MATERIAL BREAK DOWN FOR HOUSE CONSTRUCTION

Project estimated duration : 6 Months Max


Total Man Power : 25 person

SR No. LOCATION

1 Roof

2 Ceiling outside

3 Ceiling inside

4 Trusses
5 Structural
6 Bed room Flooring

7 Doors

8 Laundry
9 CR
10 Toilet bowl
11 Kitchen
12 Kitchen walls floor
13 Kitchen cabinets
14 Living room
15 Hallway
16 Balcony
17 Porch

Proposed budget for House Constrution


including Garage
Estimated cost for Pool + Nipa Hut
Total amount of project

Note:
* Total amount includes building permits, architech designs & complete drawings.
*Payment details 50% downpayment + 50% progress billing.
EAK DOWN FOR HOUSE CONSTRUCTION
6 Months Max

TYPE OF MATERIAL
Tilespan .5 / Gutter stainless smoke or mirror (Spanish
style)
Spandrill

Hardlyte or marine plywood (metal faring)


Steel truss
Load for 2 storey
Laminated Wood (to be installed by the supplier)

2 Units Narra w/ wood door jumb (Main door & Balcony)


All bedrooms shall have a mahogany w/ wood door jumb
Ceramic Tiles (Mariwasa brand)
Ceramic Tiles (Mariwasa brand)
HCG Brand , Bedey
Ceramic Tiles (Mariwasa brand)
Original granite
Wood with Varnish
Ceramic Tiles (Mariwasa brand)
Ceramic Tiles (Mariwasa brand)
Ceramic Tiles (Mariwasa brand)
Ceramic Tiles (Mariwasa brand)

4,800,00
900,000
5,700,000

ding permits, architech designs & complete drawings.


payment + 50% progress billing.