Symptoms
Cause
Solution
Applies to:
Symptoms
A calendar was created, built, and assigned to an organization with the usage of Shipping. The
calendar is set up for 6 days on, 1 day off; workdays are Monday through Saturday, inclusive.
When entering a sales order in this organization and attempting to enter a scheduled ship date of
a Saturday (e.g., 9/1/07) and saving, the scheduled ship date automatically reverts to the
previous Friday (e.g., 8/31/07).
The problem seems to be that the scheduled ship dates are not referencing the shipping calendar
but rather the production calendar, which is 5 days on, 2 days off.
Order Management Manager -> Shipping -> Setup -> Calendars -> Enter / Assign
EXPECTED BEHAVIOR
Expected ATP to use the Shipping calender and schedule the line on Saturday (a valid workday
on the Shipping calendar)
Cause
Solution