultekdi, Pune 411 037

CERTIFICATE

This is to Certify that the project


titled
_________________________ is a
bonafide work carried out by
Mr./Ms. _____________________ a
student of Bachelor of Business
Administration Semester 6th,
Specialization _____________
PRN. ___________ under Tilak
Maharashtra Vidyapeeth, in the year
2017.
Head of the Department Examiner Examiner
Internal External
Date :

Place : Vidyapeeth Seal

Certificate

TO WHOMSOEVER IT MAY CONCERN


(To be taken on Companys Letter Head)

This is to certify that Mr / Ms ......................................................... BBA


Student of Tilak Maharashtra Vidyapeeth, Pune has
successfully completed their project work for award of Bachelor
Degree of Business Administration.

He / She has done the project on _______________________________


____________________________________________________________

Company Name

Company Seal

Designation

Signature
Certificate of Internal Guide
(To be given on Centers Letter Head)

This is to certify that the project titled

is a bonafide work
carried out by
.............................................................................. a candidate for the
award of Bachelor of Business Administration of Tilak
Maharashtra Vidyapeeth, Pune under my guidance and
direction.

Signature of guide

Name:
Date: Designation:
Place: Institute:
Project On
___________________________________
___________________________________
___________________________________
Bachelor of Business Administration (Specialization)

Submitted in partial fulfillment of the requirements for award of Bachelor of


Business Administration of Tilak Maharashtra Vidyapeeth, Pune.

Submitted by
________(_Student Name_)__________
PRN:
of
(Centre Name & Place)

Tilak Maharashtra Vidyapeeth


Gultekdi , Pune 411037

You might also like