ACCESS ROAD

Cutting and filling of Access Road, 7.0m wide C/W


L-Section OF 30 m Internal Road A to D

Alphabat
Centre

Name
FINISH Grading Filling Qnt. cutting filling

ical
S.No. Chainage NGL F.L Point Fill Area Cut Area 101
BASE LVL LVL (cum) Qnt.(cum) Depth
Depth 100

1 0 99.91 100.500 100.000 0.090 7.953 0.000 0.5 99


2 30 99.81 100.400 99.900 0.090 7.283 228.53 0.000 0.00 98
3 60 99.42 100.300 99.800 0.380 14.050 319.99 0.000 0.00 97
4 90 99.47 100.200 99.700 0.230 9.660 355.65 0.000 0.00
96
5 120 99.29 100.100 99.600 0.310 11.503 317.44 0.000 0.00
6 150 99.03 100.000 99.500 0.470 15.650 407.29 0.000 0.00 95

7 180 99.33 99.900 99.400 0.070 16.353 480.04 0.000 0.00 94


8 210 98.89 99.877 99.377 0.487 21.313 564.98 0.000 0.00 93
9 240 98.88 99.853 99.353 0.473 20.667 629.70 0.000 0.00 0 30 60 90 120 1 50 180 210 240 270 30 0 330 360 390 420 450 480 510 540 570 600 630 660 69 0 7 20 750 780 810 840 870 900 930 96 0 9 90 102 0 1050 1080 1110 11 40 1170 1200 123 0 12 60 1 290 1320 1350 1 380 141 0 1440 1470 1500 15 30 1 560 1590 1620 1650 1680 17 10 1740 1770 1800 1 830 1860 1890 1920 1950 1980 2010 2040 207 0 21 00 2130 2160 2190 2 220 2250 2280 2310 2340 23 70 2 400 2430 246 0 2490 252 0 2550 2580 2610 26 40 2 670 2700 273 0
10 270 98.93 99.830 99.330 0.400 19.857 607.87 0.000 0.00
11 300 99 99.807 99.307 0.307 18.615 577.09 0.000 0.00
12 330 98.93 99.783 99.283 0.353 10.342 434.36 0.000 0.00 NGL Emb Lvl F.B.L
13 360 99.24 99.760 99.260 0.020 8.828 287.55 0.000 0.00
14 390 99.04 99.707 99.207 0.167 10.748 293.63 0.000 0.00
15 420 98.75 99.653 99.153 0.403 13.672 366.30 0.000 0.00 0 30 60 90 120 150 180 210 240 270 300 330 360 390 420 450 480 510 540 570 600 630 660 690 720 750 780 810 840 870 900 930 960 990 1020 1050 1080 1110 1140 1170 1200 1230 1260 1290 1320 1350 1380 1410 1440 1470 1500 1530 1560 1590 1620 1650 1680 1710 1740 1770 1800 1830 1860 1890 1920 1950 1980 2010 2040 2070 2100 2130 2160 2190 2220 2250 2280 2310 2340 2370 2400 2430 2460 2490 2520 2550 2580 2610 2640 2670 2700 2730
16 450 98.65 99.600 99.100 0.450 17.082 461.32 0.000 0.00 ngl 99.91 99.81 99.42 99.47 99.29 99.03 99.33 98.89 98.88 98.93 99 98.93 99.24 99.04 98.75 98.65 98.54 98.46 98.42 98.51 98.48 98.3 98.19 98.04 98.42 98.05 97.86 97.87 98.04 97.95 98.01 98.06 97.62 96.94 97.29 97.78 98.01 97.79 97.85 97.85 97.97 98.28 98.28 98.16 98.23 98.37 98.48 98.42 98.54 99.09 98.98 98.64 98.42 98.43 98 97.45 97.12 96.92 96.8 96.62 96.49 96.73 96.99 96.44 95.82 95.92 96.13 96.39 95.75 95.68 97.04 97.03 96.97 96.85 96.8 96.65 96.67 96.68 96.56 96.71 96.78 96.65 96.64 96.61 96.57 96.66 96.58 95.77 95.74 95.72 95.76 98.06
17 480 98.54 99.544 99.044 0.504 21.042 571.87 0.000 0.00 100.000 99.900 99.800 99.700 99.600 99.500 99.400 99.377 99.353 99.330 99.307 99.283 99.260 99.073 98.887 98.700 98.678 98.656 98.633 98.611 98.589 98.567 98.544 98.522 98.500 98.457 98.414 98.371 98.329 98.286 98.243 98.200 98.210 98.220 98.230 98.240 98.250 98.260 98.270 98.280 98.290 98.300 98.413 98.525 98.638 98.750 98.863 98.975 99.088 99.200 99.020 98.840 98.660 98.480 98.300 98.133 97.967 97.800 97.633 97.467 97.300 97.133 96.967 96.800 96.850 96.900 96.950 97.000 97.050 97.100 97.150 97.116 97.081 97.047 97.013 96.978 96.944 96.909 96.875 96.841 96.806 96.772 96.738 96.703 96.669 96.634 96.600 96.900 97.200 97.500 97.800 98.100
18 510 98.46 99.489 98.989 0.529 22.067 646.65 0.000 0.00
19 540 98.42 99.433 98.933 0.513 19.327 620.92 0.000 0.00
20 570 98.51 99.378 98.878 0.368 14.385 505.69 0.000 0.00
21 600 98.48 99.322 98.822 0.342 16.427 462.19 0.000 0.00
22 630 98.3 99.267 98.767 0.467 19.147 533.62 0.000 0.00
23 660 98.19 99.211 98.711 0.521 19.945 586.39 0.000 0.00
24 690 98.04 99.156 98.656 0.616 22.445 635.85 0.000 0.00
25 720 98.42 99.100 98.600 0.180 10.877 499.84 0.000 0.00
26 750 98.05 99.071 98.571 0.521 24.277 527.32 0.000 0.00
27 780 97.86 99.043 98.543 0.683 25.531 747.12 0.000 0.00
28 810 97.87 99.014 98.514 0.644 23.921 741.79 0.000 0.00
29 840 98.04 98.986 98.486 0.446 21.064 674.77 0.000 0.00
30 870 97.95 98.957 98.457 0.507 20.583 624.69 0.000 0.00
31 900 98.01 98.929 98.429 0.419 18.485 586.01 0.000 0.00
32 930 98.06 98.900 98.400 0.340 18.315 552.00 0.000 0.00
33 960 97.62 98.880 98.380 0.760 22.890 618.08 0.000 0.00
34 990 96.94 98.860 98.360 1.420 37.878 911.51 0.000 0.00
35 1020 97.29 98.840 98.340 1.050 23.795 925.09 0.000 0.00
36 1050 97.78 98.820 98.320 0.540 15.653 591.71 0.000 0.00
37 1080 98.01 98.800 98.300 0.290 11.090 401.14 0.000 0.00
38 1110 97.79 98.840 98.340 0.550 15.718 402.11 0.000 0.00
39 1140 97.85 98.880 98.380 0.530 16.345 480.94 0.000 0.00
40 1170 97.85 98.920 98.420 0.570 15.625 479.55 0.000 0.00
i 41 1200 97.97 98.960 98.460 0.490 14.028 444.79 0.000 0.00
42 1230 98.28 99.000 98.500 0.220 8.273 334.50 0.000 0.00
43 1260 98.28 99.063 98.563 0.282 9.585 267.86 0.000 0.00
44 1290 98.16 99.125 98.625 0.465 12.610 332.93 0.000 0.00
45 1320 98.23 99.188 98.688 0.457 13.078 385.31 0.000 0.00
46 1350 98.37 99.250 98.750 0.380 10.338 351.23 0.000 0.00
47 1380 98.48 99.313 98.813 0.332 10.915 318.79 0.000 0.00
48 1410 98.42 99.375 98.875 0.455 10.363 319.16 0.000 0.00
49 1440 98.54 99.438 98.938 0.397 10.492 312.82 0.000 0.00
50 1470 99.09 99.500 99.000 -0.090 14.670 377.44 0.553 8.29
51 1500 98.98 99.400 98.900 -0.080 16.850 472.80 0.803 20.33
52 1530 98.64 99.300 98.800 0.160 16.910 506.40 0.000 12.04
53 1560 98.42 99.200 98.700 0.280 10.695 414.08 0.000 0.00
54 1590 98.43 99.100 98.600 0.170 5.730 246.38 0.000 0.00
55 1620 98 99.000 98.500 0.500 12.985 280.73 0.000 0.00
56 1650 97.45 98.878 98.378 0.928 24.752 566.06 0.000 0.00
i 57 1680 97.12 98.756 98.256 1.136 28.700 801.79 0.000 0.00
58 1710 96.92 98.633 98.133 1.213 28.638 860.06 0.000 0.00
59 1740 96.8 98.511 98.011 1.211 32.259 913.45 0.000 0.00
60 1770 96.62 98.389 97.889 1.269 31.591 957.75 0.000 0.00
61 1800 96.49 98.267 97.767 1.277 31.003 938.90 0.000 0.00
62 1830 96.73 98.144 97.644 0.914 24.333 830.03 0.000 0.00
63 1860 96.99 98.022 97.522 0.532 16.913 618.68 0.000 0.00
64 1890 96.44 97.900 97.400 0.960 24.073 614.78 0.000 0.00
65 1920 95.82 97.864 97.364 1.544 37.833 928.58 0.000 0.00
66 1950 95.92 97.829 97.329 1.409 34.143 1079.64 0.000 0.00
67 1980 96.13 97.793 97.293 1.163 36.264 1056.10 0.000 0.00
68 2010 96.39 97.757 97.257 0.867 34.809 1066.09 0.000 0.00
69 2040 95.75 97.721 97.221 1.471 40.929 1136.07 0.000 0.00
70 2070 95.68 97.686 97.186 1.506 41.467 1235.95 0.000 0.00
71 2100 97.04 97.650 97.150 0.110 13.820 829.31 0.000 0.00
72 2130 97.03 97.634 97.134 0.104 11.052 373.08 0.000 0.00
73 2160 96.97 97.619 97.119 0.149 14.434 382.29 0.000 0.00
74 2190 96.85 97.603 97.103 0.253 16.320 461.32 0.000 0.00
75 2220 96.8 97.588 97.088 0.288 16.446 491.50 0.000 0.00
76 2250 96.65 97.572 97.072 0.422 18.750 527.94 0.000 0.00
77 2280 96.67 97.556 97.056 0.386 17.658 546.12 0.000 0.00
78 2310 96.68 97.541 97.041 0.361 17.562 528.30 0.000 0.00
79 2340 96.56 97.525 97.025 0.465 19.310 553.07 0.000 0.00
80 2370 96.71 97.509 97.009 0.299 14.489 506.99 0.000 0.00
81 2400 96.78 97.494 96.994 0.214 16.999 472.33 0.000 0.00
82 2430 96.65 97.478 96.978 0.328 17.668 520.01 0.000 0.00
83 2460 96.64 97.463 96.963 0.323 16.145 507.19 0.000 0.00
84 2490 96.61 97.447 96.947 0.337 14.412 458.35 0.000 0.00
85 2520 96.57 97.431 96.931 0.361 16.469 463.21 0.000 0.00
86 2550 96.66 97.416 96.916 0.256 17.066 503.02 0.000 0.00
87 2580 96.58 97.400 96.900 0.320 17.758 522.35 0.000 0.00
88 2610 95.77 97.420 96.920 1.150 13.805 473.44 0.000 0.00
89 2640 95.74 97.440 96.940 1.200 16.182 449.81 0.000 0.00
90 2670 95.72 97.460 96.960 1.240 14.655 462.56 0.000 0.00
91 2700 95.76 97.480 96.980 1.220 13.100 416.32 0.000 0.00
92 2730 98.06 97.500 97.000 -1.060 0.000 196.50 16.630 249.45
50272.71 290.10
23914.80
74187.51
7 3
13
1.2 8 99.86

Finish Base lvl


Cross Section
Alphabatical

Chainnage

Chainnage
Avg

Sectional
Cross
Name
Cutting Filling Filling Cutting Cutting Filling

Point
HI R.L
/feeling Depth Area Depth Area Depth
Cross Section of 30 M Approach Road at Various Chainages
Depth

A 0
L1 99.100 12 98.300 -0.800 0.000 0.900 0.000 0.000 0.6 106.265
L2 99.200 9 99.800 0.600 0.600 1.060 0.000 0.000 Cross Section of Access Road At 0 chainage
L3 99.400 7 99.860 0.460 0.460 0.760 0.000 0.000
100.500
L4 99.600 5 99.900 0.300 0.300 0.300 0.000 0.000
L5 99.940 3 99.940 0.000 0.000 0.055 0.000 0.000 100.000
L6 99.925 1 99.980 0.055 0.055 0.073 0.000 0.000 99.500
C.P. 99.910 0 100.000 0.090 0.090 0.000
99.000
R6 99.860 1 99.980 0.120 0.120 0.105 0.000 0.000
98.500
R5 99.810 3 99.940 0.130 0.130 0.250 0.000 0.000 98.000
97.500
R4 99.400 5 99.900 0.500 0.500 0.630 0.000 0.000
97.000
12 9 7 5 3 1 0 1 3 5 7 9 12
R3 99.200 7 99.860 0.660 0.660 1.160 0.000 0.000
R2 99.000 9 99.800 0.800 0.800 1.460 0.000 0.000
NGL Emb Lvl F.B.L
R1 98.900 12 98.300 -0.600 0.000 1.200 0.000 0.000
7.953 0.000 0
A 30
L1 99.140 12 98.200 -0.940 0.000 0.690 0.000 0.000 Cross Section of Access Road At 30 chainage
L2 99.240 9 99.700 0.460 0.460 0.880 0.000 0.000 100.500
L3 99.340 7 99.760 0.420 0.420 0.680 0.000 0.000 100.000
L4 99.540 5 99.800 0.260 0.260 0.340 0.000 0.000 99.500
L5 99.760 3 99.840 0.080 0.080 0.175 0.000 0.000 99.000
L6 99.785 1 99.880 0.095 0.095 0.093 0.000 0.000 98.500
C.P. 99.810 0 99.900 0.090 0.090 0.000
98.000
R6 99.770 1 99.880 0.110 0.110 0.100 0.000 0.000
97.500
R5 99.730 3 99.840 0.110 0.110 0.220 0.000 0.000
97.000
R4 99.350 5 99.800 0.450 0.450 0.560 0.000 0.000 12 9 7 5 3 1 0 1 3 5 7 9 12
R3 99.150 7 99.760 0.610 0.610 1.060 0.000 0.000
R2 98.950 9 99.700 0.750 0.750 1.360 0.000 0.000 NGL Emb Lvl F.B.L
R1 98.850 12 98.200 -0.650 0.000 1.125 0.000 0.000
7.283 0.000 30
A 60
L1 98.730 12 98.100 -0.630 0.000 1.155 0.000 0.000 Cross Section of Access Road At chainage 60m
L2 98.830 9 99.600 0.770 0.770 1.500 0.000 0.000 100.500
L3 98.930 7 99.660 0.730 0.730 1.300 0.000 0.000 100.000
L4 99.130 5 99.700 0.570 0.570 0.870 0.000 0.000 99.500
L5 99.440 3 99.740 0.300 0.300 0.650 0.000 0.000 99.000
L6 99.430 1 99.780 0.350 0.350 0.365 0.000 0.000 98.500
C.P. 99.420 0 99.800 0.380 0.380 0.000 98.000
R6 99.340 1 99.780 0.440 0.440 0.410 0.000 0.000 97.500
R5 99.260 3 99.740 0.480 0.480 0.920 0.000 0.000 97.000
R4 98.880 5 99.700 0.820 0.820 1.300 0.000 0.000 12 9 7 5 3 1 0 1 3 5 7 9 12
R3 98.680 7 99.660 0.980 0.980 1.800 0.000 0.000
NGL Emb Lvl F.B.L
R2 98.480 9 99.600 1.120 1.120 2.100 0.000 0.000
R1 98.380 12 98.100 -0.280 0.000 1.680 0.000 0.000
14.050 0.000 60
A 90
L1 98.570 12 98.000 -0.570 0.000 1.245 0.000 0.000 Cross Section of Access Road At chainage 90 m
L2 98.670 9 99.500 0.830 0.830 1.620 0.000 0.000 100.500
L3 98.770 7 99.560 0.790 0.790 1.420 0.000 0.000 100.000
L4 98.970 5 99.600 0.630 0.630 1.060 0.000 0.000 99.500
L5 99.210 3 99.640 0.430 0.430 0.770 0.000 0.000 99.000
L6 99.340 1 99.680 0.340 0.340 0.285 0.000 0.000 98.500
C.P. 99.470 0 99.700 0.230 0.230 0.000 98.000
R6 99.460 1 99.680 0.220 0.220 0.225 0.000 0.000 97.500
R5 99.450 3 99.640 0.190 0.190 0.410 0.000 0.000 97.000
R4 99.390 5 99.600 0.210 0.210 0.400 0.000 0.000 12 9 7 5 3 1 0 1 3 5 7 9 12
R3 99.190 7 99.560 0.370 0.370 0.580 0.000 0.000
NGL Emb Lvl F.B.L
R2 98.990 9 99.500 0.510 0.510 0.880 0.000 0.000
R1 98.890 12 98.000 -0.890 0.000 0.765 0.000 0.000
9.660 0.000 90
A 120
L1 98.690 12 97.900 -0.790 0.000 0.915 0.000 0.000 Cross Section of Access Road At chainage120M
L2 98.790 9 99.400 0.610 0.610 1.180 0.000 0.000 100.000
L3 98.890 7 99.460 0.570 0.570 0.980 0.000 0.000 99.500
L4 99.090 5 99.500 0.410 0.410 0.700 0.000 0.000
99.000
L5 99.250 3 99.540 0.290 0.290 0.600 0.000 0.000
L6 99.270 1 99.580 0.310 0.310 0.310 0.000 0.000 98.500
C.P. 99.290 0 99.600 0.310 0.310 0.000 98.000
R6 99.235 1 99.580 0.345 0.345 0.328 0.000 0.000 97.500
R5 99.180 3 99.540 0.360 0.360 0.705 0.000 0.000 97.000
R4 98.830 5 99.500 0.670 0.670 1.030 0.000 0.000 12 9 7 5 3 1 0 1 3 5 7 9 12
R3 98.630 7 99.460 0.830 0.830 1.500 0.000 0.000
NGL Emb Lvl F.B.L
R2 98.430 9 99.400 0.970 0.970 1.800 0.000 0.000
R1 98.330 12 97.900 -0.430 0.000 1.455 0.000 0.000
11.503 0.000 120
A 150
L1 98.370 12 97.800 -0.570 0.000 1.245 0.000 0.000 Cross Section of Access Road At chainage150M
L2 98.470 9 99.300 0.830 0.830 1.620 0.000 0.000 100.000
L3 98.570 7 99.360 0.790 0.790 1.420 0.000 0.000 99.500
L4 98.770 5 99.400 0.630 0.630 1.140 0.000 0.000 99.000
L5 98.930 3 99.440 0.510 0.510 1.010 0.000 0.000 98.500
L6 98.980 1 99.480 0.500 0.500 0.485 0.000 0.000 98.000
C.P. 99.030 0 99.500 0.470 0.470 0.000 97.500
R6 98.980 1 99.480 0.500 0.500 0.485 0.000 0.000 97.000
R5 98.930 3 99.440 0.510 0.510 1.010 0.000 0.000 96.500
R4 98.530 5 99.400 0.870 0.870 1.380 0.000 0.000 12 9 7 5 3 1 0 1 3 5 7 9 12
R3 98.330 7 99.360 1.030 1.030 1.900 0.000 0.000
NGL Emb Lvl F.B.L
R2 98.130 9 99.300 1.170 1.170 2.200 0.000 0.000
R1 98.030 12 97.800 -0.230 0.000 1.755 0.000 0.000
15.650 0.000 150
A 180
L1 97.750 12 97.700 -0.050 0.000 2.025 0.000 0.000 Cross-Section of Access Road At Chainage180M
L2 97.850 9 99.200 1.350 1.350 2.660 0.000 0.000 100.000
L3 97.950 7 99.260 1.310 1.310 2.460 0.000 0.000 99.500
L4 98.150 5 99.300 1.150 1.150 1.340 0.000 0.000 99.000
L5 99.150 3 99.340 0.190 0.190 0.330 0.000 0.000 98.500
L6 99.240 1 99.380 0.140 0.140 0.105 0.000 0.000 98.000
C.P. 99.330 0 99.400 0.070 0.070 0.000
97.500
R6 99.225 1 99.380 0.155 0.155 0.113 0.000 0.000
97.000
R5 99.120 3 99.340 0.220 0.220 0.375 0.000 0.000
96.500
R4 98.430 5 99.300 0.870 0.870 1.090 0.000 0.000
R3 98.230 7 99.260 1.030 1.030 1.900 0.000 0.000
R2 98.030 9 99.200 1.170 1.170 2.200 0.000 0.000 Emb Lvl F.B.L
R1 97.930 12 97.700 -0.230 0.000 1.755 0.000 0.000
16.353 0.000 180
B 210
L1 97.740 12 97.677 -0.063 0.000 2.005 0.000 0.000 Cross-Section of Access Road At Chainage210M
L2 97.840 9 99.177 1.337 1.337 2.633 0.000 0.000 100.000
L3 97.940 7 99.237 1.297 1.297 2.433 0.000 0.000 99.500
L4 98.140 5 99.277 1.137 1.137 1.573 0.000 0.000
99.000
L5 98.880 3 99.317 0.437 0.437 0.908 0.000 0.000
98.500
L6 98.885 1 99.357 0.472 0.472 0.479 0.000 0.000
98.000
C.P. 98.890 0 99.377 0.487 0.487 0.000
97.500
R6 98.830 1 99.357 0.527 0.527 0.507 0.000 0.000
97.000
R5 98.770 3 99.317 0.547 0.547 1.073 0.000 0.000
96.500
R4 98.060 5 99.277 1.217 1.217 1.763 0.000 0.000
R3 97.860 7 99.237 1.377 1.377 2.593 0.000 0.000
R2 97.660 9 99.177 1.517 1.517 2.893 0.000 0.000 Emb Lvl F.B.L
R1 97.560 12 97.677 0.117 0.117 2.450 0.000 0.000
21.313 0.000 210.00
B 240
L1 97.840 12 97.653 -0.187 0.000 1.820 0.000 0.000 Cross-Section of Access Road At Chainage240M
L2 97.940 9 99.153 1.213 1.213 2.387 0.000 0.000 99.500
L3 98.040 7 99.213 1.173 1.173 2.187 0.000 0.000
99.000
L4 98.240 5 99.253 1.013 1.013 1.467 0.000 0.000
L5 98.840 3 99.293 0.453 0.453 0.927 0.000 0.000 98.500
L6 98.860 1 99.333 0.473 0.473 0.473 0.000 0.000 98.000
C.P. 98.880 0 99.353 0.473 0.473 0.000 97.500
R6 98.855 1 99.333 0.478 0.478 0.476 0.000 0.000 97.000
R5 98.830 3 99.293 0.463 0.463 0.942 0.000 0.000
96.500
R4 97.990 5 99.253 1.263 1.263 1.727 0.000 0.000
R3 97.790 7 99.213 1.423 1.423 2.687 0.000 0.000
R2 97.590 9 99.153 1.563 1.563 2.987 0.000 0.000 Emb Lvl F.B.L
R1 97.490 12 97.653 0.163 0.163 2.590 0.000 0.000
20.667 0.000 240
B 270
L1 97.880 12 97.630 -0.250 0.000 1.725 0.000 0.000 Cross-Section of Access Road At Chainage270M
L2 97.980 9 99.130 1.150 1.150 2.260 0.000 0.000 99.500
L3 98.080 7 99.190 1.110 1.110 2.060 0.000 0.000
99.000
L4 98.280 5 99.230 0.950 0.950 1.350 0.000 0.000
L5 98.870 3 99.270 0.400 0.400 0.810 0.000 0.000 98.500
L6 98.900 1 99.310 0.410 0.410 0.405 0.000 0.000 98.000
C.P. 98.930 0 99.330 0.400 0.400 0.000 97.500
R6 98.905 1 99.310 0.405 0.405 0.402 0.000 0.000
97.000
R5 98.880 3 99.270 0.390 0.390 0.795 0.000 0.000
96.500
R4 97.950 5 99.230 1.280 1.280 1.670 0.000 0.000
R3 97.750 7 99.190 1.440 1.440 2.720 0.000 0.000
R2 97.550 9 99.130 1.580 1.580 3.020 0.000 0.000 Emb Lvl F.B.L
R1 97.450 12 97.630 0.180 0.180 2.640 0.000 0.000
19.857 0.000 270
B 300
L1 97.910 12 97.607 -0.303 0.000 1.645 0.000 0.000 Cross-Section of Access Road At Chainage300M
L2 98.010 9 99.107 1.097 1.097 2.153 0.000 0.000
99.500
L3 98.110 7 99.167 1.057 1.057 1.953 0.000 0.000
99.000
L4 98.310 5 99.207 0.897 0.897 1.223 0.000 0.000
L5 98.920 3 99.247 0.327 0.327 0.653 0.000 0.000 98.500
L6 98.960 1 99.287 0.327 0.327 0.317 0.000 0.000 98.000
C.P. 99.000 0 99.307 0.307 0.307 0.000 97.500
R6 98.920 1 99.287 0.367 0.367 0.337 0.000 0.000
97.000
R5 98.840 3 99.247 0.407 0.407 0.773 0.000 0.000
R4 97.990 5 99.207 1.217 1.217 1.623 0.000 0.000 96.500
R3 97.790 7 99.167 1.377 1.377 2.593 0.000 0.000
R2 97.590 9 99.107 1.517 1.517 2.893 0.000 0.000 Emb Lvl F.B.L
R1 97.490 12 97.607 0.117 0.117 2.450 0.000 0.000
99.010 18.615 0.000 300
B 330
L1 98.400 12 97.583 -0.817 0.000 0.875 0.000 0.000 Cross-Section of Access Road At Chainage330M
L2 98.500 9 99.083 0.583 0.583 1.127 0.000 0.000 99.500
L3 98.600 7 99.143 0.543 0.543 0.927 0.000 0.000
99.000
L4 98.800 5 99.183 0.383 0.383 0.687 0.000 0.000
L5 98.920 3 99.223 0.303 0.303 0.642 0.000 0.000 98.500
L6 98.925 1 99.263 0.338 0.338 0.346 0.000 0.000 98.000
C.P. 98.930 0 99.283 0.353 0.353 0.000 97.500
R6 98.870 1 99.263 0.393 0.393 0.373 0.000 0.000 97.000
R5 98.810 3 99.223 0.413 0.413 0.807 0.000 0.000
96.500
R4 98.710 5 99.183 0.473 0.473 0.887 0.000 0.000
R3 98.510 7 99.143 0.633 0.633 1.107 0.000 0.000
R2 98.310 9 99.083 0.773 0.773 1.407 0.000 0.000 Emb Lvl F.B.L
R1 98.210 12 97.583 -0.627 0.000 1.160 0.000 0.000
10.342 0.000 330
B 360
L1 97.770 12 97.560 -0.210 0.000 1.785 0.000 0.000 Cross-Section of Access Road At Chainage360M
L2 97.870 9 99.060 1.190 1.190 2.340 0.000 0.000 99.500
L3 97.970 7 99.120 1.150 1.150 2.140 0.000 0.000 99.000
L4 98.170 5 99.160 0.990 0.990 1.030 0.000 0.000
98.500
L5 99.160 3 99.200 0.040 0.040 0.080 0.000 0.000
L6 99.200 1 99.240 0.040 0.040 0.030 0.000 0.000 98.000
C.P. 99.240 0 99.260 0.020 0.020 0.000 97.500
R6 99.175 1 99.240 0.065 0.065 0.043 0.000 0.000 97.000
R5 99.110 3 99.200 0.090 0.090 0.155 0.000 0.000
96.500
R4 99.150 5 99.160 0.010 0.010 0.100 0.000 0.000
R3 98.950 7 99.120 0.170 0.170 0.180 0.000 0.000
R2 98.750 9 99.060 0.310 0.310 0.480 0.000 0.000 Emb Lvl F.B.L
R1 98.650 12 97.560 -1.090 0.000 0.465 0.000 0.000
8.828 0.000 360
B 390
L1 97.660 12 97.507 -0.153 0.000 1.870 0.000 0.000 Cross-Sect ion of Access Road At Chainage390M
L2 97.760 9 99.007 1.247 1.247 2.453 0.000 0.000 99.500
L3 97.860 7 99.067 1.207 1.207 2.253 0.000 0.000
99.000
L4 98.060 5 99.107 1.047 1.047 1.273 0.000 0.000
98.500
L5 98.920 3 99.147 0.227 0.227 0.433 0.000 0.000
L6 98.980 1 99.187 0.207 0.207 0.187 0.000 0.000 98.000
C.P. 99.040 0 99.207 0.167 0.167 0.000 97.500
R6 99.005 1 99.187 0.182 0.182 0.174 0.000 0.000 97.000
R5 98.970 3 99.147 0.177 0.177 0.358 0.000 0.000
96.500
R4 99.030 5 99.107 0.077 0.077 0.253 0.000 0.000
R3 98.830 7 99.067 0.237 0.237 0.313 0.000 0.000
R2 98.630 9 99.007 0.377 0.377 0.613 0.000 0.000 Emb Lvl F.B.L
R1 98.530 12 97.507 -1.023 0.000 0.565 0.000 0.000
10.748 0.000 390
B 420
L1 97.660 12 97.453 -0.207 0.000 1.790 0.000 0.000 Cross-Section of Access Road At Chainage420M
L2 97.760 9 98.953 1.193 1.193 2.347 0.000 0.000 99.500
L3 97.860 7 99.013 1.153 1.153 2.147 0.000 0.000
99.000
L4 98.060 5 99.053 0.993 0.993 1.397 0.000 0.000
98.500
L5 98.690 3 99.093 0.403 0.403 0.817 0.000 0.000
L6 98.720 1 99.133 0.413 0.413 0.408 0.000 0.000 98.000
C.P. 98.750 0 99.153 0.403 0.403 0.000 97.500
R6 98.785 1 99.133 0.348 0.348 0.376 0.000 0.000 97.000
R5 98.820 3 99.093 0.273 0.273 0.622 0.000 0.000
96.500
R4 98.680 5 99.053 0.373 0.373 0.647 0.000 0.000
R3 98.480 7 99.013 0.533 0.533 0.907 0.000 0.000
R2 98.280 9 98.953 0.673 0.673 1.207 0.000 0.000 Emb Lvl F.B.L
R1 98.180 12 97.453 -0.727 0.000 1.010 0.000 0.000
13.672 0.000 420
B 450
L1 97.770 12 97.400 -0.370 0.000 1.545 0.000 0.000 Cross-Section of Access Road At Chainage450M
L2 97.870 9 98.900 1.030 1.030 2.020 0.000 0.000 99.500
L3 97.970 7 98.960 0.990 0.990 1.820 0.000 0.000
99.000
L4 98.170 5 99.000 0.830 0.830 1.460 0.000 0.000
L5 98.410 3 99.040 0.630 0.630 1.180 0.000 0.000 98.500
L6 98.530 1 99.080 0.550 0.550 0.500 0.000 0.000 98.000
C.P. 98.650 0 99.100 0.450 0.450 0.000 97.500
R6 98.525 1 99.080 0.555 0.555 0.502 0.000 0.000
97.000
R5 98.400 3 99.040 0.640 0.640 1.195 0.000 0.000
96.500
R4 97.970 5 99.000 1.030 1.030 1.670 0.000 0.000
R3 97.770 7 98.960 1.190 1.190 2.220 0.000 0.000
R2 97.570 9 98.900 1.330 1.330 2.520 0.000 0.000 Emb Lvl F.B.L
R1 97.470 12 97.400 -0.070 0.000 1.995 0.000 0.000
17.082 0.000 450
B 480
L1 97.510 12 97.344 -0.166 0.000 1.852 0.000 0.000 Cross-Section of Access Road At Chainage480M
L2 97.610 9 98.844 1.234 1.234 2.429 0.000 0.000 99.500
L3 97.710 7 98.904 1.194 1.194 2.229 0.000 0.000
99.000
L4 97.910 5 98.944 1.034 1.034 1.549 0.000 0.000
98.500
L5 98.470 3 98.984 0.514 0.514 1.034 0.000 0.000
98.000
L6 98.505 1 99.024 0.519 0.519 0.512 0.000 0.000
97.500
C.P. 98.540 0 99.044 0.504 0.504 0.000
97.000
R6 98.490 1 99.024 0.534 0.534 0.519 0.000 0.000
96.500
R5 98.440 3 98.984 0.544 0.544 1.079 0.000 0.000
96.000
R4 97.710 5 98.944 1.234 1.234 1.779 0.000 0.000
R3 97.510 7 98.904 1.394 1.394 2.629 0.000 0.000
R2 97.310 9 98.844 1.534 1.534 2.929 0.000 0.000 Emb Lvl F.B.L
R1 97.210 12 97.344 0.134 0.134 2.503 0.000 0.000
21.042 0.000 480
B 510
L1 97.530 12 97.289 -0.241 0.000 1.738 0.000 0.000 Cross-Section of Access Road At Chainage510M
L2 97.630 9 98.789 1.159 1.159 2.278 0.000 0.000 99.500
L3 97.730 7 98.849 1.119 1.119 2.078 0.000 0.000 99.000
L4 97.930 5 98.889 0.959 0.959 1.468 0.000 0.000 98.500
L5 98.420 3 98.929 0.509 0.509 1.038 0.000 0.000 98.000
L6 98.440 1 98.969 0.529 0.529 0.529 0.000 0.000 97.500
C.P. 98.460 0 98.989 0.529 0.529 0.000 97.000
R6 98.365 1 98.969 0.604 0.604 0.566 0.000 0.000 96.500
R5 98.270 3 98.929 0.659 0.659 1.263 0.000 0.000 96.000
R4 97.510 5 98.889 1.379 1.379 2.038 0.000 0.000
R3 97.310 7 98.849 1.539 1.539 2.918 0.000 0.000
Emb Lvl F.B.L
R2 97.110 9 98.789 1.679 1.679 3.218 0.000 0.000
R1 97.010 12 97.289 0.279 0.279 2.937 0.000 0.000
98.480 22.067 0.000 510
B 540
L1 97.910 12 97.233 -0.677 0.000 1.085 0.000 0.000 Cross-Section of Access Road At Chainage540M
L2 98.010 9 98.733 0.723 0.723 1.407 0.000 0.000 99.500
L3 98.110 7 98.793 0.683 0.683 1.207 0.000 0.000 99.000
L4 98.310 5 98.833 0.523 0.523 1.037 0.000 0.000 98.500
L5 98.360 3 98.873 0.513 0.513 1.037 0.000 0.000 98.000
L6 98.390 1 98.913 0.523 0.523 0.518 0.000 0.000 97.500
C.P. 98.420 0 98.933 0.513 0.513 0.000 97.000
R6 98.375 1 98.913 0.538 0.538 0.526 0.000 0.000 96.500
96.000
R5 98.330 3 98.873 0.543 0.543 1.082 0.000 0.000
95.500
R4 97.400 5 98.833 1.433 1.433 1.977 0.000 0.000
R3 97.200 7 98.793 1.593 1.593 3.027 0.000 0.000
R2 97.000 9 98.733 1.733 1.733 3.327 0.000 0.000 Emb Lvl F.B.L
R1 96.900 12 97.233 0.333 0.333 3.100 0.000 0.000
19.327 0.000 540
B 570
L1 98.130 12 97.178 -0.952 0.000 0.672 0.000 0.000 Cross-Sect ion of Access Road At Chainage570M
L2 98.230 9 98.678 0.448 0.448 0.856 0.000 0.000 99.500
L3 98.330 7 98.738 0.408 0.408 0.656 0.000 0.000 99.000
L4 98.530 5 98.778 0.248 0.248 0.566 0.000 0.000 98.500
L5 98.500 3 98.818 0.318 0.318 0.671 0.000 0.000
98.000
L6 98.505 1 98.858 0.353 0.353 0.360 0.000 0.000
97.500
C.P. 98.510 0 98.878 0.368 0.368 0.000
97.000
R6 98.415 1 98.858 0.443 0.443 0.405 0.000 0.000
96.500
R5 98.320 3 98.818 0.498 0.498 0.941 0.000 0.000
96.000
R4 97.610 5 98.778 1.168 1.168 1.666 0.000 0.000
R3 97.410 7 98.738 1.328 1.328 2.496 0.000 0.000
R2 97.210 9 98.678 1.468 1.468 2.796 0.000 0.000 Emb Lvl F.B.L
Cross-Sect ion of Access Road At Chainage570M
99.500
99.000
98.500
98.000
97.500
97.000

Finish Base lvl


Cross Section
Alphabatical

Chainnage

Chainnage
Avg

Sectional
96.500

Cross
Name
Cutting Filling Filling Cutting Cutting Filling

Point
96.000
HI R.L
/feeling Depth Area Depth Area Depth
Cross Section of 30 M Approach Road at Various Chainages
Depth
Emb Lvl F.B.L
R1 97.110 12 97.178 0.068 0.068 2.303 0.000 0.000
14.385 0.000 570
B 600
L1 97.790 12 97.122 -0.668 0.000 1.098 0.000 0.000 Cross-Section of Access Road At Chainage600M
L2 97.890 9 98.622 0.732 0.732 1.424 0.000 0.000 99.000
L3 97.990 7 98.682 0.692 0.692 1.224 0.000 0.000
98.500
L4 98.190 5 98.722 0.532 0.532 0.974 0.000 0.000
98.000
L5 98.320 3 98.762 0.442 0.442 0.844 0.000 0.000
L6 98.400 1 98.802 0.402 0.402 0.372 0.000 0.000 97.500
C.P. 98.480 0 98.822 0.342 0.342 0.000 97.000
R6 98.365 1 98.802 0.437 0.437 0.390 0.000 0.000 96.500
R5 98.250 3 98.762 0.512 0.512 0.949 0.000 0.000
96.000
R4 97.570 5 98.722 1.152 1.152 1.664 0.000 0.000
R3 97.370 7 98.682 1.312 1.312 2.464 0.000 0.000
R2 97.170 9 98.622 1.452 1.452 2.764 0.000 0.000 Emb Lvl F.B.L
R1 97.070 12 97.122 0.052 0.052 2.257 0.000 0.000
16.427 0.000 600
B 630
L1 97.490 12 97.067 -0.423 0.000 1.465 0.000 0.000 Cross-Section of Access Road At Chainage630M
L2 97.590 9 98.567 0.977 0.977 1.913 0.000 0.000 99.000
L3 97.690 7 98.627 0.937 0.937 1.713 0.000 0.000
98.500
L4 97.890 5 98.667 0.777 0.777 1.263 0.000 0.000
98.000
L5 98.220 3 98.707 0.487 0.487 0.973 0.000 0.000
L6 98.260 1 98.747 0.487 0.487 0.477 0.000 0.000 97.500
C.P. 98.300 0 98.767 0.467 0.467 0.000 97.000
R6 98.185 1 98.747 0.562 0.562 0.514 0.000 0.000 96.500
R5 98.070 3 98.707 0.637 0.637 1.198 0.000 0.000
96.000
R4 97.470 5 98.667 1.197 1.197 1.833 0.000 0.000
R3 97.270 7 98.627 1.357 1.357 2.553 0.000 0.000
R2 97.070 9 98.567 1.497 1.497 2.853 0.000 0.000 Emb Lvl F.B.L
R1 96.970 12 97.067 0.097 0.097 2.390 0.000 0.000
19.147 0.000 630
C 660
L1 97.210 12 97.011 -0.199 0.000 1.802 0.000 0.000 Cross-Section of Access Road At Chainage660M
L2 97.310 9 98.511 1.201 1.201 2.362 0.000 0.000
99.000
L3 97.410 7 98.571 1.161 1.161 2.162 0.000 0.000
98.500
L4 97.610 5 98.611 1.001 1.001 1.452 0.000 0.000
L5 98.200 3 98.651 0.451 0.451 0.947 0.000 0.000 98.000
L6 98.195 1 98.691 0.496 0.496 0.509 0.000 0.000 97.500
C.P. 98.190 0 98.711 0.521 0.521 0.000 97.000
R6 98.105 1 98.691 0.586 0.586 0.554 0.000 0.000
96.500
R5 98.020 3 98.651 0.631 0.631 1.217 0.000 0.000
96.000
R4 97.500 5 98.611 1.111 1.111 1.742 0.000 0.000
R3 97.300 7 98.571 1.271 1.271 2.382 0.000 0.000
R2 97.100 9 98.511 1.411 1.411 2.682 0.000 0.000 Emb Lvl F.B.L
R1 97.000 12 97.011 0.011 0.011 2.133 0.000 0.000
19.945 0.000 660
C 690
L1 97.080 12 96.956 -0.124 0.000 1.913 0.000 0.000 Cross-Sect ion of Access Road At Chainage690M
L2 97.180 9 98.456 1.276 1.276 2.511 0.000 0.000
99.000
L3 97.280 7 98.516 1.236 1.236 2.311 0.000 0.000
98.500
L4 97.480 5 98.556 1.076 1.076 1.681 0.000 0.000
98.000
L5 97.990 3 98.596 0.606 0.606 1.226 0.000 0.000
97.500
L6 98.015 1 98.636 0.621 0.621 0.618 0.000 0.000
97.000
C.P. 98.040 0 98.656 0.616 0.616 0.000
96.500
R6 97.995 1 98.636 0.641 0.641 0.628 0.000 0.000
R5 97.950 3 98.596 0.646 0.646 1.286 0.000 0.000 96.000
R4 97.280 5 98.556 1.276 1.276 1.921 0.000 0.000 95.500
R3 97.080 7 98.516 1.436 1.436 2.711 0.000 0.000
R2 96.880 9 98.456 1.576 1.576 3.011 0.000 0.000 Emb Lvl F.B.L
R1 96.780 12 96.956 0.176 0.176 2.627 0.000 0.000
22.445 0.000 690
C 720
L1 97.350 12 96.900 -0.450 0.000 1.425 0.000 0.000 Cross-Section of Access Road At Chainage720M
L2 97.450 9 98.400 0.950 0.950 1.860 0.000 0.000 99.000
L3 97.550 7 98.460 0.910 0.910 1.660 0.000 0.000
98.500
L4 97.750 5 98.500 0.750 0.750 0.950 0.000 0.000
L5 98.340 3 98.540 0.200 0.200 0.400 0.000 0.000 98.000

L6 98.380 1 98.580 0.200 0.200 0.190 0.000 0.000 97.500


C.P. 98.420 0 98.600 0.180 0.180 0.000 97.000
R6 98.345 1 98.580 0.235 0.235 0.207 0.000 0.000 96.500
R5 98.270 3 98.540 0.270 0.270 0.505 0.000 0.000
96.000
R4 98.140 5 98.500 0.360 0.360 0.630 0.000 0.000
R3 97.940 7 98.460 0.520 0.520 0.880 0.000 0.000
R2 97.740 9 98.400 0.660 0.660 1.180 0.000 0.000 Emb Lvl F.B.L
R1 97.640 12 96.900 -0.740 0.000 0.990 0.000 0.000
97.960 10.877 0.000 720
C 750
L1 96.900 12 96.871 -0.029 0.000 2.057 0.000 0.000 Cross-Section of Access Road At Chainage750M
L2 97.000 9 98.371 1.371 1.371 2.703 0.000 0.000 99.000
L3 97.100 7 98.431 1.331 1.331 2.503 0.000 0.000 98.500
L4 97.300 5 98.471 1.171 1.171 1.683 0.000 0.000 98.000
L5 98.000 3 98.511 0.511 0.511 1.038 0.000 0.000 97.500
L6 98.025 1 98.551 0.526 0.526 0.524 0.000 0.000 97.000
C.P. 98.050 0 98.571 0.521 0.521 0.000 96.500
96.000
R6 98.035 1 98.551 0.516 0.516 0.519 0.000 0.000
95.500
R5 98.020 3 98.511 0.491 0.491 1.008 0.000 0.000
95.000
R4 96.930 5 98.471 1.541 1.541 2.033 0.000 0.000
R3 96.730 7 98.431 1.701 1.701 3.243 0.000 0.000
R2 96.530 9 98.371 1.841 1.841 3.543 0.000 0.000 Emb Lvl F.B.L
R1 96.430 12 96.871 0.441 0.441 3.424 0.000 0.000
24.277 0.000 750
C 780 Cross-Sect ion of Access Road At Chainage780M
L1 96.770 12 96.843 0.073 0.073 2.319 0.000 0.000 99.000
L2 96.870 9 98.343 1.473 1.473 2.906 0.000 0.000 98.500
L3 96.970 7 98.403 1.433 1.433 2.706 0.000 0.000
98.000
L4 97.170 5 98.443 1.273 1.273 1.936 0.000 0.000
97.500
L5 97.820 3 98.483 0.663 0.663 1.346 0.000 0.000
97.000
L6 97.840 1 98.523 0.683 0.683 0.683 0.000 0.000
96.500
C.P. 97.860 0 98.543 0.683 0.683 0.000
96.000
R6 97.785 1 98.523 0.738 0.738 0.710 0.000 0.000
95.500
R5 97.710 3 98.483 0.773 0.773 1.511 0.000 0.000
R4 97.040 5 98.443 1.403 1.403 2.176 0.000 0.000
R3 96.840 7 98.403 1.563 1.563 2.966 0.000 0.000 Emb Lvl F.B.L
R2 96.640 9 98.343 1.703 1.703 3.266 0.000 0.000
R1 96.540 12 96.843 0.303 0.303 3.009 0.000 0.000
25.531 0.000 780
C 810
L1 96.890 12 96.814 -0.076 0.000 1.986 0.000 0.000 Cross-Section of Access Road At Chainage810
L2 96.990 9 98.314 1.324 1.324 2.609 0.000 0.000 99.000
L3 97.090 7 98.374 1.284 1.284 2.409 0.000 0.000 98.500
L4 97.290 5 98.414 1.124 1.124 1.779 0.000 0.000 98.000
L5 97.800 3 98.454 0.654 0.654 1.314 0.000 0.000
97.500
L6 97.835 1 98.494 0.659 0.659 0.652 0.000 0.000
97.000
C.P. 97.870 0 98.514 0.644 0.644 0.000
96.500
R6 97.795 1 98.494 0.699 0.699 0.672 0.000 0.000
96.000
R5 97.720 3 98.454 0.734 0.734 1.434 0.000 0.000
95.500
R4 97.050 5 98.414 1.364 1.364 2.099 0.000 0.000
R3 96.850 7 98.374 1.524 1.524 2.889 0.000 0.000
R2 96.650 9 98.314 1.664 1.664 3.189 0.000 0.000 Emb Lvl F.B.L
R1 96.550 12 96.814 0.264 0.264 2.893 0.000 0.000
23.921 0.000 810
C 840
L1 96.990 12 96.786 -0.204 0.000 1.794 0.000 0.000 Cross-Sect ion of Access Road At Chainage840M
L2 97.090 9 98.286 1.196 1.196 2.351 0.000 0.000 99.000
L3 97.190 7 98.346 1.156 1.156 2.151 0.000 0.000 98.500
L4 97.390 5 98.386 0.996 0.996 1.561 0.000 0.000 98.000
L5 97.860 3 98.426 0.566 0.566 1.081 0.000 0.000 97.500
L6 97.950 1 98.466 0.516 0.516 0.481 0.000 0.000 97.000
C.P. 98.040 0 98.486 0.446 0.446 0.000 96.500
R6 97.970 1 98.466 0.496 0.496 0.471 0.000 0.000
96.000
R5 97.900 3 98.426 0.526 0.526 1.021 0.000 0.000
95.500
R4 97.110 5 98.386 1.276 1.276 1.801 0.000 0.000
R3 96.910 7 98.346 1.436 1.436 2.711 0.000 0.000
R2 96.710 9 98.286 1.576 1.576 3.011 0.000 0.000 Emb Lvl F.B.L
R1 96.610 12 96.786 0.176 0.176 2.627 0.000 0.000
21.064 0.000 840
C 870
L1 96.820 12 96.757 -0.063 0.000 2.006 0.000 0.000 Cross-Sect ion of Access Road At Chainage870M
L2 96.920 9 98.257 1.337 1.337 2.634 0.000 0.000 99.000
L3 97.020 7 98.317 1.297 1.297 2.434 0.000 0.000 98.500
L4 97.220 5 98.357 1.137 1.137 1.674 0.000 0.000
98.000
L5 97.860 3 98.397 0.537 0.537 1.069 0.000 0.000
97.500
L6 97.905 1 98.437 0.532 0.532 0.520 0.000 0.000
97.000
C.P. 97.950 0 98.457 0.507 0.507 0.000
96.500
R6 97.920 1 98.437 0.517 0.517 0.512 0.000 0.000
96.000
R5 97.890 3 98.397 0.507 0.507 1.024 0.000 0.000
95.500
R4 97.260 5 98.357 1.097 1.097 1.604 0.000 0.000
R3 97.060 7 98.317 1.257 1.257 2.354 0.000 0.000
R2 96.860 9 98.257 1.397 1.397 2.654 0.000 0.000 emb lvl F.B.L
R1 96.760 12 96.757 -0.003 0.000 2.096 0.000 0.000
20.583 0.000 870
C 900
L1 96.960 12 96.729 -0.231 0.000 1.753 0.000 0.000 Cross-Section of Access Road At Chainage900mM
L2 97.060 9 98.229 1.169 1.169 2.297 0.000 0.000 99.000
L3 97.160 7 98.289 1.129 1.129 2.097 0.000 0.000 98.500
L4 97.360 5 98.329 0.969 0.969 1.377 0.000 0.000
98.000
L5 97.960 3 98.369 0.409 0.409 0.832 0.000 0.000
97.500
L6 97.985 1 98.409 0.424 0.424 0.421 0.000 0.000
97.000
C.P. 98.010 0 98.429 0.419 0.419 0.000
96.500
R6 97.885 1 98.409 0.524 0.524 0.471 0.000 0.000
96.000
R5 97.760 3 98.369 0.609 0.609 1.132 0.000 0.000
95.500
R4 97.340 5 98.329 0.989 0.989 1.597 0.000 0.000
R3 97.140 7 98.289 1.149 1.149 2.137 0.000 0.000
R2 96.940 9 98.229 1.289 1.289 2.437 0.000 0.000 Emb Lvl F.B.L
R1 96.840 12 96.729 -0.111 0.000 1.933 0.000 0.000
97.930 18.485 0.000 900
C 930.0
L1 97.140 12 96.700 -0.440 0.000 1.440 0.000 0.000 Cross-Section of Access Road At Chainage930mM
L2 97.240 9 98.200 0.960 0.960 1.880 0.000 0.000 99.000
L3 97.340 7 98.260 0.920 0.920 1.680 0.000 0.000
98.500
L4 97.540 5 98.300 0.760 0.760 1.220 0.000 0.000
98.000
L5 97.880 3 98.340 0.460 0.460 0.870 0.000 0.000
97.500
L6 97.970 1 98.380 0.410 0.410 0.375 0.000 0.000
97.000
C.P. 98.060 0 98.400 0.340 0.340 0.000
96.500
R6 98.020 1 98.380 0.360 0.360 0.350 0.000 0.000
96.000
R5 97.980 3 98.340 0.360 0.360 0.720 0.000 0.000
95.500
R4 97.050 5 98.300 1.250 1.250 1.610 0.000 0.000
R3 96.850 7 98.260 1.410 1.410 2.660 0.000 0.000
R2 96.650 9 98.200 1.550 1.550 2.960 0.000 0.000 Emb Lvl F.B.L
R1 96.550 12 96.700 0.150 0.150 2.550 0.000 0.000
18.315 0.000 930
C 960.0
L1 96.840 12 96.680 -0.160 0.000 1.860 0.000 0.000 Cross-Section of Access Road At Chainage960mM
L2 96.940 9 98.180 1.240 1.240 2.440 0.000 0.000
99.000
L3 97.040 7 98.240 1.200 1.200 2.240 0.000 0.000
98.500
L4 97.240 5 98.280 1.040 1.040 1.750 0.000 0.000
L5 97.610 3 98.320 0.710 0.710 1.455 0.000 0.000 98.000
L6 97.615 1 98.360 0.745 0.745 0.753 0.000 0.000 97.500
C.P. 97.620 0 98.380 0.760 0.760 0.000 97.000
R6 97.605 1 98.360 0.755 0.755 0.758 0.000 0.000 96.500
R5 97.590 3 98.320 0.730 0.730 1.485 0.000 0.000 96.000
R4 97.030 5 98.280 1.250 1.250 1.980 0.000 0.000
95.500
R3 96.830 7 98.240 1.410 1.410 2.660 0.000 0.000
R2 96.630 9 98.180 1.550 1.550 2.960 0.000 0.000
R1 96.530 12 96.680 0.150 0.150 2.550 0.000 0.000 Emb Lvl F.B.L
22.890 0.000 960
D 990
L1 96.290 12 96.660 0.370 0.370 3.210 0.000 0.000 Cross-Section of Access Road At Chainage990M
L2 96.390 9 98.160 1.770 1.770 3.500 0.000 0.000
99.000
L3 96.490 7 98.220 1.730 1.730 3.300 0.000 0.000 98.500
L4 96.690 5 98.260 1.570 1.570 2.940 0.000 0.000 98.000
L5 96.930 3 98.300 1.370 1.370 2.775 0.000 0.000 97.500
L6 96.935 1 98.340 1.405 1.405 1.413 0.000 0.000 97.000
96.500
C.P. 96.940 0 98.360 1.420 1.420 0.000
96.000
R6 96.920 1 98.340 1.420 1.420 1.420 0.000 0.000 95.500
R5 96.900 3 98.300 1.400 1.400 2.820 0.000 0.000 95.000
R4 96.300 5 98.260 1.960 1.960 3.360 0.000 0.000 94.500
R3 96.100 7 98.220 2.120 2.120 4.080 0.000 0.000
R2 95.900 9 98.160 2.260 2.260 4.380 0.000 0.000 Emb Lvl F.B.L
R1 95.800 12 96.660 0.860 0.860 4.680 0.000 0.000
37.878 0.000 990
D 1020
L1 96.900 12 96.640 -0.260 0.000 1.710 0.000 0.000 Cross-Section of Access Road At Chainage1020M
L2 97.000 9 98.140 1.140 1.140 2.240 0.000 0.000 98.500
L3 97.100 7 98.200 1.100 1.100 2.040 0.000 0.000
98.000
L4 97.300 5 98.240 0.940 0.940 1.960 0.000 0.000
97.500
L5 97.260 3 98.280 1.020 1.020 2.065 0.000 0.000
L6 97.275 1 98.320 1.045 1.045 1.048 0.000 0.000 97.000
C.P. 97.290 0 98.340 1.050 1.050 0.000 96.500
R6 97.235 1 98.320 1.085 1.085 1.068 0.000 0.000 96.000
R5 97.180 3 98.280 1.100 1.100 2.185 0.000 0.000
95.500
R4 97.120 5 98.240 1.120 1.120 2.220 0.000 0.000
R3 96.920 7 98.200 1.280 1.280 2.400 0.000 0.000
R2 96.720 9 98.140 1.420 1.420 2.700 0.000 0.000 Emb Lvl F.B.L
R1 96.620 12 96.640 0.020 0.020 2.160 0.000 0.000
23.795 0.000 1020
D 1050
L1 97.320 12 96.620 -0.700 0.000 1.050 0.000 0.000 Cross-Section of Access Road At Chainage1050M
L2 97.420 9 98.120 0.700 0.700 1.360 0.000 0.000 98.500
L3 97.520 7 98.180 0.660 0.660 1.160 0.000 0.000
98.000
L4 97.720 5 98.220 0.500 0.500 1.040 0.000 0.000
L5 97.720 3 98.260 0.540 0.540 1.090 0.000 0.000 97.500
L6 97.750 1 98.300 0.550 0.550 0.545 0.000 0.000 97.000
C.P. 97.780 0 98.320 0.540 0.540 0.000
96.500
R6 97.705 1 98.300 0.595 0.595 0.568 0.000 0.000
R5 97.630 3 98.260 0.630 0.630 1.225 0.000 0.000 96.000

R4 97.310 5 98.220 0.910 0.910 1.540 0.000 0.000 95.500


R3 97.110 7 98.180 1.070 1.070 1.980 0.000 0.000
R2 96.910 9 98.120 1.210 1.210 2.280 0.000 0.000 Emb Lvl F.B.L
R1 96.810 12 96.620 -0.190 0.000 1.815 0.000 0.000
15.653 0.000 1050
D 1080
L1 97.600 12 96.600 -1.000 0.000 0.600 0.000 0.000 Cross-Section of Access Road At Chainage1080M
L2 97.700 9 98.100 0.400 0.400 0.760 0.000 0.000
98.500
L3 97.800 7 98.160 0.360 0.360 0.560 0.000 0.000
L4 98.000 5 98.200 0.200 0.200 0.420 0.000 0.000 98.000
L5 98.020 3 98.240 0.220 0.220 0.485 0.000 0.000 97.500
L6 98.015 1 98.280 0.265 0.265 0.277 0.000 0.000 97.000
C.P. 98.010 0 98.300 0.290 0.290 0.000
96.500
R6 97.905 1 98.280 0.375 0.375 0.332 0.000 0.000
R5 97.800 3 98.240 0.440 0.440 0.815 0.000 0.000 96.000
R4 97.380 5 98.200 0.820 0.820 1.260 0.000 0.000 95.500
R3 97.180 7 98.160 0.980 0.980 1.800 0.000 0.000
R2 96.980 9 98.100 1.120 1.120 2.100 0.000 0.000 Emb Lvl F.B.L
R1 96.880 12 96.600 -0.280 0.000 1.680 0.000 0.000
11.090 0.000 1080
D 1110
L1 97.320 12 96.640 -0.680 0.000 1.080 0.000 0.000 Cross-Section of Access Road At Chainage1110M
98.500
L2 97.420 9 98.140 0.720 0.720 1.400 0.000 0.000
L3 97.520 7 98.200 0.680 0.680 1.200 0.000 0.000 98.000
L4 97.720 5 98.240 0.520 0.520 0.960 0.000 0.000 97.500
L5 97.840 3 98.280 0.440 0.440 0.945 0.000 0.000 97.000
L6 97.815 1 98.320 0.505 0.505 0.527 0.000 0.000 96.500
C.P. 97.790 0 98.340 0.550 0.550 0.000 96.000
R6 97.710 1 98.320 0.610 0.610 0.580 0.000 0.000 95.500
R5 97.630 3 98.280 0.650 0.650 1.260 0.000 0.000
R4 97.310 5 98.240 0.930 0.930 1.580 0.000 0.000
Emb Lvl F.B.L
R3 97.110 7 98.200 1.090 1.090 2.020 0.000 0.000
R2 96.910 9 98.140 1.230 1.230 2.320 0.000 0.000
R1 96.810 12 96.640 -0.170 0.000 1.845 0.000 0.000
15.718 0.000 1110
D 1140
L1 97.290 12 96.680 -0.610 0.000 1.185 0.000 0.000 Cross-Section of Access Road At Chainage1140M
99.000
L2 97.390 9 98.180 0.790 0.790 1.540 0.000 0.000
98.500
L3 97.490 7 98.240 0.750 0.750 1.340 0.000 0.000
98.000
L4 97.690 5 98.280 0.590 0.590 1.090 0.000 0.000
97.500
L5 97.820 3 98.320 0.500 0.500 1.025 0.000 0.000 97.000
L6 97.835 1 98.360 0.525 0.525 0.528 0.000 0.000 96.500
C.P. 97.850 0 98.380 0.530 0.530 0.000 96.000
R6 97.785 1 98.360 0.575 0.575 0.553 0.000 0.000 95.500
R5 97.720 3 98.320 0.600 0.600 1.175 0.000 0.000
R4 97.320 5 98.280 0.960 0.960 1.560 0.000 0.000
Emb Lvl F.B.L
R3 97.120 7 98.240 1.120 1.120 2.080 0.000 0.000
R2 96.920 9 98.180 1.260 1.260 2.380 0.000 0.000
R1 96.820 12 96.680 -0.140 0.000 1.890 0.000 0.000
97.810 16.35 0.000 1140
D 1170
L1 97.330 12 96.720 -0.610 0.000 1.185 0.000 0.000 Cross-Section of Access Road At Chainage1170M
99.000
L2 97.430 9 98.220 0.790 0.790 1.540 0.000 0.000
98.500
L3 97.530 7 98.280 0.750 0.750 1.340 0.000 0.000
98.000
L4 97.730 5 98.320 0.590 0.590 1.110 0.000 0.000
97.500
L5 97.840 3 98.360 0.520 0.520 1.075 0.000 0.000 97.000
L6 97.845 1 98.400 0.555 0.555 0.563 0.000 0.000 96.500
C.P. 97.850 0 98.420 0.570 0.570 0.000 96.000
R6 97.775 1 98.400 0.625 0.625 0.598 0.000 0.000 95.500
R5 97.700 3 98.360 0.660 0.660 1.285 0.000 0.000
R4 97.520 5 98.320 0.800 0.800 1.460 0.000 0.000
Emb Lvl F.B.L
R3 97.320 7 98.280 0.960 0.960 1.760 0.000 0.000
R2 97.120 9 98.220 1.100 1.100 2.060 0.000 0.000
R1 97.020 12 96.720 -0.300 0.000 1.650 0.000 0.000
15.63 0.000 1170
D 1200
L1 97.390 12 96.760 -0.630 0.000 1.155 0.000 0.000 Cross-Section of Access Road At Chainage1200M
99.000
L2 97.490 9 98.260 0.770 0.770 1.500 0.000 0.000
98.500
L3 97.590 7 98.320 0.730 0.730 1.300 0.000 0.000
98.000
97.500
97.000
96.500
96.000
95.500

Emb Lvl F.B.L


Finish Base lvl
Cross Section
Alphabatical

Chainnage

Chainnage
Avg

Sectional
Cross
Name
Cutting Filling Filling Cutting Cutting Filling

Point
HI R.L
/feeling Depth Area Depth Area Depth
Cross Section of 30 M Approach Road at Various
Cross-Section Chainages
of Access Road At Chainage1200M
99.000
Depth 98.500
98.000
L4 97.790 5 98.360 0.570 0.570 1.050 0.000 0.000
97.500
L5 97.920 3 98.400 0.480 0.480 0.975 0.000 0.000 97.000
L6 97.945 1 98.440 0.495 0.495 0.493 0.000 0.000 96.500
C.P. 97.970 0 98.460 0.490 0.490 0.000 96.000
R6 97.900 1 98.440 0.540 0.540 0.515 0.000 0.000 95.500
R5 97.830 3 98.400 0.570 0.570 1.110 0.000 0.000
R4 97.700 5 98.360 0.660 0.660 1.230 0.000 0.000
Emb Lvl F.B.L
R3 97.500 7 98.320 0.820 0.820 1.480 0.000 0.000
R2 97.300 9 98.260 0.960 0.960 1.780 0.000 0.000
R1 97.200 12 96.760 -0.440 0.000 1.440 0.000 0.000
14.028 0.000 1200
C 1230.0
L1 97.820 12 96.800 -1.020 0.000 0.570 0.000 0.000 Cross-Section of Access Road At Chainage1230M
99.000
L2 97.920 9 98.300 0.380 0.380 0.720 0.000 0.000
98.500
L3 98.020 7 98.360 0.340 0.340 0.520 0.000 0.000
98.000
L4 98.220 5 98.400 0.180 0.180 0.430 0.000 0.000
97.500
L5 98.190 3 98.440 0.250 0.250 0.495 0.000 0.000 97.000
L6 98.235 1 98.480 0.245 0.245 0.233 0.000 0.000 96.500
C.P. 98.280 0 98.500 0.220 0.220 0.000 96.000
R6 98.210 1 98.480 0.270 0.270 0.245 0.000 0.000 95.500
R5 98.140 3 98.440 0.300 0.300 0.570 0.000 0.000
R4 97.920 5 98.400 0.480 0.480 0.780 0.000 0.000
Emb Lvl F.B.L
R3 97.720 7 98.360 0.640 0.640 1.120 0.000 0.000
R2 97.520 9 98.300 0.780 0.780 1.420 0.000 0.000
R1 97.420 12 96.800 -0.620 0.000 1.170 0.000 0.000
8.273 0.000 1230.00
C 1260.0
L1 97.820 12 96.863 -0.958 0.000 0.664 0.000 0.000 Cross-Section of Access Road At Chainage1260M
99.000
L2 97.920 9 98.363 0.442 0.442 0.845 0.000 0.000
98.500
L3 98.020 7 98.423 0.403 0.403 0.645 0.000 0.000
L4 98.220 5 98.463 0.243 0.243 0.555 0.000 0.000 98.000
L5 98.190 3 98.503 0.313 0.313 0.620 0.000 0.000 97.500
L6 98.235 1 98.543 0.308 0.308 0.295 0.000 0.000 97.000
C.P. 98.280 0 98.563 0.282 0.282 0.000 96.500
R6 98.210 1 98.543 0.333 0.333 0.308 0.000 0.000 96.000
R5 98.140 3 98.503 0.362 0.362 0.695 0.000 0.000
R4 97.920 5 98.463 0.543 0.543 0.905 0.000 0.000
Emb Lvl F.B.L
R3 97.720 7 98.423 0.703 0.703 1.245 0.000 0.000
R2 97.520 9 98.363 0.843 0.843 1.545 0.000 0.000
R1 97.420 12 96.863 -0.558 0.000 1.264 0.000 0.000
9.585 0.000 1260
C 1290.0
L1 97.640 12 96.925 -0.715 0.000 1.028 0.000 0.000 Cross-Section of Access Road At Chainage1290M
99.000
L2 97.740 9 98.425 0.685 0.685 1.330 0.000 0.000
L3 97.840 7 98.485 0.645 0.645 1.130 0.000 0.000 98.500

L4 98.040 5 98.525 0.485 0.485 0.990 0.000 0.000 98.000


L5 98.060 3 98.565 0.505 0.505 1.000 0.000 0.000 97.500
L6 98.110 1 98.605 0.495 0.495 0.480 0.000 0.000 97.000
C.P. 98.160 0 98.625 0.465 0.465 0.000 96.500
R6 98.100 1 98.605 0.505 0.505 0.485 0.000 0.000 96.000
R5 98.040 3 98.565 0.525 0.525 1.030 0.000 0.000
R4 97.980 5 98.525 0.545 0.545 1.070 0.000 0.000
Emb Lvl F.B.L
R3 97.780 7 98.485 0.705 0.705 1.250 0.000 0.000
R2 97.580 9 98.425 0.845 0.845 1.550 0.000 0.000
R1 97.480 12 96.925 -0.555 0.000 1.268 0.000 0.000
12.610 0.000 1290
C 1320.0
L1 97.780 12 96.988 -0.793 0.000 0.911 0.000 0.000 Cross-Section of Access Road At Chainage1320M
99.000
L2 97.880 9 98.488 0.608 0.608 1.175 0.000 0.000
L3 97.980 7 98.548 0.567 0.567 0.975 0.000 0.000 98.500
L4 98.180 5 98.588 0.407 0.407 0.845 0.000 0.000 98.000
L5 98.190 3 98.628 0.438 0.438 0.895 0.000 0.000 97.500
L6 98.210 1 98.668 0.458 0.458 0.458 0.000 0.000 97.000
C.P. 98.230 0 98.688 0.457 0.457 0.000 96.500
R6 98.180 1 98.668 0.487 0.487 0.472 0.000 0.000 96.000
R5 98.130 3 98.628 0.498 0.498 0.985 0.000 0.000
R4 97.850 5 98.588 0.738 0.738 1.235 0.000 0.000
Emb Lvl F.B.L
R3 97.650 7 98.548 0.897 0.897 1.635 0.000 0.000
R2 97.450 9 98.488 1.038 1.038 1.935 0.000 0.000
R1 97.350 12 96.988 -0.362 0.000 1.556 0.000 0.000
13.078 0.000 1320
C 1350.0
L1 98.110 12 97.050 -1.060 0.000 0.510 0.000 0.000 Cross-Section of Access Road At Chainage1350M
99.000
L2 98.210 9 98.550 0.340 0.340 0.640 0.000 0.000
L3 98.310 7 98.610 0.300 0.300 0.440 0.000 0.000 98.500

L4 98.510 5 98.650 0.140 0.140 0.390 0.000 0.000 98.000


L5 98.440 3 98.690 0.250 0.250 0.575 0.000 0.000 97.500
L6 98.405 1 98.730 0.325 0.325 0.353 0.000 0.000 97.000
C.P. 98.370 0 98.750 0.380 0.380 0.000 96.500
R6 98.290 1 98.730 0.440 0.440 0.410 0.000 0.000 96.000
R5 98.210 3 98.690 0.480 0.480 0.920 0.000 0.000
R4 97.950 5 98.650 0.700 0.700 1.180 0.000 0.000
Emb Lvl F.B.L
R3 97.750 7 98.610 0.860 0.860 1.560 0.000 0.000
R2 97.550 9 98.550 1.000 1.000 1.860 0.000 0.000
R1 97.450 12 97.050 -0.400 0.000 1.500 0.000 0.000
10.338 0.000 1350
C 1380.0
L1 98.060 12 97.113 -0.948 0.000 0.679 0.000 0.000 Cross-Section of Access Road At Chainage1380M
99.000
L2 98.160 9 98.613 0.453 0.453 0.865 0.000 0.000
L3 98.260 7 98.673 0.412 0.412 0.665 0.000 0.000 98.500
L4 98.460 5 98.713 0.253 0.253 0.545 0.000 0.000 98.000
L5 98.460 3 98.753 0.293 0.293 0.615 0.000 0.000 97.500
L6 98.470 1 98.793 0.323 0.323 0.328 0.000 0.000 97.000
C.P. 98.480 0 98.813 0.332 0.332 0.000 96.500
R6 98.395 1 98.793 0.398 0.398 0.365 0.000 0.000 96.000
R5 98.310 3 98.753 0.442 0.442 0.840 0.000 0.000
R4 98.020 5 98.713 0.693 0.693 1.135 0.000 0.000
Emb Lvl F.B.L
R3 97.820 7 98.673 0.852 0.852 1.545 0.000 0.000
R2 97.620 9 98.613 0.992 0.992 1.845 0.000 0.000
R1 97.520 12 97.113 -0.407 0.000 1.489 0.000 0.000
10.915 0.000 1380
C 1410.0
L1 98.110 12 97.175 -0.935 0.000 0.698 0.000 0.000 Cross-Section of Access Road At Chainage1410M
99.500
L2 98.210 9 98.675 0.465 0.465 0.890 0.000 0.000
99.000
L3 98.310 7 98.735 0.425 0.425 0.690 0.000 0.000
98.500
L4 98.510 5 98.775 0.265 0.265 0.660 0.000 0.000
98.000
L5 98.420 3 98.815 0.395 0.395 0.830 0.000 0.000 97.500
L6 98.420 1 98.855 0.435 0.435 0.445 0.000 0.000 97.000
C.P. 98.420 0 98.875 0.455 0.455 0.000 96.500
R6 98.385 1 98.855 0.470 0.470 0.462 0.000 0.000 96.000
R5 98.350 3 98.815 0.465 0.465 0.935 0.000 0.000
R4 98.280 5 98.775 0.495 0.495 0.960 0.000 0.000
Emb Lvl F.B.L
R3 98.080 7 98.735 0.655 0.655 1.150 0.000 0.000
R2 97.880 9 98.675 0.795 0.795 1.450 0.000 0.000
R1 97.780 12 97.175 -0.605 0.000 1.193 0.000 0.000
98.430 10.363 0.000 1410
C 1440.0
L1 98.090 12 97.238 -0.853 0.000 0.821 0.000 0.000 Cross-Section of Access Road At Chainage1440M
99.500
L2 98.190 9 98.738 0.547 0.547 1.055 0.000 0.000
99.000
L3 98.290 7 98.798 0.507 0.507 0.855 0.000 0.000
98.500
L4 98.490 5 98.838 0.347 0.347 0.635 0.000 0.000
98.000
L5 98.590 3 98.878 0.287 0.287 0.640 0.000 0.000 97.500
L6 98.565 1 98.918 0.352 0.352 0.375 0.000 0.000 97.000
C.P. 98.540 0 98.938 0.397 0.397 0.000 96.500
R6 98.485 1 98.918 0.432 0.432 0.415 0.000 0.000 96.000
R5 98.430 3 98.878 0.447 0.447 0.880 0.000 0.000
R4 98.330 5 98.838 0.507 0.507 0.955 0.000 0.000
Emb Lvl F.B.L
R3 98.130 7 98.798 0.667 0.667 1.175 0.000 0.000
R2 97.930 9 98.738 0.807 0.807 1.475 0.000 0.000
R1 97.830 12 97.238 -0.593 0.000 1.211 0.000 0.000
10.492 0.000 1440
C 1470.0
L1 97.720 12 97.300 -0.420 0.000 1.470 0.000 0.000 Cross-Section of Access Road At Chainage1470M
99.500
L2 97.820 9 98.800 0.980 0.980 1.920 0.000 0.000
99.000
L3 97.920 7 98.860 0.940 0.940 1.720 0.000 0.000
98.500
L4 98.120 5 98.900 0.780 0.780 0.780 0.000 0.110
98.000
L5 99.050 3 98.940 -0.110 0.000 0.000 0.110 0.200 97.500
L6 99.070 1 98.980 -0.090 0.000 0.000 0.090 0.090 97.000
C.P. 99.090 0 99.000 -0.090 0.000 0.090 96.500
R6 99.025 1 98.980 -0.045 0.000 0.000 0.045 0.068 96.000
R5 98.960 3 98.940 -0.020 0.000 0.000 0.020 0.065
R4 97.730 5 98.900 1.170 1.170 1.170 0.000 0.020
Emb Lvl F.B.L
R3 97.530 7 98.860 1.330 1.330 2.500 0.000 0.000
R2 97.330 9 98.800 1.470 1.470 2.800 0.000 0.000
R1 97.230 12 97.300 0.070 0.070 2.310 0.000 0.000
14.670 0.553 1470
C 1500.0
L1 98.060 12 97.200 -0.860 0.000 0.810 0.000 0.000 Cross-Section of Access Road At Chainage1500M
100.000
L2 98.160 9 98.700 0.540 0.540 1.040 0.000 0.000
L3 98.260 7 98.760 0.500 0.500 0.840 0.000 0.000 99.000
L4 98.460 5 98.800 0.340 0.340 0.340 0.000 0.130 98.000
L5 98.970 3 98.840 -0.130 0.000 0.000 0.130 0.225
97.000
L6 98.975 1 98.880 -0.095 0.000 0.000 0.095 0.088
C.P. 98.980 0 98.900 -0.080 0.000 0.080 96.000
R6 98.960 1 98.880 -0.080 0.000 0.000 0.080 0.080 95.000
R5 98.940 3 98.840 -0.100 0.000 0.000 0.100 0.180
R4 97.000 5 98.800 1.800 1.800 1.800 0.000 0.100
Emb Lvl
R3 96.800 7 98.760 1.960 1.960 3.760 0.000 0.000
R2 96.600 9 98.700 2.100 2.100 4.060 0.000 0.000
R1 96.500 12 97.200 0.700 0.700 4.200 0.000 0.000
16.850 0.803 1500
C 1530.0
L1 97.530 12 97.100 -0.430 0.000 1.455 0.000 0.000 Cross-Section of Access Road At Chainage1530M
99.000
L2 97.630 9 98.600 0.970 0.970 1.900 0.000 0.000
L3 97.730 7 98.660 0.930 0.930 1.700 0.000 0.000 98.500

L4 97.930 5 98.700 0.770 0.770 0.950 0.000 0.000 98.000


L5 98.560 3 98.740 0.180 0.180 0.360 0.000 0.000 97.500
L6 98.600 1 98.780 0.180 0.180 0.170 0.000 0.000 97.000
C.P. 98.640 0 98.800 0.160 0.160 0.000 96.500
R6 98.570 1 98.780 0.210 0.210 0.185 0.000 0.000 96.000
R5 98.500 3 98.740 0.240 0.240 0.450 0.000 0.000
R4 97.440 5 98.700 1.260 1.260 1.500 0.000 0.000
Emb Lvl F.B.L
R3 97.240 7 98.660 1.420 1.420 2.680 0.000 0.000
R2 97.040 9 98.600 1.560 1.560 2.980 0.000 0.000
R1 96.940 12 97.100 0.160 0.160 2.580 0.000 0.000
98.590 16.910 0.000 1530
C 1560.0
L1 97.830 12 97.000 -0.830 0.000 0.855 0.000 0.000 Cross-Section of Access Road At Chainage1560M
99.000
L2 97.930 9 98.500 0.570 0.570 1.100 0.000 0.000
L3 98.030 7 98.560 0.530 0.530 0.900 0.000 0.000 98.500
L4 98.230 5 98.600 0.370 0.370 0.650 0.000 0.000 98.000
L5 98.360 3 98.640 0.280 0.280 0.570 0.000 0.000 97.500
L6 98.390 1 98.680 0.290 0.290 0.285 0.000 0.000 97.000
C.P. 98.420 0 98.700 0.280 0.280 0.000 96.500
R6 98.360 1 98.680 0.320 0.320 0.300 0.000 0.000 96.000
R5 98.300 3 98.640 0.340 0.340 0.660 0.000 0.000
R4 97.990 5 98.600 0.610 0.610 0.950 0.000 0.000
Emb Lvl F.B.L
R3 97.790 7 98.560 0.770 0.770 1.380 0.000 0.000
R2 97.590 9 98.500 0.910 0.910 1.680 0.000 0.000
R1 97.490 12 97.000 -0.490 0.000 1.365 0.000 0.000
10.695 0.000 1560
C 1590.0
L1 97.930 12 96.900 -1.030 0.000 0.555 0.000 0.000 Cross-Section of Access Road At Chainage1590M
99.000
L2 98.030 9 98.400 0.370 0.370 0.700 0.000 0.000
L3 98.130 7 98.460 0.330 0.330 0.500 0.000 0.000 98.500

L4 98.330 5 98.500 0.170 0.170 0.420 0.000 0.000 98.000


L5 98.290 3 98.540 0.250 0.250 0.470 0.000 0.000 97.500
L6 98.360 1 98.580 0.220 0.220 0.195 0.000 0.000 97.000
C.P. 98.430 0 98.600 0.170 0.170 0.000 96.500
R6 98.420 1 98.580 0.160 0.160 0.165 0.000 0.000 96.000
R5 98.410 3 98.540 0.130 0.130 0.290 0.000 0.000
R4 98.310 5 98.500 0.190 0.190 0.320 0.000 0.000
Emb Lvl F.B.L
R3 98.110 7 98.460 0.350 0.350 0.540 0.000 0.000
R2 97.910 9 98.400 0.490 0.490 0.840 0.000 0.000
R1 97.810 12 96.900 -0.910 0.000 0.735 0.000 0.000
5.730 0.000 1590
C 1620.0
L1 97.470 12 96.800 -0.670 0.000 1.095 0.000 0.000 Cross-Section of Access Road At Chainage1620M
99.000
L2 97.570 9 98.300 0.730 0.730 1.420 0.000 0.000
98.500
L3 97.670 7 98.360 0.690 0.690 1.220 0.000 0.000
98.000
L4 97.870 5 98.400 0.530 0.530 1.060 0.000 0.000
97.500
L5 97.910 3 98.440 0.530 0.530 1.055 0.000 0.000 97.000
L6 97.955 1 98.480 0.525 0.525 0.512 0.000 0.000 96.500
C.P. 98.000 0 98.500 0.500 0.500 0.000 96.000
R6 97.965 1 98.480 0.515 0.515 0.507 0.000 0.000 95.500
R5 97.930 3 98.440 0.510 0.510 1.025 0.000 0.000
R4 97.860 5 98.400 0.540 0.540 1.050 0.000 0.000
Emb Lvl F.B.L
R3 97.660 7 98.360 0.700 0.700 1.240 0.000 0.000
R2 97.460 9 98.300 0.840 0.840 1.540 0.000 0.000
R1 97.360 12 96.800 -0.560 0.000 1.260 0.000 0.000
12.985 0.000 1620
C 1650.0
L1 96.920 12 96.678 -0.242 0.000 1.737 0.000 0.000 Cross-Section of Access Road At Chainage1650M
99.000
L2 97.020 9 98.178 1.158 1.158 2.276 0.000 0.000
98.500
L3 97.120 7 98.238 1.118 1.118 2.076 0.000 0.000 98.000
L4 97.320 5 98.278 0.958 0.958 1.876 0.000 0.000 97.500
L5 97.400 3 98.318 0.918 0.918 1.851 0.000 0.000 97.000
96.500
L6 97.425 1 98.358 0.933 0.933 0.930 0.000 0.000
96.000
C.P. 97.450 0 98.378 0.928 0.928 0.000 95.500
R6 97.420 1 98.358 0.938 0.938 0.933 0.000 0.000 95.000
R5 97.390 3 98.318 0.928 0.928 1.866 0.000 0.000
R4 96.920 5 98.278 1.358 1.358 2.286 0.000 0.000
Emb Lvl F.B.L
R3 96.720 7 98.238 1.518 1.518 2.876 0.000 0.000
R2 96.520 9 98.178 1.658 1.658 3.176 0.000 0.000
R1 96.420 12 96.678 0.258 0.258 2.873 0.000 0.000
24.752 0.000 1650
C 1680.0
L1 96.620 12 96.556 -0.064 0.000 2.003 0.000 0.000 Cross-Section of Access Road At Chainage1680M
98.500
L2 96.720 9 98.056 1.336 1.336 2.631 0.000 0.000
98.000
L3 96.820 7 98.116 1.296 1.296 2.431 0.000 0.000
97.500
L4 97.020 5 98.156 1.136 1.136 2.231 0.000 0.000
97.000
L5 97.100 3 98.196 1.096 1.096 2.221 0.000 0.000 96.500
L6 97.110 1 98.236 1.126 1.126 1.131 0.000 0.000 96.000
C.P. 97.120 0 98.256 1.136 1.136 0.000 95.500
R6 97.070 1 98.236 1.166 1.166 1.151 0.000 0.000 95.000
R5 97.020 3 98.196 1.176 1.176 2.341 0.000 0.000
R4 96.660 5 98.156 1.496 1.496 2.671 0.000 0.000
Emb Lvl F.B.L
R3 96.460 7 98.116 1.656 1.656 3.151 0.000 0.000
R2 96.260 9 98.056 1.796 1.796 3.451 0.000 0.000
R1 96.160 12 96.556 0.396 0.396 3.287 0.000 0.000
97.150 28.700 0.000 1680
C 1710.0
L1 96.470 12 96.433 -0.037 0.000 2.045 0.000 0.000 Cross-Section of Access Road At Chainage1710M
98.500
L2 96.570 9 97.933 1.363 1.363 2.687 0.000 0.000
98.000
L3 96.670 7 97.993 1.323 1.323 2.487 0.000 0.000
97.500
L4 96.870 5 98.033 1.163 1.163 2.317 0.000 0.000
97.000
L5 96.920 3 98.073 1.153 1.153 2.347 0.000 0.000 96.500
L6 96.920 1 98.113 1.193 1.193 1.203 0.000 0.000 96.000
C.P. 96.920 0 98.133 1.213 1.213 0.000 95.500
R6 96.825 1 98.113 1.288 1.288 1.251 0.000 0.000 95.000
R5 96.730 3 98.073 1.343 1.343 2.632 0.000 0.000
R4 96.670 5 98.033 1.363 1.363 2.707 0.000 0.000
Emb Lvl F.B.L
R3 96.470 7 97.993 1.523 1.523 2.887 0.000 0.000
R2 96.270 9 97.933 1.663 1.663 3.187 0.000 0.000
R1 96.170 12 96.433 0.263 0.263 2.890 0.000 0.000
28.638 0.000 1710
C 1740.0
L1 96.240 12 96.311 0.071 0.071 2.313 0.000 0.000 Cross-Section of Access Road At Chainage1740M
98.500
L2 96.340 9 97.811 1.471 1.471 2.902 0.000 0.000
98.000
L3 96.440 7 97.871 1.431 1.431 2.702 0.000 0.000 97.500
L4 96.640 5 97.911 1.271 1.271 2.522 0.000 0.000 97.000
L5 96.700 3 97.951 1.251 1.251 2.492 0.000 0.000 96.500
L6 96.750 1 97.991 1.241 1.241 1.226 0.000 0.000 96.000
95.500
C.P. 96.800 0 98.011 1.211 1.211 0.000 95.000
R6 96.775 1 97.991 1.216 1.216 1.214 0.000 0.000 94.500
R5 96.750 3 97.951 1.201 1.201 2.417 0.000 0.000
R4 96.180 5 97.911 1.731 1.731 2.932 0.000 0.000
Emb Lvl F.B.L
R3 95.980 7 97.871 1.891 1.891 3.622 0.000 0.000
R2 95.780 9 97.811 2.031 2.031 3.922 0.000 0.000
R1 95.680 12 96.311 0.631 0.631 3.993 0.000 0.000
32.259 0.000 1740
C 1770.0
L1 96.160 12 96.189 0.029 0.029 2.187 0.000 0.000 Cross-Section of Access Road At Chainage1770M
98.500
L2 96.260 9 97.689 1.429 1.429 2.818 0.000 0.000
98.000
L3 96.360 7 97.749 1.389 1.389 2.618 0.000 0.000 97.500
L4 96.560 5 97.789 1.229 1.229 2.438 0.000 0.000 97.000
L5 96.620 3 97.829 1.209 1.209 2.458 0.000 0.000 96.500
L6 96.620 1 97.869 1.249 1.249 1.259 0.000 0.000 96.000
95.500
C.P. 96.620 0 97.889 1.269 1.269 0.000 95.000
R6 96.555 1 97.869 1.314 1.314 1.291 0.000 0.000 94.500
R5 96.490 3 97.829 1.339 1.339 2.653 0.000 0.000
R4 96.150 5 97.789 1.639 1.639 2.978 0.000 0.000
Emb Lvl F.B.L
R3 95.950 7 97.749 1.799 1.799 3.438 0.000 0.000
R2 95.750 9 97.689 1.939 1.939 3.738 0.000 0.000
R1 95.650 12 96.189 0.539 0.539 3.717 0.000 0.000
31.591 0.000 1770
C 1800.0
L1 96.020 12 96.067 0.047 0.047 2.240 0.000 0.000 Cross-Section of Access Road At Chainage1800M
98.000
L2 96.120 9 97.567 1.447 1.447 2.853 0.000 0.000
97.500
L3 96.220 7 97.627 1.407 1.407 2.653 0.000 0.000
97.000
L4 96.420 5 97.667 1.247 1.247 2.473 0.000 0.000
96.500
L5 96.480 3 97.707 1.227 1.227 2.488 0.000 0.000 96.000
L6 96.485 1 97.747 1.262 1.262 1.269 0.000 0.000 95.500
C.P. 96.490 0 97.767 1.277 1.277 0.000 95.000
R6 96.440 1 97.747 1.307 1.307 1.292 0.000 0.000 94.500
R5 96.390 3 97.707 1.317 1.317 2.623 0.000 0.000
Emb Lvl F.B.L
Cross-Section of Access Road At Chainage1800M
98.000
97.500
97.000
96.500

Finish Base lvl


Cross Section
Alphabatical

Chainnage

Chainnage
Avg 96.000

Sectional
Cross
Name
Cutting Filling Filling Cutting Cutting Filling 95.500

Point
HI R.L
/feeling Depth Area Depth Area Depth 95.000 Cross Section of 30 M Approach Road at Various Chainages
Depth 94.500

R4 96.120 5 97.667 1.547 1.547 2.863 0.000 0.000


Emb Lvl F.B.L
R3 95.920 7 97.627 1.707 1.707 3.253 0.000 0.000
R2 95.720 9 97.567 1.847 1.847 3.553 0.000 0.000
R1 95.620 12 96.067 0.447 0.447 3.440 0.000 0.000
31.003 0.000 1800
C 1830.0
L1 96.130 12 95.944 -0.186 0.000 1.822 0.000 0.000 Cross-Section of Access Road At Chainage1830M
98.000
L2 96.230 9 97.444 1.214 1.214 2.389 0.000 0.000
97.500
L3 96.330 7 97.504 1.174 1.174 2.189 0.000 0.000
97.000
L4 96.530 5 97.544 1.014 1.014 1.969 0.000 0.000
96.500
L5 96.630 3 97.584 0.954 0.954 1.899 0.000 0.000 96.000
L6 96.680 1 97.624 0.944 0.944 0.929 0.000 0.000 95.500
C.P. 96.730 0 97.644 0.914 0.914 0.000 95.000
R6 96.655 1 97.624 0.969 0.969 0.942 0.000 0.000 94.500
R5 96.580 3 97.584 1.004 1.004 1.974 0.000 0.000
R4 96.320 5 97.544 1.224 1.224 2.229 0.000 0.000
Emb Lvl F.B.L
R3 96.120 7 97.504 1.384 1.384 2.609 0.000 0.000
R2 95.920 9 97.444 1.524 1.524 2.909 0.000 0.000
R1 95.820 12 95.944 0.124 0.124 2.473 0.000 0.000
24.33 0.000 1830
C 1860.0
L1 96.490 12 95.822 -0.668 0.000 1.098 0.000 0.000 Cross-Section of Access Road At Chainage1860M
98.000
L2 96.590 9 97.322 0.732 0.732 1.424 0.000 0.000
97.500
L3 96.690 7 97.382 0.692 0.692 1.224 0.000 0.000
97.000
L4 96.890 5 97.422 0.532 0.532 1.064 0.000 0.000
96.500
L5 96.930 3 97.462 0.532 0.532 1.074 0.000 0.000 96.000
L6 96.960 1 97.502 0.542 0.542 0.537 0.000 0.000 95.500
C.P. 96.990 0 97.522 0.532 0.532 0.000 95.000
R6 96.955 1 97.502 0.547 0.547 0.540 0.000 0.000 94.500
R5 96.920 3 97.462 0.542 0.542 1.089 0.000 0.000
R4 96.310 5 97.422 1.112 1.112 1.654 0.000 0.000
Emb Lvl F.B.L
R3 96.110 7 97.382 1.272 1.272 2.384 0.000 0.000
R2 95.910 9 97.322 1.412 1.412 2.684 0.000 0.000
R1 95.810 12 95.822 0.012 0.012 2.137 0.000 0.000
96.850 16.913 0.000 1860
C 1890.0
L1 96.040 12 95.700 -0.340 0.000 1.590 0.000 0.000 Cross-Section of Access Road At Chainage1890M
98.000
L2 96.140 9 97.200 1.060 1.060 2.080 0.000 0.000
97.500
L3 96.240 7 97.260 1.020 1.020 1.880 0.000 0.000
97.000
L4 96.440 5 97.300 0.860 0.860 1.810 0.000 0.000
96.500
L5 96.390 3 97.340 0.950 0.950 1.915 0.000 0.000 96.000
L6 96.415 1 97.380 0.965 0.965 0.963 0.000 0.000 95.500
C.P. 96.440 0 97.400 0.960 0.960 0.000 95.000
R6 96.410 1 97.380 0.970 0.970 0.965 0.000 0.000 94.500
R5 96.380 3 97.340 0.960 0.960 1.930 0.000 0.000
R4 95.980 5 97.300 1.320 1.320 2.280 0.000 0.000
Emb Lvl F.B.L
R3 95.780 7 97.260 1.480 1.480 2.800 0.000 0.000
R2 95.580 9 97.200 1.620 1.620 3.100 0.000 0.000
R1 95.480 12 95.700 0.220 0.220 2.760 0.000 0.000
24.073 0.000 1890
C 1920.0
L1 95.340 12 95.664 0.324 0.324 3.073 0.000 0.000 Cross-Section of Access Road At Chainage1920M
98.000
L2 95.440 9 97.164 1.724 1.724 3.409 0.000 0.000
L3 95.540 7 97.224 1.684 1.684 3.209 0.000 0.000 97.000
L4 95.740 5 97.264 1.524 1.524 3.049 0.000 0.000 96.000
L5 95.780 3 97.304 1.524 1.524 3.069 0.000 0.000
95.000
L6 95.800 1 97.344 1.544 1.544 1.544 0.000 0.000
C.P. 95.820 0 97.364 1.544 1.544 0.000 94.000
R6 95.740 1 97.344 1.604 1.604 1.574 0.000 0.000 93.000
R5 95.660 3 97.304 1.644 1.644 3.249 0.000 0.000
R4 95.440 5 97.264 1.824 1.824 3.469 0.000 0.000
Emb Lvl F.B.L
R3 95.240 7 97.224 1.984 1.984 3.809 0.000 0.000
R2 95.040 9 97.164 2.124 2.124 4.109 0.000 0.000
R1 94.940 12 95.664 0.724 0.724 4.273 0.000 0.000
37.833 0.000 1920
C 1950.0
L1 95.350 12 95.629 0.279 0.279 2.936 0.000 0.000 Cross-Section of Access Road At Chainage1950M
97.500
L2 95.450 9 97.129 1.679 1.679 3.317 0.000 0.000
97.000
L3 95.550 7 97.189 1.639 1.639 3.117 0.000 0.000
96.500
L4 95.750 5 97.229 1.479 1.479 2.867 0.000 0.000
96.000
L5 95.880 3 97.269 1.389 1.389 2.797 0.000 0.000 95.500
L6 95.900 1 97.309 1.409 1.409 1.409 0.000 0.000 95.000
C.P. 95.920 0 97.329 1.409 1.409 0.000 94.500
R6 95.875 1 97.309 1.434 1.434 1.421 0.000 0.000 94.000
R5 95.830 3 97.269 1.439 1.439 2.872 0.000 0.000
R4 95.660 5 97.229 1.569 1.569 3.007 0.000 0.000
Emb Lvl F.B.L
R3 95.460 7 97.189 1.729 1.729 3.297 0.000 0.000
R2 95.260 9 97.129 1.869 1.869 3.597 0.000 0.000
R1 95.160 12 95.629 0.469 0.469 3.506 0.000 0.000
34.143 0.000 1950
C 1980.0
L1 95.150 12 95.593 0.443 0.443 3.429 0.000 0.000 Cross-Section of Access Road At Chainage1980M
98.000
L2 95.250 9 97.093 1.843 1.843 3.646 0.000 0.000
L3 95.350 7 97.153 1.803 1.803 3.446 0.000 0.000 97.000
L4 95.550 5 97.193 1.643 1.643 2.736 0.000 0.000 96.000
L5 96.140 3 97.233 1.093 1.093 2.231 0.000 0.000
95.000
L6 96.135 1 97.273 1.138 1.138 1.150 0.000 0.000
C.P. 96.130 0 97.293 1.163 1.163 0.000 94.000
R6 96.115 1 97.273 1.158 1.158 1.160 0.000 0.000 93.000
R5 96.100 3 97.233 1.133 1.133 2.291 0.000 0.000
R4 95.240 5 97.193 1.953 1.953 3.086 0.000 0.000
Emb Lvl F.B.L
R3 95.040 7 97.153 2.113 2.113 4.066 0.000 0.000
R2 94.840 9 97.093 2.253 2.253 4.366 0.000 0.000
R1 94.740 12 95.593 0.853 0.853 4.659 0.000 0.000
36.264 0.000 1980
C 2010.0
L1 95.120 12 95.557 0.437 0.437 3.411 0.000 0.000 Cross-Section of Access Road At Chainage2010M
98.000
L2 95.220 9 97.057 1.837 1.837 3.634 0.000 0.000
L3 95.320 7 97.117 1.797 1.797 3.434 0.000 0.000 97.000
L4 95.520 5 97.157 1.637 1.637 2.494 0.000 0.000 96.000
L5 96.340 3 97.197 0.857 0.857 1.729 0.000 0.000
95.000
L6 96.365 1 97.237 0.872 0.872 0.870 0.000 0.000
C.P. 96.390 0 97.257 0.867 0.867 0.000 94.000
R6 96.310 1 97.237 0.927 0.927 0.897 0.000 0.000 93.000
R5 96.230 3 97.197 0.967 0.967 1.894 0.000 0.000
R4 95.150 5 97.157 2.007 2.007 2.974 0.000 0.000
Emb Lvl F.B.L
R3 94.950 7 97.117 2.167 2.167 4.174 0.000 0.000
R2 94.750 9 97.057 2.307 2.307 4.474 0.000 0.000
R1 94.650 12 95.557 0.907 0.907 4.821 0.000 0.000
34.809 0.000 2010
C 2040.0
L1 95.010 12 95.521 0.511 0.511 3.634 0.000 0.000
L2 95.110 9 97.021 1.911 1.911 3.783 0.000 0.000 Cross-Section of Access Road At Chainage2040M
98.000
L3 95.210 7 97.081 1.871 1.871 3.583 0.000 0.000
L4 95.410 5 97.121 1.711 1.711 3.103 0.000 0.000 97.000
L5 95.770 3 97.161 1.391 1.391 2.833 0.000 0.000 96.000
L6 95.760 1 97.201 1.441 1.441 1.456 0.000 0.000
95.000
C.P. 95.750 0 97.221 1.471 1.471 0.000
R6 95.690 1 97.201 1.511 1.511 1.491 0.000 0.000 94.000
R5 95.630 3 97.161 1.531 1.531 3.043 0.000 0.000 93.000
R4 94.990 5 97.121 2.131 2.131 3.663 0.000 0.000
R3 94.790 7 97.081 2.291 2.291 4.423 0.000 0.000
Emb Lvl F.B.L
R2 94.590 9 97.021 2.431 2.431 4.723 0.000 0.000
R1 94.490 12 95.521 1.031 1.031 5.194 0.000 0.000
40.929 0.000 2040
C 2070.0
L1 94.900 12 95.486 0.586 0.586 3.857 0.000 0.000
L2 95.000 9 96.986 1.986 1.986 3.931 0.000 0.000 Cross-Section of Access Road At Chainage 2070m
L3 95.100 7 97.046 1.946 1.946 3.731 0.000 0.000
97.500
L4 95.300 5 97.086 1.786 1.786 3.261 0.000 0.000 97.000
L5 95.650 3 97.126 1.476 1.476 2.976 0.000 0.000 96.500
L6 95.665 1 97.166 1.501 1.501 1.503 0.000 0.000 96.000
C.P. 95.680 0 97.186 1.506 1.506 0.000 95.500
95.000
R6 95.595 1 97.166 1.571 1.571 1.538 0.000 0.000 94.500
R5 95.510 3 97.126 1.616 1.616 3.186 0.000 0.000 94.000
R4 95.030 5 97.086 2.056 2.056 3.671 0.000 0.000 93.500
R3 94.830 7 97.046 2.216 2.216 4.271 0.000 0.000 93.000
R2 94.630 9 96.986 2.356 2.356 4.571 0.000 0.000
R1 94.530 12 95.486 0.956 0.956 4.967 0.000 0.000 Emb Lvl F.B.L
95.480 41.467 0.000 2070
C 2100.0
L1 95.850 12 95.450 -0.400 0.000 1.500 0.000 0.000
L2 95.950 9 96.950 1.000 1.000 1.960 0.000 0.000
L3 96.050 7 97.010 0.960 0.960 1.760 0.000 0.000 Cross-Section of Access Road At Chainage2100m
L4 96.250 5 97.050 0.800 0.800 0.890 0.000 0.000 97.500
L5 97.000 3 97.090 0.090 0.090 0.200 0.000 0.000 97.000
L6 97.020 1 97.130 0.110 0.110 0.110 0.000 0.000
96.500
C.P. 97.040 0 97.150 0.110 0.110 0.000
96.000
R6 96.970 1 97.130 0.160 0.160 0.135 0.000 0.000
R5 96.900 3 97.090 0.190 0.190 0.350 0.000 0.000 95.500
R4 96.180 5 97.050 0.870 0.870 1.060 0.000 0.000 95.000
R3 95.980 7 97.010 1.030 1.030 1.900 0.000 0.000 94.500
R2 95.780 9 96.950 1.170 1.170 2.200 0.000 0.000
R1 95.680 12 95.450 -0.230 0.000 1.755 0.000 0.000
Emb Lvl F.B.L
13.820 0.000 2100
C 2130.0
L1 96.300 12 95.434 -0.866 0.000 0.802 0.000 0.000
L2 96.400 9 96.934 0.534 0.534 1.029 0.000 0.000
L3 96.500 7 96.994 0.494 0.494 0.829 0.000 0.000 Cross-Section of Access Road At Chainage2130m
L4 96.700 5 97.034 0.334 0.334 0.379 0.000 0.000 97.500
L5 97.030 3 97.074 0.044 0.044 0.129 0.000 0.000 97.000
L6 97.030 1 97.114 0.084 0.084 0.094 0.000 0.000
96.500
C.P. 97.030 0 97.134 0.104 0.104 0.000
96.000
R6 97.020 1 97.114 0.094 0.094 0.099 0.000 0.000
R5 97.010 3 97.074 0.064 0.064 0.159 0.000 0.000 95.500
R4 96.050 5 97.034 0.984 0.984 1.049 0.000 0.000 95.000
R3 95.850 7 96.994 1.144 1.144 2.129 0.000 0.000 94.500
R2 95.650 9 96.934 1.284 1.284 2.429 0.000 0.000
R1 95.550 12 95.434 -0.116 0.000 1.927 0.000 0.000
Emb Lvl F.B.L
11.052 0.000 2130
C 2160.0
L1 96.070 12 95.419 -0.651 0.000 1.123 0.000 0.000
L2 96.170 9 96.919 0.749 0.749 1.458 0.000 0.000
L3 96.270 7 96.979 0.709 0.709 1.258 0.000 0.000 Cross-Section of Access Road At Chainage2160m
L4 96.470 5 97.019 0.549 0.549 0.678 0.000 0.000 97.500
L5 96.930 3 97.059 0.129 0.129 0.278 0.000 0.000 97.000
L6 96.950 1 97.099 0.149 0.149 0.149 0.000 0.000 96.500
C.P. 96.970 0 97.119 0.149 0.149 0.000 96.000
R6 96.905 1 97.099 0.194 0.194 0.171 0.000 0.000 95.500
R5 96.840 3 97.059 0.219 0.219 0.413 0.000 0.000 95.000
R4 95.860 5 97.019 1.159 1.159 1.378 0.000 0.000 94.500
R3 95.660 7 96.979 1.319 1.319 2.478 0.000 0.000 94.000
R2 95.460 9 96.919 1.459 1.459 2.778 0.000 0.000
R1 95.360 12 95.419 0.059 0.059 2.276 0.000 0.000
Emb Lvl F.B.L
14.434 0.000 2160
C 2190.0
L1 96.010 12 95.403 -0.607 0.000 1.190 0.000 0.000
L2 96.110 9 96.903 0.793 0.793 1.546 0.000 0.000
Cross-Section of Access Road At Chainage2190m
L3 96.210 7 96.963 0.753 0.753 1.346 0.000 0.000
97.500
L4 96.410 5 97.003 0.593 0.593 0.826 0.000 0.000
97.000
L5 96.810 3 97.043 0.233 0.233 0.486 0.000 0.000
96.500
L6 96.830 1 97.083 0.253 0.253 0.253 0.000 0.000
C.P. 96.850 0 97.103 0.253 0.253 0.000 96.000
R6 96.740 1 97.083 0.343 0.343 0.298 0.000 0.000 95.500
R5 96.630 3 97.043 0.413 0.413 0.756 0.000 0.000 95.000
R4 95.780 5 97.003 1.223 1.223 1.636 0.000 0.000 94.500
R3 95.580 7 96.963 1.383 1.383 2.606 0.000 0.000 94.000
R2 95.380 9 96.903 1.523 1.523 2.906 0.000 0.000
R1 95.280 12 95.403 0.123 0.123 2.469 0.000 0.000 NGL F.B.L
16.320 0.000 2190
C 2220.0
L1 96.060 12 95.388 -0.673 0.000 1.091 0.000 0.000
L2 96.160 9 96.888 0.728 0.728 1.415 0.000 0.000
Cross-Section of Access Road At Chainage2220m
L3 96.260 7 96.948 0.688 0.688 1.215 0.000 0.000
97.500
L4 96.460 5 96.988 0.528 0.528 0.815 0.000 0.000
97.000
L5 96.740 3 97.028 0.287 0.287 0.585 0.000 0.000
L6 96.770 1 97.068 0.298 0.298 0.293 0.000 0.000 96.500

C.P. 96.800 0 97.088 0.288 0.288 0.000 96.000


R6 96.685 1 97.068 0.383 0.383 0.335 0.000 0.000 95.500
R5 96.570 3 97.028 0.457 0.457 0.840 0.000 0.000 95.000
R4 95.740 5 96.988 1.248 1.248 1.705 0.000 0.000 94.500
R3 95.540 7 96.948 1.408 1.408 2.655 0.000 0.000 94.000
R2 95.340 9 96.888 1.548 1.548 2.955 0.000 0.000
R1 95.240 12 95.388 0.147 0.147 2.542 0.000 0.000 Emb Lvl F.B.L
16.446 0.000 2220
C 2250.0
L1 95.950 12 95.372 -0.578 0.000 1.233 0.000 0.000
L2 96.050 9 96.872 0.822 0.822 1.604 0.000 0.000
Cross-Section of Access Road At Chainage2250m
L3 96.150 7 96.932 0.782 0.782 1.404 0.000 0.000
97.500
L4 96.350 5 96.972 0.622 0.622 0.984 0.000 0.000
97.000
L5 96.650 3 97.012 0.362 0.362 0.764 0.000 0.000
96.500
L6 96.650 1 97.052 0.402 0.402 0.412 0.000 0.000
C.P. 96.650 0 97.072 0.422 0.422 0.000 96.000
R6 96.545 1 97.052 0.507 0.507 0.464 0.000 0.000 95.500
R5 96.440 3 97.012 0.572 0.572 1.079 0.000 0.000 95.000
R4 95.620 5 96.972 1.352 1.352 1.924 0.000 0.000 94.500
R3 95.420 7 96.932 1.512 1.512 2.864 0.000 0.000 94.000
R2 95.220 9 96.872 1.652 1.652 3.164 0.000 0.000
R1 95.120 12 95.372 0.252 0.252 2.856 0.000 0.000 Emb Lvl F.B.L
18.750 0.000 2250.00
C 2280.0
L1 95.860 12 95.356 -0.504 0.000 1.344 0.000 0.000
L2 95.960 9 96.856 0.896 0.896 1.753 0.000 0.000
Cross-Section of Access Road At Chainage2280m
L3 96.060 7 96.916 0.856 0.856 1.553 0.000 0.000
97.500
L4 96.260 5 96.956 0.696 0.696 1.043 0.000 0.000
97.000
L5 96.650 3 96.996 0.346 0.346 0.723 0.000 0.000
L6 96.660 1 97.036 0.376 0.376 0.381 0.000 0.000 96.500

C.P. 96.670 0 97.056 0.386 0.386 0.000 96.000


R6 96.525 1 97.036 0.511 0.511 0.449 0.000 0.000 95.500
R5 96.380 3 96.996 0.616 0.616 1.128 0.000 0.000 95.000
R4 95.800 5 96.956 1.156 1.156 1.773 0.000 0.000 94.500
R3 95.600 7 96.916 1.316 1.316 2.473 0.000 0.000 94.000
R2 95.400 9 96.856 1.456 1.456 2.773 0.000 0.000
R1 95.300 12 95.356 0.056 0.056 2.269 0.000 0.000 Emb Lvl F.B.L
17.658 0.000 2280
C 2310.0
L1 95.850 12 95.341 -0.509 0.000 1.336 0.000 0.000
L2 95.950 9 96.841 0.891 0.891 1.741 0.000 0.000
Cross-Section of Access Road At Chainage2310m
L3 96.050 7 96.901 0.851 0.851 1.541 0.000 0.000
97.500
L4 96.250 5 96.941 0.691 0.691 1.121 0.000 0.000
97.000
L5 96.550 3 96.981 0.431 0.431 0.836 0.000 0.000
L6 96.615 1 97.021 0.406 0.406 0.383 0.000 0.000 96.500
C.P. 96.680 0 97.041 0.361 0.361 0.000 96.000

R6 96.570 1 97.021 0.451 0.451 0.406 0.000 0.000 95.500


R5 96.460 3 96.981 0.521 0.521 0.971 0.000 0.000 95.000
R4 95.780 5 96.941 1.161 1.161 1.681 0.000 0.000 94.500
R3 95.580 7 96.901 1.321 1.321 2.481 0.000 0.000 94.000
R2 95.380 9 96.841 1.461 1.461 2.781 0.000 0.000
R1 95.280 12 95.341 0.061 0.061 2.282 0.000 0.000 Emb Lvl F.B.L
17.562 0.000 2310
C 2340.0
L1 95.750 12 95.325 -0.425 0.000 1.463 0.000 0.000
L2 95.850 9 96.825 0.975 0.975 1.910 0.000 0.000
Cross-Section of Access Road At Chainage2340m
L3 95.950 7 96.885 0.935 0.935 1.710 0.000 0.000
97.500
L4 96.150 5 96.925 0.775 0.775 1.200 0.000 0.000
97.000
L5 96.540 3 96.965 0.425 0.425 0.880 0.000 0.000
96.500
L6 96.550 1 97.005 0.455 0.455 0.460 0.000 0.000
C.P. 96.560 0 97.025 0.465 0.465 0.000 96.000

R6 96.495 1 97.005 0.510 0.510 0.488 0.000 0.000 95.500


R5 96.430 3 96.965 0.535 0.535 1.045 0.000 0.000 95.000
R4 95.650 5 96.925 1.275 1.275 1.810 0.000 0.000 94.500
R3 95.450 7 96.885 1.435 1.435 2.710 0.000 0.000 94.000
R2 95.250 9 96.825 1.575 1.575 3.010 0.000 0.000
R1 95.150 12 95.325 0.175 0.175 2.625 0.000 0.000 Emb Lvl F.B.L
96.470 19.310 0.000 2340
C 2370.0
L1 95.910 12 95.309 -0.601 0.000 1.199 0.000 0.000
L2 96.010 9 96.809 0.799 0.799 1.559 0.000 0.000
Cross-Section of Access Road At Chainage2370m
L3 96.110 7 96.869 0.759 0.759 1.359 0.000 0.000
97.500
L4 96.310 5 96.909 0.599 0.599 0.829 0.000 0.000
L5 96.720 3 96.949 0.229 0.229 0.504 0.000 0.000 97.000
L6 96.715 1 96.989 0.274 0.274 0.287 0.000 0.000 96.500
C.P. 96.710 0 97.009 0.299 0.299 0.000 96.000
R6 96.590 1 96.989 0.399 0.399 0.349 0.000 0.000
95.500
R5 96.470 3 96.949 0.479 0.479 0.879 0.000 0.000
R4 95.990 5 96.909 0.919 0.919 1.399 0.000 0.000 95.000

R3 95.790 7 96.869 1.079 1.079 1.999 0.000 0.000 94.500


R2 95.590 9 96.809 1.219 1.219 2.299 0.000 0.000
R1 95.490 12 95.309 -0.181 0.000 1.829 0.000 0.000 Emb Lvl F.B.L
14.489 0.000 2370
C 2400.0
L1 95.660 12 95.294 -0.366 0.000 1.551 0.000 0.000
L2 95.760 9 96.794 1.034 1.034 2.028 0.000 0.000
Cross-Section of Access Road At Chainage2400m
L3 95.860 7 96.854 0.994 0.994 1.828 0.000 0.000
97.500
L4 96.060 5 96.894 0.834 0.834 1.078 0.000 0.000
97.000
L5 96.690 3 96.934 0.244 0.244 0.483 0.000 0.000
96.500
L6 96.735 1 96.974 0.239 0.239 0.226 0.000 0.000
C.P. 96.780 0 96.994 0.214 0.214 0.000 96.000

R6 96.625 1 96.974 0.349 0.349 0.281 0.000 0.000 95.500

R5 96.470 3 96.934 0.464 0.464 0.813 0.000 0.000 95.000


R4 95.790 5 96.894 1.104 1.104 1.568 0.000 0.000 94.500
R3 95.590 7 96.854 1.264 1.264 2.368 0.000 0.000 94.000
R2 95.390 9 96.794 1.404 1.404 2.668 0.000 0.000
R1 95.290 12 95.294 0.004 0.004 2.111 0.000 0.000 Emb Lvl F.B.L
16.999 0.000 2400
C 2430.0
Finish Base lvl
Cross Section
Alphabatical

Chainnage

Chainnage
Avg

Sectional
Cross
Name
Cutting Filling Filling Cutting Cutting Filling

Point
HI R.L
/feeling Depth Area Depth Area Depth
Cross Section of 30 M Approach Road at Various Chainages
Depth

L1 95.640 12 95.278 -0.362 0.000 1.557 0.000 0.000


L2 95.740 9 96.778 1.038 1.038 2.036 0.000 0.000
L3 95.840 7 96.838 0.998 0.998 1.836 0.000 0.000
Cross-Section of Access Road At Chainage2430m
L4 96.040 5 96.878 0.838 0.838 1.156 0.000 0.000 97.500
L5 96.600 3 96.918 0.318 0.318 0.651 0.000 0.000 97.000
L6 96.625 1 96.958 0.333 0.333 0.331 0.000 0.000 96.500
C.P. 96.650 0 96.978 0.328 0.328 0.000 96.000
R6 96.575 1 96.958 0.383 0.383 0.356 0.000 0.000 95.500
R5 96.500 3 96.918 0.418 0.418 0.801 0.000 0.000 95.000
R4 95.740 5 96.878 1.138 1.138 1.556 0.000 0.000 94.500
R3 95.540 7 96.838 1.298 1.298 2.436 0.000 0.000 94.000
R2 95.340 9 96.778 1.438 1.438 2.736 0.000 0.000
R1 95.240 12 95.278 0.038 0.038 2.214 0.000 0.000 Emb Lvl F.B.L
17.668 0.000 2430
C 2460.0
L1 95.480 12 95.263 -0.218 0.000 1.774 0.000 0.000
L2 95.580 9 96.763 1.183 1.183 2.325 0.000 0.000
L3 95.680 7 96.823 1.143 1.143 2.125 0.000 0.000
Cross-Section of Access Road At Chainage2460m
L4 95.880 5 96.863 0.983 0.983 1.315 0.000 0.000 97.500
L5 96.570 3 96.903 0.332 0.332 0.670 0.000 0.000 97.000

L6 96.605 1 96.943 0.338 0.338 0.330 0.000 0.000 96.500


C.P. 96.640 0 96.963 0.323 0.323 0.000 96.000
R6 96.560 1 96.943 0.383 0.383 0.353 0.000 0.000 95.500
R5 96.480 3 96.903 0.423 0.423 0.805 0.000 0.000 95.000
R4 96.100 5 96.863 0.763 0.763 1.185 0.000 0.000 94.500
R3 95.900 7 96.823 0.923 0.923 1.685 0.000 0.000 94.000
R2 95.700 9 96.763 1.063 1.063 1.985 0.000 0.000
R1 95.600 12 95.263 -0.338 0.000 1.594 0.000 0.000 Emb Lvl F.B.L
16.145 0.000 2460
C 2490.0
L1 95.890 12 95.247 -0.643 0.000 1.135 0.000 0.000
L2 95.990 9 96.747 0.757 0.757 1.474 0.000 0.000
L3 96.090 7 96.807 0.717 0.717 1.274 0.000 0.000
Cross-Section of Access Road At Chainage2490m
L4 96.290 5 96.847 0.557 0.557 0.904 0.000 0.000 97.500
L5 96.540 3 96.887 0.347 0.347 0.699 0.000 0.000 97.000
L6 96.575 1 96.927 0.352 0.352 0.344 0.000 0.000 96.500
C.P. 96.610 0 96.947 0.337 0.337 0.000 96.000
R6 96.510 1 96.927 0.417 0.417 0.377 0.000 0.000 95.500
R5 96.410 3 96.887 0.477 0.477 0.894 0.000 0.000 95.000
R4 95.960 5 96.847 0.887 0.887 1.364 0.000 0.000 94.500
R3 95.760 7 96.807 1.047 1.047 1.934 0.000 0.000 94.000
R2 95.560 9 96.747 1.187 1.187 2.234 0.000 0.000
R1 95.460 12 95.247 -0.213 0.000 1.780 0.000 0.000 Emb Lvl F.B.L
14.412 0.000 2490
C 2520.0
L1 95.460 12 95.231 -0.229 0.000 1.757 0.000 0.000
L2 95.560 9 96.731 1.171 1.171 2.303 0.000 0.000
L3 95.660 7 96.791 1.131 1.131 2.103 0.000 0.000
Cross-Section of Access Road At Chainage2520m
L4 95.860 5 96.831 0.971 0.971 1.373 0.000 0.000 97.500

L5 96.470 3 96.871 0.401 0.401 0.793 0.000 0.000 97.000


L6 96.520 1 96.911 0.391 0.391 0.376 0.000 0.000 96.500
C.P. 96.570 0 96.931 0.361 0.361 0.000 96.000
R6 96.535 1 96.911 0.376 0.376 0.369 0.000 0.000 95.500
R5 96.500 3 96.871 0.371 0.371 0.748 0.000 0.000 95.000
R4 96.030 5 96.831 0.801 0.801 1.173 0.000 0.000 94.500
R3 95.830 7 96.791 0.961 0.961 1.763 0.000 0.000 94.000
R2 95.630 9 96.731 1.101 1.101 2.063 0.000 0.000
R1 95.530 12 95.231 -0.299 0.000 1.652 0.000 0.000 Emb Lvl F.B.L
16.469 0.000 2520
C 2550.0
L1 95.560 12 95.216 -0.344 0.000 1.583 0.000 0.000
L2 95.660 9 96.716 1.056 1.056 2.071 0.000 0.000
L3 95.760 7 96.776 1.016 1.016 1.871 0.000 0.000
Cross-Section of Access Road At Chainage2550m
L4 95.960 5 96.816 0.856 0.856 1.201 0.000 0.000 97.500

L5 96.510 3 96.856 0.346 0.346 0.656 0.000 0.000 97.000


L6 96.585 1 96.896 0.311 0.311 0.283 0.000 0.000 96.500
C.P. 96.660 0 96.916 0.256 0.256 0.000 96.000
R6 96.540 1 96.896 0.356 0.356 0.306 0.000 0.000 95.500
R5 96.420 3 96.856 0.436 0.436 0.791 0.000 0.000 95.000
R4 95.770 5 96.816 1.046 1.046 1.481 0.000 0.000 94.500
R3 95.570 7 96.776 1.206 1.206 2.251 0.000 0.000 94.000
R2 95.370 9 96.716 1.346 1.346 2.551 0.000 0.000
R1 95.270 12 95.216 -0.054 0.000 2.018 0.000 0.000 Emb Lvl F.B.L
17.066 0.000 2550
C 2580.0
L1 95.550 12 95.200 -0.350 0.000 1.575 0.000 0.000
L2 95.650 9 96.700 1.050 1.050 2.060 0.000 0.000
L3 95.750 7 96.760 1.010 1.010 1.860 0.000 0.000
Cross-Section of Access Road At Chainage2580m
L4 95.950 5 96.800 0.850 0.850 1.200 0.000 0.000 97.500
L5 96.490 3 96.840 0.350 0.350 0.695 0.000 0.000 97.000
L6 96.535 1 96.880 0.345 0.345 0.333 0.000 0.000 96.500
C.P. 96.580 0 96.900 0.320 0.320 0.000 96.000
R6 96.470 1 96.880 0.410 0.410 0.365 0.000 0.000 95.500
R5 96.360 3 96.840 0.480 0.480 0.890 0.000 0.000 95.000
R4 95.690 5 96.800 1.110 1.110 1.590 0.000 0.000 94.500
R3 95.490 7 96.760 1.270 1.270 2.380 0.000 0.000 94.000
R2 95.290 9 96.700 1.410 1.410 2.680 0.000 0.000
R1 95.190 12 95.200 0.010 0.010 2.130 0.000 0.000 Emb Lvl F.B.L
96.380 17.758 0.000 2580
C 2610.0
L1 95.670 12 95.220 -0.450 0.000 1.425 0.000 0.000
L2 95.770 9 96.720 0.950 0.950 1.860 0.000 0.000
L3 95.870 7 96.780 0.910 0.910 1.660 0.000 0.000
Cross-Section of Access Road At Chainage2610m
L4 96.070 5 96.820 0.750 0.750 0.960 0.000 0.000 97.500
L5 96.650 3 96.860 0.210 0.210 0.445 0.000 0.000 97.000
L6 96.665 1 96.900 0.235 0.235 0.237 0.000 0.000 96.500
C.P. 96.680 0 96.920 0.240 0.240 0.000 96.000
R6 96.655 1 96.900 0.245 0.245 0.243 0.000 0.000 95.500
R5 96.630 3 96.860 0.230 0.230 0.475 0.000 0.000 95.000
R4 96.020 5 96.820 0.800 0.800 1.030 0.000 0.000 94.500
R3 95.820 7 96.780 0.960 0.960 1.760 0.000 0.000 94.000
R2 95.620 9 96.720 1.100 1.100 2.060 0.000 0.000
R1 95.520 12 95.220 -0.300 0.000 1.650 0.000 0.000 Emb Lvl F.B.L
13.805 0.000 2610
C 2640.0
L1 95.640 12 95.240 -0.400 0.000 1.500 0.000 0.000
L2 95.740 9 96.740 1.000 1.000 1.960 0.000 0.000
L3 95.840 7 96.800 0.960 0.960 1.760 0.000 0.000
Cross-Section of Access Road At Chainage2640m
L4 96.040 5 96.840 0.800 0.800 1.180 0.000 0.000 97.500
L5 96.500 3 96.880 0.380 0.380 0.715 0.000 0.000 97.000
L6 96.585 1 96.920 0.335 0.335 0.302 0.000 0.000 96.500
C.P. 96.670 0 96.940 0.270 0.270 0.000 96.000
R6 96.610 1 96.920 0.310 0.310 0.290 0.000 0.000 95.500
R5 96.550 3 96.880 0.330 0.330 0.640 0.000 0.000 95.000
R4 95.850 5 96.840 0.990 0.990 1.320 0.000 0.000 94.500
R3 95.650 7 96.800 1.150 1.150 2.140 0.000 0.000 94.000
R2 95.450 9 96.740 1.290 1.290 2.440 0.000 0.000
R1 95.350 12 95.240 -0.110 0.000 1.935 0.000 0.000 Emb Lvl F.B.L
16.182 0.000 2640
C 2670.0
L1 95.620 12 95.260 -0.360 0.000 1.560 0.000 0.000
L2 95.720 9 96.760 1.040 1.040 2.040 0.000 0.000
L3 95.820 7 96.820 1.000 1.000 1.840 0.000 0.000
Cross-Section of Access Road At Chainage2670m
L4 96.020 5 96.860 0.840 0.840 1.100 0.000 0.000 97.500
L5 96.640 3 96.900 0.260 0.260 0.485 0.000 0.000 97.000
L6 96.715 1 96.940 0.225 0.225 0.197 0.000 0.000 96.500
C.P. 96.790 0 96.960 0.170 0.170 0.000 96.000
R6 96.675 1 96.940 0.265 0.265 0.217 0.000 0.000 95.500
R5 96.560 3 96.900 0.340 0.340 0.605 0.000 0.000 95.000
R4 96.060 5 96.860 0.800 0.800 1.140 0.000 0.000 94.500
R3 95.860 7 96.820 0.960 0.960 1.760 0.000 0.000 94.000
R2 95.660 9 96.760 1.100 1.100 2.060 0.000 0.000
R1 95.560 12 95.260 -0.300 0.000 1.650 0.000 0.000 Emb Lvl F.B.L
14.655 0.000 2670
C 2700.0
L1 95.660 12 95.280 -0.380 0.000 1.530 0.000 0.000
L2 95.760 9 96.780 1.020 1.020 2.000 0.000 0.000
L3 95.860 7 96.840 0.980 0.980 1.800 0.000 0.000
Cross-Section of Access Road At Chainage2700m
L4 96.060 5 96.880 0.820 0.820 0.900 0.000 0.000 97.500
L5 96.840 3 96.920 0.080 0.080 0.180 0.000 0.000 97.000
L6 96.860 1 96.960 0.100 0.100 0.100 0.000 0.000 96.500
C.P. 96.880 0 96.980 0.100 0.100 0.000 96.000
R6 96.820 1 96.960 0.140 0.140 0.120 0.000 0.000 95.500
R5 96.760 3 96.920 0.160 0.160 0.300 0.000 0.000 95.000
R4 96.120 5 96.880 0.760 0.760 0.920 0.000 0.000 94.500
R3 95.920 7 96.840 0.920 0.920 1.680 0.000 0.000 94.000
R2 95.720 9 96.780 1.060 1.060 1.980 0.000 0.000
R1 95.620 12 95.280 -0.340 0.000 1.590 0.000 0.000 Emb Lvl F.B.L
13.100 0.000 2700
C 2730.0
L1 97.680 12 95.300 -2.380 0.000 0.000 0.000 0.000
L2 97.780 9 96.800 -0.980 0.000 0.000 0.000 1.020
L3 97.880 7 96.860 -1.020 0.000 0.000 1.020 2.200
Cross-Section of Access Road At Chainage2730m
L4 98.080 5 96.900 -1.180 0.000 0.000 1.180 2.350 99.000
L5 98.110 3 96.940 -1.170 0.000 0.000 1.170 2.275 98.000
L6 98.085 1 96.980 -1.105 0.000 0.000 1.105 1.083 97.000
C.P. 98.060 0 97.000 -1.060 0.000 1.060 96.000
R6 98.015 1 96.980 -1.035 0.000 0.000 1.035 1.048
95.000
R5 97.970 3 96.940 -1.030 0.000 0.000 1.030 2.065
R4 97.870 5 96.900 -0.970 0.000 0.000 0.970 2.000 94.000
R3 97.670 7 96.860 -0.810 0.000 0.000 0.810 1.780 93.000
R2 97.470 9 96.800 -0.670 0.000 0.000 0.000 0.810
R1 97.370 12 95.300 -2.070 0.000 0.000 0.000 0.000 Emb Lvl F.B.L
98.050 0.000 16.63 2730

0
Finish Base lvl
Cross Section
Alphabatical

Chainnage

Chainnage
Avg

Sectional
Cross
Name
Cutting Filling Filling Cutting Cutting Filling

Point
HI R.L
/feeling Depth Area Depth Area Depth
Cross Section of 30 M Approach Road at Various Chainages
Depth