Key Plan

TEST LINE SHALL BE DRAINED BY


SPILLING ON FLOOR OF THE
NEAREST WET AREA
TO 14 C*
SD
SYSTEM HD
N
19
DELUGE FOAM / WATER SYSTEM CONTENT

A. FOAM CONCENTRATE BLADDER TANK COMPLETE WITH ITEMS FROM 1 TO 7 TO PROPOTIONAL VALVE

A
BL
22 9*** WITH CAPACITY 180L

QI
18 ANGLE STYLE
17 CCV VALVE 1. WATER DRAIN / FILL VALVE - NORMALLY CLOSED Notes
2. FILL LINE MASTER SHUT-OFF VALVE - NORMALLY CLOSED
FOAM / WATER 3. CONCENTRATE DRAIN / FILL VALVE - NORMALLY CLOSED
4. FILL CUP / SIGHT GAUGE SHUT OFF VALVE - NORMALLY CLOSED MECHANICAL
SOLUTION SPRINKLER ALARM WATER MOTOR GONG
5. SIGHT GAUGE ASSEMBLY - THE TRIM FOR THIS ASSEMBLY VARIES
14 WITH THE TYPE OF FOAM CONCENTRATES USED TO BE USED. REFER
D* 7 TO TANK MANUFACTURER'S O&M MANUAL FOR SPECIFIC DETAIL.
B 6. TANK WATER VENT VALVE - NORMALLY CLOSED.
16 22 7. DIAPHRAGM CONCENTRATE VENT VALVE - NORMALLY CLOSE.
15
SD
HD 9*** B. PROPORTIONING DEVICE - CONCENTRATE CONTROLLER WITH INTEGRAL
FOAM ORIFICE LOW AIR PRESSURE
CONCENTRATE 19 ALARM SWITCH
C. TYPE OF SYSTEM - DELUGE VALVE WITH STANDARD TRIM AND GAUGES SOLENOID VALVE DELUGE VALVE
TO 13
CONNECTED TO AN APPROPRIATE RELEASE AND DETECTION SYSTEM.
RELEASE 6
SYSTEM 10. WATER SUPPLY CONTROL VALVE - NORMALLY OPEN WATER FLOW
11 ALARM SWITCH
FSCP

D. CONCENTRATE CONTROL VALVE (CCV)


12 HYDRAULICALLY ACTUATED COATED DELUGE VALVE.

C 14. WATER PRESSURE GAUGE AND 3-WAY VALVE AND REMAINDER OF CCV SPECIAL
TRIM.
SV 19. 1/2 " FOAM CONCENTRATE AUXILLARY DRAIN VALVE.
5
E. ACCESSORY TRIM WATER SUPPLY
9. CONCENTRATE CONTROL SHUT-OFF VALVE - NORMALLY OPEN. CONTROL VALVE
A 11. TANK WATER SUPPLY CONTROL VALVE - NORMALLY OPEN.
THERMAL DETECTOR
12. WATER SUPPLY PIPING TO BLADDER TANK.
WALL WATER SUPPLY
13. RELEASE LINE / PRIMING LINE PIPING TO FOAM CCV.
15. FOAM CONCENTRATE DISCHARGE PIPING MANUAL EMERGENCY
WATER MOTOR GONG 10
SEE DELUGE 16. FOAM CONCETRATE SWING CHECK VALVE STATION (ELECTRIC)
VALVE DETAIL 17. FOAM SOLUTION TEST VALVE - NORMALLY CLOSED.
18. SYSTEM ISOLATION VALVE (OS&Y GATE VALVE) - NORMALLY OPEN. TROUBLE & ALARM
120/220 VAC
DRAIN 20. STRAINER ANUNCIATORS
4 A ISSUED FOR TENDER ARN BM* AH* 08.03.15
20 21. SYSTEM CONTROL VALVE (OS&Y GATE VALVE WITH TAMPER SWITCH)
22. CHECK VALVE RELEASING/CONTROL
1 Job Project
2 3 PANEL No Revision Drawn Manager Director Date

*** - FULL PORT BRONZE BODY WITH 316 STAINLESS STEEL TRIM AND BALL
(2' AND UNDER), CAST IRON BODY OS & Y WITH BRONZE TRIM AND SEATS
(OVER 2") Note: * indicates signatures on original issue of drawing or last revision of drawing
21
Conditions of Use. This document may only be used by GHD's client (and any other
person who GHD has agreed can use this document) for the purpose for which it was
prepared and must not be used by any other person or for any other purpose.

FROM
WATER
SUPPLY 18 - DELUGE FOAM / WATER SPRAY SYSTEM - Master Developper / Owner

SCHEMATIC DIAGRAM (IN SHEET) 19 - DELUGE VALVE DETAIL Abu Dhabi Airports Company PJSC
SCALE NTS SCALE NTS Planning & Development
PO Box 94449, Abu Dhabi, U.A.E
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300

Lead Consultant

GHD GLOBAL PTY LTD


3rd Floor, Guardian Tower, Danet Community
PO Box 45921 Abu Dhabi United Arab Emirates
T 971 2 6968700 F 971 2 4472915
E abumail@ghd.com W www.ghd.com

Specialist Consultant

Fire Life Safety, Planning


and Regulatory Specialist

Specialist Consultant

Third Party
Operational Advisor

Client
ADAC
Project
MIDFIELD TERMINAL FIRE
STATION
Title FIRE PROTECTION SERVICES -
MISCELLANEOUS DETAILS
SHEET 4 OF 4
Scale NTS DO NOT SCALE
Drawn A. NOCEJA Designer P. MOHD.
Drafting Design
Check Check
Approved
(Project Director)
Date
This Drawing must not be used for Construction unless signed as Approved
Original Size
Drawing No:
A1
DETAIL DESIGN 76-10526- F005 Rev: A
Plot Date: 7/03/2015 10:14:47 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt

You might also like