Professional Documents
Culture Documents
Project Abstract: Minerva Education System Project of Aab - The Need of Life Is
Project Abstract: Minerva Education System Project of Aab - The Need of Life Is
Project Abstract: Minerva Education System Project of Aab - The Need of Life Is
Funding in the amount of Rs. 235,000/- is requested for the construction of the
one classroom and 2 Toilets for School children.
Project Description
The school project construction for the underprivileged students will compose of
two structures. One structure will be for the one classroom (21 X 31 ft.) for
underprivileged youths vocational training. The other structure will be for two
toilets (6 X 6 ft.) for students. This project will increase the underprivileged
students confidence in the continuation of their education.
The goal of constructing new classrooms for the underprivileged students of the
Rainbow Family and others is to enable them complete their primary education
and provide free vocational trainings to community youths.
Outcome
The six classrooms, at present, are not enough for all children/classes. So, at
present they sit in the same overcrowded Classes. It seems like the children are
having fun but everyday inside in the same overcrowded classrooms to take
lessons from the teacher is unimaginable. And same as the students are
overloaded on one toilet. Therefore, we are constructing two new toilets for these
students.
When these new toilets and classrooms are constructed, the schools will have
rooms to invite more children to come to school. With clean, wide, light and
comfortable classrooms and with additional pedagogic materials (blocks, toys,
crayons learning sticks and shapes). The classrooms will be motivating more
children to come school. Certainly, school will be a Vocational Training Center for
the Azeem Khan Gabool Goth youth and Children.
BUDGET SUMMARY
Items
Total Project Cost
IDTC Contribution
Amount Requested
BUDGET = Construction of Twelve Classroom Blocks
No Items Qty Unit Cost Donor (Le) IDTC Total
(Le) Contribution Le US $
1 Land (acres) 12 1,000,000 12,000,000 12,000,000 2,775
2 Zinc (bundles) 60 260,000 15,600,000 15,600,000 3,606
3 Cement (bags) 1,500 38,000 57,000,000 57,000,000 13,179
4 Celotex (sheet) 200 30,000 6,000,000 6,000,000 1,387
5 Iron (ms) rods (assorted 40) 2 3,500,000 7,000,000 7,000,000 1,618
6 Oil Paint (gallons) 150 65,000 9,750,000 9,750,000 2,254
7 Emulsion Paint (gallons) 48 45,000 2,160,000 2,160,000 499
8 White Wash (bags 50 Kgs) 10 70,000 700,000 700,000 161
9 Roofing Nails (boxes) 36 25,000 900,000 900,000 208
10 Nails 3 (cartons) 5 100,000 500,000 500,000 115
11 Nails 4 (cartons) 8 100,000 800,000 800,000 185
12 Wire mesh (roll) 2 120,000 240,000 240,000 55
13 Ceiling Nails (box) 4 30,000 120,000 120,000 28
14 Nails 2 (cartons) 2 100,000 200,000 200,000 46
15 Wooden door (nr) 12 200,000 2,400,00 2,400,000 555
16 Wooden widows (nr) 48 250,000 12,000,000 12,000,000 2,775
17 Boards (2 X 6 X 14 (pcs) 500 20,000 10,000,000 10,000,000 2,312
18 Boards (1 X 12 X 14 (pcs) 200 25,000 5,000,000 5,000,000 1,156
19 Sand (trip) 80 300,000 24,000,000 24,000,000 5,549
20 Stones (trip) 40 350,000 14,000,000 14,000,000 3,237
21 Sticks 1,500,000 1,500,000 347
Furniture
22 Class Tables (nr) 12 100,000 1,200,000 1,200,000 277
23 Class Chairs (nr) 420 35,000 14,700,000 14,700,000 3,399
24 Desks (nr) 420 20,000 8,400,000 8,400,000 1,942
25 Class Cupboards (nr) 12 400,000 4,800,000 4,800,000 1,109
Labour
26 Skilled Labour (lump sum) 15,000,000 15,000,000 3,468
27 Unskilled Labour (lump sum) 10,000,000 10,000,000 2,312
28 Transportation 1,500,000 1,500,000 347
Total 223,570,000 23,500,000 237,470,000 54,901