Organization Unit General Projects Department

Form Title Material Status Log (MSL)

Document Ref. DM-GPD-P3-F11


Issue Date: 2/14/2017
Project No. PJ 10040 Start Date 12th June 2016 Planned Completion: 3rd December 2017
Project Title: DM STAFF ACCOMMODATION @ AL TWAR End User: M/s. DUBAI MUNICIPALITY

Consultant: M/s. ARCHDOME CONSULTING ENGINEERS Contractor: M/s. GAMMA CONTRACTING L.L.C

Liaison Engr. SEEMAN Engr. RAMZI /


DM Arch.: Engr. SAMER MOHAMOOD DM Mech. Eng.: DM Elect. Eng.: Engr. BARGHOUT
Eng.: MALIK Engr. SAEED HAYAT

FIRE FIGHTING SYSTEM


Tracking of Submission Dates - Consultant Time Taken Delivery Status
Submittal Planned Sub.
SN Rev. Description Make Remarks
No. Date
Subd to Cons. Cons. to DM DM to Cons. Cons. to Cont. Status DM Cons Total LPO arrival

Revise & Re-


0 9/18/2016 20/09/2016 26/09/2016 0 4 4
submit
1 FF-01 FIRE PUMP SET PATTERSON
Approved As
1 10/4/2016 10/10/2016 18/10/2016 20/10/2016 20/10/2016 2 6 8
Noted
Revise & Re-
0 10/27/2016 29/10/2016 08/11/2016 10/11/2016 10/11/2016 2 8 10
submit
2 FF-02 FM 200 SYSTEM KIDDIE FIRE
Approved As
1 11/30/2016 04/12/2016 18/12/2016 20/12/2016 20/12/2016 2 9 11
Noted
SPRINKLERS RELIABLE

ALARM CHECK VALVE ASSEMBLY RELIABLE

ZONE CONTROL VALVE ASSEMBLY NIBCO-USA

FIRE HOSE REEL + CABINET WALKER FIRE


Approved As
3 FF-03 0 LANDING VALVE UNIT WALKER FIRE 10/13/2016 12/10/2016 20/10/2016 23/10/2016 23/10/2016 1 6 8
Noted
FIRE EXTINGUISHERS WALKER FIRE

BREECHING INLET WALKER FIRE

OS & Y GATE VALVE NIBCO-USA

AIR RELEASE VALVE WALKER FIRE


Revise & Re-
0 12/13/2016 06/12/2016 02/01/2017 15/12/2016 0 6 6
submit
4 FF-04 DELUGE SYSTEM VICTAULIC
Approved As
1 28/12/2017 27-12-2016 02/01/2017 04--01-2017 04--01-2017 2 4 6
Noted
Revise & Re-
0 9/20/2016 21/09/2016 27/09/2016 0 6 6
submit
5 FF-07 G.I FIRE FIGHTING PIPES SURYA
Approved As
1 10/27/2016 19/10/2016 25/10/2016 30/10/2016 30/10/2016 3 4 7
Noted
HEPWORTH
Approved As
6 FF-09 0 U/G PIPE & FITTINGS (HDPE) /GEORGE 9/20/2016 21/09/2016 27/09/2016 04/10/2016 05/10/2016
Noted
4 4 8
FISCHER
Approved As
7 FF-11 0 GI GROOVED FITTINGS VICTAULIC 9/21/2016 21/09/2016 27/09/2016 04/10/2016 05/10/2016 4 4 8
Noted
Revise & Re-
0 10/10/2016 10/10/2016 11/10/2016 0 1 1
submit
8 FF-12 GI THREADED FITTINGS BIS
Approved As
1 10/27/2016 19.10-2016 25/10/2016 30/10/2016 30/10/2016 3 4 7
Noted

Remarks:
1-SuccessiveRevisionsofthesameMaterial/servicewillbeenteredinsequentialmanner.2-TrackingDatesandstatuscodewillbeenteredaspertheinformationofMaterialApprovalForm.

Page: 1of1 Issued Date: 05-11-2014 Rev. 8