Data :
* Nama Balok S1
* Dimensi Balok h: 750 mm
b: 250 mm
* Selimut Beton : 25 mm
* Kualitas beton K 225
* fy : 400
* f'c ( 0.083*K Beton ) : 18.7
* Diameter : Tulangan : 16 mm
Sengkang : 8 mm
* d : 709 mm
* min (1.4/fy) 0.0035
( fc )/4fy 0.0027
min pakai ( terkecil ) 0.0027
* balance 0.2027
(0.85*fc* b)/40*[600/(600+fy)]
* max 0.152
0.75* rbalance
Penulangan Tumpuan
* Mu 77.328 kNm
* Mn 90.97411765 kNm
(Mu/0.85)
* Rn 0.723911329 N/mm2
Mn/(bd^2)
* m 25.16514627
fy/(0.85*fc"')
* 0.001852981 min < < max min 0.0027
1/m-[1-( 1-(2*Rn*m)/fy)] max 0.152
* 0.0027
Pakai
* As 478.575 mm2
r*b*d
* n Tulangan 2.379279119 16
* n Pakai 6 16
Penulangan Lapangan
* Mu 54 kNm
* Mn 63.52941176 kNm
(Mu/0.85)
* Rn 0.505524671 N/mm2
Mn/(bd^2)
* m 25.16514627
fy/(0.85*fc"')
* 0.001284575 min < < max min 0.0027
1/m-[1-( 1-(2*Rn*m)/fy)] max 0.152
* 0.0027
Pakai
* As 478.575 mm2
*b*d
* n Tulangan 2.379279119 D 16
* n Pakai 6 D 16
Penulangan Sengkang
* Tu 6.3 kNm
* Vu 126 kN fy 240 Mpa
* Vn 210 kN D Tul 8 mm
Vu/0.6 A Tul 50.286 mm2
* Vc 127.7484963 kN
1/6* fc*b*d
Cek kemampuan penampang :
* x y
2
46875000 mm3
* j 1/24* fc* Sx y
2
5.06759726 kNm < 6.3
Bila < tulangan torsi diperlukan
* 0.6*5/6* fc*b*d >Vu 383.2454888 kN > Vu : 126 kN
Jika > dari Vu maka memakai tulangan geser minimum
Jika < dari Vu maka memakai tulangan geser