INTER OFFICE MEEMO
From : Ch.Manager (F&A) To : AGM (Fin.)
Kumool- CAO SRTS ~ |,
Secunderabad
Ref: KNL-CAO/F&A/ [FNS Date: 01st September, 2014
‘Sub: Release of Payments to ADHOC CAMPA A/C No. 344902010105407 of
Union Bank of India towards Compensatory Afforestation and NPV
Kindly arrange for release of payment to M/S ADHOC CAMPCA towards
Compensatory Afforestation and Net Present Value vide Note ref No. SR
I/PROJ/KNL dated 27.08.2014 :
SLNo. Name Amount to be
Released (Rs.)
1 Adhoc CAMPA 17,00,000.00
2 Adhoc CAMPA 18,87,400.00
A copy JV No. 102, 93 and 94 dated 01.09.2014 along with supporting
Papers enclosed.
-
Regards, Jal
(RA Rao}
Encl: a/avcnieaetenrese eer gia
io
(6a pavoxldy) payee pis se (6g pomedosg) 2ump na sp As:as0pK)
00 00.1 anro0'e0s4 (wep B&
(overs ner oxo 05-40 st0rds-10
0.00 01 0 robs10 voir ov wae 646-99 w4469) HEEL 8
ngs ane
ovr o'et OY OLE 66639 856099 EEL THT
_%a
ni A SVAMINRRES/ SPIN 1o0Uamy TORTI WOd /SiepEEAb(umunosoy aun stssy) pip BopLDe,
(ig pasoaddy) paytefere pipe sp (iq posndoag) Mp DIED
vvore'er ow vor ua'at (revo) wb
owras 0-708 nlocbs-t0
on oore'st 0 moeds10 ANN TSRLOV OOUE 66D H6K]I ST OTH
imc
fer
se er ag esa sera, | At ran eel oe ches
et nas. im sam eqgumepyputor "oy soon
wae aman Sy mane ae og eee =
es aati Spahr ruine) meee! Yoowunyaina Sia Am
a \ Fela Ala
rrrey >PLOZ/L/6 ““13RZOT—aYONO A WoOL,;>PIDYONO A + PaYstU.|-9popUDYONOA 7 A [=aPo.ypav-Igdsw EIA oNOA AYSV A/S VA/SWAMO eIpepHBLEMod guy //:An
(W9 GHB DHABW/NGIOVASIOW/OVY)
neosipw aes eer ee eee
y
(Ka posoaddy) payee DUB> ae (6q1 poaedoig) Mp INES se
(ununosoyjuesissy) winima/sphLdEe
a)
ce sbespbie
wwomeucr rome
swore apcie50.3-20N 025-10
oooavers 9 Hoees-10 OV O0LE 68°29 66
> rinedes-i0
omowver 0 rioestas-10
ayy extn 90> ssemoniea Sing adage ary sseyoK DS MIS ON
aan an
2g ae ey ae ee tangy ib ela) tae apneic M28 oe ance
ours «Isis ume
- ‘SEAUULAS/6ISSNOOWINY/ALADUANOd / LEPaan
waz Ars @reuitert sits sfer Sees Z
POWER GRID CORPORATION OF INDIA LIMITED a
A —.
Ref:SRI:PROJ:KNL: — :2014 Date:27.08.14
Sub: Construction of 765kV Kurnool-Tiruvalem Transmission line (Part-1)- Diversion of 4.214Ha forest
land (3.015Ha in Kurnool! Division and 1.195Ha in Proddatur Division}- Forest clearance-
Release of payment as per Forest Conservation Act 1980 - Reg
76SKV Kurnool-Tiruvalem transmission line is under construction as a part of SRSS-XIK. The line is
crossing the reserve forest in Kurnool and Proddatur forest divisions in Andhra Pradesh. The details of
the crossings are as below:
'SNo | Forest Reserve Forest | Length of | Forest area to be | Remarks
Division _| Name crossing _| diverted in ha |
Z| Kurnool | Panem RF 450m | 3.015 The line is crossing the RF
| between AP 15/0 and
| AP16/0
2 | Proddatur | Pennar i79m | 1.199 The line is crossing the RF_|
Plantation between AP 41/0 and |
i AP.42/0 |
Total 625m | 4.28
Govt. of India, MOEF, Chennai has accorded in-principle approval (Stage-!) for the diversion of 4.214ha
of forest land for construction of subject transmission line vide letter ref: F.No APBQO1/2014-CHN/26
dtd 23.07.14 and the same was communicated to DFO Kurnool by PCCF Hyderabad vide letter ref:
Re. No. 29820/2011-FCA-3 dtd 08.08.14
The stage-1 approval has been received subject to a few conditions. Compliance to those conditions has
to be submitted to receive the final approval (Stage-l). As a part of compliance, it is required to make
the payments towards Compensatory Afforestation, Net Present Value of diverted forest land and Cost
of raising plantation of dwarf species to the forest department:
In this regard, DFO Kurnool has issued a demand note vide ref: Rc.No.2790/2012/HS, dtd 28.08.2014
for depositing the following amounts:
‘S.No | Description Anau
1. | Cost of raising compensatory afforestation | Rs. 17,00,000/-
over 6.6Ha of degraded forest land at
comp.No. 36 Thungabadra Reserve Forest
in Adoni range.
2. | Amount towards Net Present Value (NPV) | Rs. 18,87,400/-
of 3.015Ha forest area.
3. Cost of raising plantation of dwarf species | Rs. 8,50,000/-
‘in the diverted forest area, under the
cewnioie |
etaela.
fe a err eer ara @, ae at afore)von
Se
Submitted for kind approval please.
oraz firs aorecizerat sits siden fetes
POWER GRID CORPORATION OF INDIA LIMITED
orereiars:
The above funds have to be deposited separately in SB A/c No.344902010105407- ANDHRA PRADESH
CAMPA, Union Bank of india , Sundar Nagar, New Delhi-110003 (RTGS/IFSC No. UBINOS34498)
‘The receipts for the above payment have to be submitted to DFO Kurnool so that the same would be
forwarded to CF Kurnool for Stage-ll approval process.
In view of the above, it is requested that as per DOP clause no 14.0, competent authority may kindly
accord approval for release of payment to the Forest Department.
eeagtt
(N Harshavardhan)
| fed A orm wen gram 8. yo at Se)
Provision For Time Extension in Present Contract and Whether It Is Proposed To Utilize The Same, If Not Why?:as Per Clause 4.1 of The LOA, The Contract Period Can Further Be Extended