Download as pdf or txt
Download as pdf or txt
You are on page 1of 37

BC

BB
50
38

BA 27
00 ALL TALL NICHE AT
WG
7.07 m
THIS LEVEL TO BE
3 BED (SR) CO

WG
7.09 m
136.49 m
Type C2
C-04-09
REDUCED. NO NICHE
FF
RB
OV

WITHIN THE TOP


BC

1200MM OF RISER
2 BED (SR)
85.07 m
Type C3
C-04-08

WG PB
BC
3 BED (SR) 3.06 m
FF 136.49 m
RB Type C2
CO
C-04-09

A4 A3 A2 A1
8725 8725 6900 PA

CO
AA
5.02 m
B1
AA
AA
RB

5.00 m
5.03 m

CO
1 BED (SR)
68

51.29 m
FF
00

Type C4
BC

FF
RB
C-04-07 1 BED (INT)

FF
50.44 m

CO
BC
Type A14

FF
A-04-04

CO
1 BED (INT)
B2 52.21 m
WG 1 BED (SR) Type A9
7.23 m 54.14 m A-04-06
Type C3 AA
C-04-06
69
00

CO

4450
FF
2 BED (INT) WG
78.07 m 6.17 m
C3 Type A3_Handed
WG A-04-02
10.05 m AB
2 BED (SR) 2 BED (INT)
77.02 m 77.83 m WG
B3 Type C2 Type A3 6.17 m
C-04-04 A-04-01

4450
FF
CO
00
69

RB

WG
AC
5.92 m FF
1 BED (INT)
C2 BC
50.51 m
FF
Type A7

CO
CO

A-04-03
3 BED (SR)
BC

113.51 m

CO
1 BED (SR)
FF

Type C1 50.42 m

FF
C-04-01 Type C2 1 BED (INT)
C-04-05 50.65 m
Type A8
00

CO
68

A-04-05
RB

AA AA
4.95 m 4.95 m
C1
AA
5.02 m
1 BED (SR) PD
49.88 m
Type C1
BC
C-04-03
FF

CO

FF
OV

CO
BC
PC
RB

RB

3 BED (SR)

SS
AA
113.51 m
4.90 m

A-SK-20170207-1
BC
Type C1 FF
C-04-01 2 BED (SR)

17 RE
OV
93.38 m
Type C1
C-04-02

20 G
LEVEL 04
CO

2/ O
/0 PR
WG
3.02 m

07 IN
K
WG
27 7.03 m

R
00
CA

O
32
50

W
CB
CC
BC
BB
50
38

BA 27
00 ALL TALL NICHE AT
WG
7.09 m
THIS LEVEL TO BE
3 BED (SR)
WG
7.09 m
136.59 m
Type C2
C-05-09
REDUCED. NO NICHE
FF
OV

WITHIN THE TOP


1200MM OF RISER
2 BED (SR)
85.57 m
Type C3
C-05-08

WG
3 BED (SR) 3.06 m
FF 136.59 m
Type C2
CO
C-05-09

A4 A3 A2 A1
8725 8725 6900

CO
AA
5.02 m
B1
AA
AA 5.02 m
5.03 m

CO
1 BED (SR)
68

51.33 m
FF
00

Type C4

FF
C-05-07 1 BED (INT)

FF
50.57 m

CO
Type A14

FF
A-05-04

CO
1 BED (INT)
B2 52.21 m
WG 1 BED (SR) Type A9
7.23 m 54.14 m A-05-06
Type C3 AA
C-05-06
69
00

CO

4450
FF
2 BED (INT) WG
78.30 m 6.17 m
C3 Type A3_Handed
WG A-05-02
10.08 m AB
2 BED (SR) 2 BED (INT)
77.02 m 77.91 m WG
B3 Type C2 Type A3 6.17 m
C-05-04 A-05-01

4450
FF
CO
00
69

WG
AC
5.93 m FF
1 BED (INT)
C2 50.44 m
FF
Type A7

CO
CO

A-05-03
3 BED (SR)
114.60 m

CO
1 BED (SR)
FF

Type C1 50.42 m

FF
C-05-01 Type C2 1 BED (INT)
C-05-05 50.65 m
Type A8
00

CO
68

A-05-05

AA AA
4.95 m 4.95 m
C1
AA
5.03 m
1 BED (SR)
49.89 m
Type C1
C-05-03
FF

CO

FF
OV

CO

3 BED (SR)

SS
AA
114.60 m
4.92 m
Type C1 FF
C-05-01 2 BED (SR)

17 RE
OV
93.43 m
Type C1
C-05-02

20 G
CO

2/ O
A-SK-20170207-2

/0 PR
WG
3.03 m

07 IN
LEVEL 05

K
WG
27 7.04 m

R
00
CA

O
32
50

W
CB
CC
BC
BB
50
38

BA 27
00 ALL TALL NICHE AT
WG
7.09 m
THIS LEVEL TO BE
3 BED (SR) CO

WG
7.09 m
136.59 m
Type C2
C-06-09
REDUCED. NO NICHE
FF
OV

WITHIN THE TOP


1200MM OF RISER
2 BED (SR)
85.57 m
Type C3
C-06-08

WG
3 BED (SR) 3.06 m
FF 136.59 m
Type C2
CO
C-06-09

A4 A3 A2 A1
8725 8725 6900

CO
AA
5.02 m
B1
AA
AA 4.98 m
5.03 m

CO
1 BED (SR)
68

51.50 m
FF
00

Type C4
C-06-07 1 BED (INT)

FF
50.34 m

CO
Type A7 Handed

FF
A-06-04

CO
1 BED (INT)
B2 52.14 m
WG 1 BED (SR) Type A9 FF

7.23 m 54.14 m A-06-06


Type C3 AA
C-06-06
69
00

CO

4450
FF
2 BED (INT) WG
78.06 m 6.17 m
C3 Type A3_Handed
WG A-06-02
10.08 m AB
2 BED (SR) 2 BED (INT)
77.02 m 77.80 m WG
B3 Type C2 Type A3 6.17 m
C-06-04 A-06-01

4450
FF
CO
00
69

WG
AC
5.93 m FF
1 BED (INT)
C2 50.51 m
FF
Type A7

CO
CO

A-06-03
3 BED (SR)
114.59 m

CO
1 BED (SR)
FF

Type C1 50.42 m

FF
C-06-01 Type C2 1 BED (INT)
C-06-05 50.65 m
Type A8
00

CO
68

A-06-05

AA AA
4.95 m 4.95 m
C1
AA
5.03 m
1 BED (SR)
49.89 m
Type C1
C-06-03
FF

CO

FF
OV

CO

3 BED (SR)

SS
AA
114.59 m
4.92 m
Type C1 FF
C-06-01 2 BED (SR)

17 RE
OV
93.43 m
Type C1
C-06-02

20 G
CO

2/ O
A-SK-20170206-3

/0 PR
WG
3.03 m

07 IN
LEVEL 06

K
WG
27 7.04 m

R
00
CA

O
32
50

W
CB
CC
BC
BB
50
38

BA 27
00 ALL TALL NICHE AT
WG
7.06 m
THIS LEVEL TO BE
CO
3 BED (SR)
WG
7.09 m
137.65 m
Type C3
C-07-09
REDUCED. NO NICHE
FF
WITHIN THE TOP
1200MM OF RISER
2 BED (SR)
86.67 m
Type C3_Similar
C-07-08

WG
3 BED (SR) 3.35 m
137.65 m
Type C3
C-07-09

A4 A3 A2 A1
8725 8725 6900

AA
5.02 m
B1
AA
AA 5.05 m
5.03 m

1 BED (SR)
68

51.68 m
00

Type C4
C-07-07 1 BED (INT)
50.48 m
Type A7 Handed
A-07-04
1 BED (INT)
B2 52.27 m
WG 1 BED (SR) Type A9
7.38 m 54.22 m A-07-06
Type C3 AA
C-07-06
69
00

CO

4450
FF
2 BED (INT) WG
78.28 m 5.98 m
C3 Type A3_Handed_Similar
WG A-07-02
10.14 m AB
2 BED (SR) 2 BED (INT)
77.02 m 78.45 m WG
B3 Type C2 Type A3_Similar 6.01 m
C-07-04 A-07-01

4450
FF
CO
00
69

WG
AC
6.05 m
1 BED (INT)
C2 50.64 m
Type A7
A-07-03
3 BED (SR)
116.84 m 1 BED (SR)
Type C1_Similar 50.42 m
C-07-01 Type C2 1 BED (INT)
C-07-05 50.78 m
Type A8
00
68

A-07-05

AA AA
5.02 m 5.02 m
C1
AA
5.03 m
1 BED (SR)
51.21 m
Type C1_Similar
C-07-03 BC
FF

OV

CO

3 BED (SR)

SS
AA
116.84 m
5.00 m
Type C1_Similar
C-07-01 2 BED (SR)

17 RE
94.52 m
Type C1_Similar
C-07-02

20 G
2/ O
A-SK-20170207-4

/0 PR
WG
3.03 m

07 IN
LEVEL 07

K
WG
27 7.04 m

R
00
CA

O
32
50

W
CB
CC
BC
BB
50
38

BA 27
00
WG
ALL TALL NICHE AT
7.05 m

3 BED (SR)
THIS LEVEL TO BE
WG
7.10 m
137.70 m
Type C3_Similar
C-08-09
REDUCED. NO NICHE
WITHIN THE TOP
2 BED (SR)
1200MM OF RISER
86.71 m
Type C3_Similar
C-08-08

WG
3 BED (SR) 3.32 m
137.70 m
Type C3_Similar
C-08-09

A4 A3 A2 A1
8725 8725 6900

AA
4.97 m
B1
AA
AA 9.66 m
9.76 m

1 BED (SR)
68

50.70 m
00

Type C4
C-08-07 SUITE
45.24 m
Type A1_Handed
A-08-04
SUITE
B2 45.13 m
WG 1 BED (SR) Type A3
7.37 m 53.09 m A-08-06
Type C3_Similar AA
C-08-06
69
00

4450
2 BED WG
76.17 m 6.96 m
C3 Type A1-1_Handed
WG A-08-02
10.10 m AB
2 BED (SR) 2 BED
76.97 m 76.83 m WG
B3 Type C2 Type A1-1 6.90 m
C-08-04 A-08-01

4450
00
69

WG
AC
6.02 m
SUITE
C2 45.27 m
Type A1
A-08-03
3 BED (SR)
116.66 m 1 BED (SR)
Type C1_Similar 52.16 m
C-08-01 Type C2_Similar SUITE
C-08-05 45.01 m
Type A2
00
68

A-08-05

AA AA
8.12 m 9.45 m
C1
AA
5.00 m
1 BED (SR)
51.25 m
Type C1_Similar
C-08-03 BC
FF

OV

CO

3 BED (SR)
AA

SS
116.66 m
4.90 m
Type C1_Similar
C-08-01 2 BED (SR)

17 RE
94.41 m
Type C1_Similar
C-08-02

20 G
2/ O
A-SK-20170207-5

/0 PR
WG
3.02 m

07 IN
LEVEL 08 - 10
WG

K
27 7.03 m
00

R
CA

O
32
50

W
CB
CC
BC
BB
50
38

BA 27
00
WG
ALL TALL NICHE AT
7.05 m

3 BED (SR)
THIS LEVEL TO BE
WG
7.10 m
137.70 m
Type C3_Similar
C-08-09
REDUCED. NO NICHE
WITHIN THE TOP
2 BED (SR)
1200MM OF RISER
86.71 m
Type C3_Similar
C-08-08

WG
3 BED (SR) 3.32 m
137.70 m
Type C3_Similar
C-08-09

A4 A3 A2 A1
8725 8725 6900

AA
4.97 m
B1
AA
AA 9.66 m
9.76 m

1 BED (SR)
68

50.70 m
00

Type C4
C-08-07 SUITE
45.24 m
Type A1_Handed
A-08-04
SUITE
B2 45.13 m
WG 1 BED (SR) Type A3
7.37 m 53.09 m A-08-06
Type C3_Similar AA
C-08-06
69
00

4450
2 BED WG
76.17 m 6.96 m
C3 Type A1-1_Handed
WG A-08-02
10.10 m AB
2 BED (SR) 2 BED
76.97 m 76.83 m WG
B3 Type C2 Type A1-1 6.90 m
C-08-04 A-08-01

4450
00
69

WG
AC
6.02 m
SUITE
C2 45.27 m
Type A1
A-08-03
3 BED (SR)
116.66 m 1 BED (SR)
Type C1_Similar 52.16 m
C-08-01 Type C2_Similar SUITE
C-08-05 45.01 m
Type A2
00
68

A-08-05

AA AA
8.12 m 9.45 m
C1
AA
5.00 m
1 BED (SR)
51.25 m
Type C1_Similar
C-08-03 BC
FF

OV

CO

3 BED (SR)
AA

SS
116.66 m
4.90 m
Type C1_Similar
C-08-01 2 BED (SR)

17 RE
94.41 m
Type C1_Similar
C-08-02

20 G
2/ O
A-SK-20170207-5

/0 PR
WG
3.02 m

07 IN
LEVEL 11
WG

K
27 7.03 m
00

R
CA

O
32
50

W
CB
CC
BC
BB
50
38

BA 27
00 ALL TALL NICHE AT
WG
7.17 m
THIS LEVEL TO BE
2 BED
WG
7.13 m
83.81 m
Type B2
B-12-08
REDUCED. NO NICHE
WITHIN THE TOP
1200MM OF RISER
2 BED AA
86.48 m 4.98 m
Type B3
B-12-09

1 BED
51.77 m
Type B4
B-12-06

A4 A3 A2 A1
8725 8725 6900

AA
7.72 m
B1
AA AA
9.76 m 9.66 m

1 BED
68

50.81 m
00

Type B5
B-12-07

SUITE
45.22 m
Type A1_Handed
SUITE
A-12-04
B2 45.13 m
WG SUITE Type A3
7.34 m 44.98 m A-12-06
Type A4 AA
A-12-07
69
00

4450
2 BED WG
76.38 m 6.96 m
C3 Type A1-1_Handed
WG A-12-02
6.55 m 1 BED AB
51.26 m 2 BED
Type B3 76.43 m WG
B3 B-12-05 Type A1-1 6.95 m
A-12-01

4450
00
69

WG
AC
6.98 m
SUITE
C2 2 BED
45.25 m
104.30 m
Type A1
Type A2
A-12-03
1 BED A-12-05
50.03 m
Type B1
B-12-03
00
68

AA
WG 9.45 m
5.03 m
C1
1 BED
52.66 m
Type B2
B-12-04

2 BED

SS
AA
88.25 m
5.07 m
Type B1
B-12-01 2 BED+

17 RE
94.21 m
Type B1
B-12-02

20 G
2/ O
A-SK-20170207-6

/0 PR
WG
7.13 m

07 IN
LEVEL 12

K
WG
27 7.03 m

R
00
CA

O
32
50

W
CB
CC
BC
BB
38
50 ALL
NOTE:
TALL NICHE AT
00
BA 27
WG
7.17 m
THESE LEVELS
WG = WINTER GARDEN
AA = AMENITY AREA
TO BE Project
SPIRE LONDON
REDUCED. NO NICHE Prepared For
WG
GREENLAND
7.13 m 2 BED
83.81 m
Type B2
WITHIN THE TOP HERTSMERE
B-13-08 (LONDON)
2 BED
86.50 m AV (700x650)
1200MM OF RISER LIMITED
Type B3 Client Location
B-13-09 City Tower, 11th Floor, 40 Basinghall Street,
AA
5.03 m London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

AV (700x650)
AV (700x650) UT (1600X800) 1 BED
60.00 m
Type B6
UT (1600X800)
B-13-06 A4 A3 A2 A1
UT (1600X800) 8725 8725 6900

HOK
AA Qube, 90 Whitfield Street
7.57 m
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA f +44 (0)20 7636 1987
AA
SUITE 9.76 m All reproduction & intellectual property rights reserved 2014
9.66 m
50.11 m In Association with
Type A5
68

1 BED AECOM
00

A-13-07
50.93 m Project Manager
Type B5 AV (700x650) SUITE SUITE MidCity Place, 71 High Holborn, London,
B-13-07 45.13 m 45.25 m WC1V 6QS, UK
Type A3 Type A1_Handed
UT (1600X800) A-13-06 A-13-04 RobertBirdGroup
Structural Engineer
UT (1600X800) Level 2, Harling House,
B2 WG UT (1600X800) UT (1600X800) AV (700x650) 47-51 Great Suffolk St,
7.34 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK
PL7 PL8 AV (700x650) AV (700x650) PL1 PL2 PL3
2 BED

4450
UT (1600X800)
76.57 m
AV (700x650) Type A1-1_Handed Key Plan
A-13-02 WG
C3 6.96 m ToF
: 5.9
8

WG UT (1600X800) CORE B CORE A AB


6.55 m
1 BED 9 Units 7 Units WG
B3 51.26 m 2 BED 6.95 m
Type B3 AV (700x650) 76.61 m
B-13-05 Type A1-1

4450
AV (600x600) UT (1600X800)
A-13-01
PL9 PL10 PL4 PL5
00
69

AV (700x650)

WG
AC
N
6.98 m UT (1600X800) UT (1600X800) AV (700x650)
C2

2 BED
104.30 m SUITE LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
UT (1600X800)
Type A2 45.27 m Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
1 BED A-13-05 Type A1 All areas and dimensions shown subject to further design
50.02 m AV (600x800)
A-13-03 development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
Type B1 Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

B-13-03 Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings

SS
AA
WG Rev. Description Date By
9.45 m
5.03 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 UT (1600X800) 3.0 External Cladding Tender Issue 03.10.2016 JE
3.1 Stage 3 Completion Issue 28.10.2016 AB

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

UT (1600X800)
2 Bed Wheelchair Adaptable Unit

20 G
UT (1600X800)
AV (700x650)
AV (700x650)

1- O
1 BED
52.66 m
Type B2

-0 PR
B-13-04

2 BED AA
88.24 m 5.07 m

23 N
Type B1
B-13-01
AV (700x650)

I
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
2 BED+ Scale:
94.21 m
Type B1 Project No: 14.33020.00

R
WG B-13-02
7.26 m Sheet Title:

O
GENERAL

W
WG
ARRANGEMENT
23/01/2017 16:20:49

27 7.03 m FLOOR PLAN


LEVELS 13 TO 14
CA 00
18
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2113 3.3
BC
BB
50
38
NOTE:
00
27
BA
WG
WG = WINTER GARDEN Project
7.17 m AA = AMENITY AREA SPIRE LONDON
Prepared For
WG
7.13 m 2 BED
GREENLAND
83.81 m
Type B2
HERTSMERE
B-13-08 (LONDON)
2 BED LIMITED
86.50 m AV (700x650)

Type B3 Client Location


B-13-09 City Tower, 11th Floor, 40 Basinghall Street,
AA
5.03 m London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

AV (700x650)
AV (700x650) UT (1600X800) 1 BED
60.00 m
Type B6
UT (1600X800)
B-13-06 A4 A3 A2 A1
UT (1600X800) 8725 8725 6900

HOK
AA Qube, 90 Whitfield Street
7.57 m
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA f +44 (0)20 7636 1987
AA
SUITE 9.76 m All reproduction & intellectual property rights reserved 2014
9.66 m
50.11 m In Association with
Type A5
68

1 BED AECOM
00

A-13-07
50.93 m Project Manager
Type B5 AV (700x650) SUITE SUITE MidCity Place, 71 High Holborn, London,
B-13-07 45.13 m 45.25 m WC1V 6QS, UK
Type A3 Type A1_Handed
UT (1600X800) A-13-06 A-13-04 RobertBirdGroup
Structural Engineer
UT (1600X800) Level 2, Harling House,
B2 WG UT (1600X800) UT (1600X800) AV (700x650) 47-51 Great Suffolk St,
7.34 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK
PL7 PL8 AV (700x650) AV (700x650) PL1 PL2 PL3
2 BED

4450
UT (1600X800)
76.57 m
AV (700x650) Type A1-1_Handed Key Plan
A-13-02 WG
C3 6.96 m ToF
: 5.9
8

WG UT (1600X800) CORE B CORE A AB


6.55 m
1 BED 9 Units 7 Units WG
B3 51.26 m 2 BED 6.95 m
Type B3 AV (700x650) 76.61 m
B-13-05 Type A1-1

4450
AV (600x600) UT (1600X800)
A-13-01
PL9 PL10 PL4 PL5
00
69

AV (700x650)

WG
AC
N
6.98 m UT (1600X800) UT (1600X800) AV (700x650)
C2

2 BED
104.30 m SUITE LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
UT (1600X800)
Type A2 45.27 m Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
1 BED A-13-05 Type A1 All areas and dimensions shown subject to further design
50.02 m AV (600x800)
A-13-03 development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
Type B1 Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

B-13-03 Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings

SS
AA
WG Rev. Description Date By
9.45 m
5.03 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 UT (1600X800) 3.0 External Cladding Tender Issue 03.10.2016 JE
3.1 Stage 3 Completion Issue 28.10.2016 AB

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

UT (1600X800)
2 Bed Wheelchair Adaptable Unit

20 G
UT (1600X800)
AV (700x650)
AV (700x650)

1- O
1 BED
52.66 m
Type B2

-0 PR
B-13-04

2 BED AA
88.24 m 5.07 m

23 N
Type B1
B-13-01
AV (700x650)

I
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
2 BED+ Scale:
94.21 m
Type B1 Project No: 14.33020.00

R
WG B-13-02
7.26 m Sheet Title:

O
GENERAL

W
WG
ARRANGEMENT
23/01/2017 16:20:49

27
00
7.03 m FLOOR PLAN
CA
LEVELS 15
13 TO 18
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2113 3.3
BC
BB
50
38
NOTE:
00
27
BA
WG
WG = WINTER GARDEN Project
7.17 m AA = AMENITY AREA SPIRE LONDON
Prepared For
WG
7.13 m 2 BED
GREENLAND
83.81 m
Type B2
HERTSMERE
B-13-08 (LONDON)
2 BED LIMITED
86.50 m AV (700x650)

Type B3 Client Location


B-13-09 City Tower, 11th Floor, 40 Basinghall Street,
AA
5.03 m London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

AV (700x650)
AV (700x650) UT (1600X800) 1 BED
60.00 m
Type B6
UT (1600X800)
B-13-06 A4 A3 A2 A1
UT (1600X800) 8725 8725 6900

HOK
AA Qube, 90 Whitfield Street
7.57 m
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA f +44 (0)20 7636 1987
AA
SUITE 9.76 m All reproduction & intellectual property rights reserved 2014
9.66 m
50.11 m In Association with
Type A5
68

1 BED AECOM
00

A-13-07
50.93 m Project Manager
Type B5 AV (700x650) SUITE SUITE MidCity Place, 71 High Holborn, London,
B-13-07 45.13 m 45.25 m WC1V 6QS, UK
Type A3 Type A1_Handed
UT (1600X800) A-13-06 A-13-04 RobertBirdGroup
Structural Engineer
UT (1600X800) Level 2, Harling House,
B2 WG UT (1600X800) UT (1600X800) AV (700x650) 47-51 Great Suffolk St,
7.34 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK
PL7 PL8 AV (700x650) AV (700x650) PL1 PL2 PL3
2 BED

4450
UT (1600X800)
76.57 m
AV (700x650) Type A1-1_Handed Key Plan
A-13-02 WG
C3 6.96 m ToF
: 5.9
8

WG UT (1600X800) CORE B CORE A AB


6.55 m
1 BED 9 Units 7 Units WG
B3 51.26 m 2 BED 6.95 m
Type B3 AV (700x650) 76.61 m
B-13-05 Type A1-1

4450
AV (600x600) UT (1600X800)
A-13-01
PL9 PL10 PL4 PL5
00
69

AV (700x650)

WG
AC
N
6.98 m UT (1600X800) UT (1600X800) AV (700x650)
C2

2 BED
104.30 m SUITE LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
UT (1600X800)
Type A2 45.27 m Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
1 BED A-13-05 Type A1 All areas and dimensions shown subject to further design
50.02 m AV (600x800)
A-13-03 development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
Type B1 Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

B-13-03 Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings

SS
AA
WG Rev. Description Date By
9.45 m
5.03 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 UT (1600X800) 3.0 External Cladding Tender Issue 03.10.2016 JE
3.1 Stage 3 Completion Issue 28.10.2016 AB

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

UT (1600X800)
2 Bed Wheelchair Adaptable Unit

20 G
UT (1600X800)
AV (700x650)
AV (700x650)

1- O
1 BED
52.66 m
Type B2

-0 PR
B-13-04

2 BED AA
88.24 m 5.07 m

23 N
Type B1
B-13-01
AV (700x650)

I
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
2 BED+ Scale:
94.21 m
Type B1 Project No: 14.33020.00

R
WG B-13-02
7.26 m Sheet Title:

O
GENERAL

W
WG
ARRANGEMENT
23/01/2017 16:20:49

27
00
7.03 m FLOOR PLAN
CA
LEVELS 13 TO 18
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number:
15
Revision:

CC
0 1 5 10 M A2113 3.3
BC
BB
50
38
NOTE:
00
27
BA
WG
WG = WINTER GARDEN Project
7.25 m AA = AMENITY AREA SPIRE LONDON
2 BED
84.00 m Prepared For
Type B2_Similar
WG B-19-08 GREENLAND
7.13 m
HERTSMERE
(LONDON)
2 BED
86.72 m
LIMITED
Type B3
B-19-09 Client Location
City Tower, 11th Floor, 40 Basinghall Street,
AA
London, EC2V 5DE
5.03 m
Project No: 14.33020.00
1 Bed Wheelchair Adaptable Unit
1 BED
60.71 m
Type B6_Similar
B-19-06

A4 A3 A2 A1
D-B1908-0 D-B1906-0 8725 8725 6900
AA
D-B1909-0 8.47 m HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 D-B1907-0 t +44 (0)20 7636 2006
AA f +44 (0)20 7636 1987
SUITE 5.50 m AA
50.17 m 7.33 m All reproduction & intellectual property rights reserved 2014

Type A5_Similar In Association with


A-19-07
68

1 BED AECOM
00

51.94 m Project Manager


Type B5_Similar MidCity Place, 71 High Holborn, London,
SUITE
B-19-07 SUITE WC1V 6QS, UK
50.20 m
Type A7 50.24 m
Type A6_Handed RobertBirdGroup
A-19-06
A-19-04 Structural Engineer
Level 2, Harling House,
B2 WG 47-51 Great Suffolk St,
7.34 m London, England SE1 0BS, UK
AA
SWECO
D-A1907-0 Building Services Engineer
69

1 Bath Road, Maidenhead,


D-A1906-0
00

SL6 4AQ, UK
PL7 PL8 PL1 PL2 PL3

4450
2 BED
D-A1904-0 76.79 m
Type A1-1_Handed_Similar Key Plan
A-19-02 WG
C3 D-A1902-0 6.95 m
CORE B CORE A
8
: 5.9
ToF

WG
6.55 m AB
9 Units 63.64 m 7 Units
1 BED
D-A1901-0
B3 52.44 m D-B1905-0
2 BED
WG
Type B3_Similar 6.95 m
B-19-05 76.94 m
D-A1903-0 Type A1-1_Similar

4450
PL9 PL10 D-A1905-0 PL4 PL5 A-19-01
00
69

WG
7.00 m AC
N

C2
2 BED
1 BED 106.73 m SUITE LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
51.18 m Type A2_Similar 50.40 m Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
Type B1_Similar A-19-05 Type A6 All areas and dimensions shown subject to further design
development and may be varied in future design stages.
B-19-03 A-19-03 Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings
AA

SS
D-B1903-0
WG 7.32 m Rev. Description Date By
5.00 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
D-B1901-0 3.1 Stage 3 Completion Issue 28.10.2016 AB

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB
D-B1902-0
D-B1904-0

2 Bed Wheelchair Adaptable Unit

20 G
1 BED
52.95 m

1- O
Type B2_Similar
B-19-04

-0 PR
AA
5.01 m

23 N
2 BED
88.58 m
Type B1_Similar

I
B-19-01 Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
WG
2 BED+ Sheet Title:
7.12 m
94.21 m

O
Type B1_Similar
B-19-02 GENERAL

W
WG ARRANGEMENT
23/01/2017 15:50:30

7.16 m
27
00
FLOOR PLAN
CA
LEVELS 19 TO 24
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2119 3.3
BC
BB
50
38
NOTE:
00
27
BA WG WG = WINTER GARDEN Project
7.25 m
AA = AMENITY AREA SPIRE LONDON
Prepared For
WG
7.13 m 2 BED GREENLAND
84.19 m
Type B2_Similar HERTSMERE
B-25-08
(LONDON)
2 BED AV (700x650)
LIMITED
87.13 m
Type B3_Similar
Client Location
AA City Tower, 11th Floor, 40 Basinghall Street,
B-25-09 5.04 m London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

1 BED
61.07 m
UT (1600X800) Type B6_Similar
AV (700x650) AV (700x650)
B-25-06

UT (1600X800)
A4 A3 A2 A1
UT (1600X800)
8725 8725 6900

HOK
AA Qube, 90 Whitfield Street
8.90 m London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA AA f +44 (0)20 7636 1987
6.04 m 7.01 m
All reproduction & intellectual property rights reserved 2014
SUITE In Association with
50.22 m
68

Type A5_Similar AECOM


00

1 BED A-25-07 Project Manager


52.45 m AV (700x650) SUITE SUITE MidCity Place, 71 High Holborn, London,
Type B5_Similar 50.07 m 50.12 m WC1V 6QS, UK
B-25-07 Type A7_Similar Type A6_Handed_Similar
UT (1600X800) A-25-06 A-25-04 RobertBirdGroup
Structural Engineer
UT (1600X800) Level 2, Harling House,
B2 WG UT (1600X800) UT (1600X800) AV (700x650)
47-51 Great Suffolk St,
7.37 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

AV (700x650) AV (700x650) 2 BED SL6 4AQ, UK


PL7 PL8 PL1 PL2 PL3
76.95 m

4450
UT (1600X800)
Type A1-1_Handed_Similar
AV (700x650) A-25-02 WG Key Plan

C3 7.01 m
CORE B CORE A
8
: 5.9
ToF

WG UT (1600X800)
6.85 m
9 Units 82.51 m 7 Units AB
1 BED WG
B3 51.39 m 7.01 m
Type B3_Similar
AV (700x650)
B-25-05 2 BED
77.12 m

4450
UT (1600X800)
AV (700x650)
Type A1-1_Similar
PL9 PL10 PL4 PL5
A-25-01
00
69

AV (700x650)

WG
AC
N
7.00 m UT (1600X800) UT (1600X800) AV (700x650)
C2

2 BED
106.97 m 1 BED LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
UT (1600X800) Any Levels shown in ( ) = AOD LEVEL
Type A2_Similar 52.52 m SG = Sky Garden

1 BED A-25-05 Type A3 All areas and dimensions shown subject to further design
development and may be varied in future design stages.
51.87 m AV (700x650) A-25-03 Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Type B1_Similar Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


B-25-03 This drawing is to be read in conjunction with all relevant
documents and drawings

SS
WG AA Rev. Description Date By
4.99 m 5.02 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 UT (1600X800) 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

UT (1600X800)
2 Bed Wheelchair Adaptable Unit

20 G
AV (700x650)
UT (1600X800)
AV (700x650) 1 BED
53.24 m

1- O
Type B2_Similar
B-25-04

-0 PR
AA
5.03 m

23 N
2 BED
88.61 m AV (700x650)

I
Type B1_Similar
B-25-01 Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:
2 BED+
WG 93.70 m Project No: 14.33020.00

R
7.13 m Type B2
B-25-02 Sheet Title:

O
GENERAL

W
WG ARRANGEMENT
7.82 m
23/01/2017 16:32:29

27
00
FLOOR PLAN
CA
LEVEL 25
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2125 3.3
BC
BB
50
38
NOTE:
00
27
BA WG WG = WINTER GARDEN Project
7.25 m
AA = AMENITY AREA SPIRE LONDON
2 BED Prepared For
84.19 m
WG Type B2_Similar GREENLAND
7.13 m B-26-08
HERTSMERE
(LONDON)
AV (700x650)
LIMITED
Client Location
2 BED AA City Tower, 11th Floor, 40 Basinghall Street,
87.14 m 5.04 m London, EC2V 5DE
Type B3_Similar
B-26-09
Project No: 14.33020.00
1 Bed Wheelchair Adaptable Unit

1 BED
61.07 m
UT (1600X800) Type B6_Similar
AV (700x650) AV (700x650)
B-26-06

UT (1600X800)
A4 A3 A2 A1
UT (1600X800)
8725 8725 6900

HOK
AA Qube, 90 Whitfield Street
8.90 m
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA f +44 (0)20 7636 1987
AA
6.04 m
7.01 m All reproduction & intellectual property rights reserved 2014

SUITE In Association with


50.28 m
68

AECOM
00

1 BED Type A5_Similar


52.46 m A-26-08 Project Manager
AV (700x650) SUITE MidCity Place, 71 High Holborn, London,
Type B5_Similar SUITE 50.12 m WC1V 6QS, UK
B-26-07 49.92 m Type A6_Handed_Similar
UT (1600X800) Type A7_Similar A-26-04 RobertBirdGroup
A-26-06
Structural Engineer
UT (1600X800) Level 2, Harling House,
B2 WG
UT (1600X800) UT (1600X800) AV (700x650)
47-51 Great Suffolk St,
7.37 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

2 BED 1 Bath Road, Maidenhead,


00

AV (700x650) AV (700x650) 76.94 m SL6 4AQ, UK


PL7 PL8 PL1 PL2 PL3

4450
UT (1600X800) Type A1-1_Handed_Similar
A-26-02
AV (700x650)
WG Key Plan

C3 7.01 m
CORE B CORE A
8
: 5.9
ToF

WG
6.85 m UT (1600X800)
AB
1 BED
9 Units 85.645 m 8 Units
WG
B3 51.40 m 7.01 m
Type B3_Similar AV (700x650) 2 BED
B-26-05 77.10 m

4450
UT (1600X800)
AV (700x650) Type A1-1_Similar
PL9 PL10 PL4 PL5 A-26-01
00
69

AV (700x650) AV (700x650)

AC
WG N
UT (1600X800) UT (1600X800) AV (700x650)
7.00 m
C2
UT (1600X800)

1 BED 1 BED
LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
UT (1600X800) 52.39 m 52.53 m Any Levels shown in ( ) = AOD LEVEL
Type A1 Type A3 SG = Sky Garden
1 BED All areas and dimensions shown subject to further design
51.87 m 1 BED A-26-05 A-26-03 development and may be varied in future design stages.
AV (700x650) Internal layouts are shown for illustrative purposes only
Type B1_Similar 50.46 m Do not scale unless for planning purposes
00

Type A2 Site verify all dimensions prior to construction


68

B-26-03 Report all discrepancies to HOK immediately


A-26-07 This drawing is to be read in conjunction with all relevant
documents and drawings

SS
AA AA Rev. Description Date By

4.99 m 5.02 m 2.0 Stage 3 100% Issue 16.09.2016 JE


C1 UT (1600X800) 3.0 External Cladding Tender Issue 03.10.2016 JT
AA 3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
5.14 m
3.3 Stage 4A WIP 23.01.2017 AB

UT (1600X800)

20 G
UT (1600X800) AV (700x650)
1 BED
AV (700x650)
52.97 m
Type B2_Similar

1- O
B-26-04

-0 PR
AA
5.03 m

23 N
2 BED
88.61 m
Type B1_Similar AV (700x650)

I
B-26-01 Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

2 BED+ Project No: 14.33020.00

R
WG 93.98 m
7.13 m Type B3 Sheet Title:

O
B-26-02 2 Bed Wheelchair Accessible Unit
GENERAL

W
WG ARRANGEMENT
23/01/2017 16:32:34

27
00
7.82 m
FLOOR PLAN
CA
LEVEL 26
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2126 3.3
BC
BB
50
38
NOTE:
00
27
BA WG WG = WINTER GARDEN Project
7.25 m
AA = AMENITY AREA SPIRE LONDON
Prepared For
WG
7.13 m
2 BED
84.19 m GREENLAND
Type B2_Similar
B-27-08
HERTSMERE
(LONDON)
2 BED AV (700x650)
LIMITED
87.15 m
Type B3_Similar Client Location
AA City Tower, 11th Floor, 40 Basinghall Street,
B-27-09
5.04 m London, EC2V 5DE

1 Bed Wheelchair Adaptable Unit


Project No: 14.33020.00

1 BED
61.07 m
Type B6_Similar
UT (1600X800)
AV (700x650)
B-27-06
AV (700x650)

UT (1600X800)
A4 A3 A2 A1
UT (1600X800)
8725 8725 6900
AA
HOK
4.95 m Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 AA
t +44 (0)20 7636 2006
AA f +44 (0)20 7636 1987
4.97 m 5.02 m
All reproduction & intellectual property rights reserved 2014
1 BED
56.41 m In Association with
Type A4
68

AECOM
00

1 BED A-27-08
1 BED 1 BED Project Manager
52.45 m
53.09 m 53.07 m MidCity Place, 71 High Holborn, London,
Type B5 AV (700x650)
Type A5 Type A3_Handed WC1V 6QS, UK
B-27-07
A-27-06 A-27-04
UT (1600X800)
RobertBirdGroup
Structural Engineer
UT (1600X800) Level 2, Harling House,
B2 WG UT (1600X800) UT (1600X800) AV (700x650)
47-51 Great Suffolk St,
7.37 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

AV (700x650) AV (700x650) SL6 4AQ, UK


PL7 PL8 PL1 PL2 PL3 2 BED

4450
UT (1600X800) 76.95 m
Type A1-1_Handed_Similar
AV (700x650) Key Plan
A-27-02 WG
C3 7.01 m
CORE B CORE A
8
: 5.9
ToF

WG
UT (1600X800)
6.87 m
9 Units 88.78 m 8 Units AB
1 BED WG
B3 51.40 m 7.01 m
2 BED
Type B3_Similar AV (700x650)
77.12 m
B-27-05

4450
UT (1600X800)
AV (700x650) Type A1-1_Similar
PL9 PL10 PL4 PL5 A-27-01
00
69

AV (700x650) AV (700x650)

WG
6.99 m
AC
N
UT (1600X800) UT (1600X800) AV (700x650)
C2
UT (1600X800)

UT (1600X800)
1 BED LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
Any Levels shown in ( ) = AOD LEVEL
1 BED 1 BED 53.85 m SG = Sky Garden
All areas and dimensions shown subject to further design
51.86 m 52.08 m Type A3 development and may be varied in future design stages.
AV (700x650) 1 BED Type A1 A-27-03 Internal layouts are shown for illustrative purposes only
Type B1_Similar Do not scale unless for planning purposes
00

50.46 m A-27-05 Site verify all dimensions prior to construction


B-27-03
68

Type A2 Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
A-27-07 documents and drawings

SS
AA Rev. Description Date By
AA 5.02 m
2.0 Stage 3 100% Issue 16.09.2016 JE
4.99 m
C1 UT (1600X800) 3.0 External Cladding Tender Issue 03.10.2016 JT
AA 3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
5.14 m 3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

UT (1600X800)

20 G
UT (1600X800) AV (700x650)

AV (700x650) 1 BED
53.24 m

1- O
Type B2_Similar
B-27-04

-0 PR
AA
5.03 m

23 N
2 BED
88.63 m AV (700x650)

I
Type B1_Similar
Drawn by: JT/AB Reviewed by: CL
B-27-01
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
2 BED+
WG
93.98 m 2 Bed Wheelchair Adaptable Unit
7.13 m Sheet Title:
Type B3

O
B-27-02
GENERAL

W
WG ARRANGEMENT
7.82 m
23/01/2017 16:39:52

27
00
FLOOR PLAN
CA
LEVELS 27 TO 32
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2127 3.3
BC
BB
50
38
NOTE:
00
27
BA
WG
WG = WINTER GARDEN Project
7.25 m AA = AMENITY AREA SPIRE LONDON
Prepared For
2 BED
WG 84.19 m GREENLAND
7.13 m Type B2_Similar
B-33-08
HERTSMERE
(LONDON)
2 BED AV (700x650)
LIMITED
87.13 m
Type B3_Similar AA
Client Location
B-33-09 5.04 m City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

1 BED
61.07 m
UT (1600X800)
AV (700x650) AV (700x650) Type B6_Similar
B-33-06
UT (1600X800)
A4 A3 A2 A1
UT (1600X800)
8725 8725 6900
AA
4.95 m HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA AA f +44 (0)20 7636 1987
1 BED 4.97 m 5.02 m
56.48 m All reproduction & intellectual property rights reserved 2014

Type A4 In Association with


A-33-08
68

AECOM
00

Project Manager
1 BED 1 BED
AV (700x650) MidCity Place, 71 High Holborn, London,
52.45 m 1 BED 53.07 m
WC1V 6QS, UK
Type B5 53.09 m Type A3_Handed
UT (1600X800) Type A5 A-33-04
B-33-07 RobertBirdGroup
A-33-06
Structural Engineer
UT (1600X800) Level 2, Harling House,
B2 WG UT (1600X800) UT (1600X800) AV (700x650)
47-51 Great Suffolk St,
London, England SE1 0BS, UK
7.37 m
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

AV (700x650) AV (700x650) 2 BED SL6 4AQ, UK


PL7 PL8 PL1 PL2 PL3
76.95 m

4450
UT (1600X800)
Type A1-1_Handed_Similar
AV (700x650) A-33-02 Key Plan
WG
C3 7.01 m
CORE B CORE A
8
: 5.9
ToF

WG UT (1600X800)
6.85 m
9 Units 107.59 m 8 Units AB
B3 1 BED WG
51.40 m AV (700x650)
7.01 m
Type B3_Similar 2 BED

4450
B-33-05 AV (700x650)
UT (1600X800) 77.12 m
PL9 PL10 PL4 PL5 Type A1-1_Similar
A-33-01
00
69

AV (700x650) AV (700x650)

WG AC
6.98 m N
UT (1600X800) UT (1600X800) AV (700x650)
C2
UT (1600X800)

LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)


UT (1600X800) Any Levels shown in ( ) = AOD LEVEL
1 BED 1 BED SG = Sky Garden
52.08 m 53.84 m All areas and dimensions shown subject to further design
1 BED Type A1 Type A3
development and may be varied in future design stages.
AV (700x650) 1 BED Internal layouts are shown for illustrative purposes only
51.77 m Do not scale unless for planning purposes
00

50.52 m A-33-05 A-33-03 Site verify all dimensions prior to construction


Type B1_Similar
68

Type A2 Report all discrepancies to HOK immediately


B-33-03 This drawing is to be read in conjunction with all relevant
A-33-07 documents and drawings

SS
AA AA Rev. Description Date By
4.99 m 5.02 m
2.0 Stage 3 100% Issue 16.09.2016 JE
C1 UT (1600X800) 3.0 External Cladding Tender Issue 03.10.2016 JT
AA 3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
5.14 m 3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

UT (1600X800)

20 G
UT (1600X800) AV (700x650)

AV (700x650)
1 BED
53.24 m

1- O
Type B2_Similar
B-33-04

-0 PR
AA
2 BED 5.04 m
88.21 m

23 N
Type B1_Similar
B-33-01 AV (700x650)

I
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
WG 2 BED+
7.13 m 93.76 m 2 Bed Wheelchair Adaptable Unit Sheet Title:
Type B3_Similar

O
B-33-02
GENERAL

W
WG ARRANGEMENT
23/01/2017 16:58:31

27
00
7.87 m
FLOOR PLAN
CA
LEVEL 33
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2133 3.3
BC
B1

BB

BA Project
SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
B2 (LONDON)
LIMITED
COMMS
ROOM Client Location
22 m G-40-120 VENTILATION
PLANTROOM City Tower, 11th Floor, 40 Basinghall Street,
R-34-09
1 London, EC2V 5DE
110.855
298 m
R-34-01 Project No: 14.33020.00
G-40-120
110.855

LV
SWITCHROOM
51 m B3
R-34-08

A4 A3 A2 A1
H-45-120
G-40-120 HOK
110.855 Qube, 90 Whitfield Street
H-45-120
London, W1T 4EZ, UK
G-40-120
G-40-120 t +44 (0)20 7636 2006
G-40-120 H-45-120
f +44 (0)20 7636 1987
H-45-120 H-45-120
All reproduction & intellectual property rights reserved 2014
G-40-120
VENTILATION In Association with
H-45-120 PLANTROOM
1 HEAT AECOM
H-45-120 EXCHANGER
298 m Project Manager
R-34-01 PLANT MidCity Place, 71 High Holborn, London,
H-45-120
ROOM WC1V 6QS, UK
G-40-120 110.855 59 m

G-40-120
H-45-120 R-34-02
H-45-120
RobertBirdGroup
H-45-120 110.855 Structural Engineer
CORRIDOR RISER RISER Level 2, Harling House,
STORE
H-45-120
4 H-45-120 2 m 2 m 47-51 Great Suffolk St,
C-0-120 4 m G-40-120 A-34-07 G-40-120
17 m A-34-08 London, England SE1 0BS, UK
B-34-02
B-34-01 AA
LOBBY G-40-120 SWECO
LOBBY Building Services Engineer

G-40-120
1 4
PL8 3 m ELEC. PL1 1 Bath Road, Maidenhead,
G-40-120 3 m SL6 4AQ, UK
A-34-01 ROOM A-34-04G-40-120
G-40-120
5 m G-40-120
A-34-05
Key Plan

8
: 5.9
ToF

WATER 110.915 CORE B 110.915 CORE A CORRIDOR


SERVICE LOBBY LOBBY 2 ENERGY
PLANTROOM 37 m 23 m 15 m CENTRE
H-45-120 C-0-120 H-45-120
181 m B-34-00 G-40-120 A-34-00 R-34-00 G-40-120 173 m
R-34-07 G-40-120 H-45-120 R-34-03
G-40-120 110.855
110.855
LOBBY ST-1 LOBBY PL4
PL9 2 G-40-120 16 m 3

G-40-120
3 m A-34-S1 5 m
A-34-02 A-34-03

AC
G-40-120
N
G-40-120
NT
ACEME
EPL
LA NT R
VENTILATION RP
S FO

G-40-120
PLANTROOM EL
E PAN LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
2 ABL
Any Levels shown in ( ) = AOD LEVEL

POOL 59 m OUNT SG = Sky Garden


All areas and dimensions shown subject to further design
G-40-120 VENTILATION R-34-04 DEM development and may be varied in future design stages.
H-45-120 H-45-120 Internal layouts are shown for illustrative purposes only
PLANTROOM Do not scale unless for planning purposes
H-45-120 110.855 Site verify all dimensions prior to construction
170 m Report all discrepancies to HOK immediately
R-34-05 This drawing is to be read in conjunction with all relevant
G-40-120 documents and drawings

SS
110.855 Rev. Description Date By
H-0-0 2.0 Stage 3 100% Issue 16.09.2016 JE
H-45-120 3.0 External Cladding Tender Issue 03.10.2016 JE
G-40-120 3.1 Stage 3 Completion Issue 28.10.2016 PD

17 RE
3.2 Stage 4A WIP 23.01.2017 AB

POOL ABOVE

20 G
G-40-120

1- O
G-40-120
C3

-0 PR
POOL
PLANTROOM
212 m
R-34-06

23 N
110.855
G-40-120

I
Drawn by: RG/PDW Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

C2 Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:42:45

FLOOR PLAN
CA
LEVEL 34
Original drawing is A1.

CB C1 Sheet Number: Revision:

0 1 5 10 M A2134 3.2
CC
BC
B1

BB

BA Project
K1-0-0

K1-0-0
SPIRE LONDON
J1-0-0
J1-0-0
J1-0-0 Prepared For
J1-0-0
J1-0-0
H-45-120
K1-0-0
GREENLAND
J1-0-0 H-45-120
H-45-120
HERTSMERE
F-61-60
B2 (LONDON)
K1-0-0
K1-0-0
F-61-60
LIMITED
H-45-120
Client Location
H-45-120 City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE
GYM FITNESS
218 m
K1-0-0 STUDIO
20 m Project No: 14.33020.00
R-35-15
R-35-16
H-45-120 H-45-120 K1-0-0 F-61-60
K1-0-0 C-40-0
K1-0-0 F-61-60
H-45-120 F-61-60
H-45-120 115.365
H-45-120
K1-0-0
H-45-120
H-45-120
B3
C-0-0 K1-0-0
K1-0-0
OFFICE
K1-0-0
21 m
R-35-18 F-61-60 A4 A3 A2 A1
C-0-0 C-0-0 C-40-0

C-0-0 H-45-120
C-0-0
K1-0-0
F-61-60 HOK
H-45-120 H-0-0
Qube, 90 Whitfield Street
C-45-120 K1-0-0 London, W1T 4EZ, UK
C-0-0 K1-0-0 H-0-0
H-45-120 K1-0-0 t +44 (0)20 7636 2006
K1-0-0 K1-0-0 K1-0-0
H-45-120 K-0-0 f +44 (0)20 7636 1987
H-45-120 K1-0-0
C-40-0 All reproduction & intellectual property rights reserved 2014
K1-0-0

K-0-0
K1-0-0
H-45-120

C-40-0
C-0-0 F-61-60 F-61-60 K1-0-0
H-45-120 In Association with

K1-0-0
H-45-120 K1-0-0 F-61-60
K-0-0 F-61-60
C-40-0
AECOM

C-40-0
TOILETS

K-0-0

C-40-0
C-40-0 H-45-120 CINEMA C-40-0 Project Manager
F-61-0 K1-0-0 K1-0-0 C-40-0 47 m
H-0-0 K1-0-0 H-0-0
C-40-0 48 m R-35-30 MidCity Place, 71 High Holborn, London,

E-69-60
C-40-0 C-0-0 K1-0-0 C-40-0
F-56-0 115.365

E-69-60
WC1V 6QS, UK

C-40-0
F-61-0 C-0-0
C-0-0 D1-0-0 R-35-22
C-0-0 H-45-120 H-40-0 C-40-0
H-45-120 J1-0-0
J1-0-0 D1-0-0 RobertBirdGroup

K1-0-0
H-40-0
H-0-0 C-40-0
C-0-0 H-45-120 E-69-60 Structural Engineer
H-40-0 SPA C-40-0
C-0-0 F-56-0 E-69-60 C-40-0
C-40-0 C-40-0 Level 2, Harling House,

K1-0-0
E-69-60
FEMALE K1-0-0 STORE 47 m LAUNDRY
47-51 Great Suffolk St,

H-45-120

C-40-0
E-69-60
CHANGING C-0-60 C-0-60

J1-0-0

J1-0-0
4 m C-0-0 R-35-20 K-0-0 K-0-0 K1-0-0
5 m
London, England SE1 0BS, UK
52 m CORRIDOR H-0-0 C-0-0
K1-0-0
K1-0-0 MALE H-45-120 B-35-02 R-35-31
R-35-10 CHANGING
H-45-120
1 AA
CLEANERS C-40-0 SWECO

C-40-0
K1-0-0

H-45-120 K1-0-0
K1-0-0
45 m 12 m K1-0-0 F-61-60

H-45-120
K1-0-0 K1-0-0 B-35-01C-0-120 K1-0-0 CUPBOARD Building Services Engineer
R-35-11

H-45-120
J1-0-0

H-45-120
H-45-120
1 J1-0-0 1 Bath Road, Maidenhead,

K1-0-0
H-45-120

H-45-120
115.365 H-45-120 PL7 PL8 K1-0-0 ELEC. PL1 PL2 PL3

K1-0-0 C-45-60
K1-0-0 K-0-0 2 m SL6 4AQ, UK
H-45-120 H-45-120
ROOM H-45-120

K1-0-0
H-0-0 R-35-32 H-45-120

H-45-120
H-0-120 J1-0-0
J1-0-0 C-40-120 5 m

H-45-120
K1-0-0 C-0-120 J1-0-0
A-35-05

H-45-120

H-45-120
C-40-120 Key Plan
C-0-0 H-0-0

J1-0-0

J1-0-0

J1-0-0
H-45-120 C-45-120

J1-0-0
H-0-0 F-56-0 J1-0-0
C-0-0 J1-0-0 J1-0-0 J1-0-0 J1-0-0 J1-0-0
CORE B CORE A
8

FIRE CURTAIN
: 5.9
ToF

H-0-0 H-45-120 H-45-120 J1-0-0 J1-0-0


LOBBY LOBBY
J1-0-0

C-0-0 115.365 115.365 LOUNGE+BAR


H-0-0 33 m 13 m 170 m
C-0-0 C-0-0 J1-0-0 A-35-00 H-45-120 H-45-120
B-35-00 C-40-120 H-45-120 H-45-120 C-0-120 R-35-00
C-0-0

F-56-0 J1-0-0 J1-0-0 J1-0-0 J1-0-0

H-45-120
C-0-0 C-40-120 H-45-120
F-56-0 C-0-0 C-0-0 115.365
F-56-0 C-0-120

H-45-120
K1-0-0 H-0-0 C-0-0 J1-0-0
J1-0-0

F-56-0 K1-0-0 C-40-0 C-0-0 LOBBYK1-0-0 J1-0-0


ST-1 H-45-120
1
J1-0-0

16 m PL4 H-45-120
PL5
K1-0-0
K1-0-0

K1-0-0
PL9 PL10

H-45-120
6 m

H-45-120
K1-0-0
C-40-0
K1-0-0
A-35-S1 J1-0-0
POOL/SPA POOL/KIDS POOLS IN ABEYANCE. A-35-01 H-45-120 J1-0-0

K1-0-0
K1-0-0 C-0-0 H-45-120

H-45-120
DEVIN POOL CONSULTANTS TO ADVISE K1-0-0

K1-0-0

K1-0-0
K1-0-0

C-40-0
ON POOL DETAILS H-45-120
JACUZZI C-40-60 AC

H-45-120
N

H-45-120

B-0-0

B-0-0
H-45-120

H-45-120
K1-0-0

F-56-0
C-40-120 K1-0-0 K1-0-0 K1-0-0 C-40-0

J1-0-0

J1-0-0
C-0-0 H-45-120 H-45-120
C-40-60 H-45-120
C-40-60 CLEANERS
H-45-120

H-45-120

C-40-60
CUPBOARD
2 H-45-120 F-56-0 K1-0-0
J1-0-0
STEAM F-61-60
KITCHEN LIBRARY LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
2 m ROOM Any Levels shown in ( ) = AOD LEVEL
R-35-09 19 m 53 m SG = Sky Garden
13 m R-35-03 DINING/MEETING R-35-01 K1-0-0 All areas and dimensions shown subject to further design
K1-0-0

F-61-60
C-0-0 development and may be varied in future design stages.
ST-3 R-35-05 F-61-60 50 m Internal layouts are shown for illustrative purposes only
H-45-120 C-40-0 R-35-02 Do not scale unless for planning purposes
H-45-120 17 m Site verify all dimensions prior to construction
B-35-S3 Report all discrepancies to HOK immediately
H-45-120 H-0-0 H-0-0
K1-0-0

K1-0-0

This drawing is to be read in conjunction with all relevant


H-45-120 documents and drawings
C-40-0

K1-0-0

SS
K1-0-0
H-0-0 F-56-0 F-61-60
H-0-0 Rev. Description Date By
H-45-120 SAUNA
C-40-120 H-45-120 2.0 Stage 3 100% Issue 16.09.2016 JE
H-45-120 10 m
3.0 External Cladding Tender Issue 03.10.2016 JE
H-45-120 PLANTROOM R-35-06
F-61-60 3.1 Stage 3 Completion Issue 28.10.2016 PD
7 m

17 RE
C-0-0 3.2 External Cladding Tender Update 07.11.2016 PD
A-34-06 K1-0-0 3.3 Stage 4A WIP 23.01.2017 AB
K1-0-0
H-40-120 H-40-120

K1-0-0 K1-0-0

20 G
POOL

1- O
AREA
334 m 115.365
KIDS C3
POOL
R-35-04

-0 PR
POOL

23 IN
Drawn by: RG/PDW Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

C2 Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:42:48

FLOOR PLAN
CA
LEVEL 35
Original drawing is A1.

CB C1 Sheet Number: Revision:

0 1 5 10 M A2135 3.3
CC
BC
BB
50
38
NOTE:
00
27
BA WG WG = WINTER GARDEN Project
7.17 m
AA = AMENITY AREA SPIRE LONDON
Prepared For
WG 2 BED
84.36 m
GREENLAND
7.13 m
Type B2_Similar
B-36-04
HERTSMERE
(LONDON)
LIMITED
2 BED
Client Location
87.33 m
Type B3_Similar AA City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE
B-36-05 5.03 m
Project No: 14.33020.00
1 BED
62.24 m
Type B13
B-36-02

A4 A3 A2 A1
D-B3604-0 D-B3602-0 8725 8725 6900
AA HOK
D-B3605-0
5.04 m Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 D-B3603-0 t +44 (0)20 7636 2006
AA AA
1 BED 4.97 m f +44 (0)20 7636 1987
4.99 m
57.13 m All reproduction & intellectual property rights reserved 2014
Type A4_Similar In Association with
A-36-08
68

AECOM
00

Project Manager
1 BED MidCity Place, 71 High Holborn, London,
1 BED 54.20 m 1 BED WC1V 6QS, UK
53.23 m Type A5_Similar 54.82 m
Type B5_Similar A-36-06 Type A3_Handed_Similar RobertBirdGroup
B-36-03 A-36-04 Structural Engineer
Level 2, Harling House,
B2 WG 47-51 Great Suffolk St,
7.40 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

2 BED 1 Bath Road, Maidenhead,


00

77.07 m SL6 4AQ, UK


PL7 PL8 PL1 PL2 PL3

4450
Type A1_Handed_Similar
D-A3604-0 A-36-02
D-A3608-0 D-A3606-0
Key Plan
WG
C3 6.95 m
CORE B CORE A D-A3602-0 8
: 5.9
ToF

WG
6.46 m
5 Units 119.025 m 8 Units AB
D-A3601-0 WG
B3 1 BED D-B3601-0 6.95 m
56.15 m 2 BED
Type B7 D-A3607-0 D-A3603-0 77.60 m

4450
B-36-01 Type A1_Similar
PL9 PL10 D-A3605-0 PL4 PL5 A-36-01
00
69

AC
N

C2

LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)


1 BED 1 BED Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
51.89 m 54.94 m All areas and dimensions shown subject to further design
Type A6 Type A3_Similar development and may be varied in future design stages.
1 BED Internal layouts are shown for illustrative purposes only
A-36-05 A-36-03
53.22 m Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

Type A2_Similar Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
A-36-07 documents and drawings

SS
AA Rev. Description Date By
AA 4.99 m 2.0 Stage 3 100% Issue 16.09.2016 JE
5.00 m
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT
AA

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
Void over swiming pool 5.04 m 3.3 Stage 4A WIP 23.01.2017 AB

20 G
1- O
-0 PR
23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 16:59:27

27
00
FLOOR PLAN
CA
LEVEL 36
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2136 3.3
BC
BB
50
38
NOTE:
00
27
BA WG WG = WINTER GARDEN Project
7.17 m
AA = AMENITY AREA SPIRE LONDON
2 BED Prepared For
WG
7.13 m
84.36 m
Type B2_Similar
GREENLAND
B-37-08 HERTSMERE
(LONDON)
LIMITED
2 BED
87.33 m Client Location
Type B3_Similar AA City Tower, 11th Floor, 40 Basinghall Street,
B-37-09 4.99 m London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

1 BED
61.69 m
Type B6_Similar
B-37-06

A4 A3 A2 A1
D-B3708-0 D-B3706-0 8725 8725 6900
AA HOK
D-B3709-0
5.04 m Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 AA t +44 (0)20 7636 2006
D-B3707-0 AA
4.97 m 4.99 m
f +44 (0)20 7636 1987
All reproduction & intellectual property rights reserved 2014
1 BED In Association with
57.13 m
68

1 BED
Type A4_Similar AECOM
00

53.23 m
A-37-08 Project Manager
Type B5_Similar
1 BED 1 BED MidCity Place, 71 High Holborn, London,
B-37-07
54.20 m 54.82 m WC1V 6QS, UK
Type A5_Similar Type A3_Handed_Similar
A-37-06 A-37-04 RobertBirdGroup
Structural Engineer
Level 2, Harling House,
B2 WG 47-51 Great Suffolk St,
7.40 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK
PL7 PL8 PL1 PL2 PL3 2 BED

4450
77.07 m
D-A3706-0 D-A3704-0 Type A1_Handed_Similar
Key Plan
D-A3708-0 A-37-02 WG
C3 6.95 m
CORE B CORE A D-A3702-0 8
: 5.9
ToF

WG
6.46 m 9 Units 122.16 m 8 Units AB
1 BED D-A3701-0 WG
B3 52.31 m D-B3705-5 D-A3703-0 6.95 m
Type B3_Similar D-A3707-0
B-37-05
2 BED

4450
D-A3705-0 77.63 m
PL9 PL10 PL4 PL5 Type A1_Similar
00
69

A-37-01

WG
7.38 m AC
N

C2

1 BED 1 BED LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)


Any Levels shown in ( ) = AOD LEVEL
1 BED 52.05 m 54.94 m SG = Sky Garden
All areas and dimensions shown subject to further design
52.24 m Type A6 Type A3_Similar development and may be varied in future design stages.
Type B8 1 BED A-37-05 A-37-03 Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

B-37-03 53.20 m Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


Type A2_Similar This drawing is to be read in conjunction with all relevant
documents and drawings
A-37-07

SS
D-B3703-0
AA Rev. Description Date By
AA
4.99 m 2.0 Stage 3 100% Issue 16.09.2016 JE
5.00 m
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
D-B3701-0 3.1 Stage 3 Completion Issue 28.10.2016 JT
AA

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
5.04 m 3.3 Stage 4A WIP 23.01.2017 AB
D-B3702-0
D-B3704-0

20 G
1 BED
51.84 m

1- O
Type B2_Similar
B-37-04

-0 PR
AA
5.01 m
2 BED

23 N
87.75 m
Type B1_Similar
B-37-01

I
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
WG 2 BED+
7.26 m 94.18 m Sheet Title:
Type B3_Similar

O
B-37-02 2 Bed Wheelchair Adaptable Unit
GENERAL

W
WG
ARRANGEMENT
23/01/2017 16:51:45

27
00
7.24 m FLOOR PLAN
CA
LEVELS 37 TO 38
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2137 3.3
BC
BB
50
38
NOTE:
00
27
BA WG WG = WINTER GARDEN Project
7.17 m
AA = AMENITY AREA SPIRE LONDON
2 BED Prepared For
84.36 m
WG
Type B2_Similar GREENLAND
B-39-08
7.13 m HERTSMERE
(LONDON)
LIMITED
2 BED
87.33 m
AA Client Location
Type B3_Similar City Tower, 11th Floor, 40 Basinghall Street,
4.99 m
B-39-09 London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

1 BED
61.69 m
Type B6_Similar
B-39-06

A4 A3 A2 A1
D-B3908-0 D-B3906-0 8725 8725 6900

D-B3909-0 AA HOK
5.04 m Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 D-B3907-0 t +44 (0)20 7636 2006
AA AA
4.97 m 4.99 m
f +44 (0)20 7636 1987
1 BED
57.13 m All reproduction & intellectual property rights reserved 2014
Type A4_Similar In Association with
A-39-08
68

AECOM
00

1 BED
53.23 m Project Manager
Type B5_Similar 1 BED MidCity Place, 71 High Holborn, London,
54.20 m 1 BED WC1V 6QS, UK
B-39-07
Type A5_Similar 54.82 m
A-39-06 Type A3_Handed_Similar RobertBirdGroup
A-39-04 Structural Engineer
Level 2, Harling House,
B2 WG 47-51 Great Suffolk St,
7.40 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK
PL7 PL8 PL1 PL2 PL3 2 BED

4450
77.07 m
Type A1_Handed_Similar
D-A3908-0 D-A3906-0 D-A3904-0 A-39-02 Key Plan
WG
C3 6.95 m
CORE B CORE A D-A3902-0 8
: 5.9
ToF

WG
6.46 m 9 Units 128.43 m 8 Units AB
1 BED
52.31 m D-A3901-0 WG
B3 Type B3_Similar D-B3905-0 6.95 m
B-39-05 D-A3907-0 D-A3903-0
DOWN TO LEVEL 43

4450
D-A3905-0 2 BED
PL9 PL10 PL4 PL5 77.63 m
00

Type A1_Similar
69

A-39-01
WG
7.46 m
AC
N

C2

LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)


1 BED 1 BED Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
1 BED 52.05 m 54.94 m All areas and dimensions shown subject to further design
development and may be varied in future design stages.
52.59 m Type A6 Type A3_Similar Internal layouts are shown for illustrative purposes only
Type B8 1 BED A-39-05 A-39-03 Do not scale unless for planning purposes
00

53.14 m Site verify all dimensions prior to construction


68

B-39-03 Report all discrepancies to HOK immediately


Type A2_Similar This drawing is to be read in conjunction with all relevant
documents and drawings
A-39-07

SS
D-B3903-0
AA Rev. Description Date By
AA 4.99 m
5.00 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
D-B3901-0 3.1 Stage 3 Completion Issue 28.10.2016 AB
AA

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
5.02 m 3.3 Stage 4A WIP 23.01.2017 AB
D-B3902-0
D-B3904-0

20 G
1 BED
52.29 m

1- O
Type B2_Similar
B-39-04

-0 PR
AA
4.95 m
2 BED

23 N
88.83 m
Type B1_Similar
B-39-01

I
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
WG 2 BED+
7.26 m 94.00 m
Sheet Title:
Type B3_Similar

O
B-39-02 2 Bed Wheelchair Adaptable Unit
GENERAL

W
ARRANGEMENT
WG
23/01/2017 16:54:59

27
00 7.86 m FLOOR PLAN
CA
LEVELS 39 TO 44 43

CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2139 3.3
BC
BB
50
38
NOTE:
00
27
BA WG WG = WINTER GARDEN Project
7.17 m
AA = AMENITY AREA SPIRE LONDON
2 BED Prepared For
84.36 m
WG
Type B2_Similar GREENLAND
B-39-08
7.13 m HERTSMERE
(LONDON)
LIMITED
2 BED
87.33 m
AA Client Location
Type B3_Similar City Tower, 11th Floor, 40 Basinghall Street,
4.99 m
B-39-09 London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

1 BED
61.69 m
Type B6_Similar
B-39-06

A4 A3 A2 A1
D-B3908-0 D-B3906-0 8725 8725 6900

D-B3909-0 AA HOK
5.04 m Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 D-B3907-0 t +44 (0)20 7636 2006
AA AA
4.97 m 4.99 m
f +44 (0)20 7636 1987
1 BED
57.13 m All reproduction & intellectual property rights reserved 2014
Type A4_Similar In Association with
A-39-08
68

AECOM
00

1 BED
53.23 m Project Manager
Type B5_Similar 1 BED MidCity Place, 71 High Holborn, London,
54.20 m 1 BED WC1V 6QS, UK
B-39-07
Type A5_Similar 54.82 m
A-39-06 Type A3_Handed_Similar RobertBirdGroup
A-39-04 Structural Engineer
Level 2, Harling House,
B2 WG 47-51 Great Suffolk St,
7.40 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK
PL7 PL8 PL1 PL2 PL3 2 BED

4450
77.07 m
Type A1_Handed_Similar
D-A3908-0 D-A3906-0 D-A3904-0 A-39-02 Key Plan
WG
C3 6.95 m
CORE B CORE A D-A3902-0 8
: 5.9
ToF

WG
6.46 m 9 Units 128.43 m 8 Units AB
1 BED
52.31 m D-A3901-0 WG
B3 Type B3_Similar D-B3905-0 6.95 m
B-39-05 D-A3907-0 D-A3903-0

4450
D-A3905-0 2 BED
PL9 PL10 PL4 PL5 77.63 m
00

Type A1_Similar
69

A-39-01
WG
7.46 m
AC
N

C2

LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)


1 BED 1 BED Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
1 BED 52.05 m 54.94 m All areas and dimensions shown subject to further design
development and may be varied in future design stages.
52.59 m Type A6 Type A3_Similar Internal layouts are shown for illustrative purposes only
Type B8 1 BED A-39-05 A-39-03 Do not scale unless for planning purposes
00

53.14 m Site verify all dimensions prior to construction


68

B-39-03 Report all discrepancies to HOK immediately


Type A2_Similar This drawing is to be read in conjunction with all relevant
documents and drawings
A-39-07

SS
D-B3903-0
AA Rev. Description Date By
AA 4.99 m
5.00 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
D-B3901-0 3.1 Stage 3 Completion Issue 28.10.2016 AB
AA

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
5.02 m 3.3 Stage 4A WIP 23.01.2017 AB
D-B3902-0
D-B3904-0

20 G
1 BED
52.29 m

1- O
Type B2_Similar
B-39-04

-0 PR
AA
4.95 m
2 BED

23 N
88.83 m
Type B1_Similar
B-39-01

I
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
WG 2 BED+
7.26 m 94.00 m
Sheet Title:
Type B3_Similar

O
B-39-02 2 Bed Wheelchair Adaptable Unit
GENERAL

W
ARRANGEMENT
WG
23/01/2017 16:54:59

27
00 7.86 m FLOOR PLAN
CA
LEVELS 39 TO 44
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2139 3.3
BC
BB
50
38
NOTE:
00
27
BA
WG
WG = WINTER GARDEN Project
7.17 m AA = AMENITY AREA SPIRE LONDON
Prepared For
2 BED
WG 84.69 m GREENLAND
7.16 m Type B2_Similar
B-45-08 HERTSMERE
(LONDON)
LIMITED
2 BED
87.81 m Client Location
Type B3_Similar AA City Tower, 11th Floor, 40 Basinghall Street,
B-45-07 5.08 m London, EC2V 5DE

Project No: 14.33020.00


1 Bed Wheelchair Adaptable Unit

1 BED
61.74 m
Type B6_Similar
B-45-06

A4 A3 A2 A1
D-B4508-0 D-B4506-0 8725 8725 6900
AA
D-B4507-0 5.11 m HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 D-B4505-0 t +44 (0)20 7636 2006
AA AA f +44 (0)20 7636 1987
1 BED 5.01 m 5.01 m
57.46 m All reproduction & intellectual property rights reserved 2014
Type A4_Similar In Association with
A-45-08
68

AECOM
00

1 BED
53.28 m Project Manager
Type B5_Similar 1 BED MidCity Place, 71 High Holborn, London,
B-45-05 1 BED 55.05 m WC1V 6QS, UK
54.55 m Type A3_Handed_Similar
Type A5_Similar A-45-04 RobertBirdGroup
A-45-06 Structural Engineer
Level 2, Harling House,
B2 WG 47-51 Great Suffolk St,
7.47 m London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

2 BED SL6 4AQ, UK


PL7 PL8 PL1 PL2 PL3
77.38 m

4450
Type A1_Handed_Similar
D-A4508-0 D-A4506-0 D-A4504-0 A-45-02 Key Plan
WG
C3 6.95 m
CORE B CORE A D-A4502-0 8
: 5.9
ToF

WG AB
10.03 m 8 Units 147.24 m 8 Units
D-A4501-0 WG
B3 2 BED
D-B4504-0
6.95 m
TO LEVEL 45 80.94 m D-A4507-0 D-A4503-0
2 BED

4450
Type B5
D-A4505-0 77.46 m
B-45-04
PL9 PL10 PL4 PL5 Type A1_Similar
00

A-45-01
69

AC
N

C2
WG
4.60 m

3 Bed Wheelchair Adaptable Unit LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
1 BED 1 BED All areas and dimensions shown subject to further design
52.86 m 55.01 m development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
1 BED Type A6_Similar Type A3_Similar Do not scale unless for planning purposes
00

A-45-05 A-45-03 Site verify all dimensions prior to construction


68

53.10 m Report all discrepancies to HOK immediately


Type A2_Similar This drawing is to be read in conjunction with all relevant
documents and drawings
A-45-07

SS
AA Rev. Description Date By
AA
5.09 m 2.0 Stage 3 100% Issue 16.09.2016 JE
5.10 m
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 PD
D-B4501-0 AA

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
5.16 m 3.3 Stage 4A WIP 23.01.2017 AB
D-B4502-0
D-B4503-0

TO LEVEL
UP TO LEVEL
46 46

20 G
1- O
11 1 BED
96
52.86 m
Type B2_Similar

-0 PR
WG
B-45-03
4.42 m

AA
4.98 m

23 N
3 BED
117.06 m

I
Type B1 Drawn by: JT/AB Reviewed by: CL
B-45-01 Drawn Date: 26.07.2016 1 : 100

K
Scale:
2 BED+
94.22 m Project No: 14.33020.00
TO LEVEL
UP TO LEVEL
46 46

R
Type B2_Similar
B-45-02
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 16:30:21

WG
27
00 7.80 m FLOOR PLAN
CA
LEVELS 45 TO 49
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2145 3.3
BC
BB
50
38
NOTE:
00
27
BA WG
7.18 m
WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
2 BED Prepared For
WG
7.16 m
84.77 m
Type B2_Similar
GREENLAND
B-50-08 HERTSMERE
(LONDON)
LIMITED
2 BED
87.81 m
AA
Client Location
Type B3_Similar City Tower, 11th Floor, 40 Basinghall Street,
5.02 m
B-50-07 London, EC2V 5DE

Project No: 14.33020.00

1 BED
62.49 m
Type B13
B-50-06

A4 A3 A2 A1
D-B5008-0 D-B5006-0 8725 8725 6900
AA HOK
D-B5007-0 5.12 m Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 D-B5005-0 t +44 (0)20 7636 2006
AA AA f +44 (0)20 7636 1987
1 BED 5.02 m 5.04 m
57.53 m All reproduction & intellectual property rights reserved 2014
Type A4_Similar In Association with
A-50-08
68

AECOM
00

1 BED
53.28 m Project Manager
1 BED 1 BED
Type B5_Similar MidCity Place, 71 High Holborn, London,
54.57 m 55.07 m
B-50-05 WC1V 6QS, UK
Type A5_Similar Type A3_Handed-Similar
DOWN TO 52
A-50-06 A-50-04
RobertBirdGroup
Structural Engineer
Level 2, Harling House,
B2 WG 47-51 Great Suffolk St,
London, England SE1 0BS, UK
7.47 m
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

2 BED SL6 4AQ, UK


PL7 PL8 PL1 PL2 PL3

4450
77.39 m
Type A1_Handed_Similar
D-A5008-0 D-A5006-0 D-A5004-0 A-50-02 Key Plan
WG
C3 6.95 m
CORE B CORE A D-A5002-0 8
: 5.9
ToF

WG
10.18 m
8 Units 8 Units
162.915 m AB
D-A5001-0 WG
B3 2 BED
D-B5004-0 6.98 m
D-A5003-0 2 BED
80.94 m D-A5007-0
77.50 m

4450
Type B5
D-A5005-0 Type A1_Similar
B-50-04
PL9 PL10 PL4 PL5 A-50-01
00
69

AC
N

C2
WG
6.22 m

1 BED 1 BED LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)


Any Levels shown in ( ) = AOD LEVEL
52.87 m 55.11 m SG = Sky Garden
All areas and dimensions shown subject to further design
1 BED Type A6_Similar Type A3_Similar development and may be varied in future design stages.
52.87 m A-50-05 A-50-03 DOWN TO 52 Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Type A2_Similar Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


A-50-07 This drawing is to be read in conjunction with all relevant
documents and drawings

SS
AA Rev. Description Date By
AA 5.04 m
5.13 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
D-B5001-0 AA 3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
5.24 m 3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB
D-B5002-0
D-B5003-0

20 G
1 BED

1- O
52.87 m
Type B2_Similar
WG B-50-03 DOWN TO 52

-0 PR
2.94 m

AA
5.01 m
3 BED

23 N
117.39 m
Type B2

I
B-50-01 Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
2 BED+ Scale:
94.31 m
Type B2_Similar Project No: 14.33020.00

R
B-50-02
Sheet Title:

O
GENERAL

W
WG ARRANGEMENT
23/01/2017 16:21:56

27
00
7.82 m
FLOOR PLAN
CA
LEVELS 50 TO 52
CB
32
50
Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2150 3.3
BC
BB
50
38
NOTE:
00
27
BA
WG
WG = WINTER GARDEN
9.12 m AA = AMENITY AREA
Kitchen, wardrobes, AV and Utility cupboards layout to be confirmed
AA
5.04 m
SUITE
3 BED 48.64 m
123.27 m Type B1
Type B5 B-53-08
B-53-07
AA
5.04 m
1 BED
61.75 m
Type B6_Similar
B-53-06

A4 A3 A2 A1
8725 8725 6900
AA
5.11 m

B1
AA
5.01 m
AA
1 BED 7.00 m
53.75 m 1 BED
68

Type B5_Similar 57.46 m


00

B-53-05 Type A4_Similar


A-53-07
2 BED
71.02 m
1 BED Type A4 Handed
54.55 m A-53-03
Type A5_Similar
B2 A-53-05
WG
7.42 m
AA
69
00

WG
9.00 m

4450
C3
WG
10.10 m AB
B3 3 BED
123.84 m
Type A1

4450
A-53-01
00

2 BED
69

80.60 m
Type B5_Similar
B-53-04
AC
1 BED 2 BED
C2 52.86 m 71.04 m
Type A6_Similar Type A4
WG A-53-04 A-53-02
6.15 m
1 BED
51.17 m
Type A2_Similar
A-53-06
00
68

AA
AA 7.01 m
5.10 m
C1
AA
5.23 m

3 BED 1 BED
117.11 m 54.05 m
Type B2 Type B2_Similar
WG
B-53-01 B-53-03
2.87 m

AA
5.06 m

SS
2 BED+
94.22 m

17 RE
Type B2_Similar
B-53-02

20 G
1/ O
/0 PR
A-SK-20170130-1

30 IN
WG
27 7.79 m
CA 00

RK
LEVEL 53
32
50

O
CB

W
CC
BC
BB
50
38
NOTE:
00
BA 27
WG
WG = WINTER GARDEN
9.12 m AA = AMENITY AREA
Kitchen, wardrobes, AV and Utility cupboards layout to be confirmed
AA
5.04 m
SUITE
3 BED 48.82 m
123.12 m Type B1
Type B5 B-54-08
B-54-07
AA
5.04 m

1 BED
61.47 m
Type B6_Similar
B-54-06

A4 A3 A2 A1
8725 8725 6900
AA
5.11 m

B1
AA
5.01 m
AA
1 BED 7.00 m
53.75 m 1 BED
68

Type B5_Similar 57.37 m


00

B-54-05 Type A4_Similar


A-54-07
2 BED
71.02 m
1 BED Type A4 Handed
54.55 m A-54-03
Type A5_Similar
B2 A-54-05
WG
7.42 m
AA
69
00

WG
9.00 m

4450
C3
WG
10.10 m AB
B3 3 BED
123.84 m
Type A1

4450
A-54-01
00

2 BED
69

80.60 m
Type B5_Similar
B-54-04
AC
1 BED 2 BED
C2 52.86 m 71.04 m
Type A6_Similar Type A4
WG A-54-04 A-54-02
6.15 m
1 BED
52.18 m
Type A2_Similar
A-54-06
00
68

AA
AA 7.01 m
5.10 m
C1
AA
5.23 m

3 BED 1 BED
117.11 m 54.05 m
Type B2 Type B2_Similar
WG
B-54-01 B-54-03
2.87 m

AA
5.06 m

SS
2 BED+
94.22 m
Type B2_Similar

17 RE
B-54-02

20 G
2/ O
/0 PR
A-SK-20170202-1

02 IN
WG
27 7.79 m
00
CA

RK
32
50

LEVEL 54

O
CB

W
CC
BC
BB
50
38
NOTE:
00
BA 27
WG = WINTER GARDEN
structure to be confirmed
by engineer AA = AMENITY AREA
3 BED Kitchen, wardrobes, AV and Utility cupboards layout to be confirmed
113.5 m
Type B8
B-55-06
KIT_3B09

Roof light above AV


AV

WG AA
2100mm headroom 5.1 m
9.1 m
1800mm headroom

structure to be confirmed
by engineer 1 BED
60.0 m
Type B13
AV
UT (1600X900) B-55-04
3 BED
114.9 m A4 A3 A2 A1
Type B7
B-55-05 8725 8725 6900
UT (1600X800)
KIT_3B08
WG
9.0 m

B1 AV
AV

AA
7.0 m
68
00

3 BED
UT (1600X900)
116.8 m
structure to be confirmed
Type A3 2 BED
by engineer
A-55-05 70.9 m
WG KIT_3BA3 Type A4_Handed
9.0 m A-55-03
B2 UT (1600X900) UT (1600X800) AV

AA
AV
69

AV
00

PL7 PL8 PL1 PL2 PL3 WG


9.0 m

4450
RISER ROOM AV
5.2 m
C3 A-55-R1 CORRIDOR A
WG
CORE B CORRIDOR B
CORE A 50.6 m
2 BED AV 71.4 m A-55-00 AB
10.4 m 6 Units B-55-00
80.6 m 5 Units +178.59 m
Type B5_Similar
B3 B-55-03 AV 3 BED
124.3 m
Type A1_Similar

4450
UT (1600X900)

PL9 PL10 ST-1 PL4 PL5 A-55-01


15.7 m
00

AV

UT (1600X800)
69

UT (1600X800)
A-55-S1
AV

AV
AC
UT (1600X900)

C2 3 BED
WG 130.4 m
6.2 m Type A2 2 BED
A-55-04 71.1 m
KIT_3B05 Type A4
A-55-02
ST-3
16.8 m
00

B-55-S3
68

AA
WG 7.0 m
9.0 m
C1
AV

AV

UT (1600X900)

AV

AV

WG
2.9 m
UT (1600X900)
WG
9.0 m

SS
3 BED
117.1 m
Type B2_Similar

17 RE
B-55-01

20 G
3 BED

1. O
129.7 m
Type B6

.0 PR
B-55-02

A-SK-20170130-2
KIT_3B07

30 IN
27
00
CA

RK
32
50

LEVEL 55

O
CB

W
CC
BC
BB
50
38
NOTE:
00
BA 27
WG = WINTER GARDEN
AA = AMENITY AREA
Kitchen, wardrobes, AV and Utility cupboards layout to be confirmed
WG
9.0 m

AA
5.0 m

3 BED
113.4 m
TERRACE Type A4 AV

28.1 m A-56-10 AV 1 BED


KIT_3B10
+182.05 m 58.0 m
Type B13_Similar
+181.75 m UT (1600X900) AV A-56-09

A4 A3 A2 A1
UT (1600X800) 8725 8725 6900
WG
9.0 m

B1
AA
7.0 m
68
00

3 BED
116.3 m 2 BED
Type A3 71.0 m
A-56-05 Type A4_Handed
A-56-03

B2 UT (1600X900) UT (1600X800) AV

TERRACE AA
5.6 m
AV
+182.05 m
69

AV
00

PL1 PL2 PL3 WG


structure to be confirmed 9.0 m

4450
by engineer
RISER ROOM AV
5.2 m
C3 2 BED+ A-56-R1 CORRIDOR
UT (1600X800)

95.7 m
Type A1
AV

CORRIDOR
HOLD OPEN
CORE A 50.7 m
A-56-00A
WG A-56-08 71.2 m +181.75 m
AB
10.8 m KIT_2B10 A-56-00B HOLD OPEN 10 Units 3 BED
B3 AV
123.7 m
Type A1_Similar
A-56-01

4450
UT (1600X900)
ST-1 PL4 PL5
15.7 m
00

AV

UT (1600X800)
A-56-S1
69

AV

AV
AC
UT (1600X900)

C2 WG
5.1 m
3 BED
130.9 m
structure to be confirmed 2 BED
Type A2
by engineer 71.1 m
A-56-04
Type A4
ST-3 A-56-02
16.8 m
00

A-56-S3
68

AA
WG 7.0 m
9.0 m
C1
AV

AV

UT (1600X900)

AV
structure to be confirmed
by engineer AV

Roof light above

2100mm headroom UT (1600X900)


WG
9.0 m
1800mm headroom

SS
17 RE
3 BED
115.0 m

20 G
Type B3
A-56-06

1. O
WG 3 BED

.0 PR
4.5 m 129.1 m

A-SK-20170130-3
Type B6 Similar
A-56-07
structure to be confirmed

30 IN
by engineer
27
00
CA

RK
32
50

LEVEL 56

O
CB

W
CC
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
WG
9.5 m Prepared For
GREENLAND
HERTSMERE
(LONDON)
LIMITED
Client Location
City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

TERRACE Project No: 14.33020.00


22.8 m
+185.21 m
3 BED
123.3 m
Type A6
A-57-09

A4 A3 A2 A1
UT (1600X900)
8725 8725 6900

WG
HOK
9.0 m
Qube, 90 Whitfield Street
AV
London, W1T 4EZ, UK
B1 AV t +44 (0)20 7636 2006
f +44 (0)20 7636 1987
AA All reproduction & intellectual property rights reserved 2014
7.0 m In Association with
68

AECOM
00

Project Manager
TERRACE MidCity Place, 71 High Holborn, London,
7.1 m 3 BED WC1V 6QS, UK
114.7 m
+185.21 m Type A3-1 2 BED RobertBirdGroup
A-57-05 71.1 m Structural Engineer

UT (1600X900)
Type A4_Handed Level 2, Harling House,
B2 A-57-03 47-51 Great Suffolk St,
UT (1600X800) AV
London, England SE1 0BS, UK
AA
LIFT MACHINE ROOM 1 SWECO
AV
21.9 m Building Services Engineer
69

A-57-91 1 Bath Road, Maidenhead,


00

AV
WG SL6 4AQ, UK
+184.91 m PL1 PL2 PL3 9.0 m

4450
RISER ROOM AV
5.2 m Key Plan

C3 A-57-R1 CORRIDOR
UT (1600X800)

2 BED
8
: 5.9

HOLD OPEN
ToF

50.7 m
WG 95.8 m CORRIDOR CORE A A-57-00A
AB
7.0 m Type A5 44.0 m
A-57-08 A-57-00B HOLD OPEN
9 Units +184.91 m
3 BED
B3 AV 123.8 m
structure to be confirmed Type A1_Similar
by engineer A-57-01

4450
UT (1600X900)
LIFT MACHINE ROOM 2 ST-1 PL4 PL5
21.9 m 15.7 m
00

AV

UT (1600X800)
69

A-57-92 A-57-S1
TERRACE AV
6.2 m +184.91 m AV

+185.21 m AC
AV N

C2
3 BED
121.1 m 2 BED
Type A7 71.1 m
LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
A-57-04 Type A4 Any Levels shown in ( ) = AOD LEVEL
A-57-02 SG = Sky Garden
UT (1600X900) All areas and dimensions shown subject to further design
ST-3 development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
10.7 m Do not scale unless for planning purposes
00

A-57-S3 Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings
AA

SS
7.0 m Rev. Description Date By
WG
9.0 m 2.0 Stage 3 100% Issue 16.09.2016 JE
AV
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
UT (1600X800) 3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
AV 3.3 Stage 4A WIP 23.01.2017 AB

UT (1600X900)
AV
1 BED

20 G
52.8 m
TERRACE Type A10
28.1 m A-57-07

1- O
+185.21 m

-0 PR
3 BED AA
104.8 m 5.0 m
Type A5

23 N
A-57-06

I
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:
WG

O
9.0 m
GENERAL

W
ARRANGEMENT
23/01/2017 15:28:09

27
00
FLOOR PLAN
CA
LEVEL 57
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2157 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For

AA
GREENLAND
4.2 m HERTSMERE
(LONDON)
LIMITED
Client Location
City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

Project No: 14.33020.00


TERRACE
25.0 m

+188.37 m

A4 A3 A2 A1
8725 8725 6900
AV
HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA f +44 (0)20 7636 1987
2 BED 5.1 m
AA All reproduction & intellectual property rights reserved 2014
76.0 m 7.0 m
In Association with
Type A6
68

A-58-08
AECOM
00

BMU PLANT 1 Project Manager


60.3 m MidCity Place, 71 High Holborn, London,
1 BED
A-58-93B 2 BED WC1V 6QS, UK
52.6 m
+188.97m Type A5 Similar 69.9 m
A-58-05 Type A4_Handed_Similar RobertBirdGroup
AA A-58-03 Structural Engineer
2.7 m Level 2, Harling House,
B2 47-51 Great Suffolk St,
UT (1600X800)

DE-58-93-01 UT (1600X800) UT (1600X800) AV


London, England SE1 0BS, UK
2 BED AA
2.7 m SWECO
AV
Building Services Engineer
UPPER PART OF
69

BMU PLANT 1 1 Bath Road, Maidenhead,


00

LIFT MACHINE ROOM 1 8.8 m WG SL6 4AQ, UK


PL1 PL2 PL3
9.0 m

4450
A-58-93A
structural wall below
RISER ROOM AV
5.2 m Key Plan

C3 A-58-R1 CORRIDOR
UT (1600X800)

8
: 5.9
ToF

WG
8.2 m
CORE A 69.8 m
A-58-00 AB
8 Units +188.07 m
1 BED
B3 59.5 m AV
3 BED
Type A11 123.5 m
Type A1_Similar
A-58-07

4450
structural wall below UT (1600X900) A-58-01
ST-1 PL4 PL5
15.7 m
00

AV

UT (1600X800)
A-58-S1
69

AV
UPPER PART OF
LIFT MACHINE ROOM 2 AV

AC
3 BED AV N
135.6 m
C2 Type A8
TERRACE A-58-06 2 BED
5.1 m 3 BED
AV 71.1 m
UT (1600X900) 120.5 m
Type A4 LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
Type A7 Any Levels shown in ( ) = AOD LEVEL
A-58-02
A-58-04 SG = Sky Garden
UT (1600X900) All areas and dimensions shown subject to further design
AV development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings

SS
AA Rev. Description Date By
WG 7.0 m
9.0 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

TERRACE
25.7 m

20 G
+188.37 m

1- O
-0 PR
WG
4.8 m

23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
WG
4.2 m
ARRANGEMENT
23/01/2017 15:28:30

27
00
FLOOR PLAN
CA
LEVEL 58
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2158 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
(LONDON)
LIMITED
Client Location
City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

Project No: 14.33020.00

TERRACE
25.3 m
+191.53 m
A4 A3 A2 A1
8725 8725 6900

HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA
5.1 m f +44 (0)20 7636 1987
AA All reproduction & intellectual property rights reserved 2014
7.0 m In Association with
UPPER OF
68

AECOM
00

BMU PLANT 1
Project Manager
1 BED MidCity Place, 71 High Holborn, London,
53.3 m 2 BED WC1V 6QS, UK
Type A5_Similar 69.6 m
A-59-05 Type A9 RobertBirdGroup
A-59-03 Structural Engineer
Level 2, Harling House,
B2 47-51 Great Suffolk St,
UT (1600X800) UT (1600X800) AV
London, England SE1 0BS, UK
AA
RWP to be integrated with SWECO
AV
facade in detail design LIFT CONTROL ROOM 1 STORE Building Services Engineer
69

23.5 m 8.1 m 1 Bath Road, Maidenhead,


00

A-59-91 A-59-93 PL1 PL2 PL3 SL6 4AQ, UK


AV AV

4450
+191.23 m RISER ROOM UT (1600X800)

WG RISER ROOM 7.9 m


5.2 m A-59-R2 Key Plan
6.8 m
C3 A-59-R1 CORRIDOR
2 BED+
CORE A 62.3 m
8
: 5.9
ToF

2100mm headroom 105.4 m WG


A-59-00 9.0 m
7 Units +191.23 m
Type A2 AB
2 BED A-59-01
81.8 m
UT (1600X800)

AV
B3 Type A11
A-59-07 RISER ROOM
7.3 m

4450
BMU PLANT 2
PL4 PL5 A-59-R3
7.0 m ST-1
LIFT CONTROL ROOM 2
00

A-59-94A 15.7 m

UT (1600X800)
RWP to be integrated with
69

23.5 m A-59-S1
facade in detail design
A-59-92 AV

+191.23 m AC
AV N
UT (1600X800)
AV DE-59-94-01
C2 1 BED
AA 52.5 m
UT (1600X800)
1.9 m Type A6_Similar 2 BED
A-59-04 69.3 m
LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
Type A8
2 BED Any Levels shown in ( ) = AOD LEVEL
BMU PLANT 2 A-59-02 SG = Sky Garden
79.6 m All areas and dimensions shown subject to further design
60.3 m development and may be varied in future design stages.
Type A10
A-59-94B Internal layouts are shown for illustrative purposes only
A-59-06 Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

+192.13 m Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings

SS
AA
Rev. Description Date By
AA 7.1 m
5.0 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

20 G
TERRACE
26.6 m
+191.53 m

1- O
-0 PR
23 NI
AA Drawn by: JT/AB Reviewed by: CL
1.3 m Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
AA
Sheet Title:
2.9 m

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:28:50

27
00
FLOOR PLAN
CA
LEVEL 59
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2159 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
(LONDON)
LIMITED
Client Location
City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

Project No: 14.33020.00

A4 A3 A2 A1
8725 8725 6900

HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA
5.1 m
f +44 (0)20 7636 1987
All reproduction & intellectual property rights reserved 2014
AA In Association with
7.1 m
68

AECOM
00

UPPER PART OF
WG BMU PLANT 1 Project Manager
4.5 m MidCity Place, 71 High Holborn, London,
1 BED WC1V 6QS, UK
53.4 m 2 BED
Type A5_Similar 71.9 m
Type A9_Similar
RobertBirdGroup
A-60-05 Structural Engineer
A-60-03
Level 2, Harling House,
B2 47-51 Great Suffolk St,
UT (1600X800) UT (1600X800) AV
London, England SE1 0BS, UK
PL13 AA
PL14 SWECO
AV
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

PL1 PL2 PL3 SL6 4AQ, UK

4450
RISER ROOM
AV CORRIDOR
RISER ROOM 7.6 m ST-4
62.7 m
5.2 m A-60-R2 13.6 m Key Plan
AV A-60-00
C3 3 BED A-60-R1 A-60-S4
+194.39 m
TERRACE 127.4 m
CORE A
8
: 5.9
ToF

17.7 m Type A9 UT (1600X800) AA AB


A-60-06 6 Units 4.2 m
+194.69 m AV

2 BED
B3 73.9 m
RISER ROOM Type A18_Similar
UT (1600X900) 7.3 m A-60-01

4450
ST-1 PL4 PL5 A-60-R3
15.7 m
00

UT (1600X800)
A-60-S1
69

AV

AC
AV N
UT (1600X800)

C2
2 BED
1 BED 69.7 m LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
52.2 m Type A8_Similar AA Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
WG A-60-02 2.9 m
UPPER PART OF Type A6_Similar All areas and dimensions shown subject to further design
4.6 m development and may be varied in future design stages.
BMU PLANT 2 A-60-04 Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings

SS
AA Rev. Description Date By
AA 7.1 m
5.1 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

TERRACE

20 G
27.1 m
+194.69 m

1- O
-0 PR
23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:29:08

27
00
FLOOR PLAN
CA
LEVEL 60
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2160 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
(LONDON)
LIMITED
Client Location
City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

Project No: 14.33020.00

RWP to be integrated with


facade in detail design

A4 A3 A2 A1
8725 8725 6900

HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
AA f +44 (0)20 7636 1987
5.1 m
All reproduction & intellectual property rights reserved 2014
AA
7.1 m In Association with
68

AECOM
00

Project Manager
1 BED MidCity Place, 71 High Holborn, London,
WG 51.4 m WC1V 6QS, UK
Type A5_Similar 2 BED
5.2 m
A-61-05 71.9 m
Type A9_Similar
RobertBirdGroup
Structural Engineer
A-61-03
Level 2, Harling House,
B2 47-51 Great Suffolk St,
UT (1600X800) UT (1600X800) AV
London, England SE1 0BS, UK
PL13 AA
PL14 SWECO
AV
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK

4450
RISER ROOM
RISER ROOM CORRIDOR ST-4
AV 7.6 m
TERRACE 5.2 m 61.9 m 13.6 m Key Plan
A-61-R2
C3 23.7 m A-61-R1 A-61-00 A-61-S4
AV
3 BED
CORE A +197.55 m
8
: 5.9
ToF

+197.85 m 109.5 m AA
Type A10
6 Units
4.3 m AB
A-61-06 UT (1600X800) AV 2 BED
73.5 m
B3 Type A18_Similar
UT (1600X900)
RISER ROOM A-61-01
7.3 m

4450
ST-1 A-61-R3
15.7 m
00

UT (1600X800)
69

A-61-S1
AV

AC
AV N
UT (1600X800)

C2
1 BED 2 BED
51.5 m 69.4 m LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
Type A6_Similar Type A8_Similar AA
Any Levels shown in ( ) = AOD LEVEL
SG = Sky Garden
WG A-61-04 A-61-02 2.9 m All areas and dimensions shown subject to further design
Upper PART OF development and may be varied in future design stages.
4.0 m
BMU PLANT 2 Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings
AA

SS
7.0 m Rev. Description Date By
AA
5.1 m 2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

20 G
1- O
-0 PR
23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:29:26

27
00
FLOOR PLAN
CA
LEVEL 61
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2161 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
(LONDON)
LIMITED
Client Location
City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

Project No: 14.33020.00

A4 A3 A2 A1
8725 8725 6900

HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
f +44 (0)20 7636 1987
AA All reproduction & intellectual property rights reserved 2014
5.0 m In Association with
68

AECOM
00

Project Manager
MidCity Place, 71 High Holborn, London,
2 BED WC1V 6QS, UK
UT (1600X900)
89.0 m AV SUITE
UP
Type A7 48.8 m RobertBirdGroup
A-62-05 Type A8 Structural Engineer
A-62-03
AV Level 2, Harling House,
B2 TERRACE 47-51 Great Suffolk St,
11.2 m London, England SE1 0BS, UK

+201.01 m PL13 AA
LIFT MACHINE ROOM 3 UT (1600X800) PL14 SWECO
35.1 m Building Services Engineer
WG
69

A-62-91 1 Bath Road, Maidenhead,


00

8.4 m SL6 4AQ, UK


+200.71 m

4450
RISER ROOM
RISER ROOM 7.4 m CORRIDOR ST-4
5.2 m A-62-R2 76.6 m 13.6 m Key Plan

C3 A-62-R1 A-62-00 A-62-S4


+200.71 m
8
: 5.9
ToF

CORE A AA
AB
2 BED 4.3 m
5 Units UT (1600X800) AV
75.0 m
B3 Type A18
RISER ROOM A-62-01
7.3 m

4450
A-62-R3
00

LIFT MACHINE ROOM 4


69

TERRACE 22.6 m
17.1 m A-62-92
+201.01 m +200.71 m AC
AV AV N

C2

UT (1600X900)
AV
3 BED
1 BED
114.8 m
54.3 m
Type A11 UT (1600X800)
Type A15 LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
A-62-04 Any Levels shown in ( ) = AOD LEVEL
A-62-02 AA SG = Sky Garden
AA 2.9 m All areas and dimensions shown subject to further design
development and may be varied in future design stages.
5.1 m Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


WG This drawing is to be read in conjunction with all relevant
documents and drawings
9.0 m

SS
Rev. Description Date By
2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

20 G
1- O
-0 PR
23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:29:44

27
00
FLOOR PLAN
CA
LEVEL 62
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2162 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
(LONDON)
LIMITED
Client Location
City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

Project No: 14.33020.00

A4 A3 A2 A1
8725 8725 6900

HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
f +44 (0)20 7636 1987
WG AA All reproduction & intellectual property rights reserved 2014

7.0 m 5.0 m In Association with


68

AECOM
00

Project Manager
MidCity Place, 71 High Holborn, London,
WC1V 6QS, UK

UP
SUITE RobertBirdGroup

UT (1600X800)
48.8 m Structural Engineer
Type A8 Level 2, Harling House,
B2 TERRACE A-63-03 47-51 Great Suffolk St,
London, England SE1 0BS, UK
17.3 m AV
PL13 AA
PL14 SWECO
Building Services Engineer
UPPER PART OF AV UT (1600X800)
69

1 Bath Road, Maidenhead,


00

LIFT MACHINE ROOM 3 SL6 4AQ, UK


2 BED

4450
95.2 m
Type A14
structural wall below RISER ROOM
5.7 m
CORRIDOR
39.9 m CORE A ST-4
13.6 m
A-63-05 A-63-R1 BIN STORE A-63-00 3 Units A-63-S4
Key Plan

C3 1.5 m
+203.76 m
+203.87 : 5.9
8

A-63-93
ToF

+203.81 m AA
4.3 m AB
UT (1600X800) AV 2 BED
75.0 m
B3 Type A18
RISER ROOM A-63-01

UT (1600X800)
structural wall below 7.3 m

4450
A-63-R2
00

UPPER PART OF AV
69

UT (1600X800)
LIFT MACHINE ROOM 4

AC
N
TERRACE
C2 14.4 m
1 BED
2 BED AV
53.9 m
89.0 m Type A12
LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
Type A13 A-63-02 Any Levels shown in ( ) = AOD LEVEL
A-63-04 AA SG = Sky Garden
All areas and dimensions shown subject to further design
2.9 m development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


WG This drawing is to be read in conjunction with all relevant
7.0 m AA documents and drawings
5.0 m

SS
Rev. Description Date By
2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

20 G
1- O
-0 PR
23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:30:03

27
00
FLOOR PLAN
CA
LEVEL 63
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2163 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
(LONDON)
LIMITED
Client Location
City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

Project No: 14.33020.00

A4 A3 A2 A1
8725 8725 6900

HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
f +44 (0)20 7636 1987
AA
All reproduction & intellectual property rights reserved 2014
4.3 m
In Association with
AA 2 BED AA
68

1.7 m AECOM
00

6.0 m 70.4 m
Type A16 Project Manager
A-64-03 MidCity Place, 71 High Holborn, London,
WC1V 6QS, UK

UP RobertBirdGroup
Structural Engineer
Level 2, Harling House,
B2 AV
47-51 Great Suffolk St,
AV London, England SE1 0BS, UK
AA

UT (1600X800)
PL13
TERRACE PL14 SWECO
26.8 m LIFT CONTROL ROOM 3 Building Services Engineer
2 BED 25.0 m
69

+207.33 m 1 Bath Road, Maidenhead,


00

71.8 m A-64-91 SL6 4AQ, UK


Type A17

4450
+207.03 m RISER ROOM
A-64-04 CORRIDOR
CORE A ST-4

UT (1600X800)
5.7 m 32.4 m 13.6 m
BIN STORE
A-64-R1
1.5 m
A-64-00 3 Units A-64-S4
Key Plan

C3 A-64-93 +207.03 m ToF


: 5.9
8

AA AB
UT (1600X800) AV 4.3 m
2 BED
B3 75.0 m
RISER ROOM Type A18
7.3 m A-64-01

4450
LIFT CONTROL ROOM 4 A-64-R2
22.5 m
00

UT (1600X800)
A-64-92
69

+207.03 m

AC
AV N

C2

2 BED
91.1 m LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
AA Any Levels shown in ( ) = AOD LEVEL
Type A15 SG = Sky Garden
2.9 m All areas and dimensions shown subject to further design
A-64-02 development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
TERRACE Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

7.1 m Report all discrepancies to HOK immediately


WG This drawing is to be read in conjunction with all relevant
+207.33 m 7.1 m
documents and drawings

SS
Rev. Description Date By
2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

20 G
1- O
-0 PR
23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:30:12

27
00
FLOOR PLAN
CA
LEVEL 64
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2164 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
(LONDON)
ALL TALL NICHE AT LIMITED
Client Location
THIS LEVEL TO BE City Tower, 11th Floor, 40 Basinghall Street,
London, EC2V 5DE

REDUCED. NO NICHE Project No: 14.33020.00

WITHIN THE TOP


A4 A3 A2
1200MM
A1
OF RISER
8725 8725 6900

HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
f +44 (0)20 7636 1987
All reproduction & intellectual property rights reserved 2014

In Association with
WG
68

AECOM
00

9.0 m
Project Manager
3 BED DUPLEX MidCity Place, 71 High Holborn, London,
WC1V 6QS, UK
100.4 m
Type 3
UP
A-65-03
RobertBirdGroup
TERRACE Structural Engineer
14.8 m Level 2, Harling House,
B2 +210.49 m 47-51 Great Suffolk St,
London, England SE1 0BS, UK
AV AV
PL13 AA
PL14 SWECO

UT (1600X900)
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK

4450
RISER ROOM
7.4 m
CORRIDOR
27.6 m CORE A ST-4
A-65-R1 A-65-00 3 Units 13.6 m Key Plan

C3 A-65-S4
+210.19 m ToF
: 5.9
8

AB
AV AV

B3 BIN STORE
RISER ROOM 3 BED DUPLEX

UT (1600X900)
7.3 m 5.3 m
TERRACE 88.8 m
A-65-91

4450
20.1 m A-65-R2 Type 1
+210.49 m A-65-01
00

UT (1600X900)
69

AV

AV AC
N

C2
3 BED DUPLEX
100.5 m WG
Type 2 4.5 m
LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
Any Levels shown in ( ) = AOD LEVEL
A-65-02 SG = Sky Garden
All areas and dimensions shown subject to further design
development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

WG Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


9.0 m This drawing is to be read in conjunction with all relevant
documents and drawings

SS
Rev. Description Date By
2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

20 G
1- O
-0 PR
23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:30:21

27
00
FLOOR PLAN
CA
LEVEL 65
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2165 3.3
BC
BB
50
38
NOTE:
00
27
BA WG = WINTER GARDEN Project
AA = AMENITY AREA SPIRE LONDON
Prepared For
GREENLAND
HERTSMERE
ALL TALL NICHE AT (LONDON)
LIMITED
THIS LEVEL TO BE Client Location

REDUCED. NO NICHE City Tower, 11th Floor, 40 Basinghall Street,


London, EC2V 5DE

Project No: 14.33020.00


WITHIN THE TOP
1200MM OF RISER
A4 A3 A2 A1
8725 8725 6900

HOK
Qube, 90 Whitfield Street
London, W1T 4EZ, UK
B1 t +44 (0)20 7636 2006
f +44 (0)20 7636 1987
All reproduction & intellectual property rights reserved 2014

In Association with
68

AECOM
00

3 BED DUPLEX Project Manager


69.6 m MidCity Place, 71 High Holborn, London,
Type 3 WC1V 6QS, UK
A-66-03
UP RobertBirdGroup
TERRACE Structural Engineer
14.4 m Level 2, Harling House,
B2 47-51 Great Suffolk St,
+213.65 m UT (800X800) London, England SE1 0BS, UK
AA
SWECO
Building Services Engineer
69

1 Bath Road, Maidenhead,


00

SL6 4AQ, UK

4450
CORRIDOR
RISER ROOM
9.9 m 25.0 m CORE A ST-4
14.1 m
A-66-R1 A-66-00 3 Units A-66-S4
Key Plan

C3 +213.35 m
ToF
: 5.9
8

3 BED DUPLEX
68.0 m AB
Type 1
UT (800X800) A-66-01
B3
RISER ROOM RISER ROOM
TERRACE

4450
6.8 m 2.1 m
18.4 m
A-66-R2 A-66-R3
+213.65 m
00
69

WG
4.6 m
UT (800X800)
AC
N

C2

3 BED DUPLEX
LEVEL 0.00m = 5.40m AOD (Above Ordinance Datum)
77.2 m Any Levels shown in ( ) = AOD LEVEL
Type 2 SG = Sky Garden
All areas and dimensions shown subject to further design
A-66-02 development and may be varied in future design stages.
Internal layouts are shown for illustrative purposes only
Do not scale unless for planning purposes
00

Site verify all dimensions prior to construction


68

Report all discrepancies to HOK immediately


This drawing is to be read in conjunction with all relevant
documents and drawings

SS
Rev. Description Date By
2.0 Stage 3 100% Issue 16.09.2016 JE
C1 3.0 External Cladding Tender Issue 03.10.2016 JT
3.1 Stage 3 Completion Issue 28.10.2016 JT

17 RE
3.2 External Cladding Tender Update 07.11.2016 JT
3.3 Stage 4A WIP 23.01.2017 AB

20 G
1- O
-0 PR
23 NI
Drawn by: JT/AB Reviewed by: CL
Drawn Date: 26.07.2016 1 : 100

K
Scale:

Project No: 14.33020.00

R
Sheet Title:

O
GENERAL

W
ARRANGEMENT
23/01/2017 15:30:31

27
00
FLOOR PLAN
CA
LEVEL 66
CB
32
50 Refer to L12 for typical kitchen, AV cupboard and Utility cupboard layout Original drawing is A1.

Sheet Number: Revision:

CC
0 1 5 10 M A2166 3.3

You might also like