Download as pdf
Download as pdf
You are on page 1of 21
RIDERS DIGEST PHILIPPINES 2015 ‘A compilation of cost data and related information on the Construction Industry in the Philippines. ‘Compiled by. Rider Levett Bucknall Philippines, Inc. A proud member of Rider Levatt Bucknall Group. Main offi Building 3, Corazan.Clemena Compound, #54 Danny Floro Street, Bagong llog, Pasig City, 1600, Philippines T: #63 2 687 1075 / 470 0642 F. +63 2.570 4025) E:rlb@phrib.com, bizdev@phrib.com Cebu Office: Suite 602, PO! Condominium, Archbishop Reyes ‘Avenue cor. Panis Street, Baniled, Cebu City, 6014 Philippines T: +63 32 268 0072 E:rlecebu@phirib.com Davao Office: 6th Floor, Units 15 & 19, Metro Lifestyle Complex, cor. F. Torras St. and E. Jacinto Extension, Davao Clty, 8000, Philiapines T: +63 82 222 5315 M: +63 917 550 7013, E:rlocevao@phrib.com Cagayan de Oro Office 308 Sto. Thomas St, Sta. Cecilia Vilage, Gusa, Cagayan de Oro City, 9000, Philippines M: +63 998 573 2107 E:rlo.edo@phrib.com White Rider Levett Bucknall Philippines has endeavoured to ensur the accuracy ef the Information contained hecein, f Goes not warrant Ine adequacy or completenest snd. expressly disciaime any Natty for any errors In, or omissions trom this Digest Rider Levett Bucknall Philippines, nc. shall aot be held lable for any damages: oan; expenres bor cont whatsoever or howsoever arising out of orm connection with the use of the Digest. The Digest [x provided for general Information nly and should not be construed as cost, lege, tox, of any other professional advice, Professional advice should be sought when Utlizing fry information inthis pubieation to verify is appleablty to spect Construction roqurements and crcumstances, This Digest may not In {ny medium, be reproduced, published, altered or otherwie ured In ‘ole orn part in any manner withovt the prior written concent of Rider ovett Bucknall Phitppines, Ine Cost Information in this publication is indiative and for general Suldance only. Most prices and rates are as at 4th Quarter of 20%4, Aine some are ae at fro Quarter of 3014, and expressed in Phiippines Peto unis otherwise stated. Reference? to legisintve Provisions and Fegulalions are as at 31 December 2014. Changes after these” dates cannot be reflected Sheth Edition 2015, ‘© Rider Levett Bucknall Philopihes, Inc truction, INTERNATIONAL CONSTRUCTION Building Costs Construction Market Activity Cyce | Sector Data A [ding for Ecclogically sive Design Excellence 7 21 23 25 26 28 29 31 33 36 37 my 42 44 45 Ce ea Rider Levett Bucknoll Philp MESSAGE FROM THE CHAIRMAN AND PRESIDENT Rider Levett Bucknall Philippines, inc. proudly presents to you the sixth Philippine edition of "Riders Digest,” a Compilation of cost data and related information in the Philippine Construction Industry. Rider Levett Bucknall Philipines is @ member of the Rider Hunt, Levett & Bailey, and Bucknall Austin Group now RIDER LEVETT BUCKNALL (RLB), an independent global property and construction practice with 120 offices in 80 different countries covering four Continents namely OCEANIA, which covers all of Australia and New Zealand; ASIA, which covers The Philippines, China, Hong Kong, Indonesia, Japan, Korea, Malaysia, Singapore, Taiwan, Thailand and Vietnam; EMEA, which covers Europe and Middle East; and NORTH AMERICA which covers Phoonix, Boston, Chicago. Denver, Honolulu, New Jersey, Las Vegas, Los Angeles, Florida, Portland Oregon, San Francisco, Seattle, and Washington DC together with Canada, Our group employs over 3500 people in its offices across the world, integrating local knowledge and expertise with access to the global network to provide the best and most up-to-date service our clients deserve. Our open communication and interaction between offices transform to greater experience across every sector in the Construction Industry. The Philippine office is now operating in its 25th year, heving commenced our operation in 1989, We have provided our Quantity Surveying and Project/Construction Management Services on over 700 projects in The Philippines, from Office Towers, Residential Condominiums, Hotels, Residential Estates, Industrial Development Plants, Institutional Schools, Ports and Harbors, Roads and Bridges, Airports and Airports Buildings, Commercial Centers, Hospitals, BPOs, and Land Development Works. We have also served a number of overseas projects within the Pacific Rim including’ Guam, Saipan, Palau, Hawai, Australia, Malaysia, Vietnam, and as far as the Middle East, Pakistan, and Syria Our corporate vision is to be the leading global practice in our respective market and deliver sustainable and competitive advantage to our clients through the passion of our people and our focus on integrity, professionalism, innovation, team work, and client satisfaction. We have adopted our core values, together with our global network and in-depth knowledge, making Rider Levett Bucknall Philippines, Inc. truly unique and consistent in providing quality services to our client. Our combined experience and expertise enables us to provide excellent and efficient services. We protect our integrity, optimize the use of resources, and create maximum performance and value throughout the life cycle of every proyect we handle. Rider Levett Bucknall Philippines, Inc. 's committed to developing tools and techniques that help aur clients save costs while getting their desired results, not only at present, but also in the future, The entire RIDER LEVETT BUCKNALL Group ensures ‘at a significant fund is allocated for research and development programs, uses the latest technology, and develops training to maintain quality staff performance. The publication of our Riders Digest and International Report on Construction Market Intelligence from our global network of offices will continue to be beneficial by providing professional input, expert advise, and. value added services to our clients. As key resources in the International Construction Industry, these will prioritize benchmarking of construction services throughout the International market. Rider Levett Bucknall Philippines hopes that you find this publication informative and useful, aiding in the successful completion of your construction needs, Corazon Clemena Ballard Chairman & President Rider Levett Sucknall Philippines, Ine. QUALITY POLICY STATEMENT ISO CERTIFICATE RLBIRider Levett Bucknall “scityautcaeuteracr” QUALITY POLICY STATEMENT te Sesans wih rs earner equrmen: Sur ging posse see ‘Salhae late deta eutomer fois on contac cbgatone, Te see ‘senator pare fob sateen Se + Spat rece wit ouremporae 1c hey me ct it a Se re ae me teat sitet pclae at Nita ‘ye aut anal sre asgement rant report guy The ‘Suman Maegig Diet hw cima sory aed Tepocay for he secant Gal enaerest Systm, Tu aly teagan sarod Sed eoporats nam ea main ow ey ener rem Satna Manan aeacoaed nie Rerenee rocotu. ‘ut cpanel be cra oat conrad nth nut ad te etree Frosscs barton fam he rceets est whatnot th Say anager The Citas & Manag Deca a reponn forthe per! Taher to pooun pris mpomannion Bie Comonton oe Gay Pot : Ie pa of he onan ang prograran tat 2 posey undated, a aay 200 Certificate orcs 180 8001:2008, conte Ragan Na 9480088 rere HESS... fier Lovet Buca Pipes ‘econ Genta Compan Duy Stet owaton Paso cr ones soe uty ie. Pe Manon Catan ‘Sopa ote Sn acne ‘posure Secor A. rovemeiniona Cree ea tae Cee eter Philippine Construction Trends Umer Projects by Type Distribution of New Construction Ciera sa Ig VE emo) CaN ear) et tam y Rau idol Number and Value of Non-Residential Rett aT PHILIPPINE CONSTRUCTION TRENDS Number of Construction Projects by Type Third Quarter 2014 | a ae | ‘ | Value of Construction Projects by Type Third Quarter 2014 ‘Acssitions 1585 Non-Residential 3882 ‘ + Aterations and Repairs 5049 a Residential, 20802 «| ora: 29616 a 4.5% addtions — 12.9% Now-Residentia! 13.0% Alterations and Repairs Number and Value of Residential Construction Third Quarter 2014 Distribution of Construction Projects by Region Third Quarter 2014 Total: 20,602 ‘otal PhP 4.28 ‘ 5 1057 (52%) 24,737,980 (5595) 2365.015%) 282,887 020%) y70 @53%) 4.24987 320) See ee Oe eee PHILIPPINE CONSTRUCTION TRENDS Number and Value of Non-Residential Construction by Type, Third Quarter 2014 NUMBER 2500 Total: 3832 ‘00 ‘00 1000 0 0 ype of Non Retental | Cormeen) dust! Aare others Construction oe VALUE Cin billion pesos) wo. » Totel: PhPSBS billion ® ” “ 0 0 ® ——_ dat “pat 5 Residential Corenercs nsttuiond | Ieustol /Acrcuturs Others Value Ge bilfon 35 BO 4g |, CoCo a ea Philippine Construction Cost Data Yuta M maT el Building Construction Prices eC Auli Construction Elements Colo t eeeeuLR io ieee Lela STENT Ret eCursS Ce are Reto Building Services (as of 4th (eae) Definition (Building Services) Office Fit-Out, Workstations fem CU Gla matscores PHILIPPINE CONSTRUCTION COST DATA DEFINITION OF TERMINOLOGIES Central Business District (CBD) The Central Business District is within the Metro Manila cities of the Philippines. It consists of seven planning areas, namely Makati City, Global City- Taguig, Quezon City, Pasig City, Mandaluyong City, San Juan, and Manila, It is the prime area of all the commercial and financial activities in the region and includes developments from nearby provinces around the perimeter of Metro Manila Construction Floor Area (CFA) CFA is the area of all building enclosed covered spaces measured to the outside face of the external walls, including covered basement and above ground car park, areas. Gross Floor Area (GFA) GFA is the sum of fully enclosed covered areas and the unenclosed covered areas of the building for Purposes of planning submissions (refer to Page 88: Measurement of Building Areas - Gross Floor Area for more information). Net Lettable Area (NLA) NLA js the total tenancy area designated for rentable purposes. Building Works Building Works include substructure (piling, foundation, and basement), super-structure, architectural works, finishes and fittings, external works, site works, preliminaries, attendance, and other builder's work in connection with services, Building services Building Services include mechanical services, inlcluding heating, air conditioning, mechanical, ventilation, fire protection system, sanitary, and plumbing; and electrical services, which include electrical installation, vertical transportation, and building management systems. Exclusions; Special equipment - Chutes, incinerators, compactors, Pneumatic refuse disposal system, facade maintenance equipment, engineered smoke control systems etc, IT services - high speed cables etc. The office within the CBD refers to good auality office buildings located at the Central Business District, for the upper range of the rental market and leading owner occupiers, such as headquarter offices for financial institutions and major companies. Offices outside CBD refer to medium quality office buildings that are built for the middle range of the rental market, Hotels ‘Types of hotels listed are based on ‘five-star’, ‘four- star’ and ‘three-star’ international hotel ratings Retail - Shopping Malll Shopping malls with typical amenities and finishes in commen spaces. Exclusions: Tennant equipment, shop fittings and finishes in tenancy spaces. Industrial Buildings Quality reflects @ simplified type of construction suitable for light or heavy industries, Exclusions: Special and operating equipment, processing plant and proprietary systems. Residential Ratio of kitchen, laundry and bathroom areas to iving areas and the quality of finishes required will affect the cost range. Range given is significantly affected by the height and configuration of the building. Exclusions; Show apartments. Loose furniture, special light fittings, household electrical appliances, kitchen equipment — and building owners’ special requirements. Institutions of Higher Learning Tertiary educational schools such as universities, polytechnics, and other colleges that require full range of educational facilities end amenities. Car Park Above Grade - minimal external walling excluding mechanical ventilation. Basement - diaphragm wall or contiguous bored piles wall with standard mechanical ventilation provisions. 3 "34,000 8.200 37200 asia Saal 46,200 2100000 eee 11600000, noe saanne: 1200.00 "3500.00 4.000.000 ‘5100000 '3600,000 Sas cel 3200000 mT 726000 2,000 35/000 18200 por 14.600 mee 33500 sain 29,400 33800 28,400 2700 33800 BeA00 Son) 39700 36400 M1500: 29.000 45000 24000 34000 587,000 576,000 sone 617000 PHILIPPINE CONSTRUCTION COST DATA BUILDING CONSTRUCTION PRICES All construction prices for the Phil 8 Philippines are inccatve ont and ere as at 4th Quarter 2014, iter 2 er ns Generally excluded from the order of cost are land costs leg! and rofersona development charges, euthorily fees, tnence. costs, loose furniture, tings, art works, tenancy works uch ae eat 10-25 Stoveye 25-40 Storeys 40-55 Storeys Five ) Star Four (4) Star Three (3) Star Five (S) Star Four ¢4) Star ‘Three (5) Star Mid Class High Ena 500m to U/S Truss: Metal Cladding '5.00m to U/S Truss: PCC Cladding 110 3 Storey Units; 85 - 120 SM per Unit Single and Double Storey ‘Condominiums (Up to 10 Storeys with Lift) Condominiums: 10 to 20 Storeys Condominiums: 20 te 40 Storeys Condominiums: 40 to 80 Storeys {institutions of Higher Learning Schools Basement CBD: 35 SQM per Cer Basement Outside CBD: 35 SGM per Car Som sci Sat ome won iek a en a es rot limited to sub-divisional partitions in office building end Shop ft-out In retail spaces, private telephone systems, site inastructure work, diversion of existing services, resident site ‘ait cost, models and prototypes, and future cost escalation (unless otherwise stated). All prices stated below include a General allowance for foundation and external works. Pree PHILIPPINE CONSTRUCTION COST DATA EI CONSTRUCTION COST DATA _ EXTERNAL WORKS Description tow || eh LANDSCAPING Phitppine Peso per Square Metro Dense, rubs, Topsoil and Grassing 6049 6960 Grassing Large Areas, Topsol, Sowing Testng 4030 4640 Price per Heciare (n Millions of PG) Loh. Large Areas, Meal Btanting 2 (CAR PARKS “ON GROUND) Philippine Poco per Car Ugh Duty Paving e770 93250 Heavy Duty Paving 93250 98750 Roaos (remix trish incucing kerbs, chon, and crainage) Prithepine Paso per Mate Residential estate. 680 meters wide excluding foot peths and nature Seis TED 48500, Industri estate 10.40 meters wade including rurimal to extensive formation $8000 1000 CONSTRUCTION ELEMENTS 1a following rates are incicative only and include an allowance {2x profit and overheads but exclude preliminaries Tee sacs re not valid for tendering or pricing of variations em Low Hah SUB-STRUCTURE Phitppine Peso er Guie Metre Renforced concrete pad feting (6000 ts 6500 ag00 Reinforced conerat slab on groun pe "000 4200 6.400 COLUMNS Phiioine Peto per Matra enforced Concrete 600mm x 600m (7000 Psi) Reo aaa Reinforced Concrete (200mm x 860m) (3000 Psi) 700 = tae | Hien ‘eee with renforced conerate casing ae (000 PS) Ube Floors! Polippine Peso per Sauare ete mamas eae slags and ass balustrade ebm ise) ROOF Priippine Peso por Savare Metre 2 Slab ($000 PSI) graded to fall anc Pear teaae uiteup rooting mernorene Sirucur! steal, urns ard insult raaeee een 5) deck rook Exreanal WAL Phiiopine Peso bet Sauare etre retehotow block walsointed 361200 etest mortar nels reifercerent re laze window unt pio ea user 8798) Double laze window unit eee Srement type) skin wth Ore toyperes glass curtain TERTERNAL DOORS (EXCLUDING RONNONGERYD resco 34000 E Number s 6 24500 30200, ‘Soe laf cok core stool door a 6100 86,700 Double wat glazed doer aera 1452200 Sree eee ee PHILIPPINE CONSTRUCTION COST DATA 250mm reinforces concrete well(3000 4 50007200 100mm bn or black wal 10801300 ‘tus plasterboard wall 22002700 Fe rated steal stu wa 4600 6000 hour shat wal 5800 8000 ‘Single ef sole coe woo tush door 7600 9.200 Single leat haithour erated sted door 19200-30200 Single leafone hour fre deor 3020037700 Double let auto operating door 248000 540,000 Leminated toiet partion with one cubicle 22,700 38809, Stone finsh tet partition 49500 54700 ‘Cament and sand paste anc - femusion pain 7 oa ‘Cement randoe and wiry bri 1500 2200 Cemont render and ceramic te 2200 000 Marole wall finish on recived [inca 3600 10800 Merbie wall cling 080014000 iter comet plaster boar cling Pacted ‘One way exposed grid with mineral Fiber board seoustecaling ve, 1508, Molded plasterboard celing system 4500 6100 ‘Aluminum louvre eaiing system 6700 13500 Rider Levett Bucknall Phippines, carpet te 1900 2200 ‘cerame / Homogeneous tle 2800 4300 Grant tle 600 21500 ‘Aceas loore 200 7000 ‘Average cost per plumbing point ath as including fete seilwaste end vent average cost fr storm water ams. ie ae Industral Class sided escalator aetanen || asoonn: Gin) 7 passenger it 2700000 11900000 2900000 3500000 sydraute af serving Sretural cavation ‘Wotererooting Membrane /Fhid a eh aed CONSTRUCTION MATERIALS WHOLESALE PRICE INDEX National Capital Region, Year 2014 f PHILIPPINE CONSTRUCTION COST DATA (2000=100) [cosopiry’eRoup'll| /ave | 526) NOV) (ea) Ser | cement 1970 1982 1986 1998 1984 je83 196 1967 1957 1956 1956 1956 1944 else W685 08 1908 1605 199 woo 195 1004 1092 1802 9 802175 eee ox.2 205s 2053 2052 2081 vost 2087 7041 2083 2080 2050 2028 7051 eciesl Works 0A) 2079 2075. 2070 2085 jos 7051 205 2018 28 2012 2008 7008 ME x ras vs wa om 13 yoo wO4 178 16S 5A IES 1653 Wale PVE ibe 1803 tet 1309 1009 wos woos 1803 wo2 OS 97 1797 B7187 Machinery ane me mes 146 Equipment Rental we m6 a6 M46 146 M46 M46 Nas M6 M46 146 MS OTe ec ee eo) eee et ea PHILIPPINE CONSTRUCTION COST DATA SUMMARY OF CURRENT REGIONAL DAILY SUMMARY OF DAILY MINIMUM WAGE RATES MINIMUM WAGE RATES Per Wage Order, Non - Agi Non-Agriculture, Agriculture (1989 - 2014) As of December 2014, In Pesos 42960 Nex Wore ox! siz0% P22269° pazoc0 ea2n00 a 8900 ff 26300 24700 24700- woo! Now.1, 1890 106.00 106.00 Gan Were | Fev 5 200 set 280.00 26800 268.00 oe 1900 21800 Wows Fens. 2014 2800 as | 25300 2500 Woos —bec.16,1993 15500 13500 i RE Sion 21700- 23500- 2360 14500 WO tn 5 2016 0 ponies S00 | a 25500 243.00 24300 oes Feb.2096 18100 seio0 WoW novto.zo% 29800. 28300- z00 j soo 00 RS Mey11806 16800 16500 RG: wow Hayvoom 28100- a00- 23800 BEG Gcecws noo 18000 | mayvou Fuse go” eee Woe res VB WO16 Feb1.2015 aoaee Ee 215.00 - May 1 1997 18500 185.00 8 Bano. : Feb. 6, 1998 198.00 198.00 Vi WOW Jan.10,2014 23600- > ,, 198.00- w2n0.204 36500 28600 23600 Wor | oct 311999 19800-22550 80 at 2800 Mi woat now 29,2015 4822-5509 24500 WiScs Nov 2000 71500250. aay Woes ov .200 asoo2so0 soo 32208 Vil WOT Mar. 21,2014 29500 27500- 275.00 243.00 5000 anon 888 Feo 17002 ©7800-2500 3000 24300 Wor oc:16 20% 5060 2850 220.9 Wier | 44110-2004 m.00.25000 so00 76500, WH | Gr ie 2005 ase00-27500 sooo 28809 % Wore ne'0,2013 26000 25800 a 00 9. aa00 wow 11.2006 28800-20000 s000 $800, soo X wot? Jwne20 208 28100- 27900- 27900. 2.2007 2500-36200 2 7.205 Soe00 aoe ae BEA 36200 Word ducers 2008 4000-37700 sco $4808 wow surei20 37200 se700 30700 H500- ; fas 28,2008 34500-38200 4500 : 700- XI Wow Aup.120%4 27000 asz00 25200 TSH || i200. s6r00-20400 5700. : Wie a2e 200 ser00-<0200 200 38900- Xi Wor May2i2o1s 26800 25800 23800 40300 We | din siz seamosze00 2000 10200 Ase ,WO'S Feo420% 25000 28000 25000 é oviz02 3890042600 3000 $800 fete Wo nage tr 5 ‘2300- ee eens e201 s990043600 so00 12209) SecA St ng atonnce Jen i2014 saco-ssieo 1500 42908 EoD Sreroancy Cost OF m9 Alowance een eT ea Cee onz- ovo 082-008 809 - ose oto: - 0529 zu = ooo ors - ose 0019 xe 088-008 055'9- 90% 0599-osr+ a 0886-0002 2091-0085 core oss 008-0054 0072-0084 01's. - oat. oor - BUILDING SERVICES as at 4th Quarter 2014 In Philippine Pesos per Square M PHILIPPINE CONSTRUCTION COST DATA (sp -095 —zF-on01—ome-cal_—— ORE -OFe car -09 —aze-o01 1 one-02t (O6S-0SE OOH O0F1 0011-089 OOF 1- 008 056-058 OG01-085 COZE-0DRL OOLI-059 _caLz- OE fan -009 GOri-ass GOeE-00k COST -055 ODLZ - O01 oll-0s GOst-ose —aoz-o0ee cost - 05 aor’ - oor oes -core 085-051 Cost oso CoS -00LE 085-081 Ore 0031 adsl Tejesieg — suaung ot woven, | SUS os panies ‘Yay WOOT NOUN'ISNOD wH4 1509 40 ENV os - ou : 0082-0081 056-059 oor - 088 0ss- ou : 0 -00ct 056-059 oe - 086 OSS-0SE —OszI-088 —ar-0012 081-0501 ose oon OsS-05E oo-0% —osiz-o0r1 —oott-o59 ort -ose 08-00 CoNZ-C061 GOrY=OD5E OES =r c0zt-onLe 2001-C0% O00E-coez aH'S-co» o0z1-008 core oor? Cott os oot -008% cave- 08s aori-o59 o0¥-o097 2erI-0% O00 oor O0S-008% cOFI-085 o0eI- oN “08 0032-0081 00+9-o00% costco 009-007 Bra 6 CEST cing 9 ened? eiaarg pulse CaS) Lar a si WP AmUeS ‘WHEY HOOT NOLLonUSNOD ad 1505 40 DNVH 0501-08 oso1- ose 012 - oss 0081 - 00% 0002-009 008 ooze (000'9- coz» 08 - core 0089 - oor: yea 9 aures 24129 ape19 onoay SriNavaRYS) e049 oxse0 seen jo succmasey AWNOUALIISN sosnoysiem 24 pajo0y ey vial pv uss see unpon ‘ivi onidaoHe SIVisy) 1S oon, ison sala ree nea PHILIPPINE CONSTRUCTION COST DATA BUILDING SERVICES Definition of Terminologies HVAC (Heating Ventilation and Air Conditioning) HVAC includes chiller plant, cooling towers, chilled water, condenser water pumps and pipework, air- handling unit systems, and fan coil systems, It also includes AC ductwork, diffusers, solit type air-conditioning units and ductwork, mechanical ventilation ('MV') fan system, MV ductwork, diffusers and accessories, AC electrical, and automatic control works where appropriate. Sanitary & Plumbing Sanitary & Plumbing works refer to water tanks and pumps, hot/cold water distribution piping, installation of water piping to sanitary ware and fittings, installation of waste piping to sanitary ware, aboveground and underground drainage piping system where appropriate, Fire Protection System Fire Protection system includes sprinkler, external fire hydrants, hosereels, wet and ary risers, automatic fire alarms, and fire extinguishers where appropriate. Electrical installation Electrical Installation refers to power transformer, substation, HV & LV switch gear, distribution’ sub-main cables, final sub-circuits, cable. support systems end containments. "Lighting Protection system, earthing system, luminaries and lighting control system, standby generators, Jelecommunications | System, Public Address system, intercom system, and MATV/CATV system may also fall under Electrical installation, where appropriate Vertical Transportation Vertical Transport spans Lifts, Escalators, Travelators, Dumbwaiters, etc, where appropriate Coren ee Building Management Systems (BMS) BMS include Contral Systems (mainly for HVAC services) where appropriate. Exclusions tems, car security Systems, IT systems, AV systems, Serang. Syston, compactors cites speck! et ‘etary systems, medi luipment such 85 propr Gases, menetors.preumetic refuse disposal Sixtem, faAade maintenance equipment. Shgineered smoke control systems etc; supply o' engi kitchen equipment, vided heren is inccatve ne de ofa or Bultng Serres row he Tha based on Construction Floor Area Assumat ces need nts and specification for Building Services need Po efedond oronises n concent! Gesigns 0 dere cost estimates for specific project budgetary purposes See en PHILIPPINE CONSTRUCTION COST DATA OFFICE FIT - OUT The following costs that include workstations are an indication of those currently achievable for ‘good quality office accommodation, Computer Aros 16600-19200 13800-23000 Frontoftiuse’<"” —$0100-34600 _35500- 40.800 Sovenmart 8600-13200 19800-25000 Devarmants fee Company 25000-28800 30400-35000 Solkitors Financiers 25000-28800 30,400- 35000 WORKSTATIONS 2500mm. average length including screens generally 1,220m high (managerial 620mm high) Gesks, storage cupboards, shelving etc. Supply of chairs is excluded, ca Centre 38.800 - 24,600 Beecutve 120.000 - 138.00 | Secretaria 58400-65750 Technical Statt 75000-87400 OFFICE REFURBISHMENT The following refurbishment costs include demolition and removal of partitions and internal finishes, provide new floor, ceiling and wall finishes but exclude fitting out. The lower end of the range indicates reuse and modification, Ctfices Typical Floor 39200 - 45100 Offices Core Ugrace (eluding Itt Modernization) peo Ceo eee EERIE eee esas eeeeeeenteeeeeA Eee HOTEL FIT - OUT The cost of typical hotel guest room fit-out eres ithin its wide range and is dependent on fuality of finishes specified for different rene fota, Seope af f-utretdes preineren wel a ing finishes, panting tier fl font or wares and battvoom accanones, lara mm installation of cecorative ig a eee Binds:-ete. These costs exclude loose carers ch as but not limited to furniture, room temsracnt and apoliances, suDply of decorative lighting, and bedding. reomar 1o7me0e- 1230000 sar 1g04.000 - 1852000, Five Stor 12200000 - 200,000 Pee ae Estimating Data ree SCL age Re a coy ees as Vertical Transport Services ESTIMATING DATA Reinforcement Ratios The following ratios give an indication of average weight of high tensie red reinforcement per cublc meter of concrete (Grade 35) for the isted elements. Differing structural systems, ground conditions, height of buildings, load calculations and sizes of individual elements and grid sizes will result in considerable variation to the stated ratios. For project specific ratios, a civil & structural engineer should be consulted. Pile ap Ps 15 +250 BoredPites (compression) 30-60 Bored Piles (tension) 150-250 Raft Foundation 180-220 RC pad fostings 70-100 Ground beams ee 200 - 300 Retaining Wall 150-250, RC Wall 125-150 Slab 00-200 Edge Beams 6 220-300, Columns 250-500 Beams 180 - 300 slab 110-200 wrals (core core) 150-320, Lit. Core 128 - 204 128-200 Household Sheter : 200-300) Stairs 150-160 ere ee ‘Average Construction Payment Drawdown The tabulation on next page is derived from the statistical average of a series of case histories, which will give an indication of the anticipated rate of expenditure when used for a specific project for preliminary budgetary purposes. All data are related to the date of submission of contractors’ claims to the client and not actual payment, which is generally one rnonth later. No adjustment has been made for the retentior money on the assumption that such money wil be paid by the client into a joint account with the Contractor. The payment of the outstanding monies due te the contractors and sub-contractors after the date of practical completion takes place at irregula intervals with payments spread over an indefinite period. The average rate of claims expenditure o! construction projects are from Php100,000,000 t Php 1,300,000,000 and/or greater than one ye but less than two years construction period t ‘al completion. ESTIMATING DATA Average Construction Payment Drawdown % 55 60 65 70 78 80 85 90 95 100 7 % 5 10 15 20 25 30 35 40 45 50 075 270 sm 965 14.40 1980 25.73 32.06 38.65 45.40 Note:The remaveg 25% would be released ater a pero to ‘ete manths after hand oo the ance Payment Drawdown \verage Construction 5% 10% 18% 20% 25% 30% 35% 40% 45% SOK 5646 60% 85% 70% 75% BO%% 85% 90% G5 100% Contract Period(%) ESTIMATING DATA Vertical Transport Services Office & Residential Electroce Hyaroule ceartest ‘to Passenger Gaoriase tots earless Upto” Passenger cewtess Gearess Gears Goaless os 1s. 175 16s. 178 25 30. 35 40 60 a0 $70,000 ‘$95000 75,000 105000 $95,000 - 148,000 120000 SI70C00) 150.000 270.000 8485000, $575,000 660,000 $820,000 $990,000 100,000 ee eee 20 20 40 'sas00 $7000 $7000 's7000 $8000 $8000 sige si9.c00 10000 10900 ‘s10.000 56500 35000 350000 6000 6000 $6,090 80000 8.000 4000 $8000 $8000 Ganees Bon Sedu vosoae onues toad Passat Goxtess Ute Lee oto ete UIs,” Goartess sobre ee “une Fe aroun b eB Ee Rese 25. ators to SOM PD onance Bier Sor wes0m Bed Above oa SS ie Kee 250 aso 050 050 oso os si@0.000 660.000 $505,000 +$510000 35000 $355,000 140.000 '$320.000 120900, ‘5340000, 368500 598500 eee eae s7009 13500 14000 16500 $4500 135500 NA Na rig $5000 $8000 se0c0 i050 sig00 $2,506 Litt oper up to 7-paseenger capacity sorang rot mere then 18 oars are me eri exaoged ith moter roomie tome soe above are vet an vary Inpecing on the rend ame

You might also like