Excavation for foundation in all sorts of soils Depth from 1.5m to 3.0m
including getting out the excavated soil and refilling the same when & wherever
required in layers not exceeding 20cm in depth, consolidating each deposited
layers by ramming and watering and disposal of surplus excavated soil as
directed, within site boundary. Filling with available excavated earth (excluding
1.2 1227.624
rock) in layers not exceeding 20cm in depth consolidation each deposited layer
by ramming and watering.
2.1 Providing and laying Cement Concrete 1:3:6 (1Cement : 3 coarse sand : 6
graded stone aggregate 20 mm nominal size) and curing completed 109.75
2.2 Providing and Laying R.C.C. in M-25 for footing, column, ground beam etc
Excluding the cost of form work and reinforcement for concrete work up to 448.80
Plinth.
3.1 Good quality form work up to plinth which includes propping and centering .
work including temporary brick or stone pillars for supporting as required. Steel
scaffolding of H frame, adjustable props, adjustable stirrup heads, MS
channels, base plates, top plates, MS pipe horizontal/diagonal bracings only 395.146
shall be permitted and in no case wooden staging shall be used.
In Words : Twenty Six Lacs Twenty Thousand One Hundred Fifty Eight a
Paisa Only
T
Mill, Dholi
2174166.47
Excavation for foundation in all sorts of soils Depth up to 1.5m, including getting out the excavated soil
and refilling the same when & wherever required in layers not exceeding 20cm in depth, consolidating
1.1 each deposited layers by ramming and watering and disposal of surplus excavated soil as directed, within
site boundary. Filling with available excavated earth (excluding rock) in Foundation in layers not
exceeding 20cm in depth consolidation each deposited layer by ramming and watering.
Grid A1 to A19
Grid BC1 to BC3
Grid EF1 to EF3
Grid BCDEF 4 to BCDEF 7
Grid BC 8 to BC 13
Grid EF 8 to EF 13
BCDEF 14 to BCDEF 16
Grid BC 17 to BC 19
Grid EF 17 to EF 19
Total Qty in CMT
Excavation for foundation in all sorts of soils Depth from 1.5m to 3.0m including getting out the
excavated soil and refilling the same when & wherever required in layers not exceeding 20cm in depth,
1.2 consolidating each deposited layers by ramming and watering and disposal of surplus excavated soil as
directed, within site boundary. Filling with available excavated earth (excluding rock) in layers not
exceeding 20cm in depth consolidation each deposited layer by ramming and watering.
Grid A1 to A19
Grid BC1 to BC3
Grid EF1 to EF3
Grid BCDEF 4 to BCDEF 7
Grid BC 8 to BC 13
Grid EF 8 to EF 13
BCDEF 14 to BCDEF 16
Grid BC 17 to BC 19
Grid EF 17 to EF 19
Total Qty in CMT
Providing and laying rubble soling with thickness as specified in drawing, in plinth and for plinth
protection, using 150 to 230 mm. cut size stones, covering and leveling the surface with a layer of sand
1.6 after filling the voids (25% by volume of soling) with smaller sized stones 20-40mm, 40-63mm, 63-
90mm & 90-150 mm size of stone/metals or stone chips, including watering, ramming well and
consolidating each layer completed as directed.
F1 16
F2 4
F3 7
F4 9
F5 12
F6 13
F7 2
F8 2
F9 1
F10 1
CFT-1 1
CFT-2 1
CFT-3 1
CFT-4 1
RFT-1 1
Total Qty in CMT
Supplying and Filling in foundations and plinth with murrum or selected cohesive non swelling soil
obtained from outside (Contractor's earth) in layers of 15 cm. thickness, including watering to optimum
1.7 moisture content, ramming and compacting including freight, transportation, loading, unloading,
screening, passes etc. all complete as directed by the Engineer (Consolidated measurements of fill shall
be paid for under this item )
Grid A1 to A19
Grid BC1 to BC3
Grid EF1 to EF3
Grid BCDEF 4 to BCDEF 7
Grid BC 8 to BC 13
Grid EF 8 to EF 13
BCDEF 14 to BCDEF 16
Grid BC 17 to BC 19
Grid EF 17 to EF 19
2.1 Providing and laying Cement Concrete 1:3:6 (1Cement : 3 coarse sand : 6 graded stone aggregate 20 mm
nominal size) and curing completed
F1 16
F2 4
F3 7
F4 9
F5 12
F6 13
F7 2
F8 2
F9 1
F10 1
CFT-1 1
CFT-2 1
CFT-3 1
CFT-4 1
RFT-1 1
Total Qty in CMT
Providing and Laying R.C.C. in M-25 for footing, column, ground beam etc Excluding the cost of form
2.2
work and reinforcement for concrete work up to Plinth.
As per Annexu
Providing, cutting, fabricating and fixing in position Reinforcement of TMT Fe-415 for RCC structures as
per design including transporting steel to the work site, handling, cutting, bending and binding with
2.4 wires, welding if necessary etc. for all floors & levels complete as directed by Engineer. Measurement will As per Annexur
be made on the length basis and converted into weight by using standard IS co-efficient (rolling margins
and wastage will not be paid).
Good quality form work up to plinth which includes propping and centering . work including temporary
brick or stone pillars for supporting as required. Steel scaffolding of H frame, adjustable props,
3.1 As per Annexur
adjustable stirrup heads, MS channels, base plates, top plates, MS pipe horizontal/diagonal bracings only
shall be permitted and in no case wooden staging shall be used.
D SPINNING MILL, DHOLI
Measurement Unit
L B H CMT
219.5
109.75
443.87
16.43
789.545
2212.71
Sr.
Discription Nos. Nos. Nos. Dia. Length 8mm
no.
for column
column calculate for
2.5mtr length
column C1 16.00 4 1.00 20 mm 2.50
16.00 6 1.00 16 mm 2.50
for ring 16.00 20 1.00 8 mm 2.09 669.44
16.00 20 1.00 8mm 0.82 262.4
column C2 4.00 4 1.00 20 mm 2.50
4.00 8 1.00 16 mm 2.50
for ring 4.00 20 1.00 8mm 2.09 167.36
4.00 20 1.00 8mm 0.82 65.6
column C3 7.00 4 1.00 20 mm 2.50
7.00 6 1.00 16 mm 2.50
for ring 7.00 20 1.00 8mm 2.09 292.88
7.00 20 1.00 8mm 0.82 114.8
column C4 9.00 10 1.00 16mm 2.50
for ring 9.00 20 1.00 8mm 2.09 376.56
9.00 20 1.00 8mm 0.82 147.6
column C5 11.00 4 1.00 20mm 2.50
11.00 6 1.00 16mm 2.50
for ring 11.00 20 1.00 8mm 2.09 460.24
11.00 20 1.00 8mm 0.82 180.4
column C6 12.00 4 1.00 20 mm 2.50
12.00 6 1.00 16 mm 2.50
for ring 12.00 20 1.00 8mm 2.09 502.08
12.00 20 1.00 8mm 0.82 196.8
column C7 2.00 4 1.00 16mm 2.50
for ring 2.00 20 1.00 8mm 1.03 41.2
column C8 2.00 4 1.00 20mm 2.50
2.00 6 1.00 16mm 2.50
for ring 2.00 20 1.00 8mm 2.09 83.68
2.00 20 1.00 8mm 0.82 32.8
column C9 1.00 4 1.00 20mm 2.50
1.00 6 1.00 16mm 2.50
for ring 1.00 20 1.00 8mm 2.09 41.84
1.00 20 1.00 8mm 0.82 16.4
column C10 1.00 10 1.00 16mm 2.50
for ring 1.00 20 1.00 8mm 2.09 41.84
1.00 20 1.00 8mm 0.82 16.4
column C12 2.00 10 1.00 16mm 2.50
for ring 2.00 20 1.00 8mm 2.09 83.68
2.00 20 1.00 8mm 0.82 32.8
column C13 1.00 4 1.00 20mm 2.50
1.00 8 1.00 16mm 2.50
for ring 1.00 20 1.00 8mm 2.09 41.84
1.00 20 1.00 8mm 0.82 16.4
column C14 1.00 4 1.00 20mm 2.50
1.00 8 1.00 16mm 2.50
for ring 1.00 20 1.00 8mm 2.09 41.84
1.00 20 1.00 8mm 0.82 16.4
column C15 1.00 4 1.00 20mm 2.50
1.00 8 1.00 16mm 2.50
for ring 1.00 20 1.00 8mm 2.09 41.84
1.00 20 1.00 8mm 0.82 16.4
column C16 2.00 4 1.00 20mm 2.50
2.00 8 1.00 16mm 2.50
for ring 2.00 20 1.00 8mm 2.09 83.68
2.00 20 1.00 8mm 0.82 32.8
Grid 19
GB 18 A
GB 18 B
GB 18 C
Grid 18
GB 19
GB 19
Grid 17
GB 19
GB 19
Grid 16
GB 19
GB 32 B
GB 32 C
Grid B
GB 15 A
GB 15 B
GB 15 C
Grid D
GB 34 C
GB 34 D
GB 34 E
Grid E
GB 6 J
GB 6 K
GB 6 L
Grid F
GB 2 J
GB 2 K
GB 2 L
RMAN
MN FOR DHOLI INTEGRETED SPINNING MILL, DHOLI
URE - B
2856.00
2102.40
432.00
521.40
515.20
612.50
850.50
991.80
1596.00
1869.60
1540.50
1565.85
33.00
33.00
205.90
246.40
136.3
87.4
68.20
85.00
238.39
77.50
142.50
142.50
156.00
119.00
143.00
142.40
101.40
101.40
160
240
40
80
70
105
225
110
165
120
180
20
20
30
10
15
25
50
10
20
10
20
10
20
20
40
###
SIYA NIRMAN
CONCRATE CALCULATION FOR FOOTING AND COLUMN FOR DHOLI INTEGRETED SPINNIN
ANNEXURE - A
Footing
Nos. LXBXd
(L x B X d )+ h/3 (A1+A2+ROUTE UNDER A1A2)
F1 16 3.30
F2 4 3.02
F3 7 2.35
F4 9 2.81
F5 12 3.32
F6 13 3.06
F7 2 0.52
F8 2 2.89
F9 1 4.98
F10 1 2.21
CFT-1 1 3.18
CFT-2 1 5.19
CFT-3 1 3.22
CFT-4 1 2.96
RFT-1 1 12.30
C1 16 0.3
C2 4 0.3
C3 6 0.3
C4 9 0.3
C5 12 0.3
C6 10 0.3
C7 1 0.3
C8 2 0.3
C9 1 0.3
C10 1 0.3
C12 1 0.3
C13 1 0.3
C15 1 0.3
Grid 19 0.3
GB 18 A 1 0.3
GB 18 B 1 0.3
GB 18 C 1 0.3
Grid 18 0.3
GB 19 1 0.3
GB 19 1 0.3
Grid 17 0.3
GB 19 1 0.3
GB 19 1 0.3
Grid 16 0.3
GB 19 1 0.3
GB 32 B 1 0.3
GB 32 C 1 0.3
Grid B 0.3
GB 15 A 1
GB 15 B 1
GB 15 C 1
Grid D
GB 34 C
GB 34 D
GB 34 E
Grid E
GB 6 J
GB 6 K
GB 6 L
Grid F
GB 2 J
GB 2 K
GB 2 L
OLI INTEGRETED SPINNING MILL, DHOLI
(A1+A2+ROU
T - t /3 TE UNDER Qty in CMT
A1A2)
434.29 485.39
14.51
448.80
0.6 1.8 0
0.6 1.8 0.324
0.6 1.8 0.324
0.6 1.8 0.324
0.6 1.8 0
0.6 1.8 0.324
0.3 1.8 0.162
0.6 1.8 0
0.6 1.8 0.324
0.6 1.8 0.324
0.6 1.8 0
0.6 1.8 0.324
0.6 1.8 0.324
0.6 1.8 0.324
0.6 1.8 0
3.078
-51.10 2200 -112422
4.896
1.224
1.836
2.754
3.672
3.06
0.153
0.612
0.306
0.306
0.306
0.306
0.306
SIYA NIRMAN
FORM WORK CALCULATION FOR DHOLI INTEGRETED SPINNING MILL, DHOLI
ANNEXURE - C
Footing
(L x B X d )+ h/3 (A1+A2+ROUTE Nos. Rmt
UNDER A1A2)
F1 16 15.2
F2 4 14.5
F3 7 12.8
F4 9 14.00
F5 12 15.2
F6 13 14.6
F7 2 6
F8 2 14.2
F9 1 16.4
F10 1 12.4
CFT-1 1 16.33
CFT-2 1 15.4
CFT-3 1 15
CFT-4 1 15.53
RFT-1 1 16.2
0.23 55.94
0.23 13.34
0.23 20.61
0.23 28.98
0.23 41.95
0.23 43.65
0.23 2.76
0.23 6.53
0.30 4.92
0.23 2.85
0.20 3.27
0.35 5.39
0.23 3.45
0.20 3.11
0.75 12.15
248.90
146.25
395.15
ANNEXURE - B
SIYA NIRMAN
FORM WORK CALCULATION FOR DHOLI INTEGRETED SPINNING MILL, DHOLI
ANNEXURE - C
Footing
(L x B X d )+ h/3 (A1+A2+ROUTE Nos. Rmt
UNDER A1A2)
F1 16 15.20
F2 4 14.50
F3 7 12.80
F4 9 14.00
F5 12 15.20
F6 13 14.60
F7 2 6.00
F8 2 14.20
F9 1 16.40
F10 1 12.40
CFT-1 1 16.33
CFT-2 1 15.40
CFT-3 1 15.00
CFT-4 1 15.53
RFT-1 1 16.20
0.23 55.94
0.23 13.34
0.23 20.61
0.23 28.98
0.23 41.95
0.23 43.65
0.23 2.76
0.23 6.53
0.30 4.92
0.23 2.85
0.20 3.27
0.35 5.39
0.23 3.45
0.20 3.11
0.75 12.15
248.90
198.9
447.80