TABLE OF CONCRETE MIX

JOB DESCRIPTION :- TRIAL MIX M30 GRADE

TYPE OF MIX: GRADE: M30

CEMENT USED: BATCH:

ADMIXTURE USED:

MIX PROPORTION
QTY PER 0.025 QUANTITY
MATERIAL m3 UNIT ABSORPTION CORRECTION MOISTURE CORRECTION (CORRECTED) %
SSD DRY
SSD
CEMENT 405 Kg 10.13 10.13 CA:FA
WATER 158 Ltr 3.95 4.21 59:41
40 MM ( BAJPUR ) 492 Kg 12.30 0.30% 0.037 0.000 0.000 12.26 CA1:CA2
10 MM ( BAJPUR ) 738 Kg 18.45 0.30% 0.055 0.000 0.000 18.39 60:40
SAND ( BAJPUR ) 827 Kg 20.68 0.80% 0.165 0.000 0.000 20.51
ADMIXTURE 1.80 Kg 0.045 0.258 0.000 0.045 1.80%
W/C RATIO

NOMINAL AGGREGATE DESIGN SLUMP CEMENT CONTENT MAXIMUM W/C


40 MM

RESULTS :-
TIME ( MINUTES ) 0 30 60 90 120 150 180 REMARKS
CONCRETE TEMPERATURE OC 32 Start.Time -
SLUMP ( MM ) 150
AMBIENT TEMPERATURE OC 28 SAMPLE CASTING
HUMIDITY ( % ) NA ACT
TEMPERATURE OF WATER 0C 28 01 DAYS
AIR CONTENTS ( % ) After 1hr NA CUBE SIZE - 150 x 150 x 150 mm 03 DAYS
FRESH WET DENSITY ( Kg/m3 ) NA 07 DAYS
INITIAL SETTING TIME ( Hrs:Minutes ) NA 28 DAYS

CONDUCTED BY WITNESS BY
TABLE OF CONCRETE MIX
DATE - 17/08/2013
TRIAL MIX NO - 0015

JOB DESCRIPTION :- TRIAL MIX M35 GRADE CONCRETE FOR PILLING CONCRETE

TYPE OF MIX: PUMPABLE MIX GRADE: M35

CEMENT USED: ACC (Slag) BATCH: W30/2013

ADMIXTURE USED: SIKA (Viscocrete 10 H-1) BATCH: JP135033

MIX PROPORTION
QTY PER 0.025 QUANTITY
MATERIAL m3 UNIT ABSORPTION CORRECTION MOISTURE CORRECTION (CORRECTED) %
SSD DRY
SSD
CEMENT 439 Kg 10.98 10.98 CA:FA
WATER 158 Ltr 3.95 4.19 59:41
20 MM ( AGRA ROAD ) 724 Kg 18.10 0.30% 0.054 0.000 0.000 18.05 CA1:CA2
10 MM ( AGRA ROAD ) 483 Kg 12.08 0.30% 0.036 0.000 0.000 12.04 60:40
SAND ( BANAS RIVER ) 744 Kg 18.60 0.80% 0.149 0.000 0.000 18.45
ADMIXTURE 4.39 Kg 0.110 0.239 0.000 0.110 1.00%
W/C RATIO 0.36

NOMINAL AGGREGATE DESIGN SLUMP CEMENT CONTENT MAXIMUM W/C


20 MM 175 25 MM 439 kg 0.38

RESULTS :-
TIME ( MINUTES ) 0 30 60 90 120 150 180 REMARKS
CONCRETE TEMPERATURE OC 30 33 33.5 33 Start.Time -
SLUMP ( MM ) COLLAPSE COLLAPSE 190 40 11:45 am
AMBIENT TEMPERATURE OC 28 SAMPLE CASTING
HUMIDITY ( % ) NA ACT
TEMPERATURE OF WATER 0C 29 01 DAYS
AIR CONTENTS ( % ) After 1hr NA CUBE SIZE - 150 x 150 x 150 mm 03 DAYS
FRESH WET DENSITY ( Kg/m3 ) NA 07 DAYS
INITIAL SETTING TIME ( Hrs:Minutes ) NA 28 DAYS

CONDUCTED BY WITNESS BY
TABLE OF CONCRETE MIX
DATE - 17/08/2013
TRIAL MIX NO - 0014

JOB DESCRIPTION :- TRIAL MIX M35 GRADE CONCRETE FOR PILLING CONCRETE

TYPE OF MIX: PUMPABLE MIX GRADE: M35

CEMENT USED: ACC (Slag) BATCH: W30/2013

ADMIXTURE USED: SIKA (Viscocrete 10 H-1) BATCH: JP135033

MIX PROPORTION
QTY PER 0.025 QUANTITY
MATERIAL m3 UNIT ABSORPTION CORRECTION MOISTURE CORRECTION (CORRECTED) %
SSD DRY
SSD
CEMENT 439 Kg 10.98 10.98 CA:FA
WATER 158 Ltr 3.95 4.19 59:41
20 MM ( AGRA ROAD ) 724 Kg 18.10 0.30% 0.054 0.000 0.000 18.05 CA1:CA2
10 MM ( AGRA ROAD ) 483 Kg 12.08 0.30% 0.036 0.000 0.000 12.04 60:40
SAND ( BANAS RIVER ) 744 Kg 18.60 0.80% 0.149 0.000 0.000 18.45
ADMIXTURE 3.51 Kg 0.088 0.239 0.000 0.088 0.80%
W/C RATIO 0.36

NOMINAL AGGREGATE DESIGN SLUMP CEMENT CONTENT MAXIMUM W/C


20 MM 175 25 MM 439 kg 0.38

RESULTS :-
TIME ( MINUTES ) 0 30 60 90 120 150 180 REMARKS
CONCRETE TEMPERATURE OC 32 32 Start.Time -
SLUMP ( MM ) 180 145 11:00 am
AMBIENT TEMPERATURE OC 29 SAMPLE CASTING
HUMIDITY ( % ) NA ACT
TEMPERATURE OF WATER 0C 28 01 DAYS
AIR CONTENTS ( % ) After 1hr NA CUBE SIZE - 150 x 150 x 150 mm 03 DAYS
FRESH WET DENSITY ( Kg/m3 ) NA 07 DAYS
INITIAL SETTING TIME ( Hrs:Minutes ) NA 28 DAYS

CONDUCTED BY WITNESS BY